    9 Mr. Dinesh Kumar Mandel - Interarc - HSE Officer

    1 M r. K im S ac h - H il l I nt er na ti on al - H SE M an ag er 1 0 M r. A bd ul R af ee q V . - H an li m - H SE O ff ic er

    2 M r. J af ar A th an ik ka l - H il l I nt er na ti on al - H SE E ng in ee r 1 1 M r. R ob in so n A su nc io n - C oa st al - H SE O ff ic er

    3 Mr. H.J. Chae - HDEC - HSE Manager 12

    Contractor : Hyundai Engineering & Construction Co., Ltd   4 Mr. G.S. Seok - HDEC - HSE Engineer 13 Mr. Alfred Joseph - R&R - HSE Officer

    5 M r. Ogu nt ime hin H en ry - HDE C - H SE En gi nee r 14 Mr. A gu stin o BA- ONG - Ma rc ega glia - H SE Of fic er 6 Mr. Nick Latumbo - HDEC - HSE Engineer 15

    7 Mr. Sanu Rajhovan - NWR - HSE Manager 16

    8 Mr. R. Yoharaj - EVS - HSE Officer 17 Mr. Randy Alido - GSE - HSE Officer

    Item Count Item Count Item Count Item

    1   0   12   0   23   0   34  

    2   0   13   0   24   0   35  

    3   3   14   0   25   0   36  

    4   2   15   0   26   0   37  

    5   0   16   0   27   0   38  

    6   0   17   0   28   0   39  

    7   3   18   0   29   0   40  

    8   1   19   0   30   0   41  

    9   1   20   0   31   0   42  

    10   0   21   0   32   3   43  

    11   1   22   0   33   0   44  

    Attendees:

    Occupational Health and Environmental

    Controls

    Helicopters, Hoists, Elevators, and

    Conveyors

    Office Safety / Facilities

    Inspection Part

    Construction Management : Hill International

    Inspection Part

    Client: Qatar Museum Authority

    Project Management / Client Representative : ASTAD

    Date of Inspection: 20-January-2015Mr. Mafumisebi Abulbish - FIBRO - HSE Officer

    Mr. Jessie Aquino - Muehlhan - HSE Officer

    Mr. C.J. - BOSTON - HSE Officer

    National Museum of QatarConstruction Management & Supervision Services, Contract No.: XC10100800/2011

    Date: 22012B-HS-RT-148 Rev: 00   HSE Inspection Report-148

    Project: National Museum of Qatar - Package - B&C

    NOTE: The HSE inspection report is based on Hill International own methodology and / or experience for auditing and scoring system. We do not assume full compatibility of the mentioned score with its r

    tool for the institute to improve its HSE practice.

    Contractor

    Reply Date   Insp. Date Items ClosedReport No.

    Others... (Lack of Quality

    Project Site)

    Reporting, Recording of Occ. Injuries and

    Illness

    Environmental Controls (Water pollution / AirEmission / Dust & Noise Control / Waste Mgt.)

    ASTAD / QP Inspections /

    Penalty

    Project Security

    Materials Handling, Storage, Use, and

    Disposal

    Signs, Signals, and Barricades

    Qatar Legal Requirements on Health

    Safety Environment and Fire

    General Safety and Health Provisions

    HSE Inspections / HSE Re

    HSE Meetings (Daily, week

    Project HSE Plan, Manua

    Risk AssessmentsScaffolds

    Fall / Edge Protection

    Rollover Protective Structures; Overhead

    Protection

    HSE Audits / Managemen

    Occ. Health & Industrial

    Record Maintenance Syst

    Hazardous Materials

    HSE Orientations / Specia

    Records

    Powered Platforms, Man lifts, and

    Vehicle-Mounted Work Platforms

    Personal Protective and Life Saving

    Equipment

    HILL Re-inspection Status

    Power Transmission and Distribution

    Concrete and Masonry Construction

    Demolition

    Underground Construction, Caissons,

    Cofferdams, and Compressed Air

    Item Open

    15

    Tools - Hand and Power

    We ldin g a nd C utt ing Bla sti ng a nd t he U se of Ex plo sive s

    Issue Date

    1

    Supervision (Foreman./Eng

    Loss Prevention and BBS

    Exit Routes and Emergency Planning

    Cranes and Derricks Used in Demolition

    and Underground Construction

    Inspection PInspection Part

    Cranes & Derricks in Construction

    Toxic and Hazardous Substances

    Commercial Diving Operations

    Ladders

    QATAR MUSEUMS AUTHORITY'S PROPRIETARY AND CONFIDENTIAL

    This document is confidential to and the property of QATAR MUSEUM AUTHORITY (PO BOX 2777, Doha, Qatar). Copyright and all intellectual property right ownership is reserved by QATAR MUSEUMS AU

    copied, reproduced, retained or disclosed to any unauthorized person, either wholly or in part without the prior written consent of QATAR MUSEUMS AUTHORITY.

    This report must be return to the Hill International within stipulated time / one week. All citations must be closeout with respective photograph only.

    Type of Hazards : Physical- heat, light, noise, vibration, electrical, radiation, manual handling, temperature extremes, trip & fall hazards, ladder, scaffold etc.   Chemical- solids, liquids, vapours, gases,

    mildew, insects, vermin, animals, fungi, parasites etc.   Psychosocial- stress, violence & bullying etc.   Environmental- air, water, noise pollution, waste management, poor ventilation & lighting, hot or co

    HSE Inspection Report-148 Date: 20 January 2015

    Project Contract Condition

    Motor Vehicles, Mechanized Equipment,

    and Marine Operations

    Steel Erection

    Excavations

    Electrical

    Fire Protection and Prevention

    Page 1 of 10

  • 8/9/2019 150120-HSE Inspection Report-148+Attend

    2/11

    (A) (B) (C ) (D) (E ) (F) (G) (H) (I) (J) (K) (L) (M)

    Ins.

    No.  Ins. Sl. No.

      Date of 

    Insp.  Insp. By

      Ite

    m

    Location

    on Site  Hazards Details of Unsafe Condition / Act OR Non Compliance OR Observation Priority

      Details of Corrective and Preventive Action Taken by the

    HYUNDAI  Action By

    Responsib

    le Safety

    Rep.

    Action

    Taken Date 

    1 48 1 48 .1 2 0- Ja n- 15 H IL L 4 Z o ne 1 5 O th er s

    Evidence (Smell) of Urinating in the Building - Basement - Zone # 15:

    This picture shows a unused room in the basement being used as a toilet.

    Strong urine smell in the room. Urinating in the work area is unhygienic &

    against site rules and regulations!

    Have this issue discussed again in their daily TBT & if possible, close off this

    room.

    See the picture # 01

    HIGH   HDEC S.B. Lee

    1 48 1 48 .2 2 0- Ja n- 15 H IL L 3 Z on e 1 5 P hy si ca l

    Unsafe Stair Access - Low Overhead Obstacles - No Warning Signs in-place -

    Zone # 15 - Basement:

    This picture shows there is No caution or warning signs displayed warning

    workers there is a low overhead hazard (i.e. low cable tray ) above the access

    point!

    Have suitable overhead hazard caution signs displayed on this scaffolding!

    See the picture # 02

    MEDIUM HDEC H.S. Shin

    1 48 1 48 .3 2 0- Ja n- 15 H IL L 3 2 Zo ne 1 5  Environme

    ntal

    Unsafe Practice - Concrete Repair Works with NO Dust Extraction Fans in place -

    Zone # 15-Basement:

    This picture shows HDEC workers are doing concrete repair works without a

    safe dust extraction system in place! Increase risk of respiratory problems for

    these workers!

    This is UNSAFE and UNACCEPTABLE for this project!

    Have this work stopped & install the safe dust extraction fan system that will

    reduce the dust levels in this work area.

    See the picture # 03

    HIGH   HDEC S.B. Lee

    1 48 1 48 .4 2 0- Ja n- 15 H IL L 3 4 Zo ne 0 9 O th er s

    ESSW system not implemented in ALL Locations on-site - Zone # 09- Basement:

    This picture shows the Lock out/Tag out (LOTO) system is not implemented at

    every location in the basement. The ESSW system for Pl ant & Equipment to be

    energized should be in place based on the MEP & HDEC instructions.

    Have this room & all rooms in the basement provided with the necessary locks

    & warning signs as per the ESSW procedure across the Project.

    See the picture # 04

    HIGH  HDEC / BK

    Gulf   H.S. Shin

    1 48 1 48 .5 2 0- Ja n- 15 H IL L 8 Z on e 0 8 P hy si ca l

    Poor Housekeeping - Unwanted material stored Under Stacked Fire panel

    Cartons - Zone # 08 - Basement:

    This picture shows a number of stacked cartons on shelves with stored

    materials under these cartons creating an unsafe worker access to these

    shelves.

    Have this material separated and the stacked away from the shelves so that

    workers can safely access the stacked Fire Panel cartons.

    "A Neat and tidy site is a safe site"!

    See the picture # 05

    MEDIUM  HDEC / BK

    Gulf   H.S. Shin

    1 48 1 48 .6 2 0- Ja n- 15 H IL L 3 4 Zo ne 0 8 O th er s

    Safe Work Practice - PTW-CSP system in Place - Zone # 08 -Basement:

    This picture shows the PTW-Confined Space work permit is in place & is

    relevant for the work at hand. This is an example of a good work practice being

    implemented across the Project.

    See the picture # 06

    INFO HDEC H.S. Shin

    1 48 1 48 .7 2 0- Ja n- 15 H IL L 3 2 Zo ne 0 8   Environmental

    Dust Extraction system Not Functioning Effectively - Basement- Zones # 06-08:

    This picture shows dust extraction flexible ducting NOT connected properly;

    NOT extending to outside the basement and it has numerous holes & tears. All

    these imperfections in the ducting is resulting in the extraction system NOT

    working effectively. What is the use of this safety control if the dust is recycledback into the same work area?

    Have the ducting connected properly & tears repaired so that the dust

    exhausting system will work efficiently & safely!

    See the picture # 07

    HIGH   HDEC H.S. Shin

    1 48 1 48 .8 2 0- Ja n- 15 H IL L 3 2 Zo ne 0 8  Environme

    ntal

    Poor Condition of Dust Extraction Flexible Ducting - Basement- Zone # 08:

    This picture shows there are a lot of holes in the dust extraction flexible ducting

    being used to extract dust from a concrete repairs and other work area!

    Have this hose repaired properly so that the dust exhausting system will work

    efficiently & safely!

    See the picture # 08

    HIGH   HDEC H.S. Shin

    1 48 1 48 .9 2 0- Ja n- 15 H IL L 1 1 Zo ne 0 6 P hy si ca l

    Unsafe Condition - Open DB panel Cover - Zone # 06-Basement:

    This picture shows an electrical DB panel door is open and it would appear its

    lock mechanism is broken. An increased risk of electric shock or misuse of this

    panel by unauthorized workers!

    Have the DB panel door checked by an authorized person IMMEDIATELY!

    See the picture # 09

    MEDIUM HDEC H.S. Shin

    2012B-HS-RT-148 Rev: 00   HSE Inspection Report-148

    National Museum of QatarConstruction Management & Supervisio n Services, Contract No.: XC10100800/2011

    Doc./Form No: PQA-1084-PP-16-11-FM Rev.0

    Revision Date: 01-Feb-2011Page 2  

  • 8/9/2019 150120-HSE Inspection Report-148+Attend

    3/11

    (A) (B) (C ) (D) (E ) (F) (G) (H) (I) (J) (K) (L) (M)

    Ins.

    No.  Ins. Sl. No.

      Date of 

    Insp.  Insp. By

      Ite

    m

    Location

    on Site  Hazards Details of Unsafe Condition / Act OR Non Compliance OR Observation Priority

      Details of Corrective and Preventive Action Taken by the

    HYUNDAI  Action By

    Responsib

    le Safety

    Rep.

    Action

    Taken Date 

    2012B-HS-RT-148 Rev: 00   HSE Inspection Report-148

    National Museum of QatarConstruction Management & Supervisio n Services, Contract No.: XC10100800/2011

    1 48 1 48 .1 0 2 0- Ja n- 15 H IL L 7 Z on e 0 5 O th er s

    No Information Sign Displayed at the Urinal station - Zone # 05 - Basement:

    This picture shows there is No information sign displayed at this urinal station

    for the workers' information.

    Have this urinal station provided with the appropriate Signage ASAP.

    See the picture # 10

    LOW HDEC / HSE  Chae Hyun

    Jik

    1 48 1 48 .1 1 2 0- Ja n- 15 H IL L 3 Z o n e 0 3 P hy si ca l

    Lack of Task lighting for Worker - Zone # 03-Inside Basement Room:

    This picture shows a HDEC worker is working inside a room with NO task

    lighting! This work practice is NOT ACCEPTABLE & is UNSAFE.

    Have sufficient task lighting made available for this worker.

    See the picture # 11

    MEDIUM HDEC H.S. Shin

    1 48 1 48 .1 2 2 0- Ja n- 15 H IL L 3 5 Zo ne 0 3 O th er s

    Unsafe Scaffolding - Scaf-tag Indicate The Scaffold is Not Regularly Inspected -

    Zone # 03-Basement:

    The picture shows scaffolding being used displaying an "out-of-date" scaf-tag.

    WHY? Every scaffold used on-site must be inspected and renewed on weekly

    basis by a competent person without fail!

    Have this scaffold structure inspected IMMEDIATELY and the Scaf-tag updated.

    See the picture # 12

    HIGH   HDEC H.S. Shin

    1 48 1 48 .1 3 2 0- Ja n- 15 H IL L 4 Z on e 0 3  Environme

    ntal

    No Adequate Ventilation/Pedestal fan provided for painting works inside a

    Closed Room - zone # 02-Basement:

    This picture shows a number sub-con workers doing painting works inside a

    closed room with No Forced ventilation or pedestal fans to provide some

    degree of fresh air.

    Have this work area provided with fans to increase the refresh air flow through

    the closed room.

    See the picture # 13

    MEDIUM HDEC / NWR H.S. Shin

    1 48 1 48 .1 4 2 0- Ja n- 15 H IL L 7 Z on e 0 3 O th er s

    No Exit or Direction Signs Displayed in Main Walkway - Zone # 03 - Basement

    Corridor:

    This picture shows NO Exit or directional signs provided in the main corridor sothat people know where they need to exit out of the basement, especially in an

    emergency situation.

    Have this area provided proper directional or Exit arrow signs ASAP.

    See the picture # 14

    MEDIUM HDEC / HSE  Chae Hyun

    Jik

    1 48 1 48 .1 5 2 0- Ja n- 15 H IL L 9 Z o n e 0 5 P hy si ca l

    No Hand gloves used for chipping works - Zone # 05 - Basement:

    This picture shows a worker is chipping with "home made" hand tool and

    hammer without using proper hand protection. An increased risk of 

    hitting/slipping by hammer on the worker's hand.

    Have this worker instructed to use proper chisels and wear hand gloves while

    working.

    See the picture # 15

    MEDIUM HDEC H.S. Shin

    1 48 1 48 .1 6 2 0- Ja n- 15 H IL L 7 Z o n e 0 4 P hy si ca l

    Unsafe Guardrail system Used for Excavation Edge - Zone # 04-near the Live

    road:

    This picture shows there are No concrete barriers provided on an excavation

    edge next to the live main access road. The section of hand rail is not secured

    and can easily be pushed over by workers or passing vehicles.

    Have this GI pipe connected to some concrete barriers along the excavation

    edge next to the main access road.

    See the picture # 16

    HIGH   HDEC S.B. Lee

    1 48 1 48 .1 7 2 0- Ja n- 15 H IL L 3 Z o n e 0 8 P hy si ca l

    No Warning Signs and Flash lights provided for Deep Excavation Next to LIVE

    Main Access Road - Zone # 08-Lagoon Area:This picture shows there are NO warning si gns or Flashing roadside lights

    provided on the water barriers near the LIVE road. Best practice would be to

    use concrete barriers along this section of road.

    Have this excavation area provided appropriate warning signs and Flashing

    roadside lights fixed as required. If possible replace the W/F barriers with

    concrete barriers.

    See the picture # 15

    HIGH   HDEC S.B. Lee

    Doc./Form No: PQA-1084-PP-16-11-FM Rev.0

    Revision Date: 01-Feb-2011Page 3  

  • 8/9/2019 150120-HSE Inspection Report-148+Attend

    4/11

    Picture: 03 Picture: 04

    Picture: 01 Picture: 02

    National Museum of Qatar

    Construction Management & Supervision Services, Contract No.: XC10100800/2011

    2012B-HS-RT-148 Rev: 00   HSE Inspection Report-148   Date

  • 8/9/2019 150120-HSE Inspection Report-148+Attend

    5/11

    National Museum of Qatar

    Construction Management & Supervision Services, Contract No.: XC10100800/2011

    2012B-HS-RT-148 Rev: 00   HSE Inspection Report-148   Date

    Picture: 05 Picture: 06

    Picture: 07 Picture: 08

  • 8/9/2019 150120-HSE Inspection Report-148+Attend

    6/11

    National Museum of Qatar

    Construction Management & Supervision Services, Contract No.: XC10100800/2011

    2012B-HS-RT-148 Rev: 00   HSE Inspection Report-148   Date

    Picture: 09 Picture: 10

    Picture:11 Picture:12

  • 8/9/2019 150120-HSE Inspection Report-148+Attend

    7/11

    National Museum of Qatar

    Construction Management & Supervision Services, Contract No.: XC10100800/2011

    2012B-HS-RT-148 Rev: 00   HSE Inspection Report-148   Date

    Picture: 13 Picture: 14

    Picture:15 Picture: 16

  • 8/9/2019 150120-HSE Inspection Report-148+Attend

    8/11

    National Museum of Qatar

    Construction Management & Supervision Services, Contract No.: XC10100800/2011

    2012B-HS-RT-148 Rev: 00   HSE Inspection Report-148   Date

    Picture: 17 Picture:18

    Picture:19 Picture: 20

  • 8/9/2019 150120-HSE Inspection Report-148+Attend

    9/11

    Picture: 01 Picture: 02

    National Museum of Qatar

    Construction Management & Supervision Services, Contract No.: XC10100800/2011

    2012B-HS-RT-148 Rev: 00  HSE Inspection Report-148 HYUNDAI Compliance

    Reply  Date:

  • 8/9/2019 150120-HSE Inspection Report-148+Attend

    10/11

    National Museum of Qatar

    Construction Management & Supervision Services, Contract No.: XC10100800/2011

    2012B-HS-RT-148 Rev: 00  HSE Inspection Report-148 HYUNDAI Compliance

    Reply  Date:

    Picture: 03 Picture: 04