29
(A): Revision Index (H): Internal Diameter (L*I) in meters (N): Design case for exchangers (B): Item (I): Height between tangent lines in meters S: summer case (C): Designation of the Item (J): Material: CS or LTCS + CA mm (Corrosion Allowance), W: winter case (D): Number of items SS, 316L, 304L, TI (Titanium), AL (Aluminum) PW: winter-packed sealine (E): Total number of equipment (K): Design pressure (Barg) case (F), (G): Main and Second Criteria per piece Suction / Discharge for pumps Power If necessary, value will be given as follow: x*value per piece Shell / Tube for exchangers Pe: estimated absorbed Design Flowrate (m 3 /h) In / Bottom or Out / Top Rated Installed Power (kw) (L): Design temperature Pi: installed power Exchanger Surface Area (m 2 ) Same as point (k) Duty (kw) (M): Type Volume (m 3 ) H: Horizontal or V: Vertical Bare tube area (m2); only for areorefrigerant Centrifugal Pump Head at rated capacity (m) Centrifugal (C), Dosing (Dos) for dosing pumps Reciprocating / Dosing Pump Differential Pressure (bar) Exchanger Type(TEMA) Others: trays type (valve, random……) 4) To be finalized during detail engineering. 5) Flow rate to be confirmed based on corrosion inhibitor requirement. shaft power NOTES LEGEND 1) Steam out to be considered:150°C/ATM 2) Full Vacuum to be considered at the temperature of 5°C T: Turbine, M: Motor or D: Diesel, P: Pneumatic 3) By mechanical department Doc. Number : EL-1516-100-P312-001 South Pars Gas Field Development Phases 15&16 Onshore Facilities Rev.: 2 Pars Oil and Gas Company Class: 1 Doc Title : LIST OF EQUIPMENT UNIT-100 This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited. Page 3 of 6 NARGAN

15 & 16 Equipment List

Embed Size (px)

Citation preview

Page 1: 15 & 16 Equipment List

(A): Revision Index (H): Internal Diameter (L*I) in meters (N): Design case for exchangers(B): Item (I): Height between tangent lines in meters S: summer case(C): Designation of the Item (J): Material: CS or LTCS + CA mm (Corrosion Allowance), W: winter case(D): Number of items SS, 316L, 304L, TI (Titanium), AL (Aluminum) PW: winter-packed sealine (E): Total number of equipment (K): Design pressure (Barg) case(F), (G): Main and Second Criteria per piece Suction / Discharge for pumps Power If necessary, value will be given as follow: x*value per piece Shell / Tube for exchangers Pe: estimated absorbed Design Flowrate (m3/h) In / Bottom or Out / Top Rated Installed Power (kw) (L): Design temperature Pi: installed power Exchanger Surface Area (m2) Same as point (k) Duty (kw) (M): Type Volume (m3) H: Horizontal or V: Vertical Bare tube area (m2); only for areorefrigerant Centrifugal Pump Head at rated capacity (m) Centrifugal (C), Dosing (Dos) for dosing pumps Reciprocating / Dosing Pump Differential Pressure (bar) Exchanger Type(TEMA)

Others: trays type (valve, random……)

4) To be finalized during detail engineering. 5) Flow rate to be confirmed based on corrosion inhibitor requirement.

shaft power

NOTES

LEGEND

1) Steam out to be considered:150°C/ATM2) Full Vacuum to be considered at the temperature of 5°C

T: Turbine, M: Motor or D: Diesel, P: Pneumatic

3) By mechanical department

Doc. Number : EL-1516-100-P312-001

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Rev.: 2

Pars Oil and Gas Company

Class: 1

Doc Title : LIST OF EQUIPMENT UNIT-100

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 3 of 6NARGAN

Page 2: 15 & 16 Equipment List

High Pressure Separator100-A-201

100-DH-203 Sump Drum HeaterSteam Condensate Surge DrumSump DrumHigh Pressure Separator

100-D-203100-D-202100-D-201

100-E-201

100-D-204

Gas HeaterGas Heater

Steam Condensate Surge DrumSump Drum Heater

Methanol Storage DrumMethanol Injection Package

Slug Catcher MEG Injection Pumps

Slug Catcher

Methanol Injection PackageMethanol Storage Drum

HP Separator MEG Injection Pumps HP Separator MEG Injection PumpsSlug Catcher MEG Injection Pumps

100-P-205 Methanol Injection Pump

100-X-201

100-D-205100-U-201

Methanol Injection Pump

Sump Pump

Phase 16

High Pressure SeparatorLP Steam Condenser

Slug Catcher

Steam Condensate PumpsSump Pump

100-P-204 A/B/C100-P-203 A/B100-P-202 A/B100-P-201

100-U-101

100-X-101

100-P-105100-D-105

100-P-104 A/B/C

Phase 15

100-P-101100-E-101100-DH-103100-D-104100-D-103100-D-102100-D-101100-A-101

Page 4 of 6

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-100 Pars Oil and Gas Company

Rev.: 2

100-P-103 A/B100-P-102 A/B

Class: 1Doc. Number : EL-1516-100-P312-001

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ITEM LIST

LP Steam Condenser

Sump DrumHigh Pressure Separator

Steam Condensate Pumps

NARGAN

eghtesadi
Highlight
Page 3: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm

(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

1 100-A-101 1 2 68.6 m2 Air Cooler

1 100-D-101 1 2 3.2 6.0 V

1 100-D-102 1 2 3.2 6.0 V

1 100-D-103 1 2 2.25 6.3 H

1 100-D-104 1 2 1.4 4.2 H

1 100-D-105 1 2 V

1 100-DH-103 1 2 Electric Heater

1 100-E-101 1 2 201.6 m2 CS + 3

mm SS 304L 8 (2) 82 (2) 270 -46/85 (1) BEM

1 100-P-101 1 2 96 m (3) (3)Centr.

Vertical Submerged

1 100-P-102 A/B 2 4 66.8 m (3) (3) Centri. Hrizontal

1 100-P-103 A/B 2 4 DP=79.9 /107.9bar (3) (3) Reciprocatin

g / Dosing

1 100-P-104 A/B/C 3 6 DP=66.7 /

79.9bar (3) (3) Reciprocating / Dosing

1 100-P-105 1 2 DP=81 bar Reciprocating / Dosing

1 100-X-101 1 2 6×46" Finger

Pe=6.1 kW

85136 Pe: by vendor

Pe=16.4 kW

Design case: PW - W

55

135

T.L. H

(m)

No of ITEM

No of Equi. Total

Main CRITERIA

SecondCRITERIA

Diam. L. x I. (m)

REV. ITEM

19900 kW

Sump Drum Heater

Methanol Storage Drum 5 m³

( C)

2141kW

Gas Heater

High Pressure Separator

7.2 m³ CS+3 mm

65.4 m³

28.2 m³

High Pressure Separator

Sump Drum SS (AISI 304 L)

Included in 100-D-103

85 Included in 100-U-101

(F) (K)

14 (2)

(L)

135 (1)

-46/85 (1)

135 (1)

Material (4)

(J)

Design Temp

Type Remarks

Design case: PW

(N)

CS+3mm on Header 2 (2)

Design Pressure

39.5 m³/h

LTCS + SS clad (TP 321)

LTCS + SS clad (TP 321)

CS+3 mm

2.0 (2)

82 (2) -46/85 (1)

3.5 (2)

-58/55 (1)

11.5

25

Slug Catcher MEG Injection Pumps

Steam Condensate Pumps

Sump Pump

3 m³/h (5)

15 m³/h

Pe: by vendor

Methanol Injection Pump 1.5 m³/h included in 100-U-101

102.3 85HP Separator MEG Injection Pumps 1 m³/h

90 85

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 5 of 6

Slug Catcher -29/852000 m³

Pars Oil and Gas Company

Doc. Number : EL-1516-100-P312-001 Class: 1Rev.: 2

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-100

65.4 m³

Steam Condensate Surge Drum

LP Steam Condenser

DESIGNATION OF ITEM

82 (2)

CS+3 mm 139

NARGAN

Page 4: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm

(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

1 100-U-101 1 2 -one Methanol Storage Drum (100-D-105)

-one Methanol Injection Pump (100-P-105)

ITEM

Design TempMain

CRITERIA

( C)

DESIGNATION OF ITEM

Each of the two packages consists of:

No of ITEM

Methanol Injection Package

Type

(L) (N)

Remarks

Design PressureMaterial (4)

Doc Title : LIST OF EQUIPMENT UNIT-100

Doc. Number : EL-1516-100-P312-001

Pars Oil and Gas Company

Rev.: 2 Class: 1

(F)

South Pars Gas Field Development Phases 15&16 Onshore Facilities

(J)

T.L. H

(m)

Diam. L. x I. (m)

(K)

SecondCRITERIAREV. No of Equi.

Total

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 6 of 6NARGAN

Page 5: 15 & 16 Equipment List

Common for all six MEG Regeneration Packages102-A-102 LP Steam Condenser

102-U-101 MEG Regeneration Package102-D-105 Rich MEG Flash Drums

102-D-103 Reflux drumGlycol reboilerGlycol flash drumStill column

102-D-101102-C-101102-A-101 External reflux condenser

102-E-101

102-D-102

Rich/lean MEG exchangerLean MEG Booster Pumps

Lean MEG Feed FilterMEG Injection Pumps

Still columnExternal reflux condenserMEG Regeneration Package

Steam Condensate Pumps

Lean MEG Storage Tanks

PH Control Package

Lean MEG Feed Pump Glycol export pumpReflux pump

102-F-202

102-D-202102-D-201

102-D-203102-E-201102-F-201 A/B

102-P-201102-P-207

102-C-201102-A-201102-U-201

Charcoal filter

Glycol reboilerGlycol flash drum

Rich glycol filtersRich/lean MEG exchangerReflux drum

Storage tankInjection pumps

MEG Sump Pump

Injection pumps

Charcoal filterRich glycol filters

102-P-107102-P-101102-F-102102-F-101 A/B

102-T-102 A/B102-T-101 A/B

Rich MEG Storage Tanks

102-P-111 A/B/C/D/E/F

102-P-109 A/B102-T-103102-U-102

102-F-103 A/B102-D-107 102-D-106 A/B

102-P-110

102-P-104 102-P-103 A/B102-P-102 A/B/C102-F-104

Page 4 of 8

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Rich MEG Pumps

102-U-103102-T-104

Corrosion Inhibitor PackageStorage tank

102-U-104

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-102 Pars Oil and Gas Company

Rev.: 0

102-P-106 A/B102-P-105 A/B

Class: 1Doc. Number : EL-1516-102-P312-001

ITEM LIST

MEG Sump Drum

Lean MEG FiltersSteam Condensate Surge Drum

102-T-105102-P-112 A/B/C/D/E/F

Antifoam PackageStorage tankInjection pumps

Reflux pumpGlycol export pump

NARGAN

eghtesadi
Highlight
Page 6: 15 & 16 Equipment List

Rev.: 0

102-P-307102-P-301

Class: 1Doc. Number : EL-1516-102-P312-001

ITEM LIST

External reflux condenser

Glycol reboilerGlycol flash drum

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-102 Pars Oil and Gas Company

102-A-301

Page 5 of 8

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Reflux pump

102-D-303102-D-302102-D-301102-C-301

102-F-302102-F-301 A/B102-E-301

102-C-401102-A-401102-U-401

External reflux condenser

102-E-401102-D-403102-D-402102-D-401

102-P-507102-P-501102-F-502

Still columnExternal reflux condenser

MEG Regeneration Package

Reflux pumpCharcoal filter

Glycol reboilerReflux drum

Charcoal filter

Rich/lean MEG exchanger

102-U-601

102-D-601102-C-601102-A-601

Rich/lean MEG exchangerReflux drumGlycol reboiler

Rich glycol filtersCharcoal filter

Glycol export pumpReflux pump

102-E-601102-D-603102-D-602

102-F-601 A/B102-F-602102-P-601102-P-607

Glycol flash drumStill columnExternal reflux condenser

Glycol export pump

MEG Regeneration Package

Still columnGlycol flash drum

Glycol export pump

102-F-501 A/B

102-D-503

Rich glycol filtersRich glycol filters

Reflux drumRich/lean MEG exchanger

Still column102-A-501

102-E-501 Rich/lean MEG exchangerReflux drumGlycol reboilerGlycol flash drum

102-D-502102-D-501102-C-501

102-F-401 A/B102-F-402102-P-401102-P-407

Rich glycol filtersCharcoal filterReflux pumpGlycol export pump

102-U-301 MEG Regeneration Package 102-U-501 MEG Regeneration Package

NARGAN

Page 7: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

0 102-A-101 1 6

0 102-A-102 1 1 Air Cooler

0 102-C-101 1 6

0 102-D-101 1 6

0 102-D-102 1 6

0 102-D-103 1 6

0 102-D-105 1 1 2.25 6.3 H

0 102-D-106 A/B 2 2 1.85 4.45 V

0 102-D-107 1 1 2 5.4 H

0 102-E-101 1 6

0 102-F-101 A/B 2 12

0 102-F-102 1 6

0 102-F-103 A/B 2 2 Cartridge

CS + 3 mm

3.5 (2) 155 (1)

85 (1) 3.5 (2)

Included in102-U-101 - 601

Included in102-U-101 - 601

CS + 3 mm

T.L. H

(m)

Material (4)

(J)

Type

MEG Sump Drum 28.1 m³

Reflux drum

No of ITEM

No of Equi. Total

SecondCRITERIA

Diam. L. x I. (m)

Main CRITERIA

Glycol flash drum

REV. ITEM

( C)

LP Steam Condenser

Included in102-U-101 - 601

(L)

Still column

Included in102-U-101 - 601

(N)

135 (1)CS + 3 mm

Included in102-U-101 - 601

Included in102-U-101 - 601

Included in102-U-101 - 601

4090 kW

(K)(F)

CS + Coating + 3 mm

CS + 3 mm

Rich MEG Flash Drums

Rich glycol filters

Rich/lean MEG exchanger

Steam Condensate Surge Drum

13.6 m³

19.1 m³

Pars Oil and Gas Company

6.5 85

2 (2)

Included in102-U-101 - 601

135 (1)

Charcoal filter

Class: 1Rev.: 0

Remarks

Design TempDesign Pressure

Glycol reboiler

External reflux condenser

DESIGNATION OF ITEM

2 (2)

Doc. Number : EL-1516-102-P312-001

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-102

Lean MEG Filters 44 m³/h

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 6 of 8NARGAN

Page 8: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

0 102-F-104 1 1 Cartridge

0 102-P-101 1 6

0 102-P-102 A/B/C 3 3 DP= 210.3

bar (3) (3) Reciprocating /Dosing

0 102-P-103 A/B 2 2 41.6 m (3) (3) Centrifugal

0 102-P-104 1 1 54.2 m (3) (3) Centr. Vertical Submerged

0 102-P-105 A/B 2 2 187 m (3) (3) Centrifugal

0 102-P-106 A/B 2 2 48.4 m (3) (3) Centrifugal

0 102-P-107 1 6

0 102-P-109 A/B 2 2

0 102-P-110 1 1 53.6 m (3) (3) Centrifugal

0 102-P-111 A/B/C/D/E/F 6 6

0 102-P-112 A/B/C/D/E/F 6 6

0 102-T-101 A/B 2 2 12 11 Fixed roof

DESIGNATION OF ITEM

Steam Condensate Pumps

85234

6.5 85

24.8

7.93

85

135

Class: 1Rev.: 0

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 7 of 8

Design Pressure

MEG Sump Pump

Lean MEG Feed Filter CS + 3 mm

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-102

22 m³/h

9.2 155

Pars Oil and Gas Company

Doc. Number : EL-1516-102-P312-001

Lean MEG Storage Tanks

working capacity1000 m3

-10 / 170 mbarg +hydrostatic head 85CS + 1.5 mm

Injection pumps

Injection pumps

Injection pumps

Lean MEG Feed Pump 5 m³/h

Included in102-U-104

Included in102-U-103

Pe= 15.5 kW

Included in102-U-101 - 601

(F) (K)

Pe= 3.9 kW

Pe= 257.3 kW

5 m³/h

44 m³/h

3.7 (5) 85

Lean MEG Booster Pumps

Included in102-U-102

85 Pe= 5.9 kW

Pe= 92.4 kW

15 m³/h

Pe= 9.1 kW

70 m³/h

7.7

REV. ITEM

Glycol export pump

Rich MEG Pumps 80 m³/h

( C)

Reflux pump

No of ITEM

MEG Injection Pumps

No of Equi. Total

Main CRITERIA

SecondCRITERIA

T.L. H

(m)

Diam. L. x I. (m)

Material (4)

(J)

Included in102-U-101 - 601

Type Remarks

Design Temp

(N)(L)

NARGAN

Page 9: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

0 102-T-102 A/B 2 2 12 11 Fixed roof

0 102-T-103 1 1

0 102-T-104 1 1

0 102-T-105 1 1

0 102-U-101 1 6

0 102-U-102 1 1

0 102-U-103 1 1

0 102-U-104 1 1Antifoam Package Total capacity: 60 l/h. (7) This package contains: one storage tank (102-T-105), six identical Injection pumps (102-P-112 A/B/C/D/E/F).

Total capacity: 73047 Kg/h. MEG: 27758 Kg/h, water: 45289 Kg/h. 6 identical MEG regeneration packages are provided: 4x25% packages normally operating and 2 stand-by packages.

Total capacity: 3.0 m3 /h.This package contains: one storage tank (102-T-103), two Injection pumps (102-P-109 A/B).

Total capacity: 6.0 l/h. (6) This package contains: one storage tank (102-T-104), six identical Injection pumps (102-P-111 A/B/C/D/E/F).

No of ITEM

Design Temp

Included in 102-U-102

Type Remarks

(N)

Diam. L. x I. (m)

T.L. H

(m)

Material (4)

Storage tank

MEG Regeneration Package

REV. ITEM

( C)

Included in 102-U-104

(L)

Storage tank

working capacity1000 m3

(J)

CS + 1.5 mm -10 / 170 mbarg +hydrostatic head 85

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-102

Included in 102-U-103

Pars Oil and Gas Company

Doc. Number : EL-1516-102-P312-001 Class: 1Rev.: 0

No of Equi. Total

(K)

Design Pressure

Rich MEG Storage Tanks

DESIGNATION OF ITEM

Main CRITERIA

SecondCRITERIA

Storage tank

(F)

Corrosion Inhibitor Package

PH Control Package

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 8 of 8NARGAN

Page 10: 15 & 16 Equipment List

First Stage Offgas Compressor Aftercooler103-F-101A/B

103-P-104 Sump Drum PumpStabilized Condensate Export PumpsStabilizer Reflux PumpsDesalter Feed Pumps

103-P-102 A/B103-P-101 A/B103-K-101

103-P-105 A/B

103-P-103 A/B

Steam Condensate PumpsFirst Stage Offgas Compressor Suction Drum

Condensate StabiliserPreflash Drum

Corrosion Inhibitor Injection pumpsCorrosion Inhibitor Package

Condensate Degassing Drum

Sump Drum

First Stage Offgas Compressor Discharge Sump Drum Heater

Stabiliser Reflux Drum Demulsifier Injection pumpsDemulsifier Package

103-T-102 Corrosion Inhibitor Storage tank

103-T-101

103-P-107 A/B/C/D/E103-U-102

Condensate Preflash HeatersCondensate Desalter Preheater

Second Stage Offgas Compressor Suction

Stabilizer Reboiler

First Stage & Second Stage Offgas CompressorGlycolated Water Filters

Demulsifier Storage tank

Condensate Recycle Pump

103-P-106 A/B103-U-101

103-P-108

Stabilizer Side Reboiler

103-D-110103-D-109103-D-108

HP Steam Condensate Flash Drum

103-E-103103-E-102103-E-101 A/B103-DH-108

103-E-104

103-D-107

Phase 15

103-D-103 103-D-102 103-D-101103-C-101103-A-104103-A-103103-A-102103-A-101

Page 4 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-103 Pars Oil and Gas Company

Rev.: 0

103-D-106103-D-105

Class: 1Doc. Number : EL-1516-103-P312-001

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ITEM LIST

Stabilized Condensate Air Cooler

Stabilizer Reflux CondenserSecond Stage Offgas Compressor Aftercooler

Condensate Desalter

NARGAN

eghtesadi
Highlight
Page 11: 15 & 16 Equipment List

Class: 1Doc. Number : EL-1516-103-P312-001

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ITEM LIST

Stabilized Condensate Air Cooler

Stabilizer Reflux CondenserSecond Stage Offgas Compressor Aftercooler

Condensate Desalter

Page 5 of 8

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-103 Pars Oil and Gas Company

Rev.: 0

103-D-206103-D-205

103-D-207

Phase 16

103-D-203 103-D-202 103-D-201103-C-201103-A-204103-A-203103-A-202103-A-201

Stabilizer Side Reboiler

103-D-210103-D-209103-D-208

HP Steam Condensate Flash Drum

103-E-203103-E-202103-E-201 A/B103-DH-208

103-E-204

First Stage & Second Stage Offgas CompressorGlycolated Water Filters

Demulsifier Storage tank

Condensate Recycle Pump

103-P-206 A/B103-U-201

103-P-208

Condensate Preflash HeatersCondensate Desalter Preheater

Second Stage Offgas Compressor Suction Drum

Stabilizer Reboiler

103-T-201

103-P-207 A/B/C/D/E103-U-202

Corrosion Inhibitor Storage tank103-T-202Corrosion Inhibitor Injection pumpsCorrosion Inhibitor Package

Condensate Degassing Drum

Sump Drum

First Stage Offgas Compressor Discharge DrumSump Drum Heater

Stabiliser Reflux Drum Demulsifier Injection pumpsDemulsifier Package

103-P-205 A/B

103-P-203 A/B

Steam Condensate PumpsFirst Stage Offgas Compressor Suction Drum

Condensate StabiliserPreflash Drum

First Stage Offgas Compressor Aftercooler103-F-201

103-P-204 Sump Drum PumpStabilized Condensate Export PumpsStabilizer Reflux PumpsDesalter Feed Pumps

103-P-202 A/B103-P-201 A/B103-K-201

NARGAN

Page 12: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

0 103-A-101 1 2 Air Cooler

0 103-A-102 1 2 Air Cooler

0 103-A-103 1 2 Air Cooler

0 103-A-104 1 2 Air Cooler

0 103-C-101 1 2 2.6 23.7 11.8 (2) 11.5 (2) -29/225 (1) -29/110 (1) Valves tray ( SS 304L)

0 103-D-101 1 2 3.55 11.5 H

0 103-D-102 1 2 1.15 2.65 V

0 103-D-103 1 2 1.6 4.5 V

0 103-D-105 1 2 Electrostatic desalter

0 103-D-106 1 2 3.5 10.5 H

0 103-D-107 1 2 1.3 4.15 V

0 103-D-108 1 2 2.4 7.2 H

0 103-D-109 1 2 1.4 4 V

0 103-D-110 1 2 1.25 4.36 V

0 103-DH-108 1 2 Electric Heater

SS 321

SS 321

Dimensions by desalter MFR

85 (1)11.5 (2)

102 (1)

CS + 3 mm

LTCS + COATING+ 3 mm

Main CRITERIA

CS + 3 mm

133 (1)32 (2)

T.L. H

(m)

Material (4)

(J)

130.4 m³

150 (1)

Type Remarks

Design case: S - PW

Design Temp

(N)

First Stage Offgas Compressor Suction

Drum3.2 m³

Preflash Drum 137.2 m³

No of ITEM

No of Equi. Total

SecondCRITERIA

Diam. L. x I. (m)

(F)

1750 kW

251 kW

5960 kW

REV. ITEM

( C)

First Stage Offgas Compressor Aftercooler

Second Stage Offgas Compressor Aftercooler

Stabilizer Reflux Condenser SS 321 115 (1)11.5 (2)

-46 / +85 (1)

103-A-102 in one common bay

with 103-A-103 sharing fans.

Design case: W

Design case: S - W

CS + 3 mm

CS 12 (2)

(L)

LTCS + 3 mm

CS + 3 mm

(K)

160 (1)

11.5 (2) 105 (1)

CS + 3 mm

85

3.5 (2)

213 T/h 328 m³/h 46.5

Second Stage Offgas Compressor Suction

Drum

112.8m³

Stabiliser Reflux Drum

Condensate Degassing Drum

Condensate Desalter

6.1 m³

11.2 m³

HP Steam Condensate Flash

Drum6.9 m³

3.5 (2) -46 / +205 (1)Sump Drum 36.4 m³

8 (2) 270 (1)

First Stage Offgas Compressor

Discharge Drum133 (1)6.4 m³ SS 321 32 (2)

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-103

1920 kW

Pars Oil and Gas Company

Doc. Number : EL-1516-103-P312-001 Class: 1Rev.: 0

82 (2) 150 (1)SS 321

Design Pressure

Condensate Stabiliser

Stabilized Condensate Air

Cooler

DESIGNATION OF ITEM

32 (2)

32 (2)

SS 321

Included in 103-D-108

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 6 of 8

Sump Drum Heater

NARGAN

Page 13: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

0 103-E-101 A/B 2 4 CS + 3 mm

LTCS + 3 mm 12 (2) 139 (2) 160 (1) -46 / +85 NEN

0 103-E-102 1 2 CS + 3 mm CS + 3 mm 12 (2) 46.5 (2) 210 (1) 95 (1) AES

0 103-E-103 1 2 CS + 3 mm CS + 3 mm 12 (2) 55 (2) 225 (1) 330 (1) BKU

0 103-E-104 1 2 CS + 3 mm CS + 3 mm 11.8 (2) 12 (2) 175 (1) 225 (1) BXU

0 103-F-101A/B 2 4 Cartidge orBasket

0 103-K-101 1 2 DP = 19.1 bar (3) (3) 11.5 32.0 105 132 Reciprocating

DP = 43.9 bar (3) (3) 32.0 82.0 132 150 Reciprocating

0 103-P-101 A/B 2 4 146 m (3) (3) Centrifugal

0 103-P-102 A/B 2 4 72 m (3) (3) Centrifugal

0 103-P-103 A/B 2 4 151 m (3) (3) Centrifugal

0 103-P-104 1 2 79.1 m (3) (3) Centr. VerticalSubmerged

0 103-P-105 A/B 2 4 150.45 m (3) (3) Centrifugal

0 103-P-106 A/B 2 4

0 103-P-107 A/B/C/D/E 5 10

0 103-P-108 1 2 626.4 m (3) (3) Centrifugal

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 7 of 8

Design Pressure

Glycolated Water Filters

Condensate Preflash Heaters

DESIGNATION OF ITEM

And Second Stage Offgas Compressor

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-103

12030 kW

33 (2) -46/85 (1)

Pars Oil and Gas Company

Doc. Number : EL-1516-103-P312-001 Class: 1Rev.: 0

Condensate Recycle Pump 102 Pe = 304 KW160 m³/h 48.5

Corrosion Inhibitor Injection pumps Included In 103-U-102

Demulsifier Injection pumps Includeed In 103-U-101

Stabilizer Reflux Pumps

15 m³/h

Steam Condensate Pumps

Sump Drum Pump

Stabilized Condensate Export

Pumps

Pe = 25.1 KW

Pe = 9.5 KW

29.5 m³/h

102

13.5

290 m³/h 18.4

27025.4

-46 / 175

44.1

Design Temp

(N)(L)

Pe = 1883 KW

(F) (K)

Design Case: S-PW

11020 kW

3260 kW

6710 kW

Stabilizer Reboiler

Stabilizer Side Reboiler

Pe = 4.9 KW

85 Pe = 153 KW

Pe = 920 KW

51 m³/h LTCS + 3 mm

Design Case: S-PW

37245.9 Nm³/h

Diam. L. x I. (m)

REV. ITEM

2.5 m³/h

Desalter Feed Pumps 344.2 m³/h

First Stage Offgas Compressor

14460.1 Nm³/h

( C)

Condensate Desalter Preheater

No of ITEM

No of Equi. Total

Main CRITERIA

SecondCRITERIA

Pe = 139.4 KW

T.L. H

(m)

Material (4)

(J)

Design Case PW-W

Type Remarks

Design Case: PW

17.3 85

NARGAN

Page 14: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm

(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

0 103-T-101 1 2

0 103-T-102 1 2

0 103-U-101 1 2

0 103-U-102 1 2Corrosion Inhibitor

PackageEach of the two packages contains:- one Storage Tank (103-T-102);- five Injection Pumps (103-P-107 A/B/C/D/E);-spare pumps in warehouse.

Diam. L. x I. (m)

T.L. H

(m)

Material (4)

(J)

Design Temp

Included In 103-U-102

Type Remarks

Included In 103-U-101

(N)

REV. ITEM

( C)

No of ITEM

Demulsifier Package

(F) (K) (L)

Corrosion Inhibitor Storage tank

Each of the two packages contains:- one Storage Tank (103-T-101);- two Injection Pumps (103-P-106 A/B), one inservice and one in stand-by.

Doc Title : LIST OF EQUIPMENT UNIT-103 Pars Oil and Gas Company

Doc. Number : EL-1516-103-P312-001 Class: 1Rev.: 0

No of Equi. Total

Main CRITERIA

SecondCRITERIA

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 8 of 8

Design Pressure

Demulsifier Storage tank

DESIGNATION OF ITEM

South Pars Gas Field Development Phases 15&16 Onshore Facilities

NARGAN

Page 15: 15 & 16 Equipment List

109-P-101 A/B/C/D

109-P-109

First Steam Condensate Surge Drum

109-E-102 Second Sour Water Stripper Reboiler109-F-101 A/B First Sour Water Filters109-F-102 A/B Second Sour Water Filters

Sour Water Sump Drum Heater

109-P-108 A/B

Sour Water Stripper Feed Pumps

First Sour Water Stripper Bottom PumpsFirst Sour Water Stripper Reflux PumpsSecond Sour Water Stripper Bottom PumpsSecond Sour Water Stripper Reflux PumpsFirst Steam Condensate PumpsSecond Steam Condensate PumpsSour Water Sump Pump

First Sour Water Stripper Reboiler

Second Sour Water Stripper Reflux Drum

First Sour Water Stripper Bottom CoolerFirst Sour Water Stripper CondenserSecond Sour Water Stripper Bottom CoolerSecond Sour Water Stripper Condenser

Second Sour Water StripperFirst Sour Water Stripper Feed DrumSecond Sour Water Stripper Feed DrumFirst Sour Water Stripper Reflux Drum

Class: 1Doc. Number : EL-1516-109-P312-001

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ITEM LIST

Page 4 of 7

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-109 Pars Oil and Gas Company

Rev.: 1

109-D-102109-D-101

109-D-103

Common to phases 15 & 16

109-C-102109-C-101109-A-106109-A-105109-A-104109-A-103109-A-102109-A-101

109-D-106109-D-105109-D-104

109-E-101

109-D-107109-DH-101

Slop Oil Pumps

109-P-106 A/B

109-P-102 A/B109-P-103 A/B109-P-104 A/B

Sour Water Sump DrumSecond Steam Condensate Surge Drum

First Steam Condensate Surge Drum CondenserSecond Steam Condensate Surge Drum CondenserFirst Sour Water Stripper 109-P-107 A/B

109-P-105 A/B

NARGAN

eghtesadi
Highlight
Page 16: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

1 109-A-101 1 1 176.3 m2 Air cooler

1 109-A-102 1 1 116.3 m2 Air cooler

1 109-A-103 1 1 176.3 m2 Air cooler

1 109-A-104 1 1 116.3 m2 Air cooler

1 109-A-105 1 1 14.3 m2 Air cooler

1 109-A-106 1 1 14.3 m2 Air cooler

1 109-C-101 1 1 1.35 20.7 3.8 (2) 3.5 (2) Packing

1 109-C-102 1 1 1.35 20.7 3.8 (2) 3.5 (2) Packing

1 109-D-101 1 1 2.4 9.12 H

1 109-D-102 1 1 2.4 9.12 H

1 109-D-103 1 1 1.1 2.39 H

1 109-D-104 1 1 1.1 2.39 H

190 (1)

190 (1)

DESIGNATION OF ITEM

3.5 (2) 148 (1)2.4 m3

135

( C)

SS 316L

Bottom up to 12.5m: CSTop: CS (SS316L clad)

3.5 (2)

3.5 (2)

2 (2)

148 (1)

SS 304L

SS 321

CS+3mm

CS+3mm

Class: 1Rev.: 1

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-109

29.6 m3

2nd SOUR WATER STRIPPER FEED

DRUM

1st SOUR WATER STRIPPER BOTTOM

COOLER

Pars Oil and Gas Company

Doc. Number : EL-1516-109-P312-001

13 (2)

(L)

Pi=2x55 kW common for 109-A-101 and 109-A-103

Design Temp

(N)

Remarks

3320x1.1 Kw

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 5 of 7

2.4 m3 SS 316L 3.5 (2) 148 (1)

135

SS 304L 13 (2)

Type

(J)

150 (1)

(K)

148 (1)

150 (1)

SS 321

131 (1)

1st SOUR WATER STRIPPER

44.9 m3 CS (SS321 cladding)

29.6 m3

44.9 m3

2nd SOUR WATER STRIPPER

CS (SS321 cladding)

REV. ITEM

1st SOUR WATER STRIPPER

CONDENSER

(F)

No of ITEM

No of Equi. Total

131 (1)

3.5 (2)

Bottom up to 12.5m: CSTop: CS (SS316L clad)

3.5 (2)

Main CRITERIA

SecondCRITERIA

Pi=2x45 kW common for 109-A-102/104/105/106406x1.1 Kw

406x1.1 Kw

T.L. H

(m)

Diam. L. x I.

(m)

Design PressureMaterial (4)

2 (2)

Pi=2x45 kW common for 109-A-102/104/105/106

Pi=2x55 kW common for 109-A-101 and 109-A-103

Pi=2x45 kW common for 109-A-102/104/105/106

Pi=2x45 kW common for 109-A-102/104/105/106

3970 Kw

3320x1.1 Kw

3970 Kw

2nd SOUR WATER STRIPPER REFLUX

DRUM

2nd SOUR WATER STRIPPER

CONDENSER

1st STEAM COND. SURGE DRUM CONDENSER

2nd STEAM COND. SURGE DRUM CONDENSER

1st SOUR WATER STRIPPER REFLUX

DRUM

2nd SOUR WATER STRIPPER BOTTOM

COOLER

1st SOUR WATER STRIPPER FEED

DRUM

NARGAN

Page 17: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

1 109-D-105 1 1 1.1 2.2 H

1 109-D-106 1 1 1.1 2.2 H

1 109-D-107 1 1 2.2 5.1 H

1 109-DH-101 1 1 Electric Heater

1 109-E-101 1 1 309.3 m2 CS+ 3mm SS 304L 5.4 (2) 8 (2) 162 270 BKU

1 109-E-102 1 1 309.3 m3 CS+ 3mm SS 304L 5.4 (2) 8 (2) 162 270 BKU

1 109-F-101 1 2 Cartridge or basket

1 109-F-102 1 2 Cartridge or basket

1 109-P-101 A/B/C/D 2 4 63.2 m (3) (3) Centrifugal

1 109-P-102 A/B 2 2 25.2 m (3) (3) Centrifugal

1 109-P-103 A/B 1 2 26.1 m (3) (3) Centrifugal Pe=5.2 Kw7.5 150

13111.3SOUR WATER

STRIPPER FEED PUMPS

1st SOUR WATER STRIPPER BTTOM

PUMPS42.5 m3/h

SLOP OIL PUMPS

SecondCRITERIA

No of ITEM

No of Equi. Total

Main CRITERIA

(F)

2.4 m3

2.4 m3

4.7x103kW

( C)

1st STEAM CONDENSATE SURGE DRUM

2nd STEAM CONDENSATE SURGE DRUM

REV. ITEMT.L.

H(m)

Diam. L. x I.

(m)

Design PressureMaterial (4)

135 (1)

135 (1)

CS + 3mm

CS + 3mm

2 (2)

Type

2 (2)

(K)(J)

Remarks

Design Temp

(N)(L)

SUMP DRUM HEATER

SOUR WATER SUMP DRUM

Included in 109-D-107

148 (1)CS+coating+3mm22.2 m3

2nd SOUR WATER STRIPPER REBOILER

1st SOUR WATER STRIPPER REBOILER

4.7x103kW

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 6 of 7

1st SOUR WATER FILTERS 62 m3/h

2nd SOUR WATER FILTERS 62 m3/h

CS+3mm

Pars Oil and Gas Company

Doc. Number : EL-1516-109-P312-001 Class: 1Rev.:1

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-109

DESIGNATION OF ITEM

3.5(2)

11.4 (2)

11.4 (2)

Pe=0.8 kW

131 (1)

131 (1)

131

Pe=13.3 kW

5 m3/h 6.1

CS+3mm

31 m3/h

NARGAN

Page 18: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm

(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

1 109-P-104 A/B 1 2 46.9 m (3) (3) Centrifugal

1 109-P-105 A/B 1 2 26.1 m (3) (3) Centrifugal

1 109-P-106 A/B 1 2 46.9 m (3) (3) Centrifugal

1 109-P-107 A/B 1 2 105.2 m (3) (3) Centrifugal

1 109-P-108 A/B 1 2 105.2 m (3) (3) Centrifugal

1 109-P-109 1 1 55.8 m (3) (3)Centr. Vertical Submerged

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 7 of 7

SOUR WATER SUMP PUMP

Pe=8.4 kW

Pe=3.4 kW

8.4 m3/h

148

135

15 m3/h 10.3

(F)

South Pars Gas Field Development Phases 15&16 Onshore Facilities

(J)

T.L. H

(m)

Diam. L. x I.

(m)

(K)

Design Pressure

(N)

Type

1st STEAM CONDENSATE

PUMPS

Pe=3.5 kW6.4 m3/h1st SOUR WATER

STRIPPER REFLUX PUMPS

42.5 m3/h

9.3

7.5

14.4 135 Pe=8.4 kW

Doc Title : LIST OF EQUIPMENT UNIT-109

Doc. Number : EL-1516-109-P312-001

Pars Oil and Gas Company

Rev.:1 Class: 1

SecondCRITERIA Remarks

Material (4)

(L)

Design Temp

14.42nd STEAM

CONDENSATE PUMPS

No of ITEM

Main CRITERIA

( C)

DESIGNATION OF ITEM

8.4 m3/h

148

ITEMREV. No of Equi. Total

Pe=5.2 kW

2nd SOUR WATER STRIPPER REFLUX

PUMPS6.4 m3/h 9.3 148 Pe=3.5 kW

2nd SOUR WATER STRIPPER BTTOM

PUMPS150

NARGAN

Page 19: 15 & 16 Equipment List

110-DH-105 Sump Drum Heater

Condensate Second Heater

Sump Drum

Condensate Preflash Heater

Stabilized Condensate PumpSteam Condensate Pump

110-P-103

Page 4 of 5

Sump Drum Pump

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-110 Pars Oil and Gas Company

Class: 1Doc. Number : EL-1516-110-P312-001

110-P-101110-F-101 A/B

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ITEM LIST

Preflash Drum

Degassing Drum

Glycolated Water Filter

110-P-102

110-D-103

110-E-103110-E-102

HP Steam Condensate Flash Drum

Rev.: 1

110-E-101 A/B

110-D-105110-D-104

Condensate Final Heater

110-D-102110-D-101

Flash Drum

Phase 15 &16

NARGAN

eghtesadi
Highlight
Page 20: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

1 110-D-101 1 1 3.6 11.5 H

1 110-D-102 1 1 3.1 10 H

1 110-D-103 1 1 3.2 9 H

1 110-D-104 1 1 1.4 5.4 V

1 110-D-105 1 1 2.25 6.75 H

1 110-DH-105 1 4

1 110-E-101A/B 1 2 CS+3mm (3)

LTCS+3mm (3) 5 (2) 139 (2) 165 (1) -46/85 (1) NEN

1 110-E-102 1 1 CS+3mm (3)

CS+3mm (3) 5 (2) 18 (2) 205 (1) 105 (1) AES

1 110-E-103 1 1 CS+3mm (3)

CS+3mm (3) 18 (2) 55 (2) 205 (1) 330 BEU

1 110-F-101 A/B 1 2 Cartridge or basket

1 110-P-101 1 1 90.5 m CS+ 3mm (3) (3) Centrifugal

1 110-P-102 1 1 117.3 m CS+ 3mm (3) (3) Centrifugal

1 110-P-103 1 1 158.7 m (3) (3) Centr. VerticalSubmerged

CONDENSATE SECOND HEATER Design case: S

SUMP DRUM HEATER 45 kW (3)

Design case: WDCONDENSATE PREFLASH HEATER 11021x1.1 kW

REV. ITEMT.L. H

(m)

No of ITEM

No of Equi. Total

Main CRITERIA

(3)

SecondCRITERIA

DESIGNATION OF ITEM

STEAM CONDENSATE

PUMP

Diam. L. x I. (m)

( C)

DEGASSING DRUM 81.0 m3

9.0 m3

SUMP DRUM 29.8 m3

STEAM CONDENSATE FLASH DRUM

18 (2)

17.6

204m3/h 12.5

21.5

50.6 m3/h

17344x1.1 kW

12.9 m3/h

4301x1.1 kW

LTCS+3mm (3)

270 Pe= 20.9 kW

Design case: WD

Pe= 7.2 kW

129.3 m3LTCS+3mm (3)

SS (TP321) (3) (*) 17 (2)

(F) (K)

SUMP DRUM PUMP

STABILISED CONDENSATE

PUMP

GLYCOLED WATER FILTERS -46/85 (1)

135

205

Pe= 55.5 kW

35.7 m3/h

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 5 of 5

(*) Internals

3.5 (2)

CS+3mm (3) 8 (2)

205 (1) (*) Internals

135 (1)

5 (2)

270 (1)

Design Temp

(N)

Design Pressure

(L)

-46/85 (1)

CS+3mm (3) SS (TP321) (3) (*)

CS+3mm (3)

Pars Oil and Gas Company

Doc. Number : EL-1516-110-P312-001

Material (3)

(J)

Type Remarks

Class: 1Rev.: 1

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-110

CONDENSATE FINAL HEATER

FLASH DRUM 83.3 m3

PREFLASH DRUM

Included in 110-D-105

LTCS+coating+3mm (3)SS (3) (*)

3.5 (2) -46/205 (1) (*) Internals

NARGAN

Page 21: 15 & 16 Equipment List

110-DH-105 Sump Drum Heater

Condensate Second Heater

Sump Drum

Condensate Preflash Heater

Stabilized Condensate PumpSteam Condensate Pump

110-P-103

Page 4 of 5

Sump Drum Pump

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-110 Pars Oil and Gas Company

Class: 1Doc. Number : EL-1516-110-P312-001

110-P-101110-F-101 A/B

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ITEM LIST

Preflash Drum

Degassing Drum

Glycolated Water Filter

110-P-102

110-D-103

110-E-103110-E-102

HP Steam Condensate Flash Drum

Rev.: 2

110-E-101 A/B

110-D-105110-D-104

Condensate Final Heater

110-D-102110-D-101

Flash Drum

Phase 15 &16

NARGAN

Page 22: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

2 110-D-101 1 1 3.6 11.5 H

2 110-D-102 1 1 3.1 10 H

3 110-D-103 1 1 3.2 9 H

2 110-D-104 1 1 1.4 5.4 V

3 110-D-105 1 1 2.25 6.75 H

1 110-DH-105 1 1

3 110-E-101A/B 1 2 CS+3mm (3)

LTCS+3mm (3) 5 (2) 139 (2) 165 (1) -46/85 (1) NEN

3 110-E-102 1 1 CS+3mm (3)

CS+3mm (3) 5 (2) 18 (2) 205 (1) 105 (1) AES

2 110-E-103 1 1 CS+3mm (3)

CS+3mm (3) 18 (2) 55 (2) 205 (1) 330 BEU

2 110-F-101 A/B 1 2 Cartridge or basket

1 110-P-101 1 1 90.5 m CS+ 3mm (3) (3) Centrifugal

1 110-P-102 1 1 117.3 m CS+ 3mm (3) (3) Centrifugal

1 110-P-103 1 1 158.7 m (3) (3) Centr. VerticalSubmerged

CONDENSATE SECOND HEATER Design case: S

SUMP DRUM HEATER 45 kW (3)

Design case: WDCONDENSATE PREFLASH HEATER 11021x1.1 kW

REV. ITEMT.L. H

(m)

No of ITEM

No of Equi. Total

Main CRITERIA

(3)

SecondCRITERIA

DESIGNATION OF ITEM

STEAM CONDENSATE

PUMP

Diam. L. x I. (m)

( C)

DEGASSING DRUM 81.0 m3

9.0 m3

SUMP DRUM 29.8 m3

STEAM CONDENSATE FLASH DRUM

18 (2)

17.6

204m3/h 12.5

21.5

50.6 m3/h

17344x1.1 kW

12.9 m3/h

4301x1.1 kW

LTCS+3mm (3)

270 Pe= 20.9 kW

Design case: WD

Pe= 7.2 kW

129.3 m3LTCS+3mm (3)

SS (TP321) (3) (*) 17 (2)

(F) (K)

SUMP DRUM PUMP

STABILISED CONDENSATE

PUMP

GLYCOLED WATER FILTERS -46/85 (1)

135

205

Pe= 55.5 kW

35.7 m3/h

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 5 of 5

(*) Internals

3.5 (2)

CS+3mm (3) 8 (2)

205 (1) (*) Internals

135 (1)

5 (2)

270 (1)

Design Temp

(N)

Design Pressure

(L)

-46/85 (1)

CS+3mm (3) SS (TP321) (3) (*)

CS+3mm (3)

Pars Oil and Gas Company

Doc. Number : EL-1516-110-P312-001

Material (3)

(J)

Type Remarks

Class: 1Rev.: 2

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-110

CONDENSATE FINAL HEATER

FLASH DRUM 83.3 m3

PREFLASH DRUM

Included in 110-D-105

LTCS+coating+3mm (3)SS (3) (*)

3.5 (2) -46/205 (1) (*) Internals

NARGAN

Page 23: 15 & 16 Equipment List

Class: 1Doc. Number : EL-1516-122-P312-001

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

ITEM LIST

HP Fuel Gas Drum

Page 4 of 5

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-122 Pars Oil and Gas Company

Rev.: 0

Phases 15&16 -Train 1

122-D-102 A122-D-101 A

Phases 15&16 -Train 2

LP Fuel Gas DrumHP Fuel Gas Drum

LP Fuel Gas Drum122-D-101 B122-D-102 B

NARGAN

eghtesadi
Highlight
Page 24: 15 & 16 Equipment List

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top

(°C)

(A) (B) (D) (E) ( G) (H) (I) (M)

0 122-D-101 A/B 2 2 1.5 3 V

0 122-D-101 A/B 2 2 1.2 2.9 V

HP Fuel Gas Drums

DESIGNATION OF ITEM

Class: 1Rev.: 0

(N)

7.1 m3 CS+3 mmCA (1)

(F)

REV.

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc Title : LIST OF EQUIPMENT UNIT-122 Pars Oil and Gas Company

(L)

85

Doc. Number : EL-1516-122-P312-001

Design PressureMaterial (2)

(J)

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Page 5 of 5

Type Remarks

Internals: S.S

Design Temp

31

(K)

ITEM

HP Fuel Gas Drums

( C)

T.L. H

(m)

No of ITEM

No of Equi. Total

Main CRITERIA

SecondCRITERIA

Diam. L. x I. (m)

CS+3 mmCA (1) 85 Internals: S.S3.7 m3 8.5

NARGAN

Page 25: 15 & 16 Equipment List

147-A-101 147-T-101147-D-101 A/B 147-T-102147-D-102 A/B 147-X-101147-D-103 A/B

147-P-109

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Pars Oil and Gas Company

Doc. Number : EL-1516-147-P312-001Rev. No.: 0

Class: 3

Doc Title : EQUIPMENT LIST FOR PROPANE STORAGE AND EXPORT( UNIT 147 )

ITEM LIST

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.Page 4 of 6

Common to Phasees 15 &16

Refrigerant CondenserLow Pressure Suction DrumsMedium Pressure Suction DrumsHigh Pressure Suction Drums

Propane Storage TankPropane Storage Tank

Refrigerant Surge DrumPropane BOG Compressor Suction DrumRecovered Propane DrumLPG Flare KO DrumRefrigeration Area Drain DrumTank Area Drain DrumLow Pressure Propane ChillerMedium Pressure Propane ChillerHigh Pressure Propane ChillerPropane Boil Off Gas CondenserRefrigerant CompressorPropane Boil Off Gas CompressorPropane Loading PumpsPropane Circulation PumpPropane Loading PumpsPropane Circulating PumpPropane Recovery PumpRefrigeration Area Drain Drum PumpTank Area Drain Drum Pump

147-D-104147-D-105147-D-106147-D-107147-D-108147-D-109147-E-101147-E-102147-E-103147-E-104147-K-101 A/B

LPG Tank Flare Package

Recovered Propane Transfer Pump

147-P-104147-P-106147-P-107147-P-108

147-K-102 A/B147-P-101 A/B147-P-102147-P-103 A/B/C

NARGAN

eghtesadi
Highlight
Page 26: 15 & 16 Equipment List

Class: 3 Page 5 of 5

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top (°C)

(A) (B) (D) (E) ( G) (H) (I) (J) (4) (K) (L) (M)

0 147-A-101 1 1 HOLD m2 Air cooler

0 147-D-101 A/B 2 2 2.1 3.6 V

0 147-D-102 A/B 2 2 1.5 3.2 V

0 147-D-103 A/B 2 2 1.6 3.2 V

0 147-D-104 1 1 2.9 11.3 H

0 147-D-105 1 1 2 3.55 V

0 147-D-106 1 1 1.5 5 H

0 147-D-107 1 1 HOLD HOLD H

0 147-D-108 1 1 3 10 H

0 147-D-109 1 1 3 7 H

0 147-E-101 1 1 (3) LTCS + 3mm LTCS + 3mm 18 45.4 -46 / 55 -46 / 55 HOLD

0 147-E-102 1 1 (3) LTCS + 3mm LTCS + 3mm 18 45.4 -46 / 55 -46 / 55 HOLD

0 147-E-103 1 1 (3) LTCS + 3mm LTCS + 3mm 18 45.4 -46 / 55 -46 / 55 HOLD

0 147-E-104 1 1 (3) LTCS + 3mm LTCS + 3mm 18 18 -46 / 55 -46 / 55 HOLD

0 147-K-101 A/B 2 2 DP=1.9 bar (3) (3) 18 28 -46 / 85 -46 / 115 Centrifugal

DP=5.2 bar (3) (3) 18 28 -46 / 85 -46 / 115 Centrifugal

DP=14 bar (3) (3) 18 28 -46 / 85 -46 / 115 Centrifugal

0 147-K-102 A/B 2 2 DP=2.2 bar (3) (3) 3.5 3.5 -46 / 85 -46 / 85 Centrifugal

REFRIGERANT AREA DRAIN DRUM 77.7 m3 LTCS + 3mm

REFRIGERANT COMPRESSOR 69486 kg/hr

TANK AREA DRAIN DRUM LTCS + 3mm57 m3

Pe=9117 KW

HIGH PRESSURE PROPANE CHILLER 1.12 MW Design case : Holding

Design case : HoldingLOW PRESSURE PROPANE CHILLER 1.30 MW

Design case : Holding

3.48 MW

28965 kg/hr

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc. Number : EL-1516-147-P312-001

Doc Title : EQUIPMENT LIST FOR PROPANE STORAGE AND EXPORT ( UNIT 147 )

-46 / 85

52489 kg/hr

LOW PRESSURE SUCTION DRUMS

PROPANE BOIL OFF GAS COMPRESSOR

Design case : Holding

MEDUIM PRESSURE PROPANE CHILLER 1.93 MW

PROPANE BOIL OFF GAS CONDENSER

91153 kg/hr

LPG FLARE K.O. DRUM HOLD LTCS + 3mm

LTCS + 3mm

HIGH PRESSURE SUCTION DRUMS 8.6 m3 LTCS + 3mm

MEDIUM PRESSURE SUCTION DRUMS 18

LTCS + 3mm

18 -46 / 85

-46 / 85

-46 / 85

HOLD

-46 / 85

3.5 (2)15.3 m3

-46 / 85

-46 / 85

LTCS + 3mm

Pi=19276.6 KWREFRIGERANT CONDENSER LTCS + 3mm 2819.3 MW

Pars Oil and Gas Company

Desing Temp

Remarks

Rev. No.: 0

LTCS + 3mm

Page 5 of 6

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Internals: SS (4)

Main CRITERIAREV.

Internals: SS (4)-46 / 85

ITEM Type

-46/115

DESIGNATION OF ITEM

(N)

Material

87.4 m3

Design PressureNo of Equi.

Total

(F)( C)

No of ITEM

SecondCRITERIA

Diam. L.x.I. (m)

T.L. H(m)

REFRIGERANT SURGE DRUM

18

PROPANE BOG COMPRESSOR SUCTION DRUM

RECOVERED PROPANE DRUM 9.7 m3 LTCS + 3mm 18

17.3 m3

28

7.4 m3

3.5

3.5

Pe=608 KW

3.5

NARGAN

Page 27: 15 & 16 Equipment List

Class: 3 Page 5 of 5

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top (°C)

(A) (B) (D) (E) ( G) (H) (I) (J) (4) (K) (L) (M)

0 147-P-101 A/B/C 3 3 19.74 bar (3) (3) Cent. Vertical Submerged

0 147-P-102 1 1 21.3 bar (3) (3) Cent. Vertical Submerged

0 147-P-103 A/B/C 3 3 19.74 bar (3) (3) Cent. Vertical Submerged

0 147-P-104 1 1 21.3 bar (3) (3) Cent. Vertical Submerged

0 147-P-106 1 1 21.6 bar (3) (3) Reciprocating

0 147-P-107 1 1 9.24 bar (3) (3) Cent. Vertical Submerged

0 147-P-108 1 1 7.6 bar (3) (3) Cent. Vertical Submerged

0 147-P-109 A/B 2 2 4.2 bar (3) (3) Centrifugal

0 147-T-101 1 1 by vendor by vendor Double wall

0 147-T-102 1 1 by vendor by vendor Double wall

0 147-X-101 1 1

-50 / 56

Refrrigerated, full containment, reinforced concrete external wall

-2/+130 mbarg+ full of water

No of Equi. Total

(F)

Pe=812 KW

by vendor

Pe=4.1 KW

-50 / 55 Pe=287 KW

No of ITEM

-2/+130 mbarg+ full of water

TANK AREA DRAIN DRUM PUMP

21 m3/hr

PROPANE CIRCULATION PUMP

PROPANE RECOVERY PUMP 2 m3/hr

PROPANE LOADING PUMPS 1250 m3/hr 25

REV. ITEM Type

-50 / 55

DESIGNATION OF ITEM

(N)( C)

Material

Page 6 of 6

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Main CRITERIA

15 m3/hr 12.1

23.5

25

28.2339 m3/hr

Pars Oil and Gas Company

Desing TempSecond

CRITERIADiam. L.x.I.

(m)T.L. H

(m) Remarks

Rev. No.: 0

Design Pressure

HOLD

Pe=13.5 KW14.8 -46 / 85

Pe=9 KW

Pe=15.8 KW

-50 / 55

-46 / 85

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc. Number : EL-1516-147-P312-001

Doc Title : EQUIPMENT LIST FOR PROPANE STORAGE AND EXPORT ( UNIT 147 )

Pe=812 KW-50 / 55

Pe=287 KW-50 / 55

RECOVERED PROPANE TRANSFER PUMP 52.2 m3/hr

PROPANE STORAGE TANKSworking capacity

45000m4 by vendor

LPG TANK FLARE PACKAGE

PROPANE STORAGE TANKSworking capacity

45000m3

PROPANE CIRCULATION PUMP 339 m3/hr 28.2

22.7

-46 / 85

-46 / 85

1250 m3/hrPROPANE LOADING PUMPS

REFRIGERATION AREA DRAIN DRUM PUMP

NARGAN

Page 28: 15 & 16 Equipment List

148-P-101 A/B/C148-P-102148-P-103 A/B/C148-P-104148-T-101148-T-102

Butane Storage TankButane Storage Tank

Butane Loading PumpsButane Circulating PumpButane Loading PumpsButane Circulating Pump

ITEM LIST

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.Page 4 of 5

Common to Phasees 15 &16

High Pressure Butane ChillerMedium Pressure Butane ChillerButane Circulation Subcooler

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Pars Oil and Gas Company

Doc. Number : EL-1516-148-P312-001Rev. No.: 0

Class: 3

Doc Title : EQUIPMENT LIST FOR BUTANE STORAGE AND EXPORT( UNIT 148 )

148-E-101148-E-102148-E-103

NARGAN

eghtesadi
Highlight
Page 29: 15 & 16 Equipment List

Class: 3 Page 5 of 5

ShellCasing

TubeImpeller

ShellIn/Btm(bar g)

TubeOut/Top (bar g)

ShellIn/Btm(°C)

TubeOut/Top (°C)

(A) (B) (D) (E) ( G) (H) (I) (J) (4) (K) (L) (M)

0 148-E101 1 1 HOLD LTCS+3mm LTCS+3mm 18 24 -46 / 55 -15 / 55 HOLD

0 148-E102 1 1 HOLD LTCS+3mm LTCS+3mm 18 24 -46 / 55 -15 / 55 HOLD

0 148-E103 1 1 HOLD LTCS+3mm LTCS+3mm 18 24 -46 / 55 -29 / 55 HOLD

0 148-P-101 A/B/C 3 3 18.94 bar (3) (3)Centr, Vertical

Submerged

0 148-P-102 1 1 19.2 bar (3) (3)Centr, Vertical

Submerged

0 148-P-103 A/B/C 3 3 18.94 bar (3) (3)Centr, Vertical

Submerged

0 148-P-104 1 1 19.2 bar (3) (3)Centr, Vertical

Submerged

0 148-T-101 1 1 by vendor by vendor Double wall

0 148-T-102 1 1 by vendor by vendor Double wall

-2/+130 mbarg+ full of water

Butane Loading Pumps

Butane Circulating Pump 718 m3/hr 25.6

( C)

No of ITEM

2227 KW

25.6718 m3/hr

SecondCRITERIA

Diam. L.x.I. (m)

T.L. H(m)

Main CRITERIAREV.

-15 / 55

ITEM DESIGNATION OF ITEM

Design PressureNo of Equi.

Total

(F)

Material

-2/+130 mbarg+ full of water

(N)

Page 5 of 5

This document is the property of N.I.O.C.. Any unauthorized attempt to reproduce it, in any form, is strictly prohibited.

Pars Oil and Gas Company

Desing Temp

Remarks

Rev. No.: 0

Type

Design case : HOLDINGHigh Pressure Butane Chiller 634 KW

Pe=822 KW25.31250 m3/hr

Design case : HOLDINGButane Circulation Subcooler

-46 / 55Butane Circulating Pump

Pe=548 KW

-46 / 55 Pe=822 KW

-46 / 55

-46 / 55

Butane Loading Pumps 1250 m3/hr 25.3

Pe=548 KW

Butane Storage Tank by vendor

Butane Storage Tank by vendor

South Pars Gas Field Development Phases 15&16 Onshore Facilities

Doc. Number : EL-1516-148-P312-001

Doc Title : EQUIPMENT LIST FOR BUTANE STORAGE AND EXPORT ( UNIT 148 )

Design case : HOLDING

working capacity

35000 m3

Refrigerated, full containment, reinforced concrete external

wall

-15 / 55

Medium Pressure Butane Chiller 995 KW

NARGAN