12
15 January 2008 15 January 2008 S.Infante S.Infante TS-EL TS-EL CONTROLS ACTIVITES CONTROLS ACTIVITES

15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

Embed Size (px)

Citation preview

Page 1: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

TS-ELTS-EL

CONTROLS ACTIVITESCONTROLS ACTIVITES

Page 2: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

OVERVIEWOVERVIEW Section mandateSection mandate SCADA overviewSCADA overview SCADA managementSCADA management PLC park overviewPLC park overview PLC managementPLC management SummarySummary

Page 3: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

SECTION MANDATESECTION MANDATE Responsible for the monitoring and Responsible for the monitoring and

control of the CERN electrical network: control of the CERN electrical network: Integration of new equipment/substations, Integration of new equipment/substations,

modifications, upgrade and maintenance of modifications, upgrade and maintenance of the Electrical Network Supervisor (the Electrical Network Supervisor (ENSENS) ) System.System.

4 staff members. 3 from March 2008! A 4 staff members. 3 from March 2008! A job post is currently open in ERT.job post is currently open in ERT.

1 fellow from February 2008.1 fellow from February 2008.

Page 4: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

ENS OVERVIEWENS OVERVIEW SCADA system dedicated to the SCADA system dedicated to the

supervision of the electrical network.supervision of the electrical network. Still a mixture of new supervision Still a mixture of new supervision

systems and old supervision systems:systems and old supervision systems: 2 Unix Servers: 2 Unix Servers: SCATE X – EFACECSCATE X – EFACEC >= 50 distributed concentrators: >= 50 distributed concentrators: RTU/CFERTU/CFE Data acquisition units: Data acquisition units: DAU/MICENEDAU/MICENE Intelligent Electronic Devices: Intelligent Electronic Devices: IED IED Programmable Logic Controllers: Programmable Logic Controllers: PLCPLC Discreet I/ODiscreet I/O

Page 5: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

RTULHC, SPS, Meyrin

DAUUPS

Medium/High VoltageProtection Relays

BatteryChargers

Discreet I/Oswitchboards

PLCDIRIS

CFE

MICENE

ABB SCADA SVC2

SCATE X servers

ENS current ENS current architecturearchitecture

TI Operators

LASERTIM

Remote Desktop Connection

LonWorks

JBus

Silcon

IEC IEC

Mil1553

GATED

NCCNetwork Control Centre

Web Energy

ORACLE Server

Energy Management

TCS

Insum

Page 6: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

ENS - NEW EQUIPMENT ENS - NEW EQUIPMENT INTEGRATIONINTEGRATION

Small scale integration/modificationsSmall scale integration/modifications TS-EL-COTS-EL-CO ASSYSTEM ( C194 contract TS-CSE) supportASSYSTEM ( C194 contract TS-CSE) support

Large scale integrationLarge scale integration EFACEC (B1115 contract)/TS-EL-CO EFACEC (B1115 contract)/TS-EL-CO

Page 7: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

ENS - MAINTENANCE & ENS - MAINTENANCE & TROUBLESHOOTINGTROUBLESHOOTING

SCATE X serversSCATE X servers TS-EL-CO for first line intervention. No TS-EL-CO for first line intervention. No

official piquet but 24 hour support is official piquet but 24 hour support is assured. assured.

ongoing maintenance contract with EFACEC ongoing maintenance contract with EFACEC (24h-7d helpline)(24h-7d helpline)

RTURTU TS-EL-COTS-EL-CO ASSYSTEM (Preventive maintenance)ASSYSTEM (Preventive maintenance)

Page 8: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

ENS - MAINTENANCE & ENS - MAINTENANCE & TROUBLESHOOTING TROUBLESHOOTING cont’dcont’d

CONTROLS EQUIPMENT - Micene, DAU, CONTROLS EQUIPMENT - Micene, DAU, IEDIED TS-EL-COTS-EL-CO Remedy ticket service in placeRemedy ticket service in place

CFE (ongoing replacements by RTUs)CFE (ongoing replacements by RTUs) TS-EL-CO: ApplicationsTS-EL-CO: Applications AB-CO: HW/OS/Appl.Servers (elsrv1)/Mil1553 AB-CO: HW/OS/Appl.Servers (elsrv1)/Mil1553

busbus

Page 9: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

PLCPLC Electrical Process dedicatedElectrical Process dedicated Majority of PLCs are Schneider Majority of PLCs are Schneider

(Premium/Twido)(Premium/Twido) Some Siemens PLC (S7-400H)Some Siemens PLC (S7-400H)

Page 10: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

PLC ListPLC List Ventilation substationsVentilation substations Diesel Generators Diesel Generators 48V Commutation48V Commutation EDF-EOS AutoTransfertEDF-EOS AutoTransfert 18kV normal/secours commutation18kV normal/secours commutation 18kV Interlocks18kV Interlocks LV Distribution LHC experiment (11 Premium LV Distribution LHC experiment (11 Premium

type concentrators / around 200 local Twido type concentrators / around 200 local Twido based I/O stations)based I/O stations)

Page 11: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

PLC MANAGEMENTPLC MANAGEMENT Majority Programming outsourced (EuroSystem – Majority Programming outsourced (EuroSystem –

Contract E088)Contract E088) URS definition: TS-ELURS definition: TS-EL HW configuration/Local MMI definition: TS-EL-COHW configuration/Local MMI definition: TS-EL-CO HW failure/card replacement: TS-EL-COHW failure/card replacement: TS-EL-CO Software modifications: EuroSystemSoftware modifications: EuroSystem Spare part management: TS-EL-CO. Possibility Spare part management: TS-EL-CO. Possibility

for a CERN wide spare part management for a CERN wide spare part management contract with Schneider. Currently managed by contract with Schneider. Currently managed by AB-CO (P.Gayet)AB-CO (P.Gayet)

Page 12: 15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES

15 January 200815 January 2008 S.InfanteS.Infante

SUMMARYSUMMARY The ENS system is now up and runningThe ENS system is now up and running The migration from the old (CFE/MICENE) to the The migration from the old (CFE/MICENE) to the

new ENS system (SCATEX/RTU) is ongoing (80% new ENS system (SCATEX/RTU) is ongoing (80% complete)complete)

The ENS management requires both electrical The ENS management requires both electrical and controls specialist knowledge and close and controls specialist knowledge and close collaboration with other sections within TS/ELcollaboration with other sections within TS/EL

Despite limited resources a 24h, 7d “piquet-Despite limited resources a 24h, 7d “piquet-type” service is achievedtype” service is achieved

Significant documentation updates are Significant documentation updates are required.required.