Microsoft Word - 1502b_PDB_Staff Report_2016_0114.doc2
As proposed, each building’s design is representative of the user’s
prototype; while maintaining overall cohesion with the use of
similar architectural elements, treatments, and materials.
Materials include glass, stucco, various stone veneers and
architectural screens and louvers. Accentuated volumes and other
architectural features highlight building entrances, which are
proposed to face the public right-of-way. The Applicant worked with
Staff to ensure adequate vehicular and pedestrian circulation is
provided. Safe pedestrian access is provided from the public
sidewalk to building entrances and throughout the site. The
landscaping was designed with both beautification and function in
mind and all landscape requirements have been met. The proposed
landscape helps articulate the property and enhance the design of
the buildings. A variety of native plants and trees are proposed to
work in concert with the existing site trees. Ample buffers are
provided where required and enhanced where adjacent to residential
along with a considerable amount of native trees, shrubs, and
ground covers. Due to the size, configuration, dual-frontage
condition, and tenant mix, of the proposed project, signage in
excess of what is permitted by right is necessary. Therefore, the
Applicant is requesting two variances in order to increase the
number of several signs. The Applicant worked with Staff to
minimize the amount and magnitude of Variances necessary by
reducing the number and size of signs; and creating a uniform sign
plan and design which is proportionally appropriate and compatible
with the design of the overall project. As such, Staff recommends
approval. The first Variance is to increase the number of permitted
monument signs from two to three. Two signs were previously
approved in Phases I (main identity sign for the entire parcel) and
II (sign for the service station) of this phased development. The
current request is for the third monument sign which will serve to
identify the proposed Panda Express fronting Hollywood Boulevard;
should each of these buildings be located on individual parcels,
this variance would not be necessary. The second Variance is to
increase the number of permitted wall signs for Panda Express from
one to two. The Zoning and Land Development regulations allow for
one wall sign per street frontage; and the area of such sign is
limited to one square foot per linear foot of building face where
the sign is to be located, with a minimum of 25 square feet
permitted and a maximum of 150 square feet. The Applicant is
proposing to increase the number of allowable signs, in order to
provide signs on each façade (front and side). The side façade
faces internal roads; however, the additional sign is visible from
the right-of-way, triggering the need for a Variance. The total
area for both signs is approximately the allowable area of the main
permitted sign. SITE INFORMATION Owner/Applicant: Palm Beach 2000,
Inc. and Vestmaz, Inc. Address/Location: 101 S. State Road 7 Net
Area of Property: Overall 1,747,214 Sq. Ft. (Phase IV - 23,000 Sq.
Ft) Land Use: Transit Oriented Corridor Zoning: SR7 CCD-CC, C-2,
C-3 Existing Use of Land: Vacant ADJACENT LAND USE North: Transit
Oriented Corridor South: Transit Oriented Corridor East: Low
Residential, Office West: Transit Oriented Corridor
3
Intensity Commercial District, Medium/High Intensity Commercial
District, (RS-6, SR7 CCD- CC, C-3, C-4)
East: Single Family District, Mixed Use Office District (RS-5,
RS-6, OM) West: Commercial Corridor District – Commercial Core
Sub-Area, Medium Intensity Commercial
District, Medium/High Intensity Commercial District, (SR7 CCD-CC,
C-3, C-4) CONSISTENCY WITH THE COMPREHENSIVE PLAN Located within
the Transit Oriented Corridor, the project is surrounded by
commercial, single family, and multi-family residential uses. The
goal of the Land Use Element is to promote a distribution of land
uses that will enhance and improve the residential, business,
resort, and natural communities while allowing land owners to
maximize the use of their property. Redevelopment of this site will
increase the availability of commercial uses and expand the mixture
of uses in the area; serving the adjacent community as well as the
region. Policy 2.2.11: Promote the development of US 441/SR 7 as a
major transit corridor. Policy 3.1.1: Continue to prioritize US
441/SR 7 Corridor for redevelopment opportunities and work with the
Florida Department of Transportation and other applicable agencies
on design of the highway, and create innovative zoning to implement
future plans. Policy 3.1.4: Promote land assembly along the US
441/SR 7 Corridor to create larger development parcels for economic
sustainability to offset the physical and economic loss from
Florida Department of Transportation right-of-way acquisition.
Policy 3.1.5: Provide increased buffering between businesses along
the US 441/SR 7 Corridor and adjacent residential areas.
CONSISTENCY WITH THE CITY-WIDE MASTER PLAN The City-Wide Master
Plan is a compilation of policy priorities and recommendations
designed to improve the appearance, appeal, and economic tax base
of the City. It establishes a format for future direction and
vision for the City. The City-Wide Master Plan recognizes the need
for a mix of uses along the corridors and identifies the US 441/SR
7 Corridor as a Special Emphasis Area of high importance for the
development of the City and its improved image. The proposed
project is consistent with the City-Wide Master Plan based upon the
following: Guiding Principles and Policies:
Promote the highest and best use of land in each sector of the City
without compromising the goals of the surrounding community.
Attract and retain businesses that will increase economic
opportunities for the City while
enhancing the quality of life for residents. Policy CW.21: Create
and expand where appropriate commercial and industrial zones to
increase tax dollars.
4
Policy CW.44: Foster economic development through creative land
use, zoning and development regulations, City services and City
policies. Policy CW.46: Place emphasis on redevelopment along the
major highway corridors; SR 7, US 1, Dixie Highway, Hollywood
Boulevard and A-1-A by limiting expansion of residential areas, and
deepening industrial and commercial zones to increase tax revenues.
APPLICABLE CRITERIA Analysis of Criteria and Findings for Sign
Variances as stated in the City of Hollywood’s Zoning and Land
Development Regulations Article 5. Variance 1: To increase the
number of permitted monument signs from two to three. CRITERIA 1:
The variance is not contrary to the public interest. ANALYSIS: The
Variance request is to increase the number of permitted monument
signs
from two to three. Two signs were previously approved in Phases I
and II of this phased development. The current request is for the
third monument sign which will serve to identify the proposed Panda
Express fronting Hollywood Boulevard. Should each of these
buildings be located on individual parcels, this variance would not
be necessary. Therefore, granting the Variance request should not
affect the public interest in any way.
FINDING: Consistent. CRITERIA 2: The variance is required due to
special conditions. ANALYSIS: Due to the size, configuration,
dual-frontage condition, and tenant mix, of the
proposed project, signage in excess of what is permitted by right
is necessary. The Applicant worked with Staff to minimize the
amount and magnitude of Variances necessary by reducing the number
and size of signs; and creating a uniform sign plan and design
which is proportionally appropriate and compatible with the design
of the overall project.
FINDING: Consistent. CRITERIA 3: A literal enforcement of the
provisions of Article 8 may result in unnecessary
hardship. ANALYSIS: The Zoning and Land Development Regulations
limits the number of monument
signs to one frontage. However, given the extensive length of the
frontage and the amount of buildings adjacent to it, additional
signage is necessary. Should each of these buildings be located on
smaller individual parcels, this variance would not be
necessary.
FINDING: Consistent. Variance 2: To increase the number of
permitted wall signs for Panda Express from
one to two. CRITERIA 1: The variance is not contrary to the public
interest. ANALYSIS: Increasing the number of allowable signs, in
order to provide signs on each
façade (front and side), is not contrary to the public interest. As
the area of the signage is significantly reduced by the placement
of the buildings, as a result of
5
the size and configuration of the site, the Applicant feels that
the public is better served by two smaller signs, than by one
larger one. The goal of the second sign is to provide signage for
the public heading in both directions (east and west).
FINDING: Consistent. CRITERIA 2: The variance is required due to
special conditions. ANALYSIS: The Applicant is proposing to
increase the number of allowable signs, in order to
provide signs on each façade (front and side). The side façade
faces internal roads; however, the additional sign is visible from
the right-of-way, triggering the need for a Variance. The total
area for both signs is approximately the allowable area of the main
permitted sign.
FINDING: Consistent. CRITERIA 3: A literal enforcement of the
provisions of Article 8 may result in unnecessary
hardship. ANALYSIS: The Zoning and Land Development regulations
allow for one wall sign per street
frontage; and the area of such sign is limited to one square foot
per linear foot of building face where the sign is to be located,
with a minimum of 25 square feet permitted and a maximum of 150
square feet. Had the location of each of these buildings been on
smaller individual parcels, this variance would not be
necessary.
FINDING: Consistent. Analysis of Criteria and Findings for Design
as stated in the City of Hollywood’s Zoning and Land Development
Regulations, Article 5. CRITERIA 1: Architectural and Design
components. Architecture refers to the architectural
elements of exterior building surfaces. Architectural details
should be commensurate with the building mass. The use of
traditional materials for new architectural details is recommended.
Design of the building(s) shall consider aesthetics and
functionality, including the relationship of the pedestrian with
the built environment.
ANALYSIS: The architectural details for the proposed buildings fit
harmoniously with the
building’s mass. As proposed, each building’s design is
representative of the user’s prototype; while maintaining overall
cohesion with the use of similar architectural elements,
treatments, and materials. Materials include glass, stucco, various
stone veneers and architectural screens and louvers. Accentuated
volumes and other architectural features highlight building
entrances, which are proposed to face the public right-of-way, as
recommended by the Design Guidelines. The Applicant worked with
Staff to ensure adequate vehicular and pedestrian circulation is
provided. Safe pedestrian access is provided from the public
sidewalk to building entrances and throughout the site.
FINDING: Consistent. CRITERIA 2: Compatibility. The relationship
between existing architectural styles and
proposed construction, including how each building along the street
relates to the whole and the pattern created with adjacent
structures and the surrounding neighborhood. Buildings should
contain architectural details that are characteristic of the
surrounding neighborhood.
6
ANALYSIS: Since Hollywood Boulevard and State Road 7 are commercial
corridors, the
proposed development is consistent with the surrounding buildings
in scale, massing, and placement. Therefore, it maintains a uniform
alignment with the existing street profile; as well as with other
buildings proposed in the shopping center. Architectural detailing
is provided in harmony with the surrounding built environment using
an array of materials to provide an identity for the buildings
while creating a cohesive fabric.
FINDING: Consistent. CRITERIA 3: Scale/Massing. Buildings shall be
proportionate in scale, with a height which is
consistent with the surrounding structures. Building mass shall
reflect a simple composition of basic architectural details in
relation to its length, width, height, lot coverage, and setting of
the structure in context with adjacent buildings. Architectural
details include, but are not limited to, banding molding, and
fenestration.
ANALYSIS: The proposed project was designed contextually and it’s
massing, scale, rhythm,
and architectural elements, are compatible with the adjacent
commercial corridors. The proposed one-story buildings range from
22 to 26 feet in height. Meeting all setback requirements, the
building placement also creates a consistent pattern.
As recommended by the City Design Guidelines, while the proposed
buildings distinguish themselves from neighboring buildings in
terms of architectural elements, the scale, rhythm, height, and
setbacks bear some relationship to neighboring buildings and
maintain some resemblance of compatibility. Materials include
glass, stucco, various stone veneers and architectural screens and
louvers. Accentuated volumes and other architectural features
highlight building entrances, which are proposed to face the public
right-of-way, as recommended by the Design Guidelines.
FINDING: Consistent. CRITERIA 4: Landscaping. Landscaped areas
should contain a variety of native and other
compatible plant types and forms, and be carefully integrated with
existing buildings and paved areas. Existing mature trees and other
significant plants on the site should be preserved.
ANALYSIS: The landscaping was designed with both beautification and
function in mind and
all landscape requirements have been met. The proposed landscape
helps articulate the property and enhance the design of the
buildings. A variety of native plants and trees are proposed to
work in concert with the existing site trees. Ample buffers are
provided where required and enhanced where adjacent to residential
along with a considerable amount of native trees, shrubs, and
ground covers. Vehicular use areas are landscaped along the
perimeter and with internal islands, improving the image of the
site.
FINDING: Consistent. SITE PLAN The Technical Advisory Committee
(TAC) found the proposed Site Plan compliant with all regulations
as set forth in Article 6 of Zoning and Land Development
Regulations on December 9, 2015. Therefore, Staff recommends
approval, if the Variances and Design are granted.
7
RECOMMENDATION Variances: Approval. Design: Approval, if Variances
are granted. Site Plan: Approval, if Variances and Design are
granted. ATTACHMENTS Attachment A: Application Package Attachment
B: Land Use and Zoning Maps
APPLICATION TYPE (CHECK ONE):
Date of Application:__________________
Existing Property Use: _______________________ Sq Ft/Number of
Units: _________________
Is the request the result of a violation notice? ( ) Yes ( ) No If
yes, attach a copy of violation.
Has this property been presented to the City before? If yes, check
al that apply and provide File
Number(s) and
Resolution(s):______________________________________________________
City Commission Planning and Development
Explanation of Request:
_________________________________________________________
Value of Improvement: _________________ Estimated Date of
Completion: ________________
Will Project be Phased? ( ) Yes ( )No If Phased, Estimated
Completion of Each Phase
____________________________________________________________________________
____________________________________________________________________________
Name of Current Property Owner:
________________________________________________
Address of Property Owner:
_______________________________________________________
Telephone: ________________ Fax: _______________ Email
Address:____________________
Address: ________________________________________Telephone:
____________________
Fax: __________________ Email Address:
__________________________________________
Date of Purchase: ______________ Is there an option to purchase the
Property? Yes ( ) No ( )
If Yes, Attach Copy of the Contract.
List Anyone Else Who Should Receive Notice of the Hearing:
___________________________
_________________________________
Address:___________________________________
_____________________________________ Email Address:
_________________________
This application must be completed in full and
submitted with all documents to be placed on a Board or
Committee’s agenda.
checklist for each type of application.
Applicant(s) or their authorized legal agent must be
present at all Board or Committee meetings.
At least one set of the submitted plans for each
application must be signed and sealed (i.e. Architect or
Engineer).
Documents and forms can be accessed on the City’s website
at http://www.hollywoodfl.org/
DocumentCenter/Home/ View/21
GENERAL APPLICATION
File No. (internal use only):________________________
DEPARTMENT OF PLANNING
nick.miller
Typewriter
nick.miller
Typewriter
954-927-4885
nick.miller
Typewriter
[email protected]
nick.miller
Typewriter
nick.miller
Typewriter
772-794-4100
nick.miller
Typewriter
[email protected]
nick.miller
Typewriter
X
nick.miller
Typewriter
15-DPV-02
nick.miller
Typewriter
nick.miller
Typewriter
Requesting site plan approval for Phase IV which includes 22,320 sf
of
nick.miller
Typewriter
retail a.k.a. Local shops and Panda Express
kimley-horn.com 445 24th Street, Suite 200, Vero Beach, FL 32960
772 794 4100
The Place at Hollywood Phase IV
Legal Description
· Parcel “A”, of “Hollywood Plaza”, according to the plat thereof,
as recorded in plat book 181, page 12, of the public records of
Broward County, Florida
Project Information
Project Description · The proposed Place at Hollywood Phase IV is
comprised of two outparcels totaling 2.66
acres consisting of a 2,600 square foot fast food restaurant and
19,720 square feet of retail shops. Improvements include parking
lots, landscaping, stormwater system and utilities.
Location · Section 13, Township 51 S, Range 41 E
Address · 5810-5860 Hollywood Blvd. Hollywood, FL 33023
Zoning · SR7 CCD-CC: Commercial Corridor District- Commercial Core
Sub-area · C-2: Low/Medium Intensity Commercial District · C-3:
Medium Intensity Commercial District
Land Use · 71: Transit Oriented Corridor
kimley-horn.com 445 24th Street, Suite 200, Vero Beach, FL 32960
772 794 4100
The Place at Hollywood Phase IV
Existing Conditions Photo #1 (Looking Northeast)
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Callout
Page 2
kimley-horn.com 445 24th Street, Suite 200, Vero Beach, FL 32960
772 794 4100
The Place at Hollywood Phase IV
Existing Conditions Photo #2 (Looking Southwest)
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Callout
Page 3
kimley-horn.com 445 24th Street, Suite 200, Vero Beach, FL 32960
772 794 4100
The Place at Hollywood Phase IV
Existing Conditions Photo #3 (Looking Southeast)
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Line
nick.miller
Callout
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
VERO BEACH, FL 32960-5169
VERO BEACH FL 32960
JACKSONVILLE, FL 32256-8634
LAKE WORTH, FL 33461
PROJECT DESIGN TEAM
UTILITY/ GOVERNING
AGENCIES CONTACTS
PROTECTION AS SHOWN ON THE PLANS PER THE GAS COMPANY
REQUIREMENTS
COMPANY
TELEPHONE AT&T
ARE COMPLETED PRIOR TO ASPHALT OR CURB PLACEMENT
PULL ROPES, INCLUDING ALL TRENCHING AND BACKFILLING, FROM
THE RISER POLE UP TO THE BUILDING
COMPANY REQUIREMENTS
POINT OF CONNECTION UP TO THE BUILDING
DONE BY AT&T.
ELECTRIC FLORIDA POWER & LIGHT
4000 DAVIE ROAD EXTENSION
ARE COMPLETED PRIOR TO ASPHALT OR CURB PLACEMENT
TRENCHING AND BACKFILLING, FOR THE UNDERGROUND PORTIONS
OF THE PRIMARY FROM THE RISER POLE UP TO THE TRANSFORMER.
SCHEDULE 80 PVC CONDUITS SHALL BE USED ON THE RISER POLE
AND RIGID METAL, LONG RADIUS, ELBOWS SHALL BE USED WHERE
THE UNDERGROUND PORTION MEETS THE RISER POLE AND
TRANSFORMER
ESTABLISH PRIMARY UNDERGROUND SERVICE
INSTALL PRIMARY CABLE FOR ALL
UNDERGROUND LINES UP TO THE
TRANSFORMER AND EQUIPMENT
OF RECORD AND CITY OF HOLLYWOOD DEPARTMENT OF PUBLIC
WORKS. SEE UTILITY PLAN FOR REQUIREMENTS.
WATER CITY OF HOLLYWOOD
DEPARTMENT OF PUBLIC WORKS
AND SEPCIFICATIONS
MAY BE INSTALLED BY THE PLUMBING CONTRACTOR
OF RECORD AND CITY OF HOLLYWOOD DEPARTMENT OF PUBLIC
WORKS. SEE UTILITY PLAN FOR REQUIREMENTS.
CONNECTION AT THE EXISTING LINE UP TO
AND INCLUDING SETTING OF METER AT THE
PROPERTY LINE WILL BE BY THE WATER
COMPANY
WORKS.
STORM
WATER
SPECIFICATION
PLANTATION, FL 33322
PHONE: (954) 476-6125
ARCHITECT
2830 WEST STATE ROAD 84, SUITE 117
FORT LAUDERDALE, FL 33312
DANIA, FL 33004
PHONE: (954) 927-4885
C-300 OVERALL SITE PLAN
C-301 OVERALL PARKING PLAN
C-402 SECTIONS - LOCAL RETAIL
L-100 LANDSCAPE PLAN - LOCAL RETAIL
L-101 LANDSCAPE SPECIFICATIONS & DETAILS
ARCH. DESIGN PLAN INDEX
SHEET NUMBER SHEET TITLE
PANDA EXPRESS (PREPARED BY GRIMAIL CRAWFORD, INC., RANDY REYNOLDS,
ATLAS
SIGN INDUSTRIES
LP01 LANDSCAPE PLAN
L01.1 LANDSCAPE DETAILS
A-001 EXTERIOR ELEVATIONS
A-002 EXTERIOR ELEVATIONS
A-003 EXTERIOR ELEVATIONS
A-004 FLOOR PLAN
A1.0 FLOOR PLAN
FILE: DACAR MANAGEMENT, LLC
HOLLYWOOD, BROWARD COUNTY, FLORIDA
SOUTH STATE ROAD 7
3"
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
SITE DATA
LEGAL DESCRIPTION: PARCELS 'A', 'B' AND 'C', 'HOLLYWOOD PLAZA'
ACCORDING TO THE
PLAT THEREFORE, AS RECORDED IN PLAT BOOK 181, PAGE 12, OF
THE PUBLIC RECORDS OF BROWARD COUNTY, FLORIDA.
LOCATION: SECTION 13, TOWNSHIP 51 S, RANGE 41 E
ADDRESS: 101 S. STATE ROAD 7, HOLLYWOOD, FL 33023
ZONING: SR7 CCD-CC: COMMERCIAL CORRIDOR DISTRICT -
COMMERCIAL CORE SUB-AREA
LAND USE: 71: TRANSIT ORIENTED CORRIDOR
NET AREA: 1,747,214 SF OR 40.11 AC
NOTES:
THE MAXIMUM FOOT-CANDLE LEVEL AT PROPERTY LINES (MAXIMUM 0.5
ADJACENT TO RESIDENTIAL.
SITE DATA
ZONING: SR7 CCD-CC: COMMERCIAL CORRIDOR DISTRICT -
COMMERCIAL CORE SUB-AREA
LAND USE: 71: TRANSIT ORIENTED CORRIDOR
SITE AREA: TOTAL 1,747,214 SF 40.11 AC
PARCEL A 391,179 SF 8.98 AC
PARCEL B 966,489 SF 22.19 AC
PARCEL C 364,627 SF 8.37 AC
PROPOSED ROW 24,919 SF 0.57 AC
EXISTING MALL PREVIOUSLY
PARCEL B
LOCAL SHOPS 5,600 SF
TACO BELL 2,556 SF
POLLO TROPICAL 3,505 SF
PARCEL C
LOT COVERAGE: (SEE PERVIOUS PLAN FOR DETAILS)
PARCEL A (391,179 SF)
BUILDING AREA: 5,928 SF/ 0.14 AC 28,248 SF/0.65 AC 7.22%
FUTURE DEVELOPMENT AREA: 73,314 SF/ 1.68 AC 0 SF/0.00 AC
0.00%
IMPERVIOUS AREA: 230,716 SF/ 5.30 AC 278,054 SF/6.38 AC
71.08%
PERVIOUS AREA : 81,221 SF/ 1.86 AC 84,877 SF/ 1.95 AC 21.70%
*RACETRAC DEVELOPMENT SPPREOVED SEPERATLY AND SHOWN FOR
INFORMATION
PURPOSED ONLY*
FUTURE DEVELOPMENT AREA: 24,327 SF/ 0.56 AC N/A
IMPERVIOUS AREA: 571,799 SF/ 13.21 AC N/A
PERVIOUS AREA : 172,387 SF/ 3.96 AC N/A
PARCEL C (364,627 SF)
BUILDING SETBACKS: PREVIOUSLY
APPROVED PHASE IV
PARCEL A
PARCEL B
PARCEL C
VARIANCE BOX
PREVIOUSLY APPROVED
PARCEL "A" 1 MONUMENT SIGN 1 MONUMENT SIGN
64 SF PER SIDE 349.9 SF PER SIDE VARIANCE FOR SIZE AND HEIGHT
MAX HEIGHT 16' HEIGHT 20.58'
PARCEL "B" 1 MONUMENT SIGN 349.9 SF PER SIDE
64 SF PER SIDE HEIGHT 20.58' VARIANCE FOR SIZE AND HEIGHT
MAX HEIGHT 16'
SITE ITEMS
PARCEL "A,B,C" : NO PERIMETER WALL OF 3'-6' HIGH IS PROPOSED FOR
FOOD USES PER (Q) 4.22 SUPPLEMENTAL REGULATIONS
PROPOSED VARIANCE
SIGNAGE FOR PANDA EXPRESS
PARCEL "A" 1 MONUMENT SIGN 1 MONUMENT SIGN VARIANCE FOR
ADDITIONAL
PER FRONTAGE ON EAST SIDE MONUMENT SIGN
(24 SF PER SIDE, 4' HEIGHT)
1 WALL SIGN 1 WALL SIGN VARIANCE FOR ADDITIONAL
PER FRONTAGE ON EAST ELEVATION WALL SIGN (36 SQ FT)
SITE DATA: (LOCAL RETAIL)
LIMIT OF SCOPE OF WORK: PROPOSED 60,989 SF 1.40 AC
EXISTING 22,637 SF .52 AC
TOTAL 83,626 SF 1.92 AC
LOT COVERAGE:
2' PARKING OVERHANG: 322 SF 0.01 AC 00.53%
VEHICULAR USE AREA: 17,391 SF 0.40 AC 28.51%
WALKWAYS/IMPERVIOUS AREA: 11,045 SF 0.25 AC 18.12%
60,989 SF 1.40 AC 100.00%
EXISTING
2' PARKING OVERHANG: 135 SF 0.00 AC 00.60%
VEHICULAR USE AREA: 18,693 SF 0.44 AC 82.58%
WALKWAYS/IMPERVIOUS AREA: 1,479 SF 0.03 AC 6.53%
22,637 SF 0.52 AC 100.00%
VEHICULAR USE AREA: 17,391 SF
REQUIRED LANDSCAPING FOR VEHICULAR USE AREA: 25% or 4,348 SF
PROVIDED: 31.51% or 5,480 SF
*SEE SHEET C-304 FOR PERVIOUS/IMPERVIOUS DETAILS
BUILDING SETBACKS: REQUIRED PROVIDED
2' PARKING OVERHANG: 655 SF 0.02 AC 02.03%
VEHICULAR USE AREA: 18,024 SF 0.41 AC 55.92%
WALKWAYS/IMPERVIOUS AREA: 2,027 SF 0.05 AC 06.28%
32,234 SF 0.74 AC 100.00%
VEHICULAR USE AREA: 18,024 SF
REQUIRED LANDSCAPING FOR VEHICULAR USE AREA: 25% or 4,506 SF
PROVIDED: 32.28% or 5,818 SF
*SEE SHEET C-304 FOR PERVIOUS/IMPERVIOUS DETAILS
BUILDING SETBACKS: REQUIRED PROVIDED
3"
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
TOTAL 29 29
PARKING RATIO 4.89 SP/ 1000 SF 4.89 SP/ 1000 SF
LOCAL RETAIL
LOADING SPACES 1 1
PARKING RATIO 5.58 SP/ 1000 SF 6.19 SP/ 1000 SF
PANDA EXPRESS
LOADING SPACES 0 0
PARKING RATIO 7.43 SP/ 1000 SF 13.01 SP/ 1000 SF
STANDARD 300* 303
TOTAL 459 489
WALMART
CART CORRALS N/A 29 (NOT INCLUDED IN TOTAL)
TOTAL 847 852
LOADING SPACES 4 (10' X 25') 6 (10' X 130')
LOCAL SHOPS
TOTAL 26 29
TACO BELL
TOTAL 12 28
POLLO TROPICAL
TOTAL 16 37
PARCEL C (DOES NOT INCLUDE FUTURE DEVELOPMENT)
TD BANK
LOADING SPACES 0 0
PARKING RATIO 4.55 SP/ 1000 SF 10.11 SP/ 1000 SF
NOTE: REQUIRED PARKING SPACES FOR ALL BUILDING USES WERE
CALCULATED
BASED ON SHOPPING CENTER REQUIREMENT OF 1SP/220SF.
T
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
T
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
2' PARKING OVERHANG: 322 SF 0.01 AC 00.53%
VEHICULAR USE AREA: 17,391 SF 0.40 AC 28.51%
WALKWAYS/IMPERVIOUS AREA: 11,045 SF 0.25 AC 18.12%
60,989 SF 1.40 AC 100.00%
EXISTING
2' PARKING OVERHANG: 135 SF 0.00 AC 00.60%
VEHICULAR USE AREA: 18,693 SF 0.44 AC 82.58%
WALKWAYS/IMPERVIOUS AREA: 1,479 SF 0.03 AC 06.53%
22,637 SF 0.52 AC 100.00%
VEHICULAR USE AREA: 17,391 SF
REQUIRED LANDSCAPING FOR VEHICULAR USE AREA: 25% or 4,348 SF
PROVIDED: 31.51% or 5,480 SF
SITE DATA (PANDA EXPRESS)
2' PARKING OVERHANG: 655 SF 0.02 AC 02.03%
VEHICULAR USE AREA: 18,024 SF 0.41 AC 55.92%
WALKWAYS/IMPERVIOUS AREA: 2,027 SF 0.05 AC 06.28%
32,234 SF 0.74 AC 100.00%
VEHICULAR USE AREA: 18,024 SF
REQUIRED LANDSCAPING FOR VEHICULAR USE AREA: 25% or 4,506 SF
PROVIDED: 32.28% or 5,818 SF
ryan.schulz
Typewriter
C-305
ryan.schulz
Typewriter
IV
T
9
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
1. CONTRACTOR TO CONSTRUCT DRAINAGE STRUCTURES WITH USF
GRATES,
RIMS AND COVERS AS CALLED OUT OR APPROVED EQUAL. SHOP
DRAWINGS
ARE TO BE PROVIDED TO ENGINEER FOR APPROVAL PRIOR TO ANY
CONSTRUCTION.
2. CONTRACTOR TO REFER TO FDOT DESIGN STANDARD (AND NOT LIMITED
TO)
INDEX'S 200, 201, 210, 211, 214, 232 & 233 FOR MANHOLE, INLET
AND GRATE
SPECIFICATIONS.
3. ALL DRAINAGE STRUCTURES SHALL BE CONSTRUCTED WITH (4)
SIDED
BEARING HEAVY DUTY H-20 RATED TRAFFIC RIMS AND GRATES.
4. CONTRACTOR TO VERIFY ALL EXISTING UTILITY RINGS AND COVERS ON
SITE
ARE HEAVY DUTY TRAFFIC RATED. CONTRACTOR TO REPLACE DEFICIENT
RINGS AND COVERS WITH HEAVY DUTY TRAFFIC RATED RINGS AND
COVERS.
CONTRACTOR TO ADJUST RIM ELEVATIONS OF ANY UTILITIES THAT CHANGE
IN
ELEVATION DURING CONSTRUCTION.
5. ALL CLEANOUT COVERS SHOULD BE RATED FOR HEAVY DUTY
TRAFFIC.
6. ALL EXISTING PAVEMENT AND CONCRETE TO BE JOINED SHALL BE
SAWCUT.
7. SIDEWALKS AND CROSSWALKS SHALL NOT EXCEED 2% CROSS SLOPE NOR
5%
LONGITUDINALLY. GRADES IN ACCESSIBLE PARKING SPACES SHALL NOT
EXCEED 2% IN ANY DIRECTION. IN CASES OF SIDEWALK AT BUILDING
ENTRANCES, GRADES SHALL NOT EXCEED 2% IN ANY DIRECTION.
ACCESSIBLE
CURB RAMPS SHALL NOT EXCEED 6' IN LENGTH, 6" RISE, AND 1:12
SLOPE.
LANDINGS AT CHANGES IN DIRECTION SHALL BE MINIMUM 60"x60" AND
SHALL
NOT EXCEED 2% SLOPE IN ANY DIRECTION.
8. SPOT ELEVATIONS ARE AT FACE OF CURB UNLESS OTHERWISE
NOTED.
9. EXISTING GRADES AND DRAINAGE HAVE BEEN TAKEN FROM A SURVEY
PREPARED BY PULICE LANDS SURVEYORS, INC. DATED APRIL 23RD, 2015.
THE
ELEVATIONS SHOWN HEREON ARE BASED ON THE NORTH AMERICAN
VERTICAL DATUM (NAVD) OF 1988.
10. HDPE STORM PIPE-CONTRACTOR IS RESPONSIBLE FOR OBTAINING THE
STORM DRAINAGE PIPE
INSTALLATION MANUAL AND SPECIFICATIONS AND COMPLYING WITH ALL
MANUFACTURER'S
INSTALLATION PROCEDURES AND REQUIREMENTS. TESTING OF BACKFILL
MATERIAL AND
COMPACTION OF BACKFILL MATERIAL IS THE CONTRACTOR'S
RESPONSIBILITY.
11. ROOF DRAIN CONNECTIONS TO DRAINAGE PIPE SHALL BE AS
FOLLOWS:
A. FOR ADS N-12 CORRUGATED POLYETHYLENE DRAINAGE PIPE USE ADS DUAL
WALL
FABRICATED REDUCING SADDLE TEE 4"-24" DIAMETER.
B. FOR RCP DRAINAGE PIPE MAKE CONNECTION PER FDOT INDEX
280,CONCRETE COLLAR FOR
JOINING MAINLINE PIPE AND STUB PIPE DETAIL
C. NOTIFY CONSULTANT FOR CONNECTION METHOD TO STEEL PIPE.
12. ALL DRAINAGE PIPE JOINTS SHALL BE FILTER FABRIC WRAPPED PER
FDOT INDEX #280. ALL
DRAINAGE PIPE JOINTS NEED TO BE FILTER FABRIC WRAPPED REGARDLESS OF
MATERIAL.
13. EXISTING STORM INLETS AND PIPES ON PROPERTY TO BE JETTED AND
CLEANED PRIOR TO
ENGINEER'S ACCEPTANCE OF SYSTEM.
14. CONTRACTOR SHALL COORDINATE PAVING IMPROVEMENTS TO AVOID TIRE
MARKS FROM
CONSTRUCTION ACTIVITY. FINAL PAVING SHALL BE AS SMOOTH AS POSSIBLE
AND FREE FROM
ANY MARKS, SCRAPES, GOUGES, TIRE MARKS, ETC. CAUSED DURING
CONSTRUCTION ACTIVITY.
15. CONTRACTOR TO ENSURE POSITIVE RUNOFF FROM THE BUILDING. PAVING
SHALL BE FREE OF
PONDING AND MAINTAIN POSITIVE OUTFALL TO THE DRAINAGE SYSTEM.
CONTRACTOR SHALL
FIELD VERIFY EXISTING DRAINAGE PATTERNS AND TIE-IN GRADES AND ALERT
OWNER AND
ENGINEER SHOULD ANY CONFLICTS ARISE.
16. DURING CONSTRUCTION AND AFTER FINAL GRADING, NO SURFACE WATER
RUNOFF MAY BE
DIRECTED TO ADJACENT PROPERTIES, AND ALL SURFACE WATER RUNOFF MUST
BE ROUTED TO
APPROVED DRAINAGE FACILITIES OR BE RETAINED ON SITE. ALL RUNOFF
FROM THE SITE, BOTH
DURING AND AFTER CONSTRUCTION, MUST BE FREE OF POLLUTANTS,
INCLUDING SEDIMENT,
PRIOR TO DISCHARGE.
P A
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
SEPARATION REQUIREMENTS OF F.D.E.P. / F.D.N.R.P.
Sanitary sewers and force mains should cross under water mains
whenever possible.
Sanitary sewers and force mains crossing water mains shall be laid
to provide a minimum
vertical distance of 18 inches between the invert of the upper pipe
and the crown of the
lower pipe whenever possible.
must be maintained at all crossings.
of the crossing must be mechanically restrained. A minimum vertical
clearance of 6 inches
pipe (DIP) at the crossing. Sufficient lengths of DIP must be used
to provide a minimum
vertical distance, both the sewer and the water main shall be
constructed of ductile iron
Where sanitary sewers and force mains must cross a water main with
less than 18 inches
A minimum 10 foot horizontal separation shall be maintained between
any type of sewer and
water main in parallel installations whenever possible.
In cases where it is not possible to maintain a 10 foot horizontal
separation, the water main
the new pipe shall be arranged to meet the crossing requirements
above.
Where a new pipe conflicts with an existing pipe with less than 18
inches vertical clearance,
are equidistant from the point of crossing (pipes centered on the
crossing).
All crossings shall be arranged so that the sewer pipe joints and
the water main pipe joints
All DIP shall be class 50 or higher. Adequate protective measures
against corrosion shall be
used as determined by the design.
constructed of DIP with a minimum vertical distance of 6 inches.
The water main should always
be above the sewer. Joints on the water main shall be located as
far apart as possible from
joints on the sewer or force main (staggered joints).
the water main shall be constructed of DIP and the sanitary sewer
or force main shall be
Where it is not possible to maintain a vertical distance of 18
inches in a parallel instalations,
18 inches above the top of the sewer.
the sewer or force main at such an elevation that the bottom of the
water main is at least
must be laid in a separate trench or on an undisturbed earth shelf
located on one side of
*
AT THE POINT OF CROSSING
DEFLECTION TYPE
* REFER TO WATER AND SEWER SEPARATION NOTES PER D.E.P.
REQUIREMENTS
SLOPE U P TO M
IN . C
CENTER A FULL LENGTH OF PIPE
RESTRAINED JOINT
NOTE:
SERVICE SADDLE
DOUBLE STRAP
GRADE
SAMPLING POINT SHALL NOT BE REMOVED UNTIL APPROVAL IS OBTAINED
FROM
TYP.
NOTES:
1. GUARD POSTS TO BE INSTALLED AS
REQUIRED FOR SAFETY OR AS
2. GUARD POSTS TO BE 4" DIA. GALV.
STEEL PIPE FILLED WITH CONCRETE
R / W
2 ' - 6
VISQUEEN
PLYWOOD
VARIES
4"
12"
VISQUEEN
NOTES:
1. NOTIFY THE CITY OF HOLLYWOOD 48 HOURS IN ADVANCE OF PROPOSED
TAP.
2. TAPPING MUST BE DONE IN THE PRESENCE OF AN AUTHORIZED CITY
REPRESENTATIVE.
SLEEVE
TAPPING
TYPICAL TAPPING SLEEVE
seperation of 10 feet between any two joints. All joints on the
water main within 20 feet
TESTING AND DISINFECTION
TO THE CITY OF HOLLYWOOD AND BROWARD COUNTY PUBLIC HEALTH
ON THE PROPOSED WATER MAINS AND THE SYSTEM IS ACCEPTABLE
THE PRESSURE AND BACTERIOLOGICAL TESTS HAVE BEEN PERFORMED
1. NO CONNECTIONS TO THE EXISTING LINES SHALL BE MADE UNTIL
148,000
NUMBER OF GALLONS PER HOUR AS DETERMINED BY THE FORMULA:
L =
CITY OF HOLLYWOOD WATER TREATMENT PLANT LABORATORY WILL
BACTERIOLOGICALLY TESTED FOR TWO CONSECUTIVE DAYS. THE
WITH ANSI/AWWA STANDARD C651-05 OR LATEST REVISION AND
4. PROPOSED WATER MAINS SHALL BE DISINFECTED IN ACCORDANCE
TESTED, IN LENGTHS NOT TO EXCEED 2,000 FEET PER TEST.
3. THE COMPLETE LENGTH OF THE PROPOSED WATER MAIN SHALL BE
P = THE AVERAGE TEST PRESSURE IN POUNDS PER SQUARE INCH.
D = THE NOMINAL DIAMETER OF THE PIPE BEING TESTED.
L = THE ALLOWABLE LEAKAGE IN GALLONS PER HOUR.
HOLLYWOOD. THE ALLOWABLE LEAKAGE SHALL BE LESS THAN THE
REVISION. PRESSURE TEST SHALL BE WITNESSED BY THE CITY OF
ACCORDANCE WITH ANSI/AWWA STANDARD C600-05 OR LATEST
2. THE PRESSURE TEST SHALL BE FOR 2 HOURS AT 150 PSI AND IN
UNIT (BCPHU).
3. USE RESTRAINED JOINTS FOR FITTINGS AND MECHANICAL JOINT
PIPE.
F. 18' SPAN BETWEEN THE FIRST TWO UNRESTRAINED JOINTS ON
2. RESTRAINED LENGTHS TABULATED ARE BASED ON THE FOLLOWING
CONDITIONS:
1. LENGTH SHOWN IN THE TABLE TO BE RESTRAINED IN THE DIRECTION OF
THE ARROWS,
TEE WITH PLUG
D. DESIGN PRESSURE: 150 PSI.
C. DEPTH OF COVER: 3 FEET.
B. SOIL DESIGNATION: SAND/SILT
DEAD END
NOTES:
1. USE ONE METER BOX PER METER.
SLIP X SLIP
2" NIPPLE PVC
CURB STOP TYP.
2" PVC TEE
SLIP X SLIP
SLIP X SLIP
2" PVC TEE
SLIP X SLIP
PVC TO MIP
3. 2" TAP IN BOTTOM OF CAP ON MAIN.
1. PIPE JOINT COMPOUND SHALL BE APPLIED TO MALE THREADS ONLY.
2. COAT ALL EXPOSED THREADS WITH BITUMASTIC BEFORE
BACKFILLING.
PLAN VIEW
SECTION "A-A"
4. PLYWOOD AND CONCRETE TO HAVE A HEIGHT EQUAL TO THE DIAMETER OF
THE PIPE.
RISER PIPE
ALERT TO CONTRACTOR:
1. THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS
PROJECT. CONTRACTOR'S BID
SHALL INCLUDE CONSIDERATION FOR THIS ISSUE. WHEN PERFORMING GRADING
OPERATIONS
DURING PERIODS OF WET WEATHER, PROVIDE ADEQUATE DEWATERING,
DRAINAGE AND GROUND
WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE
SPECIFICATIONS.
2. ALL WM GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL
UTILITIES, AND FINAL
GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO
BE KEPT FREE OF
JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE
OUTLOT. WM
GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO
THE SPECIFIC
PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO
PROVIDE PERMIT
DOCUMENTS AND SWPPP REQUIRED BY STATE/LOCAL REQUIREMENTS FOR
SPECIFIC OUTLOT.
THE PRESENCE OF ROCK SHOULD BE ANTICIPATED
ON THIS PROJECT. CONTRACTOR'S BID SHALL
INCLUDE CONSIDERATION FOR ADDRESSING THIS
ISSUE.
TO EXCEED 12". EACH COMPACTED
2. DENSITY TESTING SHALL BE IN ACCORDANCE WITH AASHTO T-180 AND
ASTM D-3017.
(FOR UNSUITABLE
D=DIAMETER
1. BEDDING MATERIAL WHEN NECESSARY, SHALL BE CLEAN SANDY SOIL
WHENEVER
AVAILABLE WITHIN THE LIMITS OF CONSTRUCTION. IMPORTED BEDDING SHALL
BE
WELL GRADED 3/4" MAX. SIZED CRUSHED LIMEROCK. ALL BEDDING
MATERIAL
SHALL BE COMPACTED TO 95% OF MAXIMUM DENSITY BEFORE ANY PIPE IS
LAID.
NOTES:
STRUCTURES OR PAVED AREAS
AREAS AND 95% ELSEWHERE.
UNDER STRUCTURES OR PAVED
CAREFULLY PLACED SELECT
ELSEWHERE.
MATCH EXISTING CONDITIONS
SURFACE RESTORATION TO
TO EXCEED 12". EACH COMPACTED
2. DENSITY TESTING SHALL BE IN ACCORDANCE WITH AASHTO T-180 AND
ASTM D-3017.
1. BEDDING AND HAUNCHING SHALL BE WELL GRADED 3/4" MAX. SIZE
CRUSHED LIMEROCK
NOTES:
STRUCTURES OR PAVED AREAS
AREAS AND 95% ELSEWHERE.
UNDER STRUCTURES OR PAVED
CAREFULLY PLACED SELECT
ELSEWHERE.
MATCH EXISTING CONDITIONS
SURFACE RESTORATION TO
NOTES:
MAXIMUM DENSITY, PER AASHTO T-180.
3. ASPHALT CONCRETE PAVEMENT JOINTS SHALL BE MECHANICALLY
SAWED.
4. SURFACE TREATED PAVEMENT JOINTS SHALL BE LAPPED AND
FEATHERED.
1. REPLACED BASE MATERIAL OVER TRENCH SHALL BE TWICE THE
THICKNESS
2. BASE MATERIAL SHALL BE PLACED IN 6" MAXIMUM (LOOSE
MEASUREMENT)
LAYERS AND EACH LAYER THOROUGHLY ROLLED OR TAMPED TO 98% OF
5. SURFACE MATERIAL SHALL BE CONSISTENT WITH THE EXISTING
SURFACE.
6. BASE MATERIAL SHALL HAVE A MINIMUM LBR OF 100 AND A
MINIMUM
CONCRETE SURFACE
ASPHALTIC CONCRETE PATCH TO KEEP THE FILL MATERIAL FROM
RAVELING
7. IF THE TRENCH IS FILLED TEMPORARILY, IT SHALL BE COVERED WITH A
2"
CARBONATE CONTENT OF 70%.
8. BACKFILL SHALL BE IN ACCORDANCE WITH DETAIL OF PIPE LAYING
CONDITION
UNTIL REPLACED WITH A PERMANENT PATCH.
FLEXIBLE PAVEMENT RESTORATION
PERPENDICULAR UTILITY INSTALLATION
(CITY STREETS ONLY)
MAIN AFTER FILLING & FLUSHING
OBTAINED
CORPORATION
STOP
FILLING AND FLUSH DETAIL
IN BOTTOM HALF. ADD NEW MATERIAL AS
STRIPE
CENTER
SAW CUT ASPHALT
REMOVE EXISTING PAVEMENT &
TYPICAL RESTORATION OF 1/2 LANE OR MORE OF ROCK BASE
TYPICAL RESTORATION OF LESS THAN 1/2 LANE OF ROCK BASE
IN THIS LANE & RESURFACE
NOTES:
A MINIMUM OF ONE AND ONE-HALF INCHES AND A MAXIUMUM OF TWO INCHES
IN THICKNESS.
7. REFER TO SPECIFICATIONS FOR DETAILED PROCEDURES.
STRAIGHT LINES, PARALLEL TO OR PERPENDICULAR TO THE ROADWAY, PRIOR
TO THE RESURFACING.
6. RESURFACING MATERIAL SHALL BE OF THE SAME MIX AS THE EXISTING
SURFACE, AND SHALL BE APPLIED
5. ALL EDGES OF EXISTING ASPHALT PAVEMENT WHERE RESURFACING WILL
ABUT SHALL BE SAW CUT TO
AS REQUIRED AND TESTED PRIOR TO THE PLACEMENT OF THE SUCCEEDING
LAYERS.
2. BASE MATERIAL SHALL BE PLACED IN 6" MAXIMUM THICKNESS LAYERS
WITH EACH LAYER COMPACTED
1. BASE MATERIAL SHALL HAVE A MINIMUM L.B.R. OF 100 AND A MINIMUM
CARBONATE CONTENT OF 70%.
4. BACKFILL SHALL BE PLACED AND COMPACTED IN 8" LAYERS, BUT TESTING
WILL BEGIN 12" ABOVE THE
3. SUBGRADE MATERIAL SHALL BE GRANULAR AND SHALL HAVE A MINIMUM
L.B.R. OF 40.
EXISTING PAVEMENT
12"
12"
2. THE CITY'S RESPONSIBILITY ENDS AT THE REDUCER PRECEDING THE
BACKFLOW PREVENTER.
TO BACKFLOW
BY CUSTOMER
PREVENTER OR
BY CUSTOMER
CONC. SUPPORT
RED.
TEE
1. THE WATER METER AND STRAINER BY THE CITY OF HOLLYWOOD.
NOTES:
PLAN
2" CORP STOP/BALL VALVE
3. TAPPED OUT FLANGE SHOULD MATCH SIZE OF TEE AND STANDARD 2" CORP
STOPP OR BALL VALVE.
(FIRE LINES AND COMMERCIAL APPLICATIONS)
3" OR LARGER METER INSTALLATION
(ALL AROUND)
2 2 1
WITH INSPECTOR'S DIRECTIONS. CHAIN SHALL BE LOOPED THROUGH EYELETS
CAST IN CONCRETE TOP.
4. PROTECTIVE 4" GALV. GUARD POSTS SHALL BE SPACED EVENLY APART AS
SHOWN ABOVE OR IN ACCORDANCE
3. ALL LOW FLOW METER PIPING SHALL BE BRASS OR COPPER.
2. ALL PIPING SHALL BE D.I.P. CL 50/52 AS APPLICABLE TO MINIMUM
STANDARDS.
NOTES:
1. FIELD ADJUST AND CUT ITEM 3 TO THE PROPER LENGTH.
4",6",8" VALVE, GATE
4",6",8" FLANGE, D.I.P.
4",6",8" D.I.P. SPOOL PIECE
VALVE, BYPASS DOUBLE CHECK
PEA GRAVEL
SCREW JACK/ANCHORED