441
BUDGET ESTIMATE Project:xxx # DESCRIPTIONS Basement I CONSTRUCTION COST PRELIMINARY COST 1 PRELIMINARY COST EARTH WORKS 9,087,285,300 2 SHORING SYSTEM & EARTH WORKS STRUCTURE WORKS 68,144,456,461 4 REINFORCED CONCRETE STRUCTURE 68,144,456,461 5 STEEL STRUCTURE FINISHING & CURTAIN WALL 11,705,522,304 6 WATERPROOFING WORKS 4,809,313,846 7 RC ROOF WORKS 8 BRICKWORK & MASONRY WORKS 214,027,248 9 PLASTERING WORKS 781,065,191 10 FIRE RATE WOODEN DOOR (PS) DOOR & WINDOW 11 METAL WORKS 2,171,907,571 13 SUSPENDED CEILINGS 24,013,483 14 FLOOR & WALL TILING WORK 2,407,691,133 15 PAINTING WORKS 1,297,503,832 16 SANITARY WARE 18 EXTERNAL PAINTING WORKS (P.S) 18 ALUMINIUM WORKS (P.S) 18 INTERIOR DECORATION GROUND LOBBY (PS) 20 EXTERNAL WORKS 20 EXTERNAL WORK of MC scope 20 EXTERNAL WORK by PMH 20 19 M&E WORKS (P.S) 19 19 FIRE FIGHTING, FIRE ALARM SYSTEM 19 19 GAS SYSTEM Sub Total of I II PMH package 21 Pilling works 22 PM Fee (5%) GENERAL FENCE, MAIN GATE, PUBLIC PERGOLA AND I BEAM TO SUPPORT LIFT PIT (P.S) M&E (plumping, electric, lighting, CCTV, PA system, transformer & sub-station system, ventilation system...) ELEVATORS SYSTEM (Attendance Fee only)

150714 - S10 Undate BoQ - Value

Embed Size (px)

DESCRIPTION

boq of a standard construction project

Citation preview

BudgetBUDGET ESTIMATEExchage rate21080.00VND/USD181,286Project:xxxGFA77485.00s.m26,0000Date Total Area :77,485S.m#DESCRIPTIONSBasementTowerExternalTotal Amount (VND)USD/S.mVND/S.m%ICONSTRUCTION COSTPRELIMINARY COST- 0- 00.0%- 01PRELIMINARY COSTEARTH WORKS9,087,285,3009,087,285,3006117,278100.0%5.562SHORING SYSTEM & EARTH WORKSSTRUCTURE WORKS68,144,456,461143,165,498,0772,411,677,280213,721,631,818- 02,758,2320.0%130.854REINFORCED CONCRETE STRUCTURE68,144,456,461142,475,188,0772,411,677,280- 0- 05STEEL STRUCTURE690,310,000- 0- 0FINISHING & CURTAIN WALL11,705,522,304185,337,424,9099,857,371,340206,900,318,552- 02,670,1980.0%126.676WATERPROOFING WORKS4,809,313,8469,451,433,449- 0- 021,102,849,68841,9067RC ROOF WORKS3,094,833,884- 0- 016,175,687,12532,1228BRICKWORK & MASONRY WORKS214,027,24820,631,737,405- 0- 039,630,304,08978,6989PLASTERING WORKS781,065,19116,618,235,553- 0- 037,283,517,35274,03810FIRE RATE WOODEN DOOR (PS)- 0- 023,018,794,28945,711DOOR & WINDOW94,305,429,08611METAL WORKS 2,171,907,5718,589,977,124- 0- 050,673,354,661100,62813SUSPENDED CEILINGS24,013,4831,443,236,048- 0- 04,212,025,0368,36414FLOOR & WALL TILING WORK2,407,691,13318,742,781,929- 0- 048,816,981,83396,94115PAINTING WORKS1,297,503,83212,459,760,431- 0- 010,026,369,85219,91016SANITARY WARE- 0- 0633,943,5811,25918EXTERNAL PAINTING WORKS (P.S)- 0- 013,928,801,59827,66018ALUMINIUM WORKS (P.S)- 0- 091,750,218,373182,19918INTERIOR DECORATION GROUND LOBBY (PS)- 0- 040,468,451,11880,36320EXTERNAL WORKS- 0- 0- 00.0%20EXTERNAL WORK of MC scope- 0- 020EXTERNAL WORK by PMH- 0- 020GENERAL FENCE, MAIN GATE, PUBLIC PERGOLA AND I BEAM TO SUPPORT LIFT PIT (P.S)- 0- 019M&E WORKS (P.S)159,615,491,247- 02,059,9530.0%97.72789,80019M&E (plumping, electric, lighting, CCTV, PA system, transformer & sub-station system, ventilation system...)- 0- 019FIRE FIGHTING, FIRE ALARM SYSTEM- 0- 019ELEVATORS SYSTEM (Attendance Fee only)- 0- 019GAS SYSTEM- 0- 0Sub Total of I589,324,726,91767,605,662100.0%360.80IIPMH package21Pilling works22PM Fee (5%)23Design fee24Contingency (5%)29,466,236,346Sub Total of II29,466,236,346- 0380,28318.04TOTAL (excluded VAT)88,937,264,064328,502,922,98612,269,048,620618,790,963,2637,985,945378.84NotesBasementTowerExternal- 0
SumSUMMARY OF COSTPROJECT S10-2 MIX-USE RESIDENCEItemDin giiDescriptionTotal Amount (VND)% B.CRemark1Preliminary fee29,466,236,3462Basement88,937,264,0649,508,956446252.93294.193Tower328,502,922,9864,821,566226384.504External works12,269,048,620- 05M&E works159,615,491,2472,059,95396.71Total618,790,963,263VAT 10%61,879,096,3267,985,945374.93Total (included VAT)680,670,059,590* Note
1.Pre FeePROJECT S10-2 MIX-USE RESIDENCEPRELIMINARY FEE#DESCRIPTIONUNITQTYUNIT PRICEAMOUNT REMARKXem/Refer: 1. Instruction to Tender2. The Employer (PMH) Requirement 3. Consultant Technical Specification: Section 1Chi ph s b lit k bn di Nh thu cn c k Hng dn Nh thu m bo y chi ph s b thc hin tt d nPreliminary expences hereunder, The Tenderer should read carefully the Instruction to Tender for ensure enough Peliminary to execution of the project well1.1Ph tp kt my mc thit b, nhn lc, dn dp mt bng chun b thi cng Mobilization fee (equipment, labour, materials)lot1- 01.2Ph in nc tm thi Temporary water & Electricity fee lot1- 01.3Tin ch tm thi cho nh thu Temporary Facilities for Contractor lot1- 01.4Tin ch tm thi cho nh t vn Temporary Facilities for Engineer lot1- 01.5Ph an ton, an ninh, mi trng v dn dp CT Safety, Security, Environtment fee lot1- 01.6Ph dn gio & li an tonScaffolding and Safety Net feelot1- 01.7Cu thp & My mc thit b thi cng Tower Crane and Construction Equipment fee lot1- 01.8Ph kim tra, th nghim, vt mu & h s Inspections, Test, Sample, Document fee lot1- 01.9Ph bo lnh v bo himPerformance Bond, Taxes and Insurance policieslot1- 01.10Ph qun l cng trngSite Management fee lot1- 01.11Ph qun l tr s chnhHead Office Management feelot1- 0Tng cng cha bao gm VATTOTAL (I) Excluding VAT29,466,236,346
2.BFPROJECT S10-2 MIX-USE RESIDENCEBILL OF QUANTITYITEM: BASEMENT (BF to Slab of GF)Item No.DESCRIPTIONUNITQuantityBREAKDOWNUNIT PRICEAMOUNT REMARKMaterial Labor(VND)(VND)2.0CNG TC TEARTHWORKS Khi lng c tnh ng theo kch thc hnh hc trn bn v, bt c cc phn hao ht, bin php thi cng nou c bao gm trong gi khng bao gm trong khi lng Quantity is caculated in net plan in the drawings, All allowance for watage, construction method... is included in the unit price not including in Q'tyNh thu cn c k bn v thit k & yu cu k thut theo "Tiu chun k thut" trong Hng dn nh thu v Tiu chun thit k nh km m bo tt c hng mc, khi lng cng vic theo yu cu bao gm trong gi thuThe Tenderer should read carefully the design drawings & the Specification as " Specification" in Instruction to Tender & "Design Specification" attachment for ensure All items & Q'ty of Works included in this packageChi ph gm cng tc chun b, cung cp vt t, nhn cng v my thi cngCosts are for mobilization, supply, labour & plant2.01H thng tng chn o t tng hmRetaining sheet piling for excavation of basementitem11,748,476,3641,748,476,3642.02o t tng hm, i cc, mng hng ro Excavation of Basement, pilecaps, Foundation of Fencem344,86382,5803,704,775,8322.03p ct san lp cho cng trnh bng my m 9T, cht K=0.95 Backfilling with sand to required compaction density K=0.95m32,601207,501539,636,6152.04Bc v vn chuyn t thaLoad and carry away surplus excavated materials m342,26272,5093,064,396,4892.05Bm thot nc trong sut thi gian o tGround water drainage treatment during excavationlot130,000,00030,000,000TNGSUB TOTAL9,087,285,3004.0CNG TC B TNG CT THP REINFORCED CONCRETE (B tng v ct thp s dng cho d n c cung cp bi nh cung cp ch nh; ring li thp hn s do nh thu t cung cp Concrete and rebar are supplied by Nominated Supplier, steel wire mesh will be supplied by contractor)B TNGCONCRETEB tng trn sn c cung cp bi nh thu ch nh SPCC-CFE; Ngoi n gi b tng ca SPCC-CFE, cho php Nh thu tnh thm phn n gi thi cng ca mnh bao gm tt c cc chi ph nh: Hao ph vt t trong qu trnh vn chuyn v b tng, chi ph bm, b tng ti ch, bo dng v kim tra mu b tng.The Concrete is the ready-mixed concrete supplied by NSC (SPCC-CFE) and the Contractor is, in addition to price of SPCC-CFE, For in his rates for the cost of : wastage & loss of Concrete during handling and placing, cost for pumping, placing in position, concrete curing and testing4.01p u cc v vn chuyn ra khi cng trngCut-off and removal pile heads out off sitepcs1,05280,00084,160,0004.02 b tng u cc ng v t thp ch cho ct Filling pile head and put the starter bar for connecting columnpcs1,052671,909706,848,2054.03B tng lt B10(142), 10x20mmLean concrete agg.10x20mm, grade B10 (142) Cho i mngFor capm33631,367,643496,454,300 Cho dm tng hmFor beamm31061,367,643144,970,126 Cho sn tng hmFor slab m34301,367,643588,086,360Cho mng nc, h thu (For ditch, main hole, sumpit )m3881,367,643120,352,5574.04B tng chng thm mc B30 (B12) (122), 10x20mm Admixture waterproof concrete Grade B30 (B12) (122) stone 10x20mm Cho i mngFor capm36,9321,830,21312,687,037,577 Cho dm tng hmTo beam-BFm36141,830,2131,123,750,876 Cho sn tng hmFor -BFm31,2591,830,2132,304,238,360 Cho tng chn t tng hmFor Retaining wall of BFm36262,115,1301,324,071,4204.05B tng mc B30 (122) , 10x20mm Concrete Grade B30 (122) stone 10x20mm m3Sn tng trt v cc mt ct kt cu GF slab and sectionm31,0671,676,2431,788,550,833Dm tng trt (GF beam)m39611,676,2431,610,869,1204.06B tng mc B40 (122), 10x20mm Concrete Grade B40 (122) stone 10x20mm Cho ct trong vch v vch thang my khu vc block AFor column in shear wall and shear wall of BF Area -block Am3572,131,593120,530,914 Cho ct trong vch v vch thang my khu vc block BFor column in shear wall and shear wall of BF Area -block Bm3572,131,593120,626,836 Cho ct trong vch v vch thang my khu vc block CFor column in shear wall and shear wall of BF Area -block Cm3572,131,593120,626,836 Cho ct trong vch v vch thang my khu vc block DFor column in shear wall and shear wall of BF Area -block Dm3572,131,593120,530,914Cho Ct, ct cy - Khi nh A,B,C,DFor column, separated column within Block A,B,C,Dm32302,105,722483,894,8164.07B tng mc B30 (122) , 10x20mm Concrete Grade B30 (122) ,stone 10x20mm Cho ct tng hm For column of BF m3661,976,527130,450,771 Cho ram dc To rampm3571,676,24395,545,8274.08B tng chng thm mc B30 (B8) (122) , 10x20mm Admixture waterproof concrete Grade B30 (B8) (122) stone 10x20mm Cho B nc sinh hot v cu haFor Domestic tank and Fire Tankm31432,115,130302,400,145Cho B nc thi For Septic tank m31112,115,130233,954,536Cho mng nc, h thu Ditch, sumpit m34082,115,130863,501,8494.09B tng chng co ngt B35 cho dy b tng sau c ph gia chng thmAfter pouring - waterproofing concrete with non-shrinkage additional specialized materialBFm3271,946,25252,548,7984.10B tng chng co ngt B35 cho dy b tng sau After pouring concrete with non-shrinkage additional specialized materialGFm3241,946,25246,710,0434.11B tng B30 (122) cho cu thang tng hmConcrete grade B30 (122) for stair casem3261,676,24343,582,3074.12B tng mc B20(102) cho lanh t, b tr tng hmConcrete grade B20 (102) for lintel beams, tie column for BFLanh t Tie beamm321,585,0263,170,053B tr tng L>4mTie colum L>4m m331,847,3325,541,996B tng sau cho b nc cha chy v sinh hotAfter pouring concrete to Firewwater tank, filling by RC B20m3131,847,33224,015,317CT THPREINFORCEMENTCt thp gia cng bn thnh phm oc cp bi SPCC-CFE v Ngoi n gi ca SPCC-CFE, cho php Nh thu tnh thm phn n gi thi cng ca mnh bao gm tt c cc chi ph nh bc d, lu kho, lp t hon chnh.The reinforcement is the semi-fabricated rebar supplied by SPCC-CFE,and the Contractor is, in addition For price of SPCC-CFE, For in his rates for the cost of unloading, storage, and installationSn xut, lp dng ct thpProducing and installing rebar 4.13 Cho i mng, bao gm thp neo u cc vo i For Foundationkg907,79619,10617,343,922,0814.14 Cho dm For beamBFkg147,89919,0162,812,376,987GFkg68,84719,0161,309,161,7824.15 Cho Sn v cc mt ct kt cu sn For Slab & structure section of slabBFkg290,18519,0165,518,019,838GFkg125,94319,0162,394,872,1424.16 Cho tng chn t tng hm For retaining wall - BFkg100,16019,4371,946,846,7224.17 Cho ct, ct cy tng hm For column, separated column of basementkg142,83019,1652,737,266,9304.18 Cho ct trong vch v vch thang my tng hm For column in shear wall and shear wall basement Cho ct trong vch v vch thang my khu vc block AFor column in shear wall and shear wall of BF Area -block Akg4,72919,43791,919,311 Cho ct trong vch v vch thang my khu vc block BFor column in shear wall and shear wall of BF Area -block Bkg4,72919,43791,919,311 Cho ct trong vch v vch thang my khu vc block CFor column in shear wall and shear wall of BF Area -block Ckg4,72919,43791,919,311 Cho ct trong vch v vch thang my khu vc block DFor column in shear wall and shear wall of BF Area -block Dkg4,72919,43791,919,3114.19 Cho ram dc To rampkg7,68319,437149,337,2944.20 Cho B nc For Water tanksCho B nc sinh hot v cu haFor Domestic tank and Fire Tankkg22,54019,437438,122,312Cho B nc thi For Septic tank kg15,73719,437305,885,8514.21Cho lanh t, b tr tng hmfor lintel beams, tie columnLanh t Tie beamkg27619,0165,248,285B tr cho tng L>4mTie colum to wall L>4mkg33919,1656,496,7694.22Cho cu thangFor staircasekg3,25719,01661,933,5624.23Cho dy sau For after pour concretekg3,82319,01672,696,3484.24Reinforced around PVC pipe hole across beam, slab & reinfored rebar for wall on the slab directly kg3,01019,01657,236,727VN KHUNFORMWORKSChi ph vn khun bao gm chi ph cung cp, gia cng lp dng, h thng dn gio chng , tho d v vn chuyn khi cng trng. (Lu y l cng trnh hon thin th, nn vn khun dng cho cu kin b tng khng t phi cht lng cao t tiu chun k thut) Prices for formwork include supply, erection, supporting system, dismantling and removal off (Notes: This is basic finishing project, un-plastered RC structure must be applied the high quality meet Techincal requirment)Sn xut, lp dng vn khun Producing and installing formwork 4.25 Cho b tng lt v b tng i mng For lean concrete & concrete of pipecapm23,681201,179740,603,4764.26 Cho Dm For BaemBFm21,406201,760283,673,899GFm26,296201,7601,270,277,9984.27 Cho Sn v cc mt ct kt cu For Slab & structure sectionBFm24,479201,760903,588,123GFm27,201201,7601,452,870,3724.28 Cho tng chn t tng hm For retaining wall - BFm24,183206,216862,601,4574.29 Cho ct, ct cy tng hm For column, separated column of BFm21,933210,603407,096,0484.30 Cho ct trong vch v vch thang my tng hm For column in shear wall and shear wall basement Cho ct trong vch v vch thang my khu vc block AFor column in shear wall and shear wall of BF Area -block Am2445206,21691,830,039 Cho ct trong vch v vch thang my khu vc block BFor column in shear wall and shear wall of BF Area -block Bm2443206,21691,405,234 Cho ct trong vch v vch thang my khu vc block CFor column in shear wall and shear wall of BF Area -block Cm2443206,21691,405,234 Cho ct trong vch v vch thang my khu vc block DFor column in shear wall and shear wall of BF Area -block Dm2445206,21691,830,0394.31 Cho ram dc For rampm2305201,76061,520,5164.32 Cho b nc, mng nc For Water TanksCho B nc sinh hot v cu haFor Domestic tank and Fire Tankm2720206,216148,557,994Cho B nc thi For Septic tank m2811206,216167,241,162Cho mng nc, h thu Ditch, sumpit m2728206,216150,040,6874.33Cho lanh t, b tr tng hmFor lintel beams, tie column for BFLanh t Tie beamm241201,7608,302,405B tr tng L>4m Tie colum for wall length L>4mm258210,60312,181,2914.34Cho cu thangFor staircasem2175201,76035,307,918TNGSUB TOTAL68,144,456,4616.0CNG TC CHNG THM WATERPROOFING WORKS 6.01Chng thm cho mt ngoi tng tng hm Waterproof materials to Basement wall outside surface m22,091212,764444,940,521Assume Sika Bituseal 130S 0.3mmthk6.02Chng thm sika inertol poxitar F ln 4 mt tng chung quanh b, c trm gc b phng rn nt.Layers of water proofing membrane, Sika inertol poxitar F, to continue up 4 adjacent walls, fill corner to avoid crack Cho B nc sinh hot v PCCC To domestic water and Fire Tankm2532401,412213,474,864 Cho b nc t hoi To Septic tankm2658401,412264,129,032 Cho rnh thu nc tng hm, h thu To basement floor channel/ditchm2643401,412258,043,628Cho sn phng bmTo slab of pumb roomm2259401,412103,813,1466.03Lp chng thm cun cao 300mm ln tng xung quanhLayer of water proofing membrane (Sika topseal 107 or similar) to continued 300mm up each adjacent wall, fill corner to avoid crack.Cho nh xe, ng xe chyTo parking , drive waym28,280211,4431,750,648,327Cho Ram dcTo Rampm2259211,44354,776,479Chng thm cho h thang my Waterproofing for Elevator pitm279211,44316,763,2186.04Mch ngng chng thm cho tng tng hm v dy sauWater stop for Basement wall and after pour tripSn tng hmBF slabm798191,198152,560,328Sn tng trtGF slabm104191,19819,961,021 Cho B nc sinh hot v PCCC To domestic water and Fire tankm97191,19818,454,385 Cho b t hoi To Septic tankm149191,19828,429,160 Cho h thang my To elevator pitm97191,19818,542,3366.05Va Xi mng #100 to dc 0,5%, dy ti thiu 50mm c li thp bo v lp chng thm cho:Cement mortar #100, 0.5% minimum sloping to storwater draiin, 50mm thicknessCho nh xe, ng xe chyTo parking, drive waym27,776155,6861,210,574,5146.06B tng C20 dy ti thiu 50mm, li thp F4@200C20 concrete with F4@200 steel welding mesh, 50mm thkCho ram dcTo rampm2224155,68634,909,5366.07Va xi mng #100, dy ti thiu 15mm bo v lp chng thmCement mortar #100, at least 15mm Cho B nc sinh hot v PCCC To domestic water and Fire tankm253283,37844,341,017 Cho b nt hoi To Septic tankm265883,37854,862,430Cho rnh thu nc tng hm, h thuTo basment floor drainage channelm271683,37859,737,516Cho sn phng bmTo slab of pumb roomm225983,37821,563,1036.08Xi mng nguyn cht ti thiu 2mm Pure cement mortar , at least 2mm Cho b nt hoi To Septic tankm265817,59511,577,668Cho rnh thu nc tng hmTo basment floor drainage channelm264317,59511,310,9246.09Va xi mng chng thm M100, cao 300 cho tng phng bmWater proof cemment mortar M100, 300mm height on brick wall of pump roomm290176,51715,900,690TNGSUB TOTAL4,809,313,8468.0CNG TC XY GCHMASONRY WORKS Tng trongInternal wall8.01Xy tng trong nh gch rng dy 200mm va xi mng mc 75 Internal wall thk.200mm, cement mortar M75m2456341,000155,547,1508.02Xy tng trong nh gch rng dy 100mm va xi mng mc 75 Internal wall thk.100mm, cement mortar M75m2210278,58358,480,098TNGSUB TOTAL214,027,2489.0CNG TC TPLASTER WORKS9.01T va xi mng ct t l 1:3 mc #75 vi do c chp thun Cement and sand 1:3 grade #75 with an approved plasticiser Cung cp v hon thin 15mm lp va trt cho tng v ct khu vc bi xeSupply and install 15mm thick of plaster for wall and column at carpark aream24,60983,378384,297,150Cung cp v hon thin 15mm lp va trt cho tng khu vc thangSupply and install 15mm thick of plaster for wall at stairscase aream21,02883,37885,750,479Cung cp v hon thin 15mm lp va trt cho tng khu vc nh khoSupply and install 15mm thick of plaster for wall at storage roomm27983,3786,584,909Cung cp v hon thin 15mm lp va trt cho cnh ca, ca sSupply and install 15mm thick of external plaster for edge of door & windowm21,56983,378130,856,068Cung cp v hon thin 15mm lp va trt cho trn phng bmSupply and install 15mm thick of plaster for ceiling pump roomm227496,35326,379,568Cung cp v hon thin 15mm lp va trt cho cu thangSupply and install 15mm thick of plaster for staircasem225596,35324,527,660Cung cp v hon thin 15mm lp va trt cho ram dcSupply and install 15mm thick of plaster for Ramm226396,35325,302,3409.02T va xi mng ct t l 1:3 mc #100 vi do c chp thun, c ph gia chng thmCement and sand 1:3 grade #100 with an approved plasticiser, including water proofing admixtureCung cp v hon thin 15mm lp va trt cho trn b nc sinh hot, PCCCSupply and install 15mm thick of plaster for the bottom of cover slab of Domestic and Fire water tankm2338176,51759,604,642Cung cp v hon thin 15mm lp va trt cho trn b t hoiSupply and install 15mm thick of plaster for the bottom of cover slab of Domestic and Fire water tankm2214176,51737,762,375TNGSUB TOTAL781,065,19111.0CNG TC KIM LOIMETAL WORKS11.01Cung cp v lp t ca g chn xe bng thp ng tit din D45mm di 1800mm bao gm cc vt liu ph cn thit, sn v lin kt. chi tit tham chiu bn v A14-03Supply and install Barrier edge car by steel pipe D45mm, 1800mm Length including all sub materials necessary, paint and anchor connection. refer to drawing A14-03lot235191,97045,112,95011.02Cung cp v lp t thanh m cao su bo v ct b tng khu vc bi xe, tit din L180x180x40mm thk x H1000mm, cch sn 400mm bao gm cc vt liu ph cn thit, chi tit tham chiu bn v A14-05Supply and install L-Shaped Rubber protecting column at car parking area, dimension L180x180x40mmxH1000mm, 400mm above slab, including all sub materials necessary, refer to drawing A14-05bar552985,000543,720,00011.03Np mng rnh thot nc tng hm v ramp dc rng 400mmCast Iron cover width 400mmm4942,177,7781,076,889,33311.04Thang ln xung cho b nc, b t hoi, h thu ncLadder for water tank, septic tank and sump pitlot63,500,00021,000,00011.05Np h thm cho b nc, b t hoiAccess hole and cover for water tank, septic tank and sump pitlot84,965,00039,720,00011.06Np y h thu nc Cover of sumpitlot104,965,00049,650,00011.07Cung cp, lp t tay vn lin kt vi tng bng ng thp m km D50, bao gm c thanh thp gn tay vn D12, cht lin kt, cc vt liu cn thit, lin kt v sn. Chi tit xem bn v A5-08Staircase handrail connected with wall comprising of galvanized steel D50, 5, including all painted D12 bracket weld and anchor, necessary accessories, connections and painting, refer to Drawing A5-08m1021,054,945107,646,58811.08Cung cp v lp t ca thp 2 cnh W1600xH2100mm , khung sn tnh in mu trng 50x100mm, knh cng lc 10mmv tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install double leave door overall size W1600mmxH2100mm , frame 50x100mm, powder coated, white color glass 10mm and all submaterials, refer to drawing no. A9-01Ca D9Door D9m2272,400,00064,512,00011.09Cung cp v lp t ca thp 2 cnh chng chy 60p kch thc W1200xH2060mm, khung bao dy 45x100mm, cnh dy 40mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install 60 minutes install fire-resitance steel double leave door overall size W1200mmxH2060mm comprise of frame 45x100mm, door 40mm, powder coated, white color, thichness of steel 1.2mmand all submaterials, refer to drawing no. A9-01Ca D7Door D7m2102,400,00024,192,00011.10Cung cp v lp t ca thp 1 cnh chng chy 45p kch thc W600xH2100mm, khung bao dy 45x100mm, cnh dy 40mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install 45 minutes install fire-resitance steel single leave door overall size W600mmxH2100mm comprise of frame 45x100mm, door 40mm, powder coated, white color, thichness of steel 1.2mmand all submaterials, refer to drawing no. A9-01Ca D6Door D6m2102,400,00024,192,00011.11Cung cp v lp t ca thp 1 cnh chng chy 60p kch thc W1000mmxH2100mm bao gm khung bao dy 50x100mm, cnh dy 46mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-2Supply and install 60 minutes install fire-resitance steel single leaf door overall size W1000mmxH2100mm comprise of frame 50x100mm, door 46mm, powder coated, white color, thickness of steel 1.2mm and all submaterials, refer to drawing no. A9-02Ca DFDoor DFm2422,400,000100,800,00011.12Cung cp v lp t ca i 1 cnh kch thc W1000mmxH2100mm bao gm louver nhm h 80, sn tnh in xm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-2Supply and install single leaf door overall size W1000mmxH2100mm comprise of alumium louver profile 80, door 46mm, powder coated, grey color and all submaterials, refer to drawing no. A9-02Ca D18Door D18m242,400,00010,080,000PH KIN CHO CADOORS HARDWARES11.13Cung cp v lp t ph kin cho ca thp 1 cnh chng chy 60p kch thc W800mmxH2100mm khung bao 45x100mm cnh dy 40mm sn tnh in trng dy thp l 1.2mm. v tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install hardwares for 60 minutes fire-resitance steel single leaf door overall size W800mmxH2100mm comprise of door frame 45x100 mm, door 40mm, powder coated, white color, the thickness of steel 1.2mm and all submaterials, refer to drawing no. A9-01 Ca D12 Door D12set4987,2503,949,00011.14Cung cp v lp t ph kin cho ca thp 2 cnh W1600xH2100mm , khung sn tnh in mu trng 50x100mm, knh cng lc 10mmv tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install hardwares for double leave door overall size W1600mmxH2100mm , frame 50x100mm, powder coated, white color glass 10mm and all submaterials, refer to drawing no. A9-01Ca D9Door D9set81,487,25011,898,00011.15Cung cp v lp t ph kin cho ca thp 2 cnh chng chy 60p kch thc W1200xH2060mm, khung bao dy 45x100mm, cnh dy 40mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install hardwares for 60 minutes install fire-resitance steel double leave door overall size W1200mmxH2060mm comprise of frame 45x100mm, door 40mm, powder coated, white color, thichness of steel 1.2mmand all submaterials, refer to drawing no. A9-01Ca D7Door D7set4890,9503,563,80011.16Cung cp v lp t ph kin cho ca thp 1 cnh chng chy 45p kch thc W600xH2100mm, khung bao dy 45x100mm, cnh dy 40mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install hardware for 45 minutes install fire-resitance steel single leave door overall size W600mmxH2100mm comprise of frame 45x100mm, door 40mm, powder coated, white color, thichness of steel 1.2mmand all submaterials, refer to drawing no. A9-01Ca D6Door D6set82,400,00019,200,00011.17Cung cp v lp t ph kin cho ca thp 1 cnh chng chy 60p kch thc W1000mmxH2100mm bao gm khung bao dy 50x100mm, cnh dy 46mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-2Supply and install hardwares for60 minutes install fire-resitance steel single leaf door overall size W1000mmxH2100mm comprise of frame 50x100mm, door 46mm, powder coated, white color, thickness of steel 1.2mm and all submaterials, refer to drawing no. A9-02Ca DFDoor DFset201,200,00024,000,00011.18Cung cp v lp t ph kin cho ca 1 cnh chng chy 60p kch thc W1000mmxH2100mm bao gm louver nhm h 80, sn tnh in xm v tt c cc vt liu ph, chi tit tham chiu bn v s A9-2Supply and install hardwares for single leaf door overall size W1000mmxH2100mm comprise of aluminum louver profile 80, powder coated, grey color, and all submaterials, refer to drawing no. A9-02Ca D18Door D18set2890,9501,781,900TNGSUB TOTAL2,171,907,57113.0CNG TC NG TRNSUSPENDED CEILINGS WORKS13.1Cung cp v lp t trn thch cao khung chm, tm thch cao dy 9mmSupply and install gypsum board 9mm in concealed galvanized metalCho snh thang myTo elevator lobbym271339,07824,013,483TNGSUB TOTAL24,013,48314.0CNG TC HON THIN NN V TNGFLOOR & WALL FINISHESCc Lp LtBackgrounds14.01Va xi mng ct t l 1:3 mc #100 vi do c chp thun v hon thin bng bn xoa bng gCement and sand 1:3 grade #100 with an approved plasticiser and with wood float finish.Lng va dy 20mm cho bc thang b 120mm thick floor screeding to step of staircase 1m2111101,00411,214,456Lng va dy 20mm cho bc thang b 220mm thick floor screeding to step of staircase 2m232101,0043,269,49414.02Qut lp nc xi mng chuyn dng cho c bc thang, chi tit theo bn v A5-08Skimcoat layer to raiser, detailed as drawing A5-08Cho thang b 1To staircase 1m23617,595633,253Cho thang b 2To staircase 2m2917,595162,580Hon thin snFloor finishing14.03Cung cp v lp t granite kch thc 600x600mm bao gm va xi mng mc 100 dy 20mm v cc vt liu ph khc Supply and install granite stone polish finish size 600x600mm thick including cement grade 100# , 20mm thickness and all sub materials Cho snh thang my tng hm v khu vc ln cnTo Elevator lobby at basement and adjacencem22252,219,040499,749,99814.04Cung cp v lp t gch mi bc thang rng 100mm, di bng b rng thang vi 3 im neo vo bc thang b tng, bao gm vvt t ph khc.Supply and install ceramic tile 100mm width for stair, including submaterialm221122,4922,596,83314.05Lp cng b mt Hardener 5kg/m2, x rnh hon thin (4mx4m)Hardener layer 5kg/m2 add groving (4mx4m)Cho nh xe, ng xe chyTo parking, drive waym27,943151,2821,201,615,43414.06Lp cng b mt hardener 5kg/m2, x rnh chng trtHardener layer 5kg/m2 add groving for anti slipCho Ram dc tng hmTo Ramp at basementm2263151,28239,726,52514.07Cung cp v lp t gch ceramic 300x300mm cho sn phng bm, bao gm va cn nn mc 100 dy ti thiu 15mm v vt t ph khc.Supply and install ceramic tile 300x300mm for floor of pump room, including screeding mortar #100 min thickness 15mm and submaterialm2141364,63651,420,96914.08Cung cp v lp t gch ceramic 300x300mm cho sn B nc sinh hot v PCCC, bao gm hai lp va xi mng (khng c hi) v vt t ph khc.Supply and install ceramic tile 300x300mm for floor of Domestic & Fire Fighting Tank, including two layers proofing based cement coated (non toxic) and submaterialm2213364,63677,685,70014.09Cung cp v lp t gch ceramic 300x300mm cho sn phng kho, bao gm va cn nn v vt t ph khc.Supply and install ceramic tile 300x300mm for floor of storage room, including screeding mortar and submaterialm26364,6362,078,42514.10Va xi mng nguyn cht dy ti thiu 15mmPure cement mortar at least 15mmCho y b t hoi v rnh thu nc tng hmTo bottom slab of septic tankd and drainage at basementm229383,37824,461,307Hon thin tngWall finishing14.11Cung cp v lp t granite kch thc 600x600mm bao gm mc treo v vt liu ph khc Supply and install granite stone polish finish size 600x600mm including hanging stub and all sub materials Cho tng snh thang my tng hmTo lift lobby at basementm21082,219,040238,613,37114.12Cung cp v lp t granite kch thc 600x1200x25mm cho ca thang my, bao gm mc treo v vt liu ph khc, chi tit theo bn v A14-02Supply and install granite stone size 600x1200x25mm to lift door opening, including hanging stud and all sub materials, detailed as drawing A14-02m2212,219,04045,512,51014.13Cung cp v lp t len chn tng ceramic100mm cao bao gm va v vt t ph khcSupply and install ceramic skirting 100mm height and sub materialsCho tng phng bm v khoTo wall of pump and storage roomm72122,4928,766,76014.14Cung cp v lp t gch ceramic 300x300mm cho tng B nc sinh hot v PCCC, bao gm hai lp va xi mng (khng c hi) v vt t ph khc.Supply and install ceramic tile 300x300mm for wall of Domestic & Fire Fighting Tank, including two layers proofing based cement coated (non toxic) and submaterialm2319364,636116,183,96914.15Va xi mng nguyn cht dy ti thiu 15mmPure cement mortar at least 15mmCho tng b t hoi v rnh thu nc tng hmTo wall of septic tankd and drainage at basementm21,00783,37883,999,550TNGSUB TOTAL2,407,691,13315.0CNG TC SN PAINTING WORKS15.01Vch sn phn quang cho ch u xe tReflective painting to Car Parking lot lot235100,00023,500,00015.02Sn phn quang k hiu ch ng, vch k t qung, chi tit theo bn v A14-03Reflecting Painting for driveway indicated symbol, detailed as drawing A14-03Item130,000,00030,000,00015.03Sn nh s k hiu tng v tr u xe, chi tit theo bn v A14-03Reflective Painting for car parking unit, detailed as drawing A14-03Cho t/For carlot235100,00023,500,00015.04Sn tng 3 lp bao gm lp b, sn lt v sn ph, cc vt liu ph cn thit, tham chiu bn v v tiu chun k thutWall painting 3 layer including skimcoat, primer and coat layer, all submaterials, refer to drawings and technical specification Sn tng, ct khu vc bi xeWall & column painting at parking aream24,55363,636289,733,980Sn tng khu vc thang thot himWall painting at car staircase aream297963,63662,287,060Sn tng nh khoWall painting at storage roomm28563,6365,388,485Sn tng phng bmWall painting at pump roomm227463,63617,422,197Sn tng khu vc snh thangWall painting at Lift Lobbym22663,6361,685,075Sn cho cnh ca, ca sPaint for external plaster for edge of door & windowm21,56963,63699,872,501Cho trn tng hmTo basement ceilingm211,62363,636739,607,85015.05Sn nc ni tht cho trn thch cao khung chmInterior emulsion paint for concealed gypsum boardm27163,6364,506,684TNGSUB TOTAL1,297,503,832Tng cng cha bao gm VATTOTAL (I) Excluding VAT88,937,264,064

&9&A&9&P of &N

&9&A&9&P of &N

&9&A&9&P of &N

&9&A&9&P of &N

3.TowerPROJECT S10-2 MIX-USE RESIDENCE
Nguyen Thi Ngoc Phi: Nguyen Thi Ngoc Phi:BILL OF QUANTITYTower ( Excluded Slab of GF)Item No.DESCRIPTIONUNITQuantityBREAKDOWNUNIT PRICEAMOUNT REMARKMaterial Labor(VND)(VND)Khi lng c tnh ng theo kch thc hnh hc trn bn v, bt c cc phn hao ht, bin php thi cng nou c bao gm trong gi khng bao gm trong khi lng Quantity is caculated in net plan in the drawings, All allowance for watage, construction method... is included in the unit price not including in Q'tyNh thu cn c k bn v thit k & yu cu k thut theo "Tiu chun k thut" trong Hng dn nh thu v Tiu chun thit k nh km m bo tt c hng mc, khi lng cng vic theo yu cu bao gm trong gi thuThe Tenderer should read carefully the design drawings & the Specification as " Specification" in Instruction to Tender & "Design Specification" attachment for ensure All items & Q'ty of Works included in this package4.0CNG TC B TNG CT THP REINFORCED CONCRETE (B tng v ct thp s dng cho d n c cung cp bi nh cung cp ch nh; ring li thp hn s do nh thu t cung cp Concrete and rebar are supplied by Nominated Supplier, steel wire mesh will be supplied by contractor)B TNGCONCRETEB tng trn sn c cung cp bi nh thu ch nh SPCC-CFE; Ngoi n gi b tng ca SPCC-CFE, cho php Nh thu tnh thm phn n gi thi cng ca mnh bao gm tt c cc chi ph nh: Hao ph vt t trong qu trnh vn chuyn v b tng, chi ph bm, b tng ti ch, bo dng v kim tra mu b tng.The Concrete is the ready-mixed concrete supplied by NSC (SPCC-CFE) and the Contractor is, in addition to price of SPCC-CFE, For in his rates for the cost of : wastage & loss of Concrete during handling and placing, cost for pumping, placing in position, concrete curing and testing4.01B tng mc B40 , 10x20mm Concrete Grade B40 stone 10x20mm Cho Ct, ct cy For column, separated columnGFm31782,131,593378,954,566MFm31612,131,593343,698,022 Cho ct trong vch v vch thang my For column in shear wall and shear wall GFm31482,131,593315,475,733MFm31482,131,593315,475,7334.02B tng mc B35 , 10x20mm Concrete Grade B35 stone 10x20mm Cho Ct tng 2 n tng 3 For column 2F to 3Fm33442,041,124702,310,015 Cho Ct tng 4 n tng 15 For column 4F to 15Fm32,0012,143,1804,288,504,003 Cho ct trong vch v vch thang my 2F to 3F For column in shear wall and shear wall 2F to 3Fm33282,041,124669,488,738 Cho ct trong vch v vch thang my 4F to 15F For column in shear wall and shear wall 4F to 15Fm39522,143,1802,039,879,1154.03B tng mc B30, 10x20mm Concrete Grade B30 ,stone 10x20mm Cho Ct For columnKhi (GF to 2nd FL)m31641,976,527323,972,51416F to Technical m37332,075,3531,521,233,881 Cho ct trong vch v vch thang my For column in shear wall and shear wall 16F to Technical m33171,976,527627,112,4354.04B tng mc B30, 10x20mm Concrete Grade B30 ,stone 10x20mm Cho Dm For BeamTng lng/Mezzanine Floorm34901,676,243821,995,837Tng 2/2nd Floorm37141,676,2431,197,407,125Tng 3/3rd Floorm33301,676,243553,428,250Tng 4/4th Floorm33591,676,243601,586,700Tng 5 n 19/5thF to 19thFm35,4481,760,0559,589,270,871Tng k thut/Technical Floorm33571,760,055628,269,129Mi/Roof Floorm31021,760,055178,821,558 Cho Sn For SlabTng lng/Mezzanine Floorm36201,676,2431,039,655,936Tng 2/2nd Floorm39411,676,2431,576,522,909Tng 3/3rd Floorm33501,676,243587,321,875Tng 4/4th Floorm33911,676,243655,293,512Tng 5 n 19/5thF to 19thFm36,0341,760,05510,619,888,507Tng k thut/Technical Floorm34081,760,055717,257,495Mi/Roof Floorm3451,760,05579,202,462 Cho cc mt ct kt cu, chi tit gia cng For structure section, strengthen detailsTng lng/Mezzanine Floorm311,676,243972,221Tng 2/2nd Floorm351,676,2439,085,235Tng 3/3rd Floorm3131,676,24321,774,391Tng 4/4th Floorm331,676,2435,816,562Tng 5 n 19/5thF to 19thFm32311,760,055406,643,040Tng k thut/Technical Floorm31491,760,055263,022,576 Cho cu thang (GF~RF) For staircases (GF~RF)m33621,676,243606,866,864Cho ram rcFor rampsm3241,676,24340,347,1594.05B tng mc B20 cho lanh t, b tr ru tng(GF-RF)Concrete grade B20 for tie beam, tie column (GF~RF)Lanh t Tie beamm31191,585,026188,665,702B tr cho tng L>4mTie colum for wall length L>4mm33051,847,332562,697,3614.06B tng chng co ngt B35 cho dy b tng sau c ph gia chng thmAfter pouring - waterproofing concrete with non-shrinkage additional specialized materialTng lng/Mezzanine Floorm341,946,2527,473,607Tng 2/2nd Floorm331,946,2526,266,9314.07B tng chng thm mc B30 (B12) (122) , 10x20mm Admixture waterproof concrete Grade B30 (B12) (122) stone 10x20mmCho B cn bng For balancing tankm3172,115,13036,591,750CT THP REINFORCEMENTCt thp gia cng bn thnh phm oc cp bi SPCC-CFE v Ngoi n gi ca SPCC-CFE, cho php Nh thu tnh thm phn n gi thi cng ca mnh bao gm tt c cc chi ph nh bc d, lu kho, lp t hon chnh.The reinforcement is the semi-fabricated rebar supplied by SPCC-CFE,and the Contractor is, in addition For price of SPCC-CFE, For in his rates for the cost of unloading, storage, and installationSn xut, lp dng ct thpProducing and installing rebar ( deformed steel bar ) 4.08 Cho Ct, ct cy For column, separated columnGF to 3Fkg261,21919,1655,006,141,3274F to Technical Floorkg341,42119,1656,543,166,2014.09 Cho ct trong vch v vch thang my For column in shear wall and shear wall GF to 3Fkg151,94719,4372,953,440,6884F to Technical Floorkg98,46919,4371,913,985,8574.10 Cho dm To beamTng lng/Mezzanine Floorkg80,64719,0161,533,546,573Tng 2/2nd Floorkg117,86619,0162,241,285,656Tng 3/3rd Floorkg71,58119,0161,361,150,225Tng 4/4th Floorkg76,83119,0161,460,981,726Tng 5 n 19/5thF to 19thFkg1,152,38619,01621,913,220,019Tng k thut/Technical Floorkg77,67119,0161,476,950,485Mi/Roof Floorkg12,30719,016234,021,2124.11 Cho sn To slabTng lng/Mezzanine Floorkg87,30619,0161,660,164,891Tng 2/2nd Floorkg121,48019,0162,310,011,796Tng k thut/Technical Floorkg2,15619,01641,005,318Mi/Roof Floorkg5,78019,016109,911,8094.12 Cho b tng dy sau To slabTng lng/Mezzanine Floorkg55119,01610,473,772Tng 2/2nd Floorkg31619,0166,016,8484.13 Cho cc mt ct kt cu, chi tit gia cng, sleeve For structure section, strengthen detailsTng lng/Mezzanine Floorkg2,26719,01643,117,054Tng 2/2nd Floorkg2,99319,01656,918,971Tng 3/3rd Floorkg2,97719,01656,604,637Tng 4/4th Floorkg2,97719,01656,604,637Tng 5 n mi/5thF to RFkg120,91219,0162,299,200,7684.14 Cho cu thang (GF to roof) To staircasekg43,86419,016834,093,9684.15 Cho b cn bng To balance tankkg1,68819,43732,817,7154.16Cho ram dc t GF ln MFTo Rampkg4,88619,01692,906,0474.17Cho lanh t, ging, b tr tngFor lintel, tie beam, tie column and collecting sump coverLanh t Tie beamkg16,426.1419,016312,351,660B tr cho tng L>4m Tie colum to wall L>4mkg34,419.8019,165659,638,593LI THP HNSTEEL WIRE MESHChi ph li thp bao gm tt c cc chi ph nh cung cp, bc d, lu kho, gia cng lp t hon chnhThe steel wiremesh is the cost of Supply, unloading, storage, and installation4.18Cung cp lp dng li thp hn cho sn Producing and installing steel wiremesh for Slab3Fkg41,02420,805853,510,6644Fkg47,09220,805979,745,8675F to 19Fkg188,36620,8053,918,983,468Technical Floorkg49,64020,8051,032,758,556VN KHUNFORMWORKSChi ph vn khun bao gm chi ph cung cp, gia cng lp dng, h thng dn gio chng , tho d v vn chuyn khi cng trng. (Lu y l cng trnh hon thin th, nn vn khun dng cho cu kin b tng khng t phi cht lng cao t tiu chun k thut) Prices for formwork include supply, erection, supporting system, dismantling and removal off (Notes: This is basic finishing project, un-plastered RC structure must be applied the high quality meet Techincal requirment)Sn xut, lp dng vn khun cho cc kt cu phn thnProducing and installing formwork for structure member of superstructure4.19 Cho Ct, ct cy For column, separated columnGF~3Fm25,814210,6031,224,390,3304F~19Fm216,991221,1333,757,365,94919F~RFm22,067221,133457,003,1174.20 Cho ct trong vch v vch thang my For column in shear wall and shear wall GF~3Fm24,849210,6031,021,158,2114F~19Fm218,734221,1334,142,801,45519F~TFm21,249221,133276,186,7644.21 Cho dm To beamTng lng/Mezzanine Floorm23,297201,760665,249,591Tng 2/2nd Floorm24,341201,760875,854,259Tng 3/3rd Floorm22,196201,760442,997,346Tng 4/4th Floorm22,362201,760476,572,150Tng 5 n 19/5thF to 19thFm238,514211,8488,159,060,951Tng k thut/Technical Floorm22,496211,848528,813,745Mi/Roof Floorm21,241211,848262,801,0684.22 Cho Sn For SlabTng lng/Mezzanine Floorm24,134201,760834,021,438Tng 2/2nd Floorm26,100201,7601,230,745,236Tng 3/3rd Floorm22,395201,760483,181,792Tng 4/4th Floorm22,678201,760540,322,108Tng 5 n 19/5thF to 19thFm238,914211,8488,243,876,219Tng k thut/Technical Floorm22,717211,848575,530,357Mi/Roof Floorm2375211,84879,451,2894.23 Cho b tng dy sau To slabTng lng/Mezzanine Floorm225201,7605,056,094Tng 2/2nd Floorm221201,7604,327,7424.24 Cho cc mt ct kt cu, chi tit gia cng For structure section, strengthen detailsTng lng/Mezzanine Floorm214201,7602,747,965Tng 2/2nd Floorm220201,7603,968,610Tng 3/3rd Floorm2107201,76021,634,674Tng 4n mi/4thF to RFm25,491211,8481,163,220,7604.25 Cho cu thang ( GF to Roof) To staircasem22,510201,760506,412,3844.26 Cho b cn bng To balance tankm2131210,60327,603,7664.27Cho ram dc t GF ln MFTo Rampm2206201,76041,544,3054.28 Cho cho lanh t, ging tng, b tr (GF-RF) For tie beam, tie column (GF~RF)m2Lanh t Tie beamm22,636201,760531,821,979B tr cho tng L>4mTie colum to wall length L>4mm26,441210,6031,356,489,101TNGSUB TOTAL142,475,188,0775.0CNG TC KT CU THPSTRUCTURAL STEEL WORKSn gi gm cung cp vt t chnh, vt t ph nhn cng gia cng, lp t, sn hon thin, vn chuyn, bc d, lu kho, an ninh, bo qun m bo thc hin hon chnh cng tc y theo bn v v theo Tiu chun k thut Prices for Metal works include supply main materials, submaterial, labor for fabrication, installation, finishing, transportation, unloading, storage, security, protection as the draings and the Specification5.01Kt cu thp canopy 1 - 2F/ Steel structure for canopy 1 - 2FBao gm khung thp ch I (120x60mm)Steel frame I (120x60mm)Lam nhm 20x100mmAlu louver 20x100mmMt knh cng lc dy 10mm, dc 1.7%Temper glass 10mm thk, 1.7% slopeThp treo 2 uHanging bracing at both endSn hon thinFinished paintingChi tit theo bn v A7-02Detail as drawing A7-02m21023,000,000304,860,0005.01Kt cu thp canopy 2 / Steel structure for canopy 2Bao gm khung bng cc thanh st 40x80mmSteel frame 40x80mmCc thanh st dy 20x60mm, 100x100mmSteel frame 20x60mm, 100x100mmSn hon thinFinished paintChi tit theo bn v A7-02Detail as drawing A70-02m2352,500,00087,575,0005.03Kt cu thp chi ngh khu vc b bi / Steel structure for rest area at swimming pool Bao gm khung bng st hp 60x120mmIncluding steel box 60x120mmCc thanh st hp 30x120 nghing 60 so vi phng ngangSteel box 30x120, 60degree slanting compared to horizontal Chi tit theo bn v A7-03Detail as A7-03m21192,500,000297,875,000TNGSUB TOTAL690,310,0006.0CNG TC CHNG THM WATERPROOFING WORKS 6.01Mch ngng chng thm cho dy sauWater stop for Basement wall and after pour tripTng LngTo Mezzanine Floorm28191,1985,353,5316.02Mch ngng chng thm cho b cn bngWater stop for balancing tankm23191,1984,330,6246.03Lp chng thm cun cao 300mm ln tng xung quanh Layer of water proofing membrane to continued 300mm up each adjacent wall, fill corner to avoid crack.Cho nh xe, ng xe chyTo parking, drive wayTng trt To Ground Floorm23,409211,443720,725,343Tng LngTo Mezzanine Floorm23,761211,443795,168,155Cho Ram dcTo Rampm2130211,44327,468,588Cho khu vc bpTo kitchen aream25,947211,4431,257,531,033Cho nh v sinh To toiletm27,728211,4431,634,024,708Cho phng git, logia, ban cngTo laundry, logia, balconym25,169211,4431,092,890,774Cho vngTo auventm2253211,44353,547,994Cho mi che thng tng (tng 2)To void roof (2nd floor)m231211,4436,451,1326.04Chng thm sika inertol poxitar F ln 4 mt tng chung quanh b, c trm gc b phng rn nt.Layers of water proofing membrane, Sika inertol poxitar F, to continue up 4 adjacent walls, fill corner to avoid crack Cho phng qut, phng my pht in, phng my bin th To fan room generator room, transformer roomm2505401,412202,801,322Cho phng rcTo Trash/garbage roomm2971401,412389,674,619 Cho rnh thu nc tng trt To ground floor channel/ditchm2177401,41271,061,949 Cho rnh thu nc tng lng To mezzanine floor channel/ditchm2219401,41287,752,656Cho phng bmTo pump roomm267401,41226,701,920Cho b cn bngTo balance tankm260401,41223,940,2066.05X l khe co gin, chi tit theo bn v A14-01Movement joint, detailed as drawing A14-01m35180,0006,264,0006.06Va Xi mng #100 to dc 0,5%, dy ti thiu 50mm c li thp bo v lp chng thm cho:Cement mortar #100, 0.5% minimum sloping to storwater draiin, 50mm thicknessCho nh xe, ng xe chyTo parking, drive waym26,777155,6861,055,008,1086.07B tng C20 dy ti thiu 50mm, li thp F4@200C20 concrete with F4@200 steel welding mesh, 50mm thkCho ram dcTo rampsm2105155,68616,396,8806.08Va xi mng #100, dy ti thiu 15mm bo v lp chng thmCement mortar #100, at least 15mm Cho rnh thu nc tng trt To ground floor channel/ditchm217783,37814,760,328 Cho rnh thu nc tng lng To mezzanine floor channel/ditchm221983,37818,227,1676.09Xi mng nguyn cht ti thiu 2mm Pure cement mortar , at least 2mmm2 Cho rnh thu nc tng trt To ground floor channel/ditchm217717,5953,114,885 Cho rnh thu nc tng lng To mezzanine floor channel/ditchm221917,5953,846,4956.10Va xi mng #100 ch mng nht dy 20mm, to dc 2% v l thu ncCement mortar #100, at least 20mm thk , 2% sloping into drainageCho nh v sinh (cun cao ln tng 300mm)To toilet (upto wall 300mm)m27,517176,5171,326,823,298Cho phng git, logia, ban cngTo laundry, logia, balconym22,949176,517520,583,450Cho vngTo auventm2150176,51726,458,1986.11Va xi mng #100 ch mng nht dy 20mmCement mortar #100, at least 20mm thk Cho phng rcTo Trash/Garbage roomm2114176,51720,085,919 Cho phng qut, phng my pht in, phng my bin th To fan room generator room, transformer roomm2181176,51731,917,8826.12Va xi mng #100 ch mng nht dy 15mmCement mortar #100, at least 20mm thk Cho b cn bngTo balance tankm22783,3782,272,872Cho phng bmTo pump roomm23083,3782,502,1606.13Lp bitum chng thm cho vngBitume layer of water proofing for auventm215025,0003,747,250TNGSUB TOTAL9,451,433,4497.0CNG TC MIROOF WORKS7.01Lp b tng chng thm sn miWater proof concrete roof slabCho sn thngTo lower roof terracem22,756211,443582,720,5857.02Lp chng th dng mng gc bituseal, cun cao 300mm ln tng chung quanh, trm cc gc phng rn ntWaterproof layer extraction bituseal membrane upto wall 300mmCho sn thngTo lower roof terracem23,022211,443638,922,192Cho mi To the roofm2397211,44384,002,1607.03Lp va M75 dy 20mm cho sn thngMortar M75 20mm thick to lower roof terracem22,75657,808159,314,4507.04Lp cch nhit 40mm, t trng 50kg/m3Cho sn thngTo lower roof terracem22,756143,300394,923,2617.05Lp b tng 1x2 M200 li thp F4a2001x2 stone concrete M200 steel mesh F4a200Cho sn thngTo lower roof terracem22,756246,145678,356,4647.06Va xi mng mc 100 ch mng nht dy 20mm, c ph gia chng thm to dc 2% Cement motar #100, at least 20mm thk, waterproof additive, sloping 2%Cho sn thngTo lower roof terracem22,756176,517486,467,926Cho mi To the roofm2397176,51770,126,846TNGSUB TOTAL3,094,833,8848.0CNG TC XY GCHMASONRY WORKS Tng ngoiExternal wall8.01Xy tng gch c ngai nh dy 200mm va xi mng mc 75 External brick wall thk.200mm, cement mortar M75Tng trt/Ground Floorm2556341,000189,722,170Tng lng/Mezzanine Floorm2340341,000115,813,830Tng 2/2nd Floorm2908341,000309,587,080Tng 3/3rd Floorm2871341,000297,161,040Tng 4 n 19/4thF to 19thFm217,256341,0005,884,186,880Tng k thut/Technical Floor787341,000268,448,8408.02Xy tng gch rng ngai nh 100mm va xi mng mc 75 External wall thk.100mm, cement mortar M75Tng trt/Ground Floorm294278,58326,100,421Tng lng/Mezzanine Floorm225278,5836,978,499Tng 2/2nd Floorm2347278,58396,637,582Tng 3/3rd Floorm22278,583615,668Tng 4 n 19/4thF to 19thFm26,961278,5831,939,114,463Tng k thut/Technical Floorm232278,5839,014,939Tng trongInternal wall8.03Xy tng trong nh gch c dy 200mm va xi mng mc 75 Internal wall thk.200mm, cement mortar M75Tng trt/Ground Floorm21,189341,000405,605,860Tng lng/Mezzanine Floorm21,064341,000362,800,130Tng 2/2nd Floorm2604341,000206,052,660Tng 3/3rd Floorm2575341,000195,982,930Tng 4 n 19/4thF to 19thFm210,828341,0003,692,184,320Tng k thut/Technical Floorm2292341,00099,449,2408.04Xy tng trong nh gch rng dy 100mm va xi mng mc 75 Internal wall thk.100mm, cement mortar M75Tng trt/Ground Floorm2659278,583183,544,267Tng lng/Mezzanine Floorm2446278,583124,231,206Tng 2/2nd Floorm2854278,583237,934,769Tng 3/3rd Floorm2888278,583247,270,078Tng 4 n 19/4thF to 19thFm220,510278,5835,713,755,166Tng k thut/Technical Floorm270278,58319,545,368TNGSUB TOTAL20,631,737,4059.0CNG TC TPLASTER WORKSTng ngoiExternal wallVa xi mng ct t l 1:3 mc #75 vi do c chp thun Cement and sand 1:3 grade #75 with an approved plasticiser 9.01Cung cp v hon thin 15mm lp va trt bn ngoi cho tng gch, dm, ct ngoi nh.Supply and install 15mm thick of plaster for external brick wall, column, beam.m262,78492,1815,787,486,2209.02Cung cp v hon thin 15mm lp va trt bn ngoi cho cnh ca, ca s Supply and install 15mm thick of external plaster for edge of door & windowm24,55392,181419,738,397Tng trongInternal wallVa xi mng ct t l 1:3 mc #75 vi do c chp thun Cement and sand 1:3 grade #75 with an approved plasticiser 9.03Cung cp v hon thin 15mm lp va trt trong cho tng gch v dm trn tng, ct trong nhSupply and install 15mm thick of plaster for internal brick wall and beam on wall, columnm2106,80183,3788,904,818,6189.04Cung cp v hon thin 15mm lp va trt cho cnh ca, ca s Supply and install 15mm thick of plaster for edge of door & windowm21,93183,378160,996,220Dm, trn, cu thangBeam, Ceiling, StaircaseVa xi mng ct t l 1:3 mc #75 vi do c chp thun Cement and sand 1:3 grade #75 with an approved plasticiser 9.05Cung cp v hon thin 15mm lp va trt trong cho trn v y dm trong nhSupply and install 15mm thick of plaster for internal ceiling and beam m28,56796,353825,477,7549.06Cung cp v hon thin 15mm lp va trt cho trn v y dm balcony v sn phiSupply and install 15mm thick of plaster for internal ceiling of balcony, yardm23,39796,353327,331,9189.07Cung cp v hon thin 15mm lp va trt cho cu thangSupply and install 15mm thick of plaster for staircase m21,99796,353192,386,427TNGSUB TOTAL16,618,235,55311.0CNG TC KIM LOIMETAL WORKS11.01Cung cp v lp t thang leo ln phng k thut, chi tit theo bn v A14-04Supply and install ladder to technical room, detailed as drawing A14-04m23,000,0006,600,00011.02Cung cp v lp t bng hiu, chi tit theo bn v A8-04Supply and install signage detail as drawing A8-04m21831,500,000274,890,00011.03Cung cp v lp t lan can knh cao 1400mm (LK1)Supply and install Glass balustrade1400mm high (LK1)Cho tng 3To 3rd Floorm1732,367,849410,324,635T tng 4 n 194th to 19th floorm1,6522,367,8493,912,823,89811.04Cung cp v lp t lan can knh cao 1000mm Supply and install Glass balustrade1000mm high
Admin: Admin:bacony detailCho tng 2To 2nd Floorm1211,691,321203,973,31911.05Cung cp v lp t lan can knh cao 900mm Supply and install Glass balustrade 900mm high Cho tng 2To 2nd Floorm271,522,18940,870,77311.06Cung cp v lp t lan can knh cao 850mm Supply and install Glass balustrade 850mm high Cho tng 2To 2nd Floorm601,437,62385,567,31511.07Cung cp v lp t lan can thp cao 1400mm (LS1)Supply and install steel balustrade1400mm high (LS1)Cho tng 2To 2nd Floorm71,054,9456,962,637Cho tng 3To 3rd Floorm191,054,94520,107,252T tng 4 n 194th to 19th floorm4101,054,945432,105,47211.08Cung cp v lp t lan can thp cao 900mmSupply and install steel balustrade900mm highm3678,1792,251,55411.09Cung cp v lp t lan can thp thang shop cao 1000mm (LS3)Supply and install steel balustrade for shop'stair 100mm high (LS3)m207753,532155,951,01211.10Cung cp, lp t tay vn v lan can cu thang b cao 900mm bao gm cc ng thp m km 25mmx25mm, 5mmx5mm v tay vn bng ng thp m km ng knh D50mm dy 3mm, bao gm tt c cc vt liu cn thit, lin kt v sn, chi tit xem bn v A5-08Staircase handrail and balustrade overall 950mm high, comprising of galvanized steel 25mmx25mm, 5mmx5mm and handrail by steel pipe D50x3mm thk, including all necessary accessories, connections and painting, refer to Drawing A15-08Tng trt To Ground Floorm61,054,9456,076,483Tng LngTo Mezzanine Floorm431,054,94545,415,382Tng 2To 2nd Floorm551,054,94557,916,481Tng 3To 3rd Floorm1021,054,945107,973,621T tng 4 n 19 4th to 19th floorm8631,054,945910,797,31511.11Cung cp, lp t tay vn lin kt vi tng bng ng thp m km D50, bao gm c thanh thp gn tay vn D12, cht lin kt, cc vt liu cn thit, lin kt v sn. Chi tit xem bn v A5-08Staircase handrail connected with wall comprising of galvanized steel D50, 5, including all painted D12 bracket weld and anchor, necessary accessories, connections and painting, refer to Drawing A5-08m56738,46241,390,76711.12Cung cp, lp t tay vn v lan can cho Ram dcHandrail for Rampm471,054,94550,078,23911.13Cung cp v lp t ca g chn xe bng thp ng tit din D45mm di 1800mm bao gm cc vt liu ph cn thit, sn v lin kt. chi tit tham chiu bn v A14-03Supply and install Barrier edge car by steel pipe D45mm, 1800mm Length including all sub materials necessary, paint and anchor connection. refer to drawing A14-03Tng trt To Ground Floorlot114191,97021,884,58011.14Cung cp v lp t thanh m cao su bo v ct b tng khu vc bi xe, tit din L180x180x40mm thk x H1000mm, cch sn 400mm bao gm cc vt liu ph cn thit, chi tit tham chiu bn v A14-05Supply and install L-Shaped Rubber protecting column at car parking area, dimension L180x180x40mmxH1000mm, 400mm above slab, including all sub materials necessary, refer to drawing A14-05Tng trt To Ground Floorbar248985,000244,280,000Tng LngTo Mezzanine Floorbar278985,000273,830,00011.15Np gang mng rnh thot nc rng 250mmCast Iron cover width 250mmTng trt To Ground Floorm1611,361,111219,043,611Tng LngTo Mezzanine Floorm1991,361,111270,507,22211.16Np gang mng rnh thot nc rng 400mm c thp V gc, chi tit theo bn v A14-05Cast Iron cover width 400mm including V bar, detailed as drawing A14-05 Sn thng To lower roof terracem3622,177,778788,355,556TNGSUB TOTAL8,589,977,12412.0CNG TC CA V CA SDOOR AND WINDOW WORKSKHUN V CNH CADOOR FRAME, LEAVESCA GWOODEN DOOR12.01Cung cp v lp t ca g chng chy 45 pht 1 cnh, kch thc W1080mmxH2120m, bao gm khung bao dy 50x100mm, cnh dy 50mm, mt ca Veneer dy 1.2mm, bn trong l khung xng g x l nhi lp chng chy.Ca D1Door D1m21,2693,800,0004,820,832,00012.02Cung cp v lp t ca g chng chy 60 pht m 1 cnh, kch thc W800mmxH2100m, bao gm khung bao dy 50x100mm, cnh dy 50mm, mt ca veneer dy 1.2mm, bn trong l khung xng g thng x l nhi lp chng chyCa D2Door D2m21,8873,000,0005,659,920,00012.03Cung cp v lp t ca g HDF 1 cnh, kch thc W780mmxH2100m, bao gm 2 pano mu trng, khung bao dy 50x100mm, cnh dy 40mm, bn trong l khung xng g thng x l mi mt.Ca D11Door D11m273,000,00019,650,000CA THPSTEEL DOOR12.04Cung cp v lp t ca thp 1 cnh chng chy 60p loi kch thc W800mmxH2100mm khung bao 45x100mm cnh dy 40mm sn tnh in trng dy thp l 1.2mm. v tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install 60 minutes fire-resitance steel single leaf door overall size W800mmxH2100mm comprise of door frame 45x100 mm, door 40mm, powder coated, white color, the thickness of steel 1.2mm and all submaterials, refer to drawing no. A9-01Ca D12Door D12m22422,400,000580,608,00012.05Cung cp v lp t ca thp 2 cnh W1600xH2100mm , khung sn tnh in mu trng 50x100mm, knh cng lc 10mmv tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install double leave door overall size W1600mmxH2100mm , frame 50x100mm, powder coated, white color glass 10mm and all submaterials, refer to drawing no. A9-01Ca D9Door D9m2342,400,00080,640,00012.06Cung cp v lp t ca thp 1 cnh chng chy 45p kch thc W600xH2100mm, khung bao dy 45x100mm, cnh dy 40mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install 60 minutes install fire-resitance steel double leave door overall size W600mmxH2100mm comprise of frame 45x100mm, door 40mm, powder coated, white color, thichness of steel 1.2mmand all submaterials, refer to drawing no. A9-01Ca D6Door D6m22122,400,000508,032,00012.07Cung cp v lp t ca thp 2 cnh chng chy 60p kch thc W1200xH1200mm, khung bao dy 45x100mm, cnh dy 40mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install 60 minutes install fire-resitance steel double leave door overall size W1200mmxH1200mm comprise of frame 45x100mm, door 40mm, powder coated, white color, thichness of steel 1.2mmand all submaterials, refer to drawing no. A9-01Ca D7Door D7m22092,400,000501,984,00012.08Cung cp v lp t ca thp 2 cnh chng chy 60p kch thc W1800xH2100mm, khung bao dy 50x100mm, cnh dy 46mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install 60 minutes install fire-resitance steel double leave door overall size W1200mmxH1200mm comprise of frame 50x100mm, door 46mm thk, powder coated, white color, thichness of steel 1.2mmand all submaterials, refer to drawing no. A9-01Ca D8Door D8m252,400,00013,104,00012.09Cung cp v lp t ca thp 1 cnh chng chy 60p kch thc W1000mmxH2100mm bao gm khung bao dy 50x100mm, cnh dy 46mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-2Supply and install 60 minutes install fire-resitance steel single leaf door overall size W1000mmxH2100mm comprise of frame 50x100mm, door 46mm, powder coated, white color, thickness of steel 1.2mm and all submaterials, refer to drawing no. A9-02Ca DFDoor DFm27122,400,0001,708,560,00012.10Cung cp v lp t ca thp 1 cnh kch thc W1000mmxH2100mm sn tnh in mu xm. v tt c cc vt liu ph, chi tit tham chiu bn v s A9-01Supply and install 6 steel single leaf door overall size W1000mmxH2100mm powder coated, gray color, tefer to drawing no. A9-01Ca D14Door D14m2252,400,00060,480,000LAM NHMALUMINUM LOUVER12.11Cung cp v lp t louver nhm c nh h 76, kch thc W2000xH1500 sn tnh in mu xm, bao gm ph kin v vt t ph, chi tit theo bn v A9-03W4 ca thng gi tng miW4 at roof floorm2121,886,00022,632,00012.12Cung cp v lp t louver nhm c nh h 76, kch thc W3380xH2600 sn tnh in mu xm, bao gm ph kin v vt t ph, chi tit theo bn v A9-03W6 phng my pht inW6 at generator roomm291,886,00016,577,94012.13Cung cp v lp t louver nhm c nh h 76, kch thc W4000xH2600 sn tnh in mu xm, bao gm ph kin v vt t ph, chi tit theo bn v A9-03W7 phng my pht inW7 at generator roomm2211,886,00039,228,80012.14Cung cp v lp t louver nhm c nh h 76, kch thc W1600xH2600 sn tnh in mu xm, bao gm ph kin v vt t ph, chi tit theo bn v A9-03W8 phng trm bin pW8 at tranformer roomm241,886,0007,845,76012.15Cung cp v lp t louver nhm c nh h 76, kch thc W2100xH2750 sn tnh in mu xm, bao gm ph kin v vt t ph, chi tit theo bn v A9-03W12 phng qutW12 at fan roomm2161,886,00029,817,66012.16Cung cp v lp t louver nhm c nh h 76, kch thc W2100xH2750 sn tnh in mu xm, bao gm ph kin v vt t ph, chi tit theo bn v A9-03W13 phng qutW13 at fan roomm261,886,00010,901,08012.17Cung cp v lp t louver nhm c nh h 76, kch thc W650xH2750 sn tnh in mu xm, bao gm ph kin v vt t ph, chi tit theo bn v A9-03W14 phng qutW14 at fan roomm221,886,0003,375,94012.18Cung cp v lp t h lam nhm 40x80 cho tng chia hnh lang 2 cn h, chi tit theo bn v A14-04m2151,886,00027,460,16012.19Cung cp v lp t lam nhm kch thc W1050xH2400mm, bao gm vt t ph v ph kin, chi tit theo bn v A9-06Lam LV2Louver LV2m21761,886,000332,690,40012.20Cung cp v lp t lam nhm kch thc W2000xH2400mm, bao gm vt t ph v ph kin, chi tit theo bn v A9-06Lam LV3Louver LV3m26531,886,0001,231,180,80012.21Cung cp v lp t lam nhm kch thc W1000xH2400mm, bao gm vt t ph v ph kin, chi tit theo bn v A9-06Lam LV4Louver LV4m23311,886,000624,643,20012.22Cung cp v lp t lam nhm kch thc W950xH2500mm, bao gm vt t ph v ph kin, chi tit theo bn v A9-06Lam LV5Louver LV5m251,886,0008,958,50012.23Cung cp v lp t lam nhm kch thc W1000xH2400mm, bao gm vt t ph v ph kin, chi tit theo bn v A9-06Lam LV6Louver LV6m21,0751,886,0002,027,827,20012.24Cung cp v lp t lam nhm kch thc W1100xH2400mm, bao gm vt t ph v ph kin, chi tit theo bn v A9-06Lam LV7Louver LV7m21851,886,000348,532,80012.25Cung cp v lp t lam nhm kch thc W1275xH2400mm, bao gm vt t ph v ph kin, chi tit theo bn v A9-06Lam LV8Louver LV8m22081,886,000392,438,88012.26Cung cp v lp t lam nhm kch thc W850xH2400mm, bao gm vt t ph v ph kin, chi tit theo bn v A9-06Lam LV10Louver LV10m241,886,0007,694,88012.27Cung cp v lp t lam nhm kch thc W1000xH2400mm, bao gm vt t ph v ph kin, chi tit theo bn v A9-06Lam LV11Louver LV11m23501,886,000660,100,00012.28Cung cp v lp t lam nhm kch thc W1700xH750mm, bao gm vt t ph v ph kin, chi tit theo bn v A9-06Lam LV13Louver LV13m231,886,0004,809,30012.29Cung cp v lp t lam nhm kch thc W6700xH1600mm, bao gm vt t ph v ph kin, chi tit theo bn v A9-06Lam LXLouver LXLV01-8070x1670m2131,886,00025,423,280LV02-7960x1670m2531,886,000100,278,620LV03-4910x1670m2331,886,00061,860,800LV04-7260x1670m2241,886,00045,735,500LV05-5630x1670m291,886,00017,728,400LV06-5000x1670m281,886,00015,748,100LV07-6260x1670m2101,886,00019,708,700LV08-6060x1670m2101,886,00019,086,320LV09-7060x1670m2121,886,00022,235,940LV10-5160x1670m291,886,00016,257,320LV11-3060x1670m2151,886,00028,912,380LV12-6360x1670m2111,886,00020,029,320LV13-4160x1670m271,886,00013,107,700LV15-610x1670m211,886,0001,923,720LV16-7080x1670m2121,886,00022,292,520LV17-5000x1670m281,886,00015,748,100LV18-3510x1670m2121,886,00022,103,920LV19-8070x1670m2131,886,00025,423,280LV20-3510x1600m261,886,00010,599,320LV21-6360x1600m2311,886,00057,579,580LV22-3060x1600m2151,886,00027,705,340LV23-6660x1600m2431,886,00080,381,320LV24-9310x1600m2601,886,000112,367,880LV25-7960x1600m2511,886,00096,072,840LV26-4910x1600m2311,886,00059,258,120LV27-7260x1600m2231,886,00043,811,780LV28-6810x1600m2221,886,00041,095,940LV29-6260x1600m2101,886,00018,897,720LV30-6060x1600m2391,886,00073,139,080LV31-5885x1600m2381,886,00071,026,760LV32-6280x1600m2101,886,00018,954,300LV33-6380x1600m2101,886,00019,256,060LV35-5685x1600m291,886,00017,162,600CA ALUMINUMALUMINUM DOOR12.30Cung cp v lp t ca g nhm knh 1 cnh, kch thc W900mmxH2100m, bao gm knh cng lc ly sng dy 10mm, khung bao dy 50x100mm, cnh dy 40mm, bn trong l khung xng g thng x l mi mt.Ca D10Door D10m2173,000,00051,030,00012.31Cung cp v lp t ca la 3 cnh h 80, kch thc W2500xH2450mm, khung nhm sn tnh in mu trng, knh cng lc 10mm mu xanh bin nht, bm silicon chng ngp t ban cng.Ca D3Door D3m24,1283,653,48915,082,552,49912.32Cung cp v lp t ca i 1 cnh m khung nhm tnh in mu xm, kch thc W900xH2100, knh cng lc dy 10mm, mu xanh bin nht, bm silicon chng ngp t ban cngCa D4Door D4m21,0473,653,4893,825,422,19212.33Cung cp v lp t ca la 3 cnh h 80, kch thc W2100xH2450mm, khung nhm sn tnh in mu trng, knh cng lc 10mm mu xanh bin nht, bm silicon chng ngp t ban cng.Ca D5Door D5m27093,653,4892,589,410,32912.34Cung cp v lp t ca la 4 cnh h 80, kch thc W2500xH2400mm, khung nhm sn tnh in mu trng, knh cng lc 10mm mu xanh bin nht, bm silicon chng ngp t ban cng.Ca D15Door D15m21503,653,489548,023,35012.35Cung cp v lp t ca i 2 cnh m, louver nhm h 80, kch thc W1500xH2100mm, sn tnh in mu xm.Ca D16Door D16m2223,010,56666,382,98012.36Cung cp v lp t ca i 2 cnh m, louver nhm h 80, kch thc W1200xH2100mm, sn tnh in mu xm.Ca D17Door D17m283,010,56622,759,87912.37Cung cp v lp t ca i 1 cnh m, louver nhm h 80, kch thc W1000xH2100mm, sn tnh in mu xm.Ca D18Door D18m243,010,56612,644,37712.38Cung cp v lp t ca i 2 cnh m, louver nhm h 80, kch thc W1800xH2100mm, sn tnh in mu xm.Ca D19Door D19m243,010,56611,379,93912.39Cung cp v lp t ca cun kch thc 5900x2400, 4140x2400mm, bao gm vt t ph, chi tit theo bn v A9-05Supply and instal rolling door size 5900x2400, 4140x2400mm, including submaterial, detailed as drawing A9-05CC2m21982,980,000589,896,96012.40Cung cp v lp t ca cun kch thc 2760x2400, 7660x2400mm, bao gm vt t ph, chi tit theo bn v A9-05Supply and instal rolling door size 2760x2400, 7660x2400mm, including submaterial, detailed as drawing A9-05CC3m22002,980,000596,190,72012.41Cung cp v lp t ca cun kch thc 6600x2400, 7100x2400mm, bao gm vt t ph, chi tit theo bn v A9-05Supply and instal rolling door size 6600x2400, 7100x2400mm, including submaterial, detailed as drawing A9-05CC4m22632,980,000783,859,20012.42Cung cp v lp t ca cun kch thc 7680x2400, 3150x2400mm, bao gm vt t ph, chi tit theo bn v A9-05Supply and instal rolling door size 7680x2400, 3150x2400mm, including submaterial, detailed as drawing A9-05CC5m22082,980,000619,649,28012.43Cung cp v lp t ca cun kch thc 4260x2400, 5540x2400mm, bao gm vt t ph, chi tit theo bn v A9-05Supply and instal rolling door size 4260x2400, 5540x2400mm, including submaterial, detailed as drawing A9-05CC6m21882,980,000560,716,80012.44Cung cp v lp t ca cun kch thc 5000x2400, 5720x2400mm, bao gm vt t ph, chi tit theo bn v A9-05Supply and instal rolling door size 5000x2400, 5720x2400mm, including submaterial, detailed as drawing A9-05CC7m21032,980,000306,677,76012.45Cung cp v lp t ca cun kch thc 5580x2500, 12430x2500mm, bao gm vt t ph, chi tit theo bn v A9-05Supply and instal rolling door size 5580x2500, 12430x2500mm, including submaterial, detailed as drawing A9-05CC8m22702,980,000805,047,00012.46Cung cp v lp t ca cun kch thc 3080x2400, 3780x2400mm, bao gm vt t ph, chi tit theo bn v A9-05Supply and instal rolling door size 3080x2400, 3780x2400mm, including submaterial, detailed as drawing A9-05CC9m21322,980,000392,501,76012.47Cung cp v lp t ca cun kch thc 3560x2550mm, bao gm vt t ph, chi tit theo bn v A9-05Supply and instal rolling door size 3560x2550mm, including submaterial, detailed as drawing A9-05CC10m292,980,00027,052,440VCH KNHCURTAIN WALL12.48Cung cp v lp t vch knh kch thc W4850xH8420mm, bao gm khung nhm sn tnh in, knh cng lc 12mm, vt t ph v ph kin, chi tit theo bn v A9-06Lam LV1Louver LV1m2743,200,000236,192,00012.49Cung cp v lp t vch knh, bao gm khung nhm sn tnh in, knh cng lc 12mm, ca D13 quay 180 d bn l sn, ph kin v vt t ph chi tit theo bn v A9-04Supply and install curtain wall, D13 door opening, including submaterial and accessories, detailes as drawing no. A9-04Vch VK1VK1 curtain Wallm23263,200,0001,042,656,000Vch VK2VK2 curtain Wallm2933,200,000299,104,000Vch VK3VK3 curtain Wallm2973,200,000311,008,000Vch VK4VK4 curtain Wallm21273,200,000407,616,000Vch VK5VK5 curtain Wallm21013,200,000322,144,000Vch VK6VK6 curtain Wallm2903,200,000288,672,000Vch VK7VK7 curtain Wallm2503,200,000159,232,000Vch VK8VK8 curtain Wallm21393,200,000445,472,000Vch VK9VK9 curtain Wallm2693,200,000221,152,00012.50Cung cp v lp t vch knh, bao gm khung nhm sn tnh in, knh cng lc 12mm, ca D13 quay 180 d bn l sn, ph kin v vt t ph chi tit theo bn v A9-05Supply and install curtain wall, D13 door opening, including submaterial and accessories, detailes as drawing no. A9-05Vch VK11VK11 curtain Wallm2403,200,000127,808,000Vch VK12VK12 curtain Wallm2323,200,000101,920,000Vch VK13VK13 curtain Wallm2403,200,000128,096,000Vch VK14VK14 curtain Wallm2273,200,00087,392,00012.51Cung cp v lp t vch knh, bao gm khung nhm sn tnh in, knh cng lc 12mm, ph kin v vt t ph chi tit theo bn v A9-05Supply and install curtain wall, including submaterial and accessories, detailes as drawing no. A9-05Vch VK10VK10 curtain Wallm2123,200,00039,776,000Vch VK15VK15 curtain Wallm2983,200,000314,944,00012.52Vch knh cho hnh lang cn h (tng 2)Curtain wall at corridor area (2nd floor)m2142,700,00039,042,000CA SWINDOW12.53Cung cp v lp t ca s khung nhm sn tnh in mu trng, W2200xH1450, knh cng lc 10mm mu trng, li chng mui, bao gm vt t ph, chi tit theo bn v A9-03Supply and install aluminum window white paint W2200x1450, termper glass door 10mm, mosquito screen, including submaterial, detail as per A9-03 DWGCa s W1Window W1m22,6292,100,0005,519,976,00012.54Cung cp v lp t ca s bc h 40, khung nhm sn tnh in mu trng, W600xH900, knh trong m 10mm cng lc, li chng mui, bao gm vt t ph, chi tit theo bn v A9-03Supply and install aluminum window white paint, W600xH900, temper glass 10mm, mosquito scree, including submaterial, detail as A9-03 DWGCa s W2Window W2m24772,100,0001,002,456,00012.55Cung cp v lp t ca s bc h 40, khung nhm sn tnh in mu trng, W500xH900, knh trong m 10mm cng lc, li chng mui, bao gm vt t ph, chi tit theo bn v A9-03Supply and install aluminum window white paint, W500xH900, temper glass 10mm, mosquito screen, including submaterial, detail as A9-03 DWGCa s W3Window W3m21.052,100,0002,205,00012.56Cung cp v lp t ca s khung nhm sn tnh in mu trng, W1200xH1280, knh trong cng lc 10mm, bao gm vt t ph, chi tit theo bn v A9-03Supply and install aluminum window white paint, W1200xH1280, temper glass 10mm, I ncluding submaterial detail as A9-03 DWGCa s W5Window W5m262,100,00012,894,00012.57Cung cp v lp t ca s khung nhm sn tnh in mu trng, W600xH1600, knh m cng lc 10mm, bao gm vt t ph, chi tit theo bn v A9-03Supply and install aluminum window white paint, W600xH1600, temper glass 10mm, I ncluding submaterial detail as A9-03 DWGCa s W9Window W9m242,100,0008,064,00012.58Cung cp v lp t ca s khung nhm sn tnh in mu trng, W2400xH1200, knh cng lc trng 12mm, bao gm vt t ph, chi tit theo bn v A9-03Supply and install aluminum window white paint, W2400xH1200, temper glass 12mm, Including submaterial detail as A9-03 DWGCa s W15Window W15m232,100,0006,048,00012.59Cung cp v lp t ca s gc tng basewindow, knh trng cng lc 12mm, bao gm vt t ph, chi tit theo bn v A7-01Supply and install basement window, temper glass 12mm, included submterial, detailed as A7-01m21,4972,100,0003,144,540,000PH KIN CHO CADOORS HARDWARESPH KIN CA GWOODEN DOOR'S HARDWARECung cp v lp t ph kin cho ca g, chi tit theo yu cu ca thit k.Supply and install hardward for wooden door, detail refer to design requirementCa D1Door D1Set5547,500,0004,155,000,000Ca D2Door D2Set1,1236,800,0007,636,400,000Ca D11Door D11Set46,800,00027,200,000PH KIN CA THPSTEEL DOOR HARDWARES12.60Cung cp v lp t ph kin ca thp, chi tit theo yu cu ca thit k.Supply and install hardward for steel door, detail refer to design requirementCa D12Door D12Set88987,25086,878,000Ca D9Door D9Set101,487,25014,872,500Ca D6Door D6Set168520,95087,519,600Ca D7Door D7Set83890,95073,948,850Ca D8Door D8Set21,487,2502,974,500Ca DFDoor DFSet3392,500,000847,500,000Ca D14Door D14Set12987,25011,847,000PH KIN CA ALUMINUMALUMINUM DOOR'S HARDWARE12.61Cung cp v lp t ph kin ca aluminum, chi tit theo yu cu thit kSupply and install hardware for aluminum door, detailed as design requirementCa D10Door D10Set916,673,132150,058,188Ca D3Door D3Set67416,673,13211,237,690,968Ca D4Door D4Set5545,144,8522,850,248,097Ca D5Door D5Set13514,291,2561,929,319,560Ca D15Door D15Set2516,332,864408,321,600Ca D16Door D16Set78,170,39957,192,795Ca D17Door D17Set36,859,80320,579,409Ca D18Door D18Set210,289,70420,579,409Ca D19Door D19Set110,289,70410,289,70412.62Cung cp v lp t ph kin ca cun, chi tit theo yu cu thit kSupply and install hardware for rolling shutter door, detailed as design requirementCa CC2Door CC2Set85,000,00040,000,000Ca CC3Door CC3Set85,000,00040,000,000Ca CC4Door CC4Set85,000,00040,000,000Ca CC5Door CC5Set85,000,00040,000,000Ca CC6Door CC6Set85,000,00040,000,000Ca CC7Door CC7Set45,000,00020,000,000Ca CC8Door CC8Set65,000,00030,000,000Ca CC9Door CC9Set85,000,00040,000,000Ca CC10Door CC10Set15,000,0005,000,000PH KIN CHO CA SWINDOWS HARDWARES12.63Cung cp v lp t ph kin cho ca s, chi tit theo yu cu thit kSupply and install window hardwares, detaled as design requirementCa s W1Window W1set8241,159,545955,465,080Ca s W2Window W2set8841,159,5451,025,037,780Ca s W3Window W3set31,159,5453,478,635Ca s W5Window W5set41,159,5454,638,180Ca s W9Window W9set41,159,5454,638,180Ca s W15Window W15set11,159,5451,159,545Ca s gcBasement Windowsset2041,159,545236,547,180TNGSUB TOTAL94,305,429,08613.0CNG TC NG TRNSUSPENDED CEILINGS WORKSTrn thch caoGypsum ceiliing13.01Cung cp v lp t trn thch cao chng m dy 9mm, khung chm Supply and install anti moist Gypsum board 9mm in concealed galvanized metalCho khu vc v sinh chungTo public toiletm265185,62711,980,337Cho snh vo cn h, snh cu thang v khu hm th tng 1To entrance lobby, lift lobbies and corridor, mail box area at 1st floorm2304185,62756,462,024Cho li i b tng 1To ground floor arcade at 1st floorm2773185,627143,470,751Cho hnh lang chung cc tngTo common corridorm23,939185,627731,207,06313.02Cung cp v lp t trn thch cao khung chm, tm thch cao dy 9mmSupply and install gypsum board 9mm in concealed galvanized metalCho khu vc snh thang myTo Lift lobbym21,475339,078500,115,874TNGSUB TOTAL1,443,236,04814.0CNG TC HON THIN NN V TNGFLOOR & WALL FINISHESCc Lp LtBackgrounds14.01Va xi mng ct t l 1:3 mc #100 vi do c chp thun v hon thin bng bn xoa bng gCement and sand 1:3 grade #100 with an approved plasticiser and with wood float finish.Lng va dy 20mm cho bc thang b 120mm thick floor screeding to step of staircase 1m22,056101,004207,646,711Lng va dy 20mm cho bc thang b 220mm thick floor screeding to step of staircase 2m242101,0044,274,48214.02Qut lp nc xi mng chuyn dng cho c bc thang, chi tit theo bn v A5-08Skimcoat layer to raiser, detailed as drawing A5-08Cho thang b 1To staircase 1m255217,5959,713,804Cho thang b 2To staircase 2m21017,595175,77614.03Va xi mng mc 100 dy 20mm cn sn cn h200mm thick #100 cement mortar to floor of apartmentm235,677101,0043,603,497,61414.04Va xi mng mc 100 dy 20mm cn sn shop tng 1200mm thick #100 cement mortar to floor of shop at ground floorm22,960101,004298,975,38814.05RC layer 80mm thick and 400mm height to wall of parapetm2267303,01280,994,974Hon thin snFloor finishing14.06Cung cp v lp t gch ceramic 300x300mm bao gm va cn nn, vt liu phSupply and install ceramic tile 300x300mm including screeding, submaterials Cho phng qut, phng my pht in, phng my bin th To fan room generator room, transformer roomm2128364,63646,560,371Cho phng khoTo storagem226364,6369,651,915Cho phng qut tng k thutTo fan room at TFm253364,63619,369,464Cho phng my thang myTo lift motor roomm263364,63622,957,483Cho phng qun l ta nhTo building management roomm246364,63616,623,755Cho phng bmTo pump roomm230364,63610,942,726Cho y b cn bngTo floor of balancing tankm227364,6369,939,977Cho phng bo vTo guard housem222364,6368,109,50514.07Cung cp v lp t gch ceramic chng trn 300x300mm bao gm va cn nn, vt liu phSupply and install non slip ceramic tile 300x300mm including screeding, submaterialsCho phng rcTo trash/garbage roomm248364,63617,458,77214.08Cung cp v lp t gch ceramic 300x600mm bao gm va cn nn, vt liu phSupply and install ceramic tile 300x600mm including screeding, submaterialsCho snh vo cn h, snh cu thang v khu hm th tng 1To entrance lobby, lift lobbies and corridor, mail box area at 1st floorm2436458,372200,010,619Cho hanh lang chungTo common corridorm24,040458,3721,851,754,097Snh thang my tng in hnhTo lift lobby for typical floorm21,497458,372686,095,783Khu vc ht thuc tng in hnhTo smoke lobby of typical floorm2303458,372138,946,302Cho phng sinh hot cng ng, gym, cu lc b, phng chi tr emTo community living room, gym, club house, children roomm2482458,372220,784,03814.09Cung cp v lp t gch ceramic chng trn 300x600mm bao gm va cn nn, vt liu phSupply and install nonslip ceramic tile 300x600mm including screeding, submaterialsCho khu vc v sinh chungTo public toiletm265458,37229,583,32814.10Lp cng b mt hardener dy 2mm cho nh xe, ng xe chy2mm hardener layer to parking area, drive waym26,775151,2821,024,883,83414.11Lp cng b mt hardener 5kg/m2, x rnh chng trt cho ram dcHardener layer 5kg/m2 add groving for anti slip for rampsm2109181,28219,839,44914.12Lp cng b mt hardener 50mmMotar screeding with hardener 50mmCho phng E&T, phng M&Em2153453,84569,506,29114.13Cung cp v lp t gch ceramic 400x400x10mm, khe joint 20mm bc 3x3m bm silicone hoc bitume, bao gm keo dn dy 5mm v vt t ph khc.Supply and install 400x400x10 ceramic tile, joint 20mm width each side 3x3m fill by silicone or bitume, including 5mm thk glue bondCho sn thngTo lower roof terracem22,857525,9901,502,774,74114.14Cung cp v lp t gch ceramic 400x400x10mm, bao gm va lt v vt t ph khc.Supply and install 400x400x10 ceramic tile, including submaterialCho miTo upper roofm2397525,990208,965,34514.15Ron sn 10mmx10mmm3,00750,000150,338,500Hon thin tngWall finishing14.16Cung cp v lp t granite kch thc 600x600mm bao gm mc treo v vt liu ph khc Supply and install granite stone polish finish size 600x600mm including hangsing stub and all sub materials Cho snh chnh, snh thang my, khu hm thTo entrance lobby, lift lobby, mail box area m23,1262,219,0406,936,186,47014.17Cung cp v lp t gch ceramic kch thc 300x600x10mm cho ca thang my, bao gm va mc treo v vt liu ph khc, chi tit theo bn v A14-02Supply and install granite stone size 300x600x10mm to lift door opening, including Hanging stud and all sub materials, detailed as drawing A14-02m280458,37236,486,41114.18Cung cp v lp t len chn tng ceramic100mm cao bao gm va v vt t ph khcSupply and install ceramic skirting 100mm height and sub materialsCho phng khoTo storagem40122,4924,884,985Cho phng pht in, my bin pTo generator, transformer roomm5122,492612,461Cho phng qun l ta nhTo building management roomm3122,492334,403Cho phng bmTo pump roomm2122,492273,157Cho sn phi, logia, ban cngTo laundry, logia, balconym2,762122,492338,302,357Cho hnh lang chungTo common corridorm4,056122,492496,783,860Khu vc ht thuc tng To smoke lobby of typical floorm361122,49244,269,870Cho phng qutTo fan roomm61122,4927,521,015Cho phng my thang myTo lift motor roomm49122,4925,962,915Cho phng bo vTo guard housem2122,492229,060Cho tng parapetTo parapet wallm849122,492103,981,09414.19Cung cp v lp t gch ceramic 300x300mm cho tng b cn bng, bao gm vt t phSupply and install ceramic tile 300x300mm to wall of balancing tank including submaterialsm261364,63622,308,43014.20Cung cp v lp t gch ceramic n cao 1.5m cho tng phng rc bao gm vt t phSupply and install ceramic tile to wall of trash room including submaterialsm2433364,636157,825,40014.21Cung cp v lp t gch ceramic 300x600mm cho tng, bao gm vt liu phSupply and install ceramic tile 300x600mm to wall including submaterialsCho khu vc v sinh chungTo public toiletm2215458,37298,513,30914.22Cung cp v lp t tng v trn cch m dy 100mm bao gm: m mt cao su 6mm, khung thp U1200x1200, Rock wool D=100kgm3, vi chng chy, tole soi l 0.5mmCho phng my pht inTo generator roomm287206,25417,931,686TNGSUB TOTAL18,742,781,92915.0CNG TC SN PAINTING WORKS15.01Sn tng 3 lp bao gm lp b, sn lt v sn ph, cc vt liu ph cn thit, tham chiu bn v v tiu chun k thutWall painting 3 layer including skimcoat, primer and coat layer, all submaterials, refer to drawings and technical specification Sn tng, ct, dm trong nhPainting for internal brick wall, column, beamm232,84663,6362,090,189,595Sn tng, ct, dm ngoi nh Painting for external brick wall, column, beam m263,315129,2288,182,071,491Sn cho ca, ca sPainting for door & window openingm26,40863,636407,801,47115.02Sn trn b tng 3 lp bao gm lp b, sn lt v sn ph, cc vt liu ph cn thit, tham chiu bn v v tiu chun k thutPainting for gypsumboard ceiling 3 layer including skimcoat, primer and coat layer, all submaterials, refer to drawings and technical specification Sn trn trong nhPainting for internal ceilingm28,45963,636538,319,044Sn trn ngoi nh nhPainting for external ceiling m23,376129,228436,302,349Sn cho cu thang Painting for staircase m21,90363,636121,081,66215.03Sn nc ni tht cho trn thch cao khung chmInterior emulsion paint for concealed gypsum boardm26,73363,636428,474,81915.04Vch sn phn quang cho ch u xe tReflective painting to Car Parking lot Tng trtGround Floorlot114100,00011,400,00015.05Vch sn phn quang cho ch u xe myReflective painting to Bike Parking lot Tng trtGround Floorlot4880,0003,840,000Tng lngMezzanine Floorlot1,09480,00087,520,00015.06Sn k hiu phn quang ch dn ng giao thngReflective painting for driveway indicated symbol Item150,000,00050,000,00015.07Sn nh phn quang s k hiu tng v tr u xe Reflective Painting for car parking unitCho tFor carlot114100,00011,400,000Cho xe myFor motobkielot1,14280,00091,360,000TNGSUB TOTAL12,459,760,431Tng cng cha bao gm VATTOTAL (I) Excluding VAT328,502,922,986

&"-,Italic"&9&F &A&"-,Italic"&9&P of &N

&"-,Italic"&9&F &A&"-,Italic"&9&P of &N

&"-,Italic"&9&F &A&"-,Italic"&9&P of &N

&"-,"&9&A&"-,"&9&P of &N

4.External WorkPROJECT S10-2 MIX-USE RESIDENCEBILL OF QUANTITIESEXTERNAL WORKSItemDESCRIPTIONUNITQuantityBREAKDOWNUNIT PRICEAMOUNT REMARKMaterial Labor(VND)(VND)Khi lng c tnh ng theo kch thc hnh hc trn bn v, bt c cc phn hao ht, bin php thi cng nou c bao gm trong gi khng bao gm trong khi lng Quantity is caculated in net plan in the drawings, All allowance for watage, construction method... is included in the unit price not including in Q'tyNh thu cn c k bn v thit k & yu cu k thut theo "Tiu chun k thut" trong Hng dn nh thu v Tiu chun thit k nh km m bo tt c hng mc, khi lng cng vic theo yu cu bao gm trong gi thuThe Tenderer should read carefully the design drawings & the Specification as " Specification" in Instruction to Tender & "Design Specification" attachment for ensure All items & Q'ty of Works included in this package1.0VA H, U XE NGOI TRISIDE WALK AND MOTOR PARKING1.01Lp lng nn to dc 2%Screed min 2% slopingm22,935102,006299,366,6291.02Lp ct ti nc m kSand to be watered and dampedm21,2299,97412,254,1411.03Gch b tng lt va h dy 70mm70mm thk concrete paversm22,796257,156719,041,9431.04Lp hon thin harderner 5kg/m2 c x rnh chng trt cho ng xe chy ngoi nhHardener layer 5kg/m2 add groving for external drive waym21,229181,282222,731,530TNGSUB TOTAL1,253,394,2432.0TAM CP & RAMP DC NGOI NHEXTERNAL STEPS & RAMPS2.01Sn xut, lp dng vn khun bao gm c phng n thi cng cn thitProducing and installing formwork includng the construction methodology costsCho Ram dc tng trtTo ramp at ground floorm24201,760833,267Cho Ram dc tng 2To ramp at 2nd floorm241201,7608,221,701Cho bc tam cp ngoi nhTo outsite threestepm255201,76011,193,619Cho thang ngoi nh khu vc tng 2To outsite stairs at 2nd floorm222201,7604,349,9352.02Sn xut, lp dng ct thpProducing and installing reinforcementCho Ram dc tng trtTo ramp at ground floorkg41819,0167,942,503Cho Ram dc tng 2To ramp at 2nd floorkg67219,01612,775,184Cho bc tam cp ngoi nhTo outsite threestepkg1,84819,01635,147,431Cho thang ngoi nh khu vc tng 2To outsite stairs at 2nd floorkg28519,0165,428,0612.03B tng B20 Concrete grade B20Cho Ram dc ngoi nh tng trtTo ramp at ground floorm341,585,0266,783,913Cho Ram dc ngoi nh tng 2To ramp at 2nd floorm361,585,0269,747,913Cho bc tam cp ngoi nhTo outsite threestepm3191,585,02630,020,402Cho thang ngoi nh khu vc tng 2To external stair at 2nd floorm331,585,0264,945,2832.04Cung cp v lp t lan can Inox cho ng dc ngi tn tt Supply and install inox handrail for handicaped peoplem281,054,94529,835,9542.05Lan can thp cho ram dc (bao gm tay vn ng thp m km D50 dy 3mm v 5x5mm, tr ng l ng thp m km 25x25mm)Railing for ramp (including galv steel handrail D50, 3mm thick and galv steel baluster 25x25mm in paint finish)m331,054,94534,950,3282.06Chng thm cho ram dc ngoi triWaterproof for rampsm247211,4439,914,5722.07Lan can thp cho thang ngoi tri (bao gm tay vn ng thp m km D50 dy 3mm v 5x5mm, tr ng l ng thp m km 25x25mm)Railing for outdoor staircases (including galv steel handrail D50, 3mm thick and galv steel baluster 25x25mm in paint finish)m131,054,94513,482,1972.08Cung cp v lp t granite 600x600 cho bc tam cpSupply and install granite stone 600x600 to stepsm22732,219,040605,731,3492.09Cung cp v lp t granite 900x900 cho ng i ni b tng 1Supply and install granite stone 900x900 to ground floor arcadem21632,219,040361,570,378TNGSUB TOTAL1,192,873,9903.0PHNG GAS GAS ROOM3.01Sn xut, lp dng vn khun bao gm c phng n thi cng cn thitProducing and installing formwork includng the construction methodology costsCho sn mi phng gasTo slab of gas roomm221201,7604,158,264Cho dm phng gasTo beam of gas roomm217201,7603,417,806Cho ct phng gasTo column of gas roomm215201,7602,977,9713.02Sn xut, lp dng ct thpProducing and installing reinforcementCho sn mi phng gasTo slab of gas roomkg253.8019,0164,826,140213Cho dm phng gasTo beam of gas roomkg156.9619,0162,984,677274Cho ct phng gasTo column of gas roomkg161.9819,0163,080,1351583.03B tng B20 Concrete grade B20Cho sn mi phng gasTo slab of gas roomm321,585,0262,979,850Cho dm phng gasTo beam of gas roomm311,585,0262,282,438Cho ct phng gasTo column of gas roomm311,585,0261,410,6743.04Xy tng gch c dy 200mm va xi mng mc 75 External brick wall thk.200mm, cement mortar M75 Cho phng gas To gas roomm238707,26826,939,8243.05Lp chng thm cun cao 300mm ln tng xung quanhLayer of water proofing membrane to continued 300mm up each adjacent wall, fill corner to avoid crack.Chng thm cho mi phng GasWaterproofing for gas roomm216211,4433,482,4703.06Va xi mang mc 100 dy 20mm bo v lp chng thm, nh dc v l thu ncCho mi phng gasTo roof of gas roomm217111,1701,834,3063.07Cung cp v lp t ca thp 1 cnh chng chy 60p kch thc W1000mmxH2100mm bao gm khung bao dy 50x100mm, cnh dy 46mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-2Supply and install 60 minutes install fire-resitance steel single leaf door overall size W1000mmxH2100mm comprise of frame 50x100mm, door 46mm, powder coated, white color, thickness of steel 1.2mm and all submaterials, refer to drawing no. A9-02ok da suaCa phng gas, DFEntry door at gas room, DFm222,400,0005,040,0003.08Cung cp v lp t louver nhm c nh h 76, kch thc W680xH1900 sn tnh in mu xm, bao gm ph kin v vt t ph, chi tit theo bn v A9-03ok da suaW11 phng GasW11 at generator roomm221,886,0003,036,460ok da suaLV14 phng GasLV14 at generator roomm291,886,00116,974,0093.09Cung cp v lp t ph kin ca thp 1 cnh chng chy 60p kch thc W1000mmxH2100mm bao gm khung bao dy 50x100mm, cnh dy 46mm sn tnh in mu trng, dy ca thp l 1.2mm, v tt c cc vt liu ph, chi tit tham chiu bn v s A9-2Supply and install accessories for 60 minutes install fire-resitance steel single leaf door overall size W1000mmxH2100mm comprise of frame 50x100mm, door 46mm, powder coated, white color, thickness of steel 1.2mm and all submaterials, refer to drawing no. A9-02Ca phng gas, DFEntry door at gas room, DFset15,570,6505,570,6503.10Cung cp v lp t gch ceramic chng trn 300x300mm bao gm va cn nn, vt liu phSupply and install non slip ceramic tile 300x300mm including screeding, submaterialsCho sn phng gasTo gas roomm212364,6364,346,4613.11Cung cp v lp t len chn tng ceramiccao 100mm cho tng phng gas bao gm va v vt t ph khcSupply and install ceramic skirting 100mm height to wall of gas room and sub materialsm1122,492131,6793.12Va xi mng ct t l 1:3 mc #75 vi do c chp thun Cement and sand 1:3 grade #75 with an approved plasticiser Lp trt 15mm cho 15mm plastering layer toCho tng , ct ni tht phng gasTo interior wall, column of gas roomm23592,1813,203,287Cho dm v trn phng gasTo beam and ceiling of gas roomm21892,1811,626,993Cho tng , ct ngoi tht phng gasTo exterior wall, column of gas roomm25592,1815,031,2343.13Sn tng 3 lp bao gm lp b, sn lt v sn ph, cc vt liu ph cn thit, tham chiu bn v v tiu chun k thutWall painting 3 layer including skimcoat, primer and coat layer, all submaterials, refer to drawings and technical specification Sn tng ngoi tht cho phng gasExternal wall painting for gas roomm255129,2287,053,288Sn tng ni tht cho phng gasInternal wall painting for gas roomm23563,6362,211,3433.14Sn trn 3 lp bao gm lp b, sn lt v sn ph, cc vt liu ph cn thit, tham chiu bn v v tiu chun k thutPainting for concrete ceiling 3 layer including skimcoat, primer and coat layer, all submaterials, refer to drawings and technical specification Cho phng gasTo gas roomm21863,6361,123,171TNGSUB TOTAL115,723,1284.0BN HOA, THNG GIBED FLOWER, AIR VENT4.01Sn xut, lp dng vn khun bao gm c phng n thi cng cn thitProducing and installing formwork includng the construction methodology costsCho bn hoa v hp thng gi tng trtTo bedflower and airvent at ground floorm21,162201,760234,428,433Bn hoa ngoi nh khu vc tng 2To bedflower and airvent at 2nd floorm22,101201,760423,985,5464.02Sn xut, lp dng ct thpProducing and installing reinforcementCho bn hoa v hp thng gi tng trtTo bedflower and airvent at ground floorkg7,74019,016147,172,550Bn hoa ngoi nh khu vc tng 2To bedflower and airvent at 2nd floorkg12,71219,016241,717,7354.03B tng B20 Concrete grade B20Cho bn hoa v hp thng gi tng trtTo bedflower and airvent at ground floorm3701,585,026111,522,463Bn hoa ngoi nh khu vc tng 2To bedflower and airvent at 2nd floorm31161,585,026183,165,6604.04Lp chng thm cun cao 300mm ln tng xung quanhLayer of water proofing membrane to continued 300mm up each adjacent wall, fill corner to avoid crack.Bn hoa ngoi nh khu vc tng trtExternal Bedflower at ground floorm2823211,443174,093,885Bn hoa ngoi nh khu vc tng 2External Bedflower at 2nd floorm21,390211,443293,988,532Cho hp thng giTo airventm250211,44310,576,3904.05Va xi mng ct t l 1:3 mc #75 vi do c chp thun Cement and sand 1:3 grade #75 with an approved plasticiser Lp trt 15mm cho 15mm plastering layer toBn hoa ngoi nh, hp thng gi khu vc tng trtTo external bedflower and arivent at ground floorm21,88592,181173,796,043Bn hoa ngoi nh khu vc tng 2External bedflowers at 2nd floorm23,38992,181312,378,0574.06Lt granite supply and install granite stoneBn hoa ngoi nh khu vc tng trtExternal bedflower at ground floorm21241,553,328192,410,739Bn hoa ngoi nh khu vc tng 2External bedflower at 2nd floorm22421,553,328376,542,2404.07p granite cho Supply and install granite stone toBn hoa ngoi nh khu vc tng trtExternal bedflower at ground floorm26451,553,3281,002,269,359Bn hoa ngoi nh khu vc tng 2External bedflower at 2nd floorm21,2741,553,3281,978,986,4724.08Sn hp thng gi tng trtairvent at ground floorm278129,22810,121,171TNGSUB TOTAL5,867,155,2755.0H BISWIMMING POOL5.01Sn xut, lp dng vn khun bao gm c phng n thi cng cn thitProducing and installing formwork includng the construction methodology costsCho y bTo bottom slab of swimming poolm2325206,21666,931,522Cho tng bTo wall of swimming poolm2564206,216116,361,493Cho ct b biTo column at swimming poolm292206,21618,938,8765.02Sn xut, lp dng ct thpProducing and installing reinforcementCho y bTo bottom slab of swimming poolkg10,28619,437199,923,330130.7394577693Cho tng bTo wall of swimming poolkg6,23119,437121,105,888Cho ct b biTo column at swimming poolkg1,059.2219,43720,588,4485.03B tng B30 c ph gia chng thmConcrete grade B30 with waterproofing additiveCho y bTo bottom slab of swimming poolm3652,115,130137,293,092Cho tng bTo wall of swimming poolm3652,115,130138,117,993Cho ct b biTo column at swimming poolm342,115,1308,925,8495.04Cung cp v lp t np rng 300 cho mng thu nc cho h bi trn tng 2 m91766,52569,753,793MJ5.05Chng thm sika inertol poxitar F ln 4 mt tng chung quanh b, c trm gc b phng rn nt.Layers of water proofing membrane, Sika inertol poxitar F, to con