15 January 200815 January 2008 S.InfanteS.Infante
TS-ELTS-EL
CONTROLS ACTIVITESCONTROLS ACTIVITES
15 January 200815 January 2008 S.InfanteS.Infante
OVERVIEWOVERVIEW Section mandateSection mandate SCADA overviewSCADA overview SCADA managementSCADA management PLC park overviewPLC park overview PLC managementPLC management SummarySummary
15 January 200815 January 2008 S.InfanteS.Infante
SECTION MANDATESECTION MANDATE Responsible for the monitoring and Responsible for the monitoring and
control of the CERN electrical network: control of the CERN electrical network: Integration of new equipment/substations, Integration of new equipment/substations,
modifications, upgrade and maintenance of modifications, upgrade and maintenance of the Electrical Network Supervisor (the Electrical Network Supervisor (ENSENS) ) System.System.
4 staff members. 3 from March 2008! A 4 staff members. 3 from March 2008! A job post is currently open in ERT.job post is currently open in ERT.
1 fellow from February 2008.1 fellow from February 2008.
15 January 200815 January 2008 S.InfanteS.Infante
ENS OVERVIEWENS OVERVIEW SCADA system dedicated to the SCADA system dedicated to the
supervision of the electrical network.supervision of the electrical network. Still a mixture of new supervision Still a mixture of new supervision
systems and old supervision systems:systems and old supervision systems: 2 Unix Servers: 2 Unix Servers: SCATE X – EFACECSCATE X – EFACEC >= 50 distributed concentrators: >= 50 distributed concentrators: RTU/CFERTU/CFE Data acquisition units: Data acquisition units: DAU/MICENEDAU/MICENE Intelligent Electronic Devices: Intelligent Electronic Devices: IED IED Programmable Logic Controllers: Programmable Logic Controllers: PLCPLC Discreet I/ODiscreet I/O
15 January 200815 January 2008 S.InfanteS.Infante
RTULHC, SPS, Meyrin
DAUUPS
Medium/High VoltageProtection Relays
BatteryChargers
Discreet I/Oswitchboards
PLCDIRIS
CFE
MICENE
ABB SCADA SVC2
SCATE X servers
ENS current ENS current architecturearchitecture
TI Operators
LASERTIM
Remote Desktop Connection
LonWorks
JBus
Silcon
IEC IEC
Mil1553
GATED
NCCNetwork Control Centre
Web Energy
ORACLE Server
Energy Management
TCS
Insum
15 January 200815 January 2008 S.InfanteS.Infante
ENS - NEW EQUIPMENT ENS - NEW EQUIPMENT INTEGRATIONINTEGRATION
Small scale integration/modificationsSmall scale integration/modifications TS-EL-COTS-EL-CO ASSYSTEM ( C194 contract TS-CSE) supportASSYSTEM ( C194 contract TS-CSE) support
Large scale integrationLarge scale integration EFACEC (B1115 contract)/TS-EL-CO EFACEC (B1115 contract)/TS-EL-CO
15 January 200815 January 2008 S.InfanteS.Infante
ENS - MAINTENANCE & ENS - MAINTENANCE & TROUBLESHOOTINGTROUBLESHOOTING
SCATE X serversSCATE X servers TS-EL-CO for first line intervention. No TS-EL-CO for first line intervention. No
official piquet but 24 hour support is official piquet but 24 hour support is assured. assured.
ongoing maintenance contract with EFACEC ongoing maintenance contract with EFACEC (24h-7d helpline)(24h-7d helpline)
RTURTU TS-EL-COTS-EL-CO ASSYSTEM (Preventive maintenance)ASSYSTEM (Preventive maintenance)
15 January 200815 January 2008 S.InfanteS.Infante
ENS - MAINTENANCE & ENS - MAINTENANCE & TROUBLESHOOTING TROUBLESHOOTING cont’dcont’d
CONTROLS EQUIPMENT - Micene, DAU, CONTROLS EQUIPMENT - Micene, DAU, IEDIED TS-EL-COTS-EL-CO Remedy ticket service in placeRemedy ticket service in place
CFE (ongoing replacements by RTUs)CFE (ongoing replacements by RTUs) TS-EL-CO: ApplicationsTS-EL-CO: Applications AB-CO: HW/OS/Appl.Servers (elsrv1)/Mil1553 AB-CO: HW/OS/Appl.Servers (elsrv1)/Mil1553
busbus
15 January 200815 January 2008 S.InfanteS.Infante
PLCPLC Electrical Process dedicatedElectrical Process dedicated Majority of PLCs are Schneider Majority of PLCs are Schneider
(Premium/Twido)(Premium/Twido) Some Siemens PLC (S7-400H)Some Siemens PLC (S7-400H)
15 January 200815 January 2008 S.InfanteS.Infante
PLC ListPLC List Ventilation substationsVentilation substations Diesel Generators Diesel Generators 48V Commutation48V Commutation EDF-EOS AutoTransfertEDF-EOS AutoTransfert 18kV normal/secours commutation18kV normal/secours commutation 18kV Interlocks18kV Interlocks LV Distribution LHC experiment (11 Premium LV Distribution LHC experiment (11 Premium
type concentrators / around 200 local Twido type concentrators / around 200 local Twido based I/O stations)based I/O stations)
15 January 200815 January 2008 S.InfanteS.Infante
PLC MANAGEMENTPLC MANAGEMENT Majority Programming outsourced (EuroSystem – Majority Programming outsourced (EuroSystem –
Contract E088)Contract E088) URS definition: TS-ELURS definition: TS-EL HW configuration/Local MMI definition: TS-EL-COHW configuration/Local MMI definition: TS-EL-CO HW failure/card replacement: TS-EL-COHW failure/card replacement: TS-EL-CO Software modifications: EuroSystemSoftware modifications: EuroSystem Spare part management: TS-EL-CO. Possibility Spare part management: TS-EL-CO. Possibility
for a CERN wide spare part management for a CERN wide spare part management contract with Schneider. Currently managed by contract with Schneider. Currently managed by AB-CO (P.Gayet)AB-CO (P.Gayet)
15 January 200815 January 2008 S.InfanteS.Infante
SUMMARYSUMMARY The ENS system is now up and runningThe ENS system is now up and running The migration from the old (CFE/MICENE) to the The migration from the old (CFE/MICENE) to the
new ENS system (SCATEX/RTU) is ongoing (80% new ENS system (SCATEX/RTU) is ongoing (80% complete)complete)
The ENS management requires both electrical The ENS management requires both electrical and controls specialist knowledge and close and controls specialist knowledge and close collaboration with other sections within TS/ELcollaboration with other sections within TS/EL
Despite limited resources a 24h, 7d “piquet-Despite limited resources a 24h, 7d “piquet-type” service is achievedtype” service is achieved
Significant documentation updates are Significant documentation updates are required.required.