    STANDARD OPERATING PROCEDURE (SOP) MANUAL FOR

    WAREHOUSING OPERATIONS

    TITLE : PURCHASE RETURN PROCESS

    Reference No:. WH/SOP/13 Issue No:. 00

    Revision No : 00 Effective Date: 01/01/2006Page 1 of 2

    1. Subject : Purchase Return Process

    2. Purpose : To define the purchase return process to be followed at the warehouses.3. Terminology : As per SOP/WH/03.4. Responsibility : Circle SCM Head5. Flow Diagram :

    Purchase Return

    PO/BO/COCO

    Warehouse

    Vendor

    Finance

    Issue debit note againstvendor to the extent

    material returned

    Transfers all the DOA stock back to

    warehouse

    Sends repalcement against therejected & DOA qty back to the

    warehouse

    Transfers the stock to PO/BO/COCO

    as per stock transfer process.

    Receives DOA material from PO/

    BO/COCO as per receipt process &

    return back to the vendor by

    preparing system generated transit

    document.

    OKConsignment received at

    Warehouse against PO

    Quality check

    result

    Not Ok

    Consolidates all DOA material

    Return the rejected qty back to th e vendor by

    preparing system generated transit document.Keep the said po open for taking back the

    replacement from the vendor for the rejected qty.

    Receives stock from the warehouse

    Vendor Receives rejected& DOA Material from the

    warehouse

    StartPrepare the GRN as per

    receipt process against PO

    6. Procedure :

    Step no. Process descriptionPerformed

    bySystem /Manual

    1 Material received at warehouse from the vendor Exe Manual

    2 Warehouse does quality check of the material Exe Manual

    3If part of the quantity or total quantity is not as perspecifications or rejected in quality check, then rejectedquantity has to be sent back to vendor.

    Exe Manual

    4

    In case of damage material received at the time ofreceipt and If material responsibility is of vendor tillmaterial reaches at DICL warehouse as per PO terms,then Send back the damage material to vendor for

    replacement.

    Exe System

    5In case GRN processing completed then Issue debitnote to vendor to the extent material returned.

    Finance System

    6In case GRN processing not completed, return thematerial.

    Warehouse System

    7System should generate transit document for the saidqty and PO should be open for the said qty so thatreplacement from vendor can be receive at later stage.

    Warehouse System

  • 7/29/2019 14.WH_SOP_13_PurchaseReturnProcess_20080724063732.394_X

    2/2

    STANDARD OPERATING PROCEDURE (SOP) MANUAL FOR

    WAREHOUSING OPERATIONS

    TITLE : PURCHASE RETURN PROCESS

    Reference No:. WH/SOP/13 Issue No:. 00

    Revision No : 00 Effective Date: 01/01/2006Page 2 of 2

    RECORDS

    S. No. Records Stor LocationRetention

    Period1 GRN WH 8 years