    SADARA PROJECTLSPB CONTRACT

    TECHNICAL DATA BOOKATTACHMENT IV TO SCHEDULE B

    15.2.1 BUILD INTERFACE MANAGEMENTPLAN

    Document No:A554-R-730-IN-GEN-INT-001

    RTIP Rev: 1 2 3 3

    FW Preparedby:

    Majid MAlghamdi

    Majid MAlghamdi

    Majid MAlghamdi

    FW Approvedby:

    Mike Dowden Mike Dowden Mike Dowden

    Owner

    Approved by: Daniel Abanto Daniel Abanto Daniel Abanto

    Revision Date: 11 July 2012 28 Aug 2012 10 Sept 2012

    IssuePurpose:

    ITB IFT IFT

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    2/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    SUMMARY OF DOCUMENT REVISIONS

    Rev.No.

    DateRevised

    SectionRevised Revision Descript ion

    1 3 July-12 Issued for Client Review

    2 28 Aug-12 Attachment 2 Interface Dependency Table Update

    3 10-Sept-12 Attachment 2 Interface Dependency Table Update

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    3/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    TABLE OF CONTENTS

    Section Topic

    1.0 PURPOSE ................................................................................................................ 4

    2.0 SCOPE ..................................................................................................................... 4

    3.0 DEFINITIONS ........................................................................................................... 4

    4.0 RESPONSIBILITIES ................................................................................................ 5

    4.1 INTERFACE PARTIES ............................................................................................ 6

    4.2 CONTRACTOR F ..................................................................................................... 6

    4.3 CONTRACTOR O .................................................................................................... 7

    4.4 PROGRAM INTERFACE MANAGEMENT TEAM (PIMT) ....................................... 8

    5.0 INTERFACE TYPES ................................................................................................ 8

    5.1 EXTERNAL INTERFACE ......................................................................................... 8

    5.2 INTERNAL INTERFACE .......................................................................................... 9

    6.0 INTERFACE NUMBERING ...................................................................................... 9

    7.0 COMMUNICATION ................................................................................................ 10

    7.1 INTERFACE QUERIES (IQS) ................................................................................ 11

    7.2 IQ NUMBERING ..................................................................................................... 11

    7.3 TRANSMISSION OF DOCUMENTATION ............................................................. 11

    8.0 INTERFACE GUIDELINES .................................................................................... 11

    8.1 PIPING ................................................................................................................... 12

    8.1.1 ABOVE GROUND PIPING INTERFACES ............................................................. 12

    8.1.2 UNDERGROUND PIPING INTERFACES .............................................................. 12

    8.2 CIVIL INTERFACES .............................................................................................. 13

    8.2.1 ROAD INTERFACE ............................................................................................... 13

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    4/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    5/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    1.0 PURPOSE

    This document defines how interfaces are to be managed by the PackagesContractors. It defines the role and responsibilities of each interface Party. Itdoes not define the engineering requirements of each interface.

    This document is intended to:

    Ensure all interfaces are identified

    Define clear responsibilities for each Party

    Ensure there are no interface gaps or overlaps

    Define the physical method of making the interface (flange, junction box, etc)

    Ensure schedule compatibility, relating to interfaces

    2.0 SCOPE

    This document defines the requirements for the management of interfaces duringconstruction phase

    The physical interface definition includes the following connections:

    Piping (above and underground)

    Civil (roads, paving, ditches, ducts) IT/Telecoms

    Electric power cable and Control Cable

    3.0 DEFINITIONS

    Title Definition

    BL Battery limit

    ContractorPackage A, B, C,Or D Contractor

    The SDL Building Project is divided into four Packages, A,B,C and D. Each Package will be constructed by a Packagecontractor

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    6/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    3rdParty contractor Contractors nominated for works outside of the buildingbattery limit or not included in Contractor A,B,C& D scope ofwork

    ICF Interconnecting Facilities Contractor

    ITC Information Technology Contractor

    EW Early Work ContractorIDT Interface Dependency Table

    External Interface External Interface is an interface between any PackageContractor and a third party contractor e.g. betweenPackage C Contractor and ICF Contractor

    Internal Interface An Internal Interface is an interface between any twoPackage Contractors

    IP Interface Point

    IQ Interface Query

    ISBL Inside Battery Limit. A category of work scope for facilitiesinside a process Unit BL

    OSBL Outside Battery Limits. Outside the Process Unit BL butwithin the Site boundary

    PMT Project Management Team

    SPOC Single Point of Contact

    4.0 RESPONSIBILITIES

    This section outlines the respective responsibilities of the Project Management

    Team and the Packages Contractors.

    Package Contractors are wholly responsible for the completion of allInterface Points within the parameters of the contract price. PackageContractor shall be responsible to communicate with any other PackageContractor as required to complete all works relating to the InterfacePoints Package Contractor shall also be responsible for all documentation

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    7/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    on the role they will be assigned to as an Originator contractor OrFinalization contractor.

    III. Contractor O will be the first contractor to install their works in acondition that Contractor F will be able to complete the IP per theContract Documents.

    IV. Contractor F prior to starting any works at an IP shall confirm

    Contractor O installation is acceptable to complete the IP per theterms of the contract documents. This is to include layout andelevations and general soundness of the installation.

    V. Contractor O shall facilitate Contractor F as required to complete theIP, providing required access or traffic control, etc. etc.

    VI. Upon completion of any irregularities and acceptance of Contractor O

    IP works, Contractor F shall complete the IP per the requirements ofthe contract documents.

    VII. Contractor F shall be responsible for future protection of the IP and allsnag list works associated with the said IP.

    VIII. It is the responsibility of the parties involved to ensure that theappropriate Non-Disclosure Agreements are in place where theexchange of information and / or drawings & documents as specifiedin this document.

    4.1 Interface Parties

    There are four parties involved in the management of interface points:

    Finalization Contractor Contractor F

    Originator Contractor Contractor O

    3rdparty Contractor

    Project Management Team

    For each IP, Contractor F and Contractor O will be identified by the PMT.

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    8/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    6. Populate interfaces completion dates in the Interface Dependency Schedule(See Attachment 2) and update regularly to manage and monitor the timing ofcompletion of interface points and gates. Copy to be provided to PMT.

    7. Reach agreement on interfaces with other Contractors in a timely manner tosupport the overall Project schedule.

    8. Identify and agree with Contractor O the inspections, tests and constructionand pre-commissioning records that are required to be performed and/ormaintained by itself and Contractor O. This applies to situations where both

    Contractors have an overlap of activities at the interface such as the jointhydrotest of both sides of an interface point at the same time. Otherwise theContractors shall each be responsible for their 'side' of the interface.

    9. Identify and agree with Contractor O any inspections, tests, drying and anyother requirements to be witnessed by itself and Contractor O.

    10. Prior to starting any interface works, confirm the acceptability of the in-placeworks instated by Contractor O. This confirmation shall include the overallacceptability of the in place IP works, including: layout, alignment elevation

    and the integrity of the elements being attached to or abutted. If anyunacceptable conditions are identified then an equitable resolution shall besought with Contractor O and the PMT. If Contractor F connects to an IPwithout identifying any deficiencies then Contractors O IP works will beconsidered as accepted without exception. This will not include any latent orimpossible to identify problems. The PMT will act as arbitrator as required.

    11. Upon acceptance of Contractor O works at IP Contractor F shall complete theIP works and provide protection until final turnover of the works.

    12. Complete all Snag list works associated with the IP13. Be fully responsible for the procurement and construction of the part ofsystem within its own area.

    14. Identify IPs that are no longer relevant, and communicate such to ContractorO and the PMT in a timely manner. .

    4.3 Contractor O

    Contractor O shall:

    1. Be the contractor that starts the works at an IP2. Participate in the creation and maintenance of the IDT Interface Dependency

    Table3. Participate in all requested IP coordination meetings4. Mutually agree with Contractor F that the IP and associated data is correct,

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    9/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    hydrotest of both sides of an interface point at the same time. Otherwise theContractors shall each be responsible for their 'side' of the interface.

    9. Identify and agree with Contractor F any inspections, tests, drying and anyother requirements to be witnessed by itself and Contractor O.

    10. Complete the first stage of the works relating to subject IP per thedocumented agreements made with Contractor F.

    11. Facilitate all requested inspections of the IP with Contractor F and or the PMTto confirm installation is installed per the contract requirements, position and

    elevation. Any and all unacceptable conditions shall be rectified promptly toprevent any schedule disruption of Contractor F and the overall programschedule.

    12. Provide all required interface assistance including access, traffic control andany other reasonable or required assistance to allow Contractor F completethe IP.

    13. Identify IPs that are no longer relevant, and communicate such to ContractorF in a timely manner. Also communicate to PMT.

    14. Be fully responsible for the procurement and construction of the part of aSystem within its own area.

    4.4 Project Management Team (PMT) will :

    1. Develop, communicate and maintain the Interface Management Plan andassociated guidelines for:

    Identifying and defining interface points Assigning responsibilities of parties at each IP

    Data required to define each interface point construction phase2. Provide Final resolution of any queries at interface points

    5.0 INTERFACE TYPES

    5.1 External Interface

    External Interface specifically refers to 3rdparties outside of the contractors nominated forthe building envelope.

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    10/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    5.2 Internal Interface

    Internal Interface is an interface between Package Contractors nominated for theBuilding scope.

    Unit 1

    Unit 2

    Unit 3

    Envelope

    Package A

    Package C

    Package B

    Unit

    External Interface Point

    Unit 1

    Unit 2

    Unit 3

    Envelope

    External Interface Point

    Package A

    Package C

    Package B

    Unit

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    11/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    d Discipline code, see below

    w/u Package Contractors Code

    The first number shown (w) is Contractor O and the secondnumber (u) is Contractor F.

    nnnn Serial number (a unique number will be assigned for eachdiscipline)

    Discipline codes:

    CAE Cable Tray - Electrical

    CAT Cable Tray IT

    CBE Cable Trench Electrical

    CBT Cable Trench/Duct Bank - ITCC Civil Open Ditch

    CF Civil Fence Crossing

    CR Civil Road

    CRT Road Crossing - IT

    E Electrical Cable

    F Firewater

    P Piping

    S Structural

    T Telecommunications Cable

    TS Miscellaneous IT (Supplementary Interface Table)

    U Underground Piping (gravity flow only)

    The following is the specific Package Contractors Codes, which will be used toprovide clarity.

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    12/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    7.0 COMMUNICATION

    Packages Contractors shall communicate directly with each other to agreedefinition and completion of interfaces. PMT will maintain, the master SPOCsList which will include the names and contact details of the interface coordinators(Single Points of Contact) for all parties.

    Communication may take place in a combination of the following formats:

    Interface Queries (IQs)

    Transmission of documentation

    Meetings (with decisions subsequently recorded by IQs using MOM as aproof of agreements)

    Emails

    Each Package Contractor shall appoint a SPOC to efficiently manage suchcommunications. Each Package Contractor shall maintain a log of all IQssent/received. IQs raised by any Contractor shall be addressed to the otherPartys Contractor SPOC and shall also be copied to the PMT SPOC additional people may be copied but all IQs must be sent only To the PackageContractor SPOC

    7.1 Interface Queries (IQs)

    Interface Queries (IQs) may be raised by any Party to make a query, provide orrequest information or to confirm an agreement, using the form in Attachment P,

    Contractors shall communicate directly with all other Contractors havingan interest in the interface. All formal agreements and requests shall berecorded in an IQ.

    7.2 IQ Numbering

    IQs shall be numbered in the form:

    IQ-x-y-nnnn

    Where:

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    13/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    7.3 Transmission of Documentation

    A record shall be kept of all documentation (documents and drawings)transmitted between Contractors and IQs shall be used for the transmittal.

    8.0 INTERFACE GUIDELINES

    The following defines the split of responsibilities between Contractors duringconstruction at IPs and provides guidance on how to implement interfaces fordifferent situations that may arise. The engineering requirements are defined inthe relevant Program documents and drawings. The list of IPs are listed inAt tachment 2

    The following is general guidance

    For external interfaces between a Package and a 3rdParty contractor, thenthe Package Contractor will be Contractor F.

    For internal interfaces between Packages, then Contractor F will beassigned by the Project Management Team.

    8.1 Piping

    8.1.1 Above Ground Piping Interfaces

    8.1.1.1 General

    1. The default position shall be that Contractor F shall provide the requiredisolation, based on the service, at the IP for commissioning and operatingpurposes. This isolation could be blind flanges, figure 8 blinds, valves orother means. Contractor F shall provide any final spacers, gaskets and boltsrequired for the final closure of the IP.

    CONTRACTOR FCONTRACTOR O

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    14/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    8.1.2 Underground Piping Interfaces

    8.1.2.1 Firewater

    1. Contractor O shall provide fire mains and appurtenances along the mainroads for the overall firemain outside Buildings area and provide spurs off thering main at the indicated on the drawings

    2. The IP, which consists of a valve supplied by Contractor O will be installed in

    a valve box constructed by Contractor O. Contractor F will be responsible forgrouting and sealing the valve box where his pipe protrudes.3. Contractor O shall install and test the fire main up to the IP.4. Contractor F shall install and test his fire main up to the isolation valve.5. Contractor F shall provide the gaskets, bolts etc to make the final closure.

    8.1.2.2 Other services

    1. Each contractor shall construct, test, flush, clean, and back fill their pipingup to their respective battery limits. Contractor F will then complete thesystem with a short section of pipe. These final joints will be consideredGolden Joints followed by service test before backfilling.

    8.2 Civil Interfaces

    8.2.1 Road Interfaces

    1. Contractor O shall lay and compact the pavement materials to an acceptable

    CONTRACTOR F

    ANCHOR

    ANCHOR

    TEMPORARY END

    PIECES FOR TESTING

    FINAL SPOOL, JOINTS & TESTING BY

    CONTRACTOR O

    ANCHOR

    ANCHOR

    TEMPORARY END

    PIECES FOR TESTING

    FINAL SPOOL, JOINTS & TESTING BY

    CONTRACTOR F

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    15/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    It is the responsibility of Contractor F to complete the interface, unless PMTinstructed otherwise, recognizing that the edge of the courses, shown above,may have worn during the interim period. They will be responsible for rectificationwork to the edge.

    8.2.2 Paving Interfaces

    1. Paving interface shall typically be at the high point of paving.2. Contractor O shall lay and compact the pavement materials to an acceptablestable slope beyond the extent of his wearing surface slope.

    3. Contractor F shall ensure the soundness of this material prior to laying allsubsequent layers.

    Centreline of Road

    Interface

    CONTRACTOR F CONTRACTOR ICF

    *Dimensions to be confirmed by CONTRACTOR F

    1.0m*1.0m*

    Surface wearing course

    Base course

    Sub base (if required)

    Sub -grade

    Interface

    Interface

    PLANPLAN

    CONTRACTOR FCONTRACTOR F

    CONTRACTOR ICF CONTRACTOR ICF

    Final Joint

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    16/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    8.2.3 Ditch Interfaces

    1. If the IP is a direct tie-in to the Contractor O ditch, Contractor O willConstruct the ditch without provision for Contractor F, who will tie-in inaccordance with Project Specifications.

    2. If the IP is not a direct tie-in to the Contractor O ditch, ContractorO shall extend the reinforcement to permit continuity by Contractor F.

    3. Contractors O & F shall provide initial construction joint with

    Water stops.

    8.2.4 Telecommunication Concrete Encased Duct Banks

    1. The Contractor O ensures the integrity of the conduits to be free from damage.

    2. Conduit ends shall be cap and plugged at the interface point to ensure that no un-

    desired material will enter into the conduits.3. The Contractor O shall leave at least 300mm of the conduit, free of concrete for the

    Contractor F to conveniently place the couplings.

    4. Contractor F shall provide and install the couplings to properly connect the conduits.

    5. Contractor F shall provide and install the completion of concrete encasement for the

    conduit protection

    CONTRACTOR F

    CONTRACTOR O

    0.5m *

    exposed

    reinforcement

    Expansion Joint

    Slope

    Plan

    Elevation

    Section

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    17/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    8.3 IT/ Telecom Interface

    All telecommunication cables inside buildings will be supplied and installed byPackage Contractors as per Package Contractor scope, however ITC willterminate the cables at the wall faceplates and at the building interface terminalstrip; Package Contractor will supervise terminations within the building.

    8.4 Electrical Interface

    Electrical interfaces will be as described in DocA554-R-730-IN-GEN-INT-002

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    18/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

    ATTACHMENT 1 INTERFACE QUERY FORM

    IQ-xxx-yyy-nnn

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    19/31

    SADARA Project Document No. A554-R-730-IN-GEN-INT-001

    Revision: 3

    SDL BUILDING CONSTRCUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: Tender

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    20/31

    ATTACHMENT 2 INTERFACE DEPENDENCY TABLE

    No. Interface PointContractor

    OContractor

    F Type IP StatusContractor OTarget Date

    Contractor FTarget Date

    Diff.Days

    ELECTRICAL

    1 IPCBEB/A0001 B A ElectricalTrench

    2 IPCBEB/A0002 B A ElectricalTrench

    3 IPCBEB/A0003 B A ElectricalTrench

    4 IPCBEB/ICF0004 B ICF ElectricalTrench

    5 IPCBEB/ICF0005 B ICF ElectricalTrench

    6 IPCBEB/ICF0006 B ICF ElectricalTrench

    7 IPCBEB/C0007 B C ElectricalTrench

    8 IPCBEB/C0008 B C ElectricalTrench

    9 IPCBED/C0009 D C ElectricalTrench

    10 IPCBEB/C0010 B C ElectricalTrench

    11 IPCBED/A0011 D A ElectricalTrench

    12 IPCBEC/A0012 C A ElectricalTrench

    13 IPCBED/C0013 D C ElectricalTrench

    14 IPCBED/C0014 D C ElectricalTrench

    15 IPCBED/C0015 D C ElectricalTrench

    16 IPCBEC/A0016 C A ElectricalTrench

    17 IPCBEC/A0017 C A ElectricalTrench

    18 IPCBEC/A0018 C A ElectricalTrench

    19 IPCBEC/A0019 C A ElectricalTrench

    20 IPCAEA/ICF0001 A ICF ElectricalCable

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    21/31

    SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3

    SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER

    Contains Confidential Information of Both Dow and Saudi AramcoPage 21 of 31

    Tray

    21 IPCAEA/ICF0002 A ICFElectricalCableTray

    22 IPCAEA/ICF0003 A ICFElectricalCableTray

    IT

    1 IPCBT B/A0001 B A ITDuctBanks

    2 IPCBT B/A0002 B A ITDuctBanks

    3 IPCBT A/ICF0003 A ICF ITDuctBanks

    4 IPCBTA/ICF0004 A ICF ITDuctBanks

    5 IPCBT A/ICF0005 A ICF ITDuctBanks

    6 IPCBTB/C0006 B C ITDuctBanks

    7 IPCBTD/C0007 D C ITDuctBanks

    8 IPCBT D/C0008 D C ITDuctBanks

    9 IPCBTD/C0009 D C ITDuctBanks

    10 IPCBT D/C0010 D C ITDuctBanks

    11 IPCBT D/C0011 D C ITDuctBanks

    12 IPCBTB/C0012 B C ITDuctBanks

    13 IPCBT B/ICF0013 B ICF ITDuctBanks

    14 IPCBT B/A0014 C ICF ITDuctBanks

    15 IPCBTC/A0015 C A ITDuctBanks

    16 IPCBTD/A0016 D A ITDuctBanks

    17 IPCBT D/C0017 D C ITDuctBanks

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    22/31

    SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3

    SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER

    Contains Confidential Information of Both Dow and Saudi AramcoPage 22 of 31

    18 IPCBT D/C0018 D C ITDuctBanks

    19 IPCBTD/C0019 D C ITDuctBanks

    20 IPCBT A/C0020 A C ITDuctBanks

    21 IPCBT C/ICF0021 C ICF ITDuctBanks

    22 IPCBTD/A0022 D A ITDuctBanks

    23IP

    CBT

    B/C

    0023

    B

    D

    IT

    Duct

    Banks

    24 IPCBT B/D0024 B D ITDuctBanks

    25 IPCBTD/C0025 D C ITDuctBanks

    26 IPCBTB/ICF0026 B ICF ITDuctBanks

    27 IPCBTB/ITC0027 B ITC ITDuctBanks

    28 IPCBTB/ITC0028 C ITC ITDuctBanks

    29IP

    CBT

    B/ITC

    0029

    B

    ITC

    IT

    Duct

    Banks

    30 IPCBTB/ICF0030 B ICF ITDuctBanks

    31 IPCBT/0031IntentionallyNotUsed

    32 IPCBTD/A0032 D A ITDuctBanks

    33 IPCBT C/EW0033 C EW ITDuctBanks

    34IP

    CBT

    C/EW

    0034

    C

    EW

    IT

    Duct

    Banks

    35 IPCBT D/EW0035 D EW ITDuctBanks

    36 IPCBT D/EW0036 D EW ITDuctBanks

    37 IPCBT D/EW0037 D EW ITDuctBanks

    38 IPCBT D/EW0038 D EW ITDuctBanks

    39 IPCBT D/EW0039 D EW ITDuctBanks

    3

    3

    3

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    23/31

    SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3

    SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER

    Contains Confidential Information of Both Dow and Saudi AramcoPage 23 of 31

    40 IPCBT D/EW0040 D EW ITDuctBanks

    41 IPCBT D/EW0041 D EW ITDuctBanks

    42 IPCBT D/EW0042 D EW ITDuctBanks

    43 IPCBT D/EW0043 D EW ITDuctBanks

    CIVIL

    1IP

    CR

    A/ICF

    0001

    A

    ICF

    Road

    2 IPCRA/ICF0002 A ICF Road

    3 IPCRA/ICF0003 A ICF Road

    4 IPCRA/ICF0004 A ICF Road

    5 IPCRA/ICF0005 A ICF Road

    6 IPCRA/ICF0006 A ICF Road

    7IP

    CR

    A/ICF

    0007

    A

    ICF

    Road

    8 IPCRA/ICF0008 A ICF Road

    9 IPCRA/ICF0009 A ICF Road

    10 IPCRB/ICF0010 B ICF Road

    11 IPCRA/B0011 A B Road

    12 IPCRA/B0012 A B Road

    13IP

    CR

    A/B

    0013

    A

    B

    Road

    14 IPCRA/B0014 A B Road

    15 IPCRA/B0015 A B Road

    16 IPCRA/B0016 A B Road

    17 IPCRA/B0017 A B Road

    18 IPCRA/B0018 A B Road

    3

    3

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    24/31

    SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3

    SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER

    Contains Confidential Information of Both Dow and Saudi AramcoPage 24 of 31

    19 IPCRB/ICF0019 B ICF Road

    20 IPCRB/ICF0020 B ICF Road

    21 IPCRB/ICF0021 B ICF Road

    22 IPCRC/ICF0022 C ICF Road

    23 IPCRD/C0023 D C Road

    24IP

    CR

    D/C

    0024

    D

    C

    Road

    25 IPCRD/C0025 D C Road

    26 IPCRD/C0026 D C Road

    27 IPCRA/C0027 A C Road

    28 IPCRA/C0028 A C Road

    29 IPCRA/C0029 A C Road

    30IP

    CR

    A/C

    0030

    A

    C

    Road

    31 IPCRD/C0031 D C Road

    32 IPCRD/PREP0032 D PREP Road

    33 IPCRD/PREP0033 D PREP Road

    34 IPCRD/PREP0034 D PREP Road

    35 IPCRD/PREP0035 D PREP Road

    36IP

    CR

    D/C

    036

    D

    C

    Road

    37 IPCRC/ICF0037 C ICF Road

    38 IPCRC/ICF0038 C ICF Road

    39 IPCRD/ICF0039 D ICF Road

    40 IPCRD/PREP0040 D PREP Road

    41 IPCRD/ICF0041 D ICF Road

    3

    3

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    25/31

    SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3

    SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER

    Contains Confidential Information of Both Dow and Saudi AramcoPage 25 of 31

    42 IPCRD/PREP0042 D PREP Road

    43 IPCRD/PREP0043 D PREP Road

    44 IPCRD/ICF0044 D ICF Road

    37 IPCCA/B0001 A B StormDitches

    38 IPCCA/B0002 A B StormDitches

    39IP

    CC

    A/ICF

    0003

    A

    ICF

    Storm

    Ditches

    40 IPCCA/ICF0004 A ICF StormDitches

    41 IPCCA/ICF0005 A ICF StormDitches

    42 IPCCB/ICF0006 B ICF StormDitches

    43 IPCCC/PREP0007 D C StormDitches

    44 IPCCD/C0008 D C StormDitches

    45 IPCC 0009Intentionally

    Not

    Used

    46 IPCCD/C0010 D C StormDitches

    47 IPCCC/A0011 C A StormDitches

    48 IPCCA/C0012 A C StormDitches

    49 IPCC 0013Intentionally Not

    Used

    50IP

    CC

    C/A

    0014

    C

    A

    Storm

    Ditches

    51 IPCCA/RC0015 A RC StormDitches

    52 IPCCD/C0016 D C StormDitches

    53 IPCCD/C0017 D C StormDitches

    54 IPCCC/RC0018 C RC StormDitches

    3

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    26/31

    SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3

    SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER

    Contains Confidential Information of Both Dow and Saudi AramcoPage 26 of 31

    55 IPCCD/C0019 D C StormDitches

    56 IPCCD/C0020 D C StormDitches

    57 IPCCB/C0021 B C StormDitches

    58 IPCCB/RC0022 B RC StormDitches

    59 IPCCB/C0023 B C StormDitches

    60IP

    CC

    B/C

    0024

    B

    C

    Storm

    Ditches

    61 IPCCC/ICF0025 C ICF StormDitches

    62 IPCCC/ICF0026 C ICF StormDitches

    PIPING

    1 IPPB/A0001 B A SanitarySystem

    2IP

    P

    B/A

    0002

    B

    A

    Return Chilled

    Water

    3 IPPB/A0003 B ASupply ChilledWater

    4 IPP 0004IntentionallyNotUsed

    5 IPP 0005IntentionallyNotUsed

    6 IPP 0006Intentionally

    NotUsed

    7 IPP 0007IntentionallyNotUsed

    8 IPPB/A0008 B A PotableWater

    9 IPPB/A0009 B A CompressedAir

    3

    SADARA PROJECT D t N A554 R 730 IN GEN INT 001

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    27/31

    SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3

    SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER

    Contains Confidential Information of Both Dow and Saudi AramcoPage 27 of 31

    10 IPPB/A0010 B AReturn ChilledWater

    11 IPPB/A0011 B ASupply ChilledWater

    12 IPPB/A0012 B A SanitarySystem

    13IP

    P

    B/C

    0013

    B

    C

    Return Chilled

    Water

    14 IPPB/C0014 B CSupply ChilledWater

    15 IPPB/C0015 B C PotableWater

    16 IPPB/C0016 B C PotableWater

    17 IPPB/C0017 B C SanitarySystem

    18IP

    P

    B/C

    0018

    B

    C

    Sanitary

    System

    19 IPPD/C0019 D C SanitarySystem

    20 IPPD/C0020 D C PotableWater

    21 IPPB/C0021 B C UtilityWater

    22 IPPB/C0022 B C CompressedAir

    23 IPPB/C0023 B C PotableWater

    24IP

    P

    C/A

    0024

    C

    A

    Potable

    Water

    25 IPPC/A0025 C A UtilityWater

    26 IPPC/A0026 C A SanitarySystem

    27 IPPD/C0027 D CSupply ChilledWater

    28 IPPD/C0028 D C Return Chilled

    SADARA PROJECT D t N A554 R 730 IN GEN INT 001

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    28/31

    SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3

    SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER

    Contains Confidential Information of Both Dow and Saudi AramcoPage 28 of 31

    Water

    29 IPP 0029IntentionallyNotUsed

    30 IPPD/C0030 D C PotableWater

    31 IPP 0031IntentionallyNotUsed

    32 IPPA/C0032 A C PotableWater

    33 IPPA/C0033 A CReturn ChilledWater

    34 IPPA/C0034 A CSupply ChilledWater

    35

    IP

    P

    0035

    Intentionally

    Not

    Used

    36 IPPD/C0036 D C SanitarySystem

    37 IPPD/C0037 D C SanitarySystem

    38 IPPD/C0038 D C PotableWater

    39 IPPD/C0039 D C SanitarySystem

    40 IPPD/C0040 D C SanitarySystem

    41

    IP

    P

    D/B

    0041

    D

    B

    Potable

    Water

    42 IPP 0042Intentionally Not

    Used

    43 IPPB/C0043 B C SanitarySystem

    44 IPP 0044Intentionally NotUsed

    45 IPP 0045 Intentionally Not

    SADARA PROJECT Document No A554 R 730 IN GEN INT 001

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    29/31

    SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3

    SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER

    Contains Confidential Information of Both Dow and Saudi AramcoPage 29 of 31

    Used

    46 IPP 0046Intentionally NotUsed

    47 IPP 0047Intentionally NotUsed

    48

    IP

    P

    0048

    Intentionally Not

    Used

    49 IPP 0049Intentionally NotUsed

    50 IPPB/A0050 B A SanitarySystem

    51 IPPB/A0051 B A PotableWater

    52 IPPB/A0052 B A CompressedAir

    53 IPPC/A0053 C A PotableWater

    54 IPPC/A0054 C A CompressedAir

    55 IPPC/A0055 C A UtilityWater

    56 IPPC/EW0056 C EW SanitarySystemMUSSALA&CAF4

    57 IPPC/EW0057 C EW PotableWaterMUSSALA&CAF4

    58 IPPD/BRINE0058 D BRINE SanitarySystem GATE4

    59 IPPD/BRINE0059 D BRINE PotableWater GATE4

    60 IPPD/EW0060 D EW PotableWater GATE5

    61 IPPD/ICF0061 D ICF SanitarySystem GATE5

    62 IPPD/ICF0062 D ICF SanitarySystem GATE7

    63 IPPD/ICF0063 D ICF PotableWater GATE73

    3

    3

    3

    SADARA PROJECT Document No A554-R-730-IN-GEN-INT-001

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    30/31

    SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001Revision: 3

    SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER

    Contains Confidential Information of Both Dow and Saudi AramcoPage 30 of 31

    64 IPPD/ICF0064 D ICF SanitarySystemPEDESTRIANSOUTH

    65 IPPD/ICF0065 D ICF PotableWaterPEDESTRIANSOUTH

    66 IPFB/A0001 B A Firewater

    67IP

    F

    0002

    Intentionally

    NotUsed

    68 IPF 0003IntentionallyNotUsed

    69 IPF 0004IntentionallyNotUsed

    70 IPF 0005IntentionallyNotUsed

    71IP

    F

    B/C

    0006

    B

    C

    Firewater

    72 IPFB/C0007 B C Firewater

    73 IPF 0008IntentionallyNotUsed

    74 IPF 0009IntentionallyNotUsed

    75 IPFC/A0010 C A Firewater

    76 IPFB/C0011 B C Firewater

    77 IPF 0012IntentionallyNotUsed

    78 IPF 0013IntentionallyNotUsed

    79 IPF 0014 Intentionally

    3

    SADARA PROJECT Document No. A554-R-730-IN-GEN-INT-001

  • 7/25/2019 15.2.1-Interface Management Plan_ R3

    31/31

    SADARA PROJECT Document No. A554 R 730 IN GEN INT 001Revision: 3

    SDL BUILDING CONSTRUCTION INTERFACEMANAGEMENT PLAN Issue Purpose: TENDER

    Contains Confidential Information of Both Dow and Saudi AramcoPage 31 of 31

    NotUsed

    80 IPF 0015IntentionallyNotUsed

    81 IPF 0016Intentionally NotUsed

    82IP

    F

    0017

    Intentionally Not

    Used

    83 IPFA/PREP0018Intentionally NotUsed

    84 IPF 0019IntentionallyNotUsed

    85 IPFB/C0020 B C Firewater

    86 IPFB/A0021 B A Firewater

    87IP

    F

    C/A

    0022

    C

    A

    Firewater

    88 IPFB/C0023 B C Firewater

    89 IPFC/EW0024 C EW Firewater 3