Audit Step W/P Ref Preparer Sign-off Reviewer Sign-off 1. Prepare the audit announcement / notification letter informing applicable people of the estimated start date of the audit, the objective and the scope. E-mail it to addressee(s). Maintain e-mail in audit file. 2. Prepare a budget of estimated audit hours by audit category. See Audit Time Budget tab. Identify audit staff that will be assigned to the engagement. 3. Review prior SDLC audits and permanent files to ensure understanding of SDLC process and previously identified audit findings. Document any risks noted in the Risk Assessment tab. Update information in the permanent files, if necessary. 4. Perform pre-audit risk assessment. Map risks identified with audit procedures by updating the Benchmarking and Detail Audit Testing tabs as necessary. 5. Obtain and review the most current SDLC Policies and Procedures manual from auditee. Update the Benchmarking and Detail Audit Testing tabs as necessary. 6. Research industry best practices (ISACA, IIA, NIST, ISO, PMBOK) and compliance requirements (PCI DSS, Privacy, HIPAA, etc.) that are applicable to the system being implemented. Update the Benchmarking and Detail Audit Testing tabs as necessary. Scope The audit of the SDLC process will review each phase of a system implementation project. The audit will address the following areas: governance and risk management, compliance with company procedures and regulation, project management methodology, budget, internal controls, and business processes. 5. Provide management with an evaluation of the project metrics / KPIs and expected benefits stated within the project business case report. AA - Planning 4. Provide management with an assessment of the adequacy of security controls implemented. [INSERT NAME OF AUDIT AND AUDIT NUMBER] Objectives 1. Provide management with an independent assessment of the progress, quality and attainment of project objectives, at defined milestones within the project, based off of company policies and procedures. 3. Provide management with an evaluation of the internal controls of proposed business processes at a point in the development cycle where enhancements can be easily implemented and processes adapted. 2. Provide management with an assessment of the adequacy of project management methodologies and that the methodologies are applied consistently across all projects.

141 ISACA NACACS Auditing IT Projects Audit Program

Embed Size (px)

DESCRIPTION

System audit

Citation preview

Audit Step W/P Ref Preparer

Sign-off

Reviewer

Sign-off

1. Prepare the audit announcement / notification letter informing

applicable people of the estimated start date of the audit, the

objective and the scope. E-mail it to addressee(s). Maintain e-mail

in audit file.

2. Prepare a budget of estimated audit hours by audit category. See

Audit Time Budget tab. Identify audit staff that will be assigned to

the engagement.

3. Review prior SDLC audits and permanent files to ensure

understanding of SDLC process and previously identified audit

findings. Document any risks noted in the Risk Assessment tab.

Update information in the permanent files, if necessary.

4. Perform pre-audit risk assessment. Map risks identified with

audit procedures by updating the Benchmarking and Detail Audit

Testing tabs as necessary.

5. Obtain and review the most current SDLC Policies and

Procedures manual from auditee. Update the Benchmarking and

Detail Audit Testing tabs as necessary.

6. Research industry best practices (ISACA, IIA, NIST, ISO,

PMBOK) and compliance requirements (PCI DSS, Privacy, HIPAA,

etc.) that are applicable to the system being implemented. Update

the Benchmarking and Detail Audit Testing tabs as necessary.

Scope

The audit of the SDLC process will review each phase of a system implementation project. The audit will

address the following areas: governance and risk management, compliance with company procedures and

regulation, project management methodology, budget, internal controls, and business processes.

5. Provide management with an evaluation of the project metrics / KPIs and expected benefits stated within the

project business case report.

AA - Planning

4. Provide management with an assessment of the adequacy of security controls implemented.

[INSERT NAME OF AUDIT AND AUDIT NUMBER]

Objectives

1. Provide management with an independent assessment of the progress, quality and attainment of project

objectives, at defined milestones within the project, based off of company policies and procedures.

3. Provide management with an evaluation of the internal controls of proposed business processes at a point in

the development cycle where enhancements can be easily implemented and processes adapted.

2. Provide management with an assessment of the adequacy of project management methodologies and that

the methodologies are applied consistently across all projects.

Audit Step W/P Ref Preparer

Sign-off

Reviewer

Sign-off7. Schedule pre-audit meeting with audit team and IT Project Team

to discuss the objectives, scope, timing, involvement and

requirements of the audit. Maintain meeting minutes.

(Note: Audit Team should communicate to the Project Team the

expectation that Audit Team will be invited to project meetings and

included in any project e-mail groups.)

8. Prepare a preliminary request list of documentation and discuss

it during the pre-audit meeting (e.g. flow charts, process narratives,

listing of project team members, business case, system product

information, etc).

See separate tab for detailed audit program.

1. Prepare Audit Memos for each major phase of the IT Project (see

below) and e-mail it to Project Team and Project Sponsor. Request

from addressee(s) response(s) to all audit findings, along with an

implementation date.

a. Business case and planning phase.

b. Development and build phase.

c. Testing phase.

d. Pre Go-live & data conversion phase.

f. Training phase.

2. Prepare draft Audit Report and e-mail it to direct addressee(s).

Request from addressee(s) response(s) to all audit findings, along

with an implementation date.

3. Schedule an audit completion meeting with the Project team and

Project Sponsor within 2 weeks of issuing the draft report. Review

draft audit report and discuss audit findings and recommendations.

Maintain meeting minutes.

4. Review management response (i.e. Action Plan) to audit findings.

Review completion date(s) of action items for reasonableness.

5. Prepare final version of Audit Report and include the responses

received from addressee(s) for all audit findings (if applicable). E-

mail it to addressee(s) and management.

6. Prepare and e-mail Audit Survey to auditees. Request that

responses are returned to the Audit Manager. See Audit Survey

tab.

Detailed Audit Testing

BB - Audit Conclusion and Reporting

Audit Step W/P Ref Preparer

Sign-off

Reviewer

Sign-off

1. Perform follow-up procedures (if applicable) to ensure that

responses to audit findings have been implemented. Follow-up

procedures should be performed within 6 months of issuance date

of audit report. (Note: If management hasn't addressed findings,

schedule a meeting with applicable employees to discuss

implementation of action plan. Maintain meeting minutes.)

2. Prepare Follow-up Audit Report and e-mail it to direct

addressess(s) and management.

3. If management is not properly or timely addressing audit findings,

escalate the matter to the CAE. Document escalation in a

memorandum to the Audit Files.

1. Perform a residual risk assessment and incorporate risks into the

annual audit risk assessment.

2. Update permanent file, if necessary.

3. Review audit workpapers. Verify that all review notes have been

properly addressed and closed. Verify that audit sign-offs have

been performed by audit staff and reviewer(s).

4. Schedule a meeting of the audit team to discuss what worked

well during the audit and areas for improvement to consider for

future audits. Discuss with Audit Manager.

5. This audit has been completed in its entirety as of: [insert date]

6. The audit report and workpapers shall be retained for 7 years

from the date of completion, unless indicated otherwise (e.g.

permanent files). The retentation date is:

[insert date]

DD - Audit Close-Out & Retention Dates

CC - Follow-up Audit Procedures

Audit Area Budget Hours Actual Hours Notes

Planning

Reporting

Follow-up Audit Procedures

Audit Close-out

Detailed Audit Testing

Project Governance

Pre Implementation - Business Case & Project Planning

Pre Implementation - System Development

Pre Implementation - Testing

Pre Implementation - Pre Go-Live & Conversion

Pre Implementation - Training

Post Implementation - Support & Maintenance

Post Implementation - Project Assessment

Post Implementation - Internal Controls Assessment

Total Hours 0 0

Planning

Reporting

Follow-up Audit Procedures

Audit Close-out

Detailed Audit Testing

Project Governance

Pre Implementation - Business Case & Project Planning

Pre Implementation - System Development

Pre Implementation - Testing

Pre Implementation - Pre Go-Live & Conversion

Pre Implementation - Training

Post Implementation - Support & Maintenance

Post Implementation - Project Assessment

Post Implementation - Internal Controls Assessment

Total Hours 0 0

Audit Charge Code:

Audit Manager: [Insert Auditor Name]

Audit Senior: [Insert Auditor Name]

Audit Area Budget Hours Actual Hours Notes

Audit Charge Code:

Planning

Reporting

Follow-up Audit Procedures

Audit Close-out

Detailed Audit Testing

Project Governance

Pre Implementation - Business Case & Project Planning

Pre Implementation - System Development

Pre Implementation - Testing

Pre Implementation - Pre Go-Live & Conversion

Pre Implementation - Training

Post Implementation - Support & Maintenance

Post Implementation - Project Assessment

Post Implementation - Internal Controls Assessment

Total Hours 0 0

Audit Staff: [Insert Auditor Name]

[Provide a high level overview of the area(s), function(s), business process(es), and current systems that will be affected by the system being implmeneted.]

General listing of common risks that may occur during a system implementation project.

• System does not align with strategic objectives • End Users do not accept the system due to poor design • Project mismanagement leads to scope creep, budget overruns, and delays • Security vulnerabilities • Internal control gaps • Lack of data completeness, accuracy, and integrity • Inability to adhere to regulation resulting in fines / penalties • Damage to reputation (especially if system is used by external parties) • Disruption of service

Risk Rating Definition High Rating: The potential for a material impact on the company's earnings, assets, reputation, customers, and operations. This risk has a high likelihood of occurring. Medium Rating: The potential for a significant impact on the company's earnings, assets, reputation, customers, and operations. This risk has a medium likelihood of occurring. Low Rating: The potential for a significant impact on the company's earnings, assets, reputation, customers, and operations. This risk has a low likelihood of occurring.

Risk Assessment Questionnaire Audit Notes Risk Rating Audit Step

R1 How will the new system benefit your area and the company

the most?

R2 How critical is the system to the overall organization?

R3 Will the system be included in the corporate wide Disaster

Recovery Plan and / or Business Continuity Plan?

(Note: Not all systems will be in the DRP due to low

criticality rating. Auditor should ask if the department will

prepare procedures to perform in situations where the

system is unavailable? If not, then system should be

reassessed to determine if it warrants Internal Audit

attention due to its insignificance in regards to company

wide needs).

R4 Will this system be used by external parties (e.g. customers

or business partners) or internally?

R5 What function(s) do you believe will be impacted the most

by the new system?

R6 Will the new system change the business process(es)

significantly?

R7 Were other departmental groups included in the

assessment of the product to ensure that it meets all user

needs?

R8 What are the weaknesses in your current process(es) and

will they be addressed by the new system?

R9 Will the new system require a significant amount of

customization?

R10 Will the system contain confidential information? If so, what

kind of data (e.g. customer PII, employee PII, R&D,

intellectual property, etc.)?

R11 How will access to confidential data be safeguarded during

the development of the system (e.g. security is generally not

tight in a development or test environment)?

R12 How will access to confidential data be safeguarded when

system is in production through access rights (e.g.

segregation of duties)?

R13 What systems will be interfacing with the new system?

R14 What system(s) will be retired once the new system is in

production?

R15 What data will be converted over to the new system?

R16 Do you believe the data to be converted is complete and

accurate (e.g. good data) or does the data need to be

cleansed?

R17 Do you believe the budgeted timeline for the project is

acheivable?

R18 If the estimated go-live date was significantly delayed, what

would be the impact on the organization?

R19 What do you believe would be the most challenging aspect

of the project?

R20 Do you believe that the project has the appropriate support

from senior / upper management?

R21 In looking back on previous implementation projects, what

were the things that worked well and what were the things

that did not work well? How do you plan on addressing the

things that did not go well?

R22 Do you have any concerns regarding project team personnel

resources (e.g. availability, training, experience)?

R23 Do you believe that there are departmental silos that may

impact the development and implementation of the system?

R24 What areas do you believe could result in scope creep?

Audit Senior Interview of Project Team Members

Risk Assessment Questionnaire Audit Notes Risk Rating Audit Step

R25 Do you believe that the new system will require a significant

amount of support from the Help Desk, IS, Super Users, or

the Project Team members after it goes live?

R26 Did you include an assessment of the vendor's security

process related to the product you are purchasing for the

history of vulnerabilities, notifying customers of

vulnerabilities and remediating vulnerabilities identified

through patching?

R27 Will you be using a software development model in

implementing this system? (e.g. rapid application

development, joint application development, agile, spiral,

prototype, or waterfall)

R28 Will you be using any implementation tools on the cloud in

implementing this system?

R29 Does this system or the data that will be contained within it

fall under the scope of international / federal / state

regulation?

R30 [Add additional risks as needed]

R31 Indicate risks stated in the annual audit risk assessment.

R32 Indicate risks identified in review of prior SDLC audits

performed.

R33 Indicate any control deficiencies identified in the area(s),

function(s), or business process(es) that have occurred in

the past two years.

R34 Determine if the members on the Project Team have the

proper training and experience to manage a SDLC project.

R35 Are there any financial risks concerning this project (e.g.

going overbudget, impacting the financial statements,

impacting customer billing or vendor payments, etc.)?

R36 Are there any fraud risks that need to be considered

(programming backdoors, unauthorized access to / theft of

data, intentionally misconfiguring the system, unauthorized

individual (internal employees and contractors) with access

to data and / or systems)?

R37 Are there any security risks that need to be considered

(server / OS, application, data, placement in network

infrastructure (segmentation))?

R38 Review post implementation project assessment reports

and identify any lessons learned that may pose a risk to this

project.

r

R39 Assess if there are any risks related to the response in

question #R27.

R40 Assess if there are any risks related to the response in

question #R28.

R41 [Add additional risks as needed]

Audit Team Assessment

Audit Risk Control

Lack of procedures leads to

mismanaged project, system not

meeting business needs, and

ineffective responsibilities and

accountabilities.

IT project management policy,

procedures, and templates have been

developed and are reviewed on a

periodic basis.

A1

Employees do not have the

required skills to implement a

system leading to mismanaged

project and system not meeting

business needs.

Employees involved in IT system

implementation projects have been

trainined on policy, procedures and

use of the templates.

A2

A3

A4

A5

Project Steering Committee provides

oversight over IT system

implementation projects.

Section A - Governance

Audit Procedures

Communication of project status

are not performed throughout the

life cycle of the project resulting in

unidentified issues, surprises and

delays.

A6

A7

A8

A9

A10

A11

A12

A13

Project Steering Committee provides

oversight over IT system

implementation projects.

Project Team meets regularly with

project team members, subject matter

experts, and system implementors /

contractors to review project status

and identify tasks and issues.

Communication of project status

are not performed throughout the

life cycle of the project resulting in

unidentified issues, surprises and

delays.

An organizational change

communication plan is developed and

implemented. (typically for major

systems)

End Users do not accept or use

the system.

A14

B1

B2

B3

B4

Lack of business justification

results in the purchase of a system

that does not meet business

needs.

IT projects are assessed according to

organizational objectives and are

approved.

Vendor is selected according to

company bid procedures.

Inadequate vendor is selected to

implement the system resulting in

cost overruns, project delays, and

system not meeting business

needs.

Section B - Pre-Implementation: Business Case and Project Planning

An organizational change

communication plan is developed and

implemented. (typically for major

systems)

End Users do not accept or use

the system.

B5

B6

B7

B8

B9

B10

B11

Vendor contract is prepared according

to company procedures.

Inadequate contract terms may

result in cost overruns, project

delays, and exposure to additional

risks (e.g. unauthorized access /

disclosure of data).

A project plan is created to establish

accountability and expectations.

Inadequate project planning may

result in cost overruns, project

delays, and system not meeting

business needs.

B12

Lack of procedures leads to

mismanaged project, system not

meeting business needs, and

ineffective responsibilities and

accountabilities.

Project documentation is in

conformance with company

procedures.

B13

System design team does not

understand capabilities resulting in

inadequate system design.

Project Team members are trained on

the capabilities of the system prior to

blueprinting.

B14

B15

C1

C2

System Development Plan meets

business needs and is updated

throughout the project.

C3

Section C - Pre-Implementation: System Development -- Design & Build

System design meetings are held with

a crossfunctional group of users and

technical SMEs.

Inadequate system design results

in a system that does not meet

user needs and increases

likelihood of nonacceptance.

A project plan is created to establish

accountability and expectations.

Inadequate project planning may

result in cost overruns, project

delays, and system not meeting

business needs.

Security and internal control

requirements are included in the

System Development Plan.

C4

System Development Plan is reviewed

and approved by Project Sponsor.

C5

C6

C7

Confidential data is properly secured. C8

Inadequate data conversion plan

results in data integrity issues and

increases likelihood of

nonacceptance by users.

Data Conversion Plan is well designed

and meets business needs.

Inadequate system design results

in a system that does not meet

user needs and increases

likelihood of nonacceptance.

Data Conversion Plan is reviewed and

approved by Project Sponsor.

C9

Lack of procedures leads to

mismanaged project, system not

meeting business needs, and

ineffective responsibilities and

accountabilities.

Project documentation is in

conformance with company

procedures.

C10

Project team members are

unaware of system design

documentation leading to a system

that does not meet business

needs.

Project documentation is

communicated to Project team

members.

C11

C12

C13

System build is in conformance with

company policies and procedures.

Lack of procedures leads to

mismanaged project, system not

meeting business needs, and

ineffective responsibilities and

accountabilities.

Inadequate data conversion plan

results in data integrity issues and

increases likelihood of

nonacceptance by users.

C14

C15

C16

C17

C18

C19

C20

System build is in conformance with

company policies and procedures.

Lack of procedures leads to

mismanaged project, system not

meeting business needs, and

ineffective responsibilities and

accountabilities.

Inaccurate converted data results

in data integrity issues and

increases likelihood of

nonacceptance by users.

Data in the old system is reviewed to

ensure accuracy and integrity.

Data conversion process is tested and

errors are addressed.

Inadequate testing of data

conversion results in unidentified

issues or errors occurring during

the go-live phase.

C21

C22

C23

C24

C25

Project Lead reevalutes the project

budget, timeline, and milestones

against actual results throughout the

project to identify any issues that need

to be addressed.

Lack of project monitoring leads to

budget overruns, delays and not

meeting project objectives.

System documentation is developed

and maintained to current

specifications.

Lack of technical documentation

leads to inability to effectively

support the system.

C26

C27

C28

Lack of a test plan may lead to

ineffective testing resulting in

acceptance of a system that does

not meet business needs.

Test Plan is created to ensure testing

is complete and system meets stated

requirements prior to implementation.

D1

Lack of procedures leads to

mismanaged project, system not

meeting business needs, and

ineffective responsibilities and

accountabilities.

Project documentation is in

conformance with company

procedures.

D2

Lack of a test plan may lead to

ineffective testing resulting in

acceptance of a system that does

not meet business needs.

Test Plan is reviewed and approved by

Project Sponsor.

D3

Test environment is created and kept

separate from the development and

production environment.

D4

Project Lead reevalutes the project

budget, timeline, and milestones

against actual results throughout the

project to identify any issues that need

to be addressed.

Lack of project monitoring leads to

budget overruns, delays and not

meeting project objectives.

Lack of a test environment results

in ineffective testing and may lead

to a system not meeting business

needs.

Section D - Pre-Implemetntation: Test

Test environment simulates the

production environment.

D5

Lack of cross functional testers

may result in system not meeting

business needs.

Testers are made up of cross

functional users to ensure system

meets business needs.

D6

D7

D8

D9

D10

Testing issues identified are not

resolved prior to implementation.

Issues are tracked in a log and

monitored to ensure timely and proper

resolution.

D11

Lack of a test scripts may lead to

ineffective testing resulting in

acceptance of a system that does

not meet business needs.

Test scripts are created and monitored

for satisfactory results.

D12

D13

D14

D15

Lack of a test scripts may lead to

ineffective testing resulting in

acceptance of a system that does

not meet business needs.

Test scripts are created and monitored

for satisfactory results.

Lack of a test environment results

in ineffective testing and may lead

to a system not meeting business

needs.

Lack of technical documentation

leads to inability to effectively

support the system.

System documentation is developed

and maintained to current

specifications.

D16

D17

D18

D19

D20

D21

Lack of implementation plan

results in go-live steps being

missed leading to a system that

does not meet business needs or

unavailability of the new system.

Implementation Plan is created to

ensure a smooth and complete

transition to the production

environment.

E1

Lack of procedures leads to

mismanaged project, system not

meeting business needs, and

ineffective responsibilities and

accountabilities.

Project documentation is in

conformance with company

procedures.

E2

Project Lead reevalutes the project

budget, timeline, and milestones

against actual results throughout the

project to identify any issues that need

to be addressed.

Lack of project monitoring leads to

budget overruns, delays and not

meeting project objectives.

Section E - Pre-Implementation: System Pre Go-live & Data Conversion

Lack of implementation plan

results in go-live steps being

missed leading to a system that

does not meet business needs or

unavailability of the new system.

Implementation Plan is reviewed and

approved by Project Sponsor.

E3

E4

Modification of loss of data in the

old system may impact data

conversion process.

Data in the old system is backed up

prior to data conversion to production

environment.

E5

E6

E7

E8

All test scripts have been completed

with satisfactory results.

E9

Production environment is tested to

ensure it performs in the same

capacity as the test environment.

E10

Unresolved issues are tracked. E11

Unresolved issues are assessed for

impact on the system prior to going

live.

E12

Lack of testing of the production

environment prior to go live may

result in system not meeting

business needs or unavailability of

the system.

Unresolved issues are not

identified resulting in system not

meeting business needs in

production environment.

Inadequate testing of data

conversion results in unidentified

issues or errors occurring during

the go-live phase.

Data conversion process is tested and

errors are addressed.

Unresolved issues are reviewed and

approved.

E13

Privielged users do not have access to

the production environment.

E14

Security personnel review and approve

the security specifications prior to

system going live.

E15

Lack of access review may lead to

unauthorized users having access

to the system or authorized users

set up in the wrong access group.

System owner reviews and approves

user access rights prior to system

going live.

E16

E17

E18

Lack of go-live checklist results in

go-live steps being missed leading

to a system that does not meet

business needs or unavailability of

the new system.

Go-live checklist is maintained to track

all go-live tasks and ensure all have

been completed.

E19

E20

E21

E22

E23

Unresolved issues are not

identified resulting in system not

meeting business needs in

production environment.

Lack of project monitoring leads to

budget overruns, delays and not

meeting project objectives.

Project Lead reevalutes the project

budget, timeline, and milestones

against actual results throughout the

project to identify any issues that need

to be addressed.

Lack of security controls leads to

security vulnerabilities in the

system.

Section F - Pre-Implementation: Training

Lack of approval to go-live may

result in system not meeting

business needs.

Project Steering Committee approves

system to go live.

F1

F2

F3

F4

F5

Lack of support personnel may

lead to user frustration and lack of

acceptance.

Support team is properly staffed to

meet business needs.

G1

G2

G3

G4

Support personnel do not

understand system and are unable

to resolve user issues.

Technical training is provided to

support personnel on newly

implemented systems.

G5

G6

G7

Lack of a patch management

process leads to security

vulnerability exposures.

Patch management procedures are in

place and reviewed annually.

G8

Section G - Post Implementation: Support & Maintenance

Training is provided to users to provide

them with the proper procedures in

utilizing the system.

Users do not accept the system.

Slow support response may lead

to user frustration and lack of

acceptance.

Lack of change management

procedures results in unauthorized

changes being made, changes not

being properly tested, and system

documentation not being updated.

Change management procedures are

in place and reviewed annually.

SLA metrics are developed and

monitored to measure performance

and meet business needs.

Lack of inventory listing leads to

unauthorized devices / software on

the network resulting in exposure

to security vulnerabilities.

IT asset inventory listing is maintained

and reviewed on an ongoing basis.

G9

H1

H2

H3

H4

H5

H6

I1

I2

Internal controls are not created or

operating effectively for the

system, which could lead to

inaccurate financial reporting.

Section H - Post Implementation: Review of Project Results & Close Out

Secion I - Post Implementation: Internal Controls Assessment

Post implementation review is

performed by the Project Lead and

reviewed by the Project Steering

Committee.

I3

Evaluation of the management of

the project is not performed, which

could lead to ineffective project

management practices, an

ineffective system, and not

meeting business objectives.

Internal controls are created or

modified to ensure the safeguarding of

assets and financial records. Controls

to be considered:

- security

- change management

- operations

- continuity

- business processes

I4

Internal controls are not created or

operating effectively for the

system, which could lead to

inaccurate financial reporting.

Internal controls are created or

modified to ensure the safeguarding of

assets and financial records. Controls

to be considered:

- security

- change management

- operations

- continuity

- business processes

Pre-Audit

Risk #

Company

Procedures

COBIT 5 COSO

Principle

Obtain and examine policy, procedures and

templates. Verify that they address the following:

- Business Case Analysis

- Project risk assessment

- Roles and responsibilities

- System documentation

- System specification

- User specification

- Security specification

- System development plan

- Change requests

- Developing internal controls

- Project issue procedures

- Data conversion plan

- Test plan

- Pre Go-live plan

- Training

- Organizational change management plan

- Project monitoring & status updates

- Post implementation project review

BAI01.01 4, 5, 10, 11,

12

Examine training records and verify that

employees on the project team have been trained

on company IT project management procedures.

BAI01.12 4

Verify that a Project Steering Committee exists,

as evidenced by the committee charter.

BAI01.02 3

A member of the Audit Team should attend the

Project Steering Committee meetings.

Obtain and examine Project Steering Committee

meeting minutes to verify that committee is

reviewing project status, achievement of project

milestones, monitoring budget-to-actual costs,

and results of project measurements (i.e. KPIs).

BAI01.05,

BAI01.06,

BAI01.07,

BAI01.11

5, 13, 16

Section A - Governance

Audit Procedures

Verify that the Project Team Lead is submitting

status reports on a periodic basis and any other

required documentation to the Project Steering

Committee throughout the lifecycle of the project.

Status reports should contain budget-to-actual

comparison & variation analysis, monitoring of

milestones & KPIs, description of achievements

and any issues effecting the progress of the

project.

BAI01.06,

BAI01.07,

BAI01.11

14, 16

Verify that the Project Steering Committee has

reviewed the post implementation project results

report and develops an Action Plan to address

any actionable lessons learned.

BAI01.06,

BAI01.11

17

A member of the Audit Team should attend the

Project Team status meetings.

Examine the Project Team's status meeting

minutes and verify that the team discusses tasks

completed / to be completed and issues identified

/ assigned / resolved.

BAI01.08 16

Verify that an organizational change

communication plan has been developed and

should address:

- Assessing company's readiness to accept

change

- Educating end users on the reason and timing

behind the change

- Roles and responsibilities of organizational

change management team

- Vision and strategy for change

- Communication of vision and strategy to end

users

- Remove barriers / silos that inhibit end user

acceptance

- Short-term and long-term goals identified and

monitored

- Identify training needs

- Other communication activities (newsletter,

posters, intranet site, etc.)

- Continuous feedback

BAI01.03 14

Verify that an external communication plan has

been created to provide information to customers

and / or business partners regarding the

implementation of the system (if system will be

used by these parties).

BAI01.03 15

Verify that the Communication Plan has been

approved by the Project Sponsor.

BAI01.03 3

Verify that the communication plan has been

implemented.

BAI01.03 14

Interview a sample of employees to determine the

effectiveness of the communication plan and end

user acceptance of system.

BAI01.03 14

Verify that a Business Case Report has been

developed and approved by the appropriate level

of management and governance committee(s)

(e.g. IT Steering Committee, Capital Assets

Committee, etc.).

BAI01.02 6

Verify that the Business Case Report includes:

- Current state of business process, identifying

any control weaknesses

- Expected future state of business process

(consider future growth)

- Addresses corporate / department strategic

goals

- Description of the application systems reviewed

(e.g. proof of concepts, demos)

- Reason behind system recommended to be

implemented (e.g. feasibility study)

- Cost benefit analysis (dollar & labor cost /

benefits, other benefits)

- Potential risks of the project and significance of

risks

- Potential impact to critical systems

- Regulatory concerns / approvals

- End User feedback

BAI01.02,

BAI01.10,

BAI02.02

6, 7, 9, 13

Verify that a Request for Proposal was prepared

and sent to selected vendors.

APO10.02

Verify that Vendor proposals were reviewed for:

- Reputation and experience of vendor

- Experience of vendor personnel

- Proposal content met scope of the project

- Rates for time and expense

- Ability to respond to system vulnerabilities and

provide patches to customers timely

APO10.02

Section B - Pre-Implementation: Business Case and Project Planning

Verify that the vendor contract addresses the

following:

- Vendor expectations

- Deliverables

- System requirements

- Warranties and liabilities

- Rates for time and expense (pymt terms based

on achievement of milestones)

- Change request process

- Confidentiality / Non-Disclosure

- Terms and conditions

- Project timelines and milestones

- Insurance requirements

- Adherence to company policies and procedures

in developing system

- Terms to restore back to current system

BAI03.03,

BAI03.04,

APO10.01,

APO10.02

Verify that the vendor contract has been

approved by the appropriate level of

management.

3

Verify that a Project Plan has been created and

includes:

- Project objectives

- Project scope

- Project risk assessment

- Identifies stakeholders

- Project Sponsor

- Team members

- Roles and responsibilities

- Budgets and timelines

- Project milestones and KPIs

- Communication plan

- Deliverables

- Change in scope procedures

BAI01.04,

BAI01.05,

BAI01.07,

BAI01.08,

BAI01.10,

BAI01.12,

BAI02.03

3, 5, 6, 7, 14

Verify that the Project Plan has been approved by

the Project Team Lead and Project Sponsor.

BAI01.07

Verify that a project kick-off meeting has been

held to review the Project Plan with team

members by obtaining the meeting minutes.

BAI01.07.

BAI01.08

14

Assess project timelines and determine if timeline

is reasonably acheivable.

Assess project pesonnel resources for:

- Availability

- Cross functional respresentation of all

departments impacted by system

- Experience

BAI01.12

Review prior project lessons learned and

determine if they have been properly incorporated

into the Project Plan.

BAI01.01

Verify that the Project Plan is in compliance with

company procedures.

BAI01.01 12

Verify that employees involved in the design and

build of the application system have been

properly trained to configure / customize the

system and ability to use the system when

performing tests.

BAI01.12 4

Prepare an audit memorandum of the results of

this phase of testing and distribute to the Project

Team and Project Sponsor.

Verify that project design / blueprint meetings

have been held to develop the System

Development Plan and Data Conversion Plan by

obtaining the meeting minutes.

BAI02.01,

BAI03.01

10, 14

Verify that the appropriate employees are

participating in the project design meetings:

- Project team

- System implementors

- Subject matter experts

- Super users

- End users

- Network administrators

- System administrators

- Security administrators

BAI01.12,

BAI03.01

10, 14

Verify that a System Development Plan has been

created and includes:

- System documentation

- System specification

- User specification

- Functional requirements

- Reporting requirements

- Customization

- Security and internal controls requirements

- Interfaces with other systems (consider impact

on inter-operability)

- Process and data flowcharts

- Data storage

- Issue identification and resolution

- Constraints

- Backout / Contingency Plan

BAI02.01,

BAI03.01,

BAI03.02,

BAI03.03

5, 11

Section C - Pre-Implementation: System Development -- Design & Build

Verify that security and internal control

requirements consider the following:

- access rights based on least privilege

- segregation of duties

- system authorizations

- edit checks

- audit logs

- input checks

- matching checks

- sequence checks

- duplication checks

- output

- exception reporting

BAI02.01,

BAI03.01,

BAI03.02,

BAI03.03

5, 11

Verify that the System Development Plan has

been approved by the Project Team Lead, Project

Sponsor, and System Implementor.

BAI03.01

Verify that a Data Conversion Plan has been

created and includes:

- Identification of data to be transferred /

converted

- Data cleansing procedures

- Error tolerances

- Data mapping

- Data extraction

- Data transfer

- Data validation test plans

- Issue identification and resolution

- Conversion timeline

- Conversion tasks included in go-live checklist

- Required approvals

BAI03.01,

BAI03.02,

BAI03.06,

BAI07.01

11

Verify that the Project Team has developed the

data map. Determine if data map is in sufficient

detail to assist IT in converting the data and for

testers in testing the system.

- flow chart of data movement

- identification of common data elements

- identification of field mapping between old

system and new system

- determine file format and layout for import: field

length, format, name, values, etc.

- translation of data values

- identification of confidential / key data

BAI03.02,

BAI07.02

Assess whether the data to be converted is

confidential and whether appropriate security

measures have been implemented to protect that

data where it resides (e.g. dev / test / prod

environments).

BAI03.02,

BAI07.04

Verify that the Data Conversion Plan has been

approved by the Project Team Lead, Project

Sponsor, and System Implementor.

BAI02.04

Verify that the System Development Plan and

Data Conversion Plan are in compliance with

company procedures.

BAI02.01 12

Verify that the System Development Plan and

Data Conversion Plan have been discussed with

applicable employees involved in implementing

these plans.

BAI01.08

Verify that any servers and operating systems

pertaining to the new system have been

configured according to the company's

configuration management procedures.

- default and unncecssary accounts / services are

disabled, if possible

- disable local admin account

- default passwords are changed and made

complex for admin accounts, application /

operating systems and any other new networked

device

- limiting admin privileges to those who have a

business need to modify configuration

- enable logging

BAI01.09,

BAI03.05

11

Verify that any servers and operating systems

pertaining to the new system have been secured

according to the company's security procedures.

Examples are:

- anti-virus / malware on server

- password management enabled (log-on

attempts, password change timeframe, password

history)

- admins have different passwords for admin

accounts and non-admin accounts

- disabling LM hashes

- encryption

- network segmentation

- enable firewall

- remote administration of servers over secure

channels

BAI01.09,

BAI03.05

11

Verify that changes made to current systems

(setting up interfaces, extracting data, importing

data) follow the company's change management

procedures.

- changes are documented

- changes are tested

- changes are approved by business and IT prior

to migration into production environment

- quality assurance review

BAI01.09,

BAI03.05,

BAI06

11

Verify that the data cleansing has been

performed by determining if the Project Team

verified that:

- All mandatory fields are populated

- All records are present

- Default or dummy values cannot be inserted

where there is missing data

- Data is complete

- No duplication of data fields

BAI07.02

For data that has not been cleansed, determine

potential risks and impacts to the project.

Determine if error tolerances have been

evaluated against the approved thresholds stated

in the Data Conversion Plan.

BAI07.02

Verify that the Project Team has verified the

accuracy, integrity and completeness of data

conversion to the test system by reviewing test

documentation.

BAI07.02

Verify that data converted to the test system is

complete, accurate, and has integrity.

- batch and control totals

- check sums / digits

- range checks

- date and time stamps

- use a data analysis tool to compare a sample of

data from the old system and the new system

- verify a test sample of data to source

documentation

BAI03.05,

BAI03.06,

BAI07.02

11, 13

Verify that the Project Team addresses any

errors or omissions identified as part of testing

the data conversion.

BAI07.02

Verify that appropriate controls are in place to

prevent or detect any data manipulation during

the conversion process and that they are

operating effectively.

BAI03.05,

BAI07.02

11

Verify that the Project Team has maintained

documentation of process design, configuration,

and customization.

- flow charts

- screenshots

- exhibits of code

- online and batch operating instructions

- system narratives

- configuration baselines

BAI03.05,

BAI07.02,

BAI10.03

11

At the end of the system build phase, verify that

the Project Team has created the User Manual.

The manual may include:

- description of the system

- use of the system

- input data and parameters

- output data

- operating procedures

- error identification and resolution

- user responsibilities related to security, privacy

and internal controls

BAI07.02 11

At the end of the system build phase, verify that

the Project Team has created the Operations and

Maintenance Manual. This manual may include:

- description of software

- instructions to operate software

- technical flow charts

- exhibits of code

- technical specifications

- security specifications

- description of internal controls

- description of non-routine procedures and

security requirements

- procedures for error resolution

- maintenance procedures

- configuration baselines

BAI01.09,

BAI02.01,

BAI03.03,

BAI03.05,

BAI03.10,

BAI10.03

11

Determine if any change orders have been

approved. If so, verify if the project budget cost,

labor hours and timeline have been updated.

Determine if there is any risk due to scope creep.

BAI01.11,

BAI03.09

Verify that any milestone(s) achieved during this

phase have been reviewed and approved by the

Project Sponsor.

BAI01.08,

BAI01.11

Verify that the Project Lead has reviewed the

Project Plan to ensure that the project is on target

with budgets, milestones and timeline. Verify that

Project Lead has reassessed the project risks for

the activities in this phase. Verify the Project

Lead has updated the Project Plan, if necessary.

BAI01.10,

BAI01.11,

BAI02.03

Review the project actual cost, labor hours and

timeline in comparison with the budget.

Determine if there are any risks that may impact

the project in the testing phase (e.g. going over

budget in the design and build phase may lead to

decreasing hours dedicated to testing system).

BAI01.05

Prepare an audit memorandum of the results of

this phase of testing and distribute to the Project

Team and Project Sponsor.

Verify that a Test Plan has been created and

includes the following:

- testing methodology, including types of tests to

be performed (e.g. functional, unit, integration,

end-to-end, acceptance, performance, parallel /

pilot, volume / stress, regression, quality

assurance, penetration, scanning, fuzzing, testing

for failures, security)

- Testing procedures

- Testing templates / scripts (purpose, procedure,

conclusion, sign-off)

- Testing documentation to be maintained, along

with retention period

- Reporting, tracking and remediating issues

identified during testing

- Acceptance and approval of test results

- test location and preparation

BAI01.09,

BAI03.06,

BAI03.07,

BAI07.01,

BAI07.03

11

Verify that the Test Plan is in compliance with

company policy and procedures.

BAI01.01,

BAI03.07,

BAI07.03

12

Verify that the Test Plan has been reviewed and

approved by the Project Leader and Project

Sponsor.

BAI07.03

Verify that there is a separate test environment

from the development and production

environment.

BAI03.07,

BAI07.04

12

Section D - Pre-Implemetntation: Test

Verify that the test environment simluates the

production environment.

BAI03.07,

BAI07.04

Verify that the Project Team has identified all

employees to be used in the testing process.

Verify that these employees:

- have been provided training on how to use the

system

- have been provided a copy of the Test Plan

- understand their roles and responsibilities

regarding testing the system

- have the availability to perform the required test

scripts and retest if necessary

- are from business areas in the company that will

be using the system

BAI01.12,

BAI03.08,

BAI07.03

4

Verify that test scripts have been created for all

tests that are to be performed and have been

mapped back to System Development Plan

specifications.

BAI01.09,

BAI03.06,

BAI03.07,

BAI07.03

11

Verify that the test scripts created are testing for

failures in the process or negative testing where

users can't perform functions that are beyond

their authorization or responsibilities.

BAI03.06,

BAI07.05

11

Verify that test scripts include testing of security

and system controls.

11

Verify that the Project Team is tracking the

performance and completion of all test scripts.

BAI03.08,

BAI07.05

11

Verify that the Project Team is tracking all issues

identified on a log where the issue is assigned to

an owner for resolution. Verify that the

remediated issue is retested with a satisfactory

result.

BAI03.06,

BAI03.08,

BAI07.05

11

Verify that the Project Team is tracking testing

documentation and ensuring it is being

maintained for all test scripts.

BAI01.09,

BAI03.08,

BAI07.05

11

Select a sample of test scripts and observe the

Testers performing the tests. Verify that the

Testers are performing the tests in accordance

with the Test Plan.

Select a sample of test scripts and reperform.

Compare the audit results to the Tester's results.

Use a data analysis tool to identify any gaps in

the security or internal control requirements.

Verify that the User Manual and / or Operations

Manual have been updated for any changes that

occurred during the testing phase to ensure

complete and accurate system documentation.

BAI02.01,

BAI03.10

11, 12

Determine if any change orders have been

approved. If so, verify if the project budget cost,

labor hours and timeline have been updated.

Determine if there is any risk due to scope creep.

BAI01.11,

BAI03.09

Verify that any milestone(s) achieved during this

phase have been reviewed and approved by the

Project Sponsor.

BAI01.08,

BAI01.11

Verify that the Project Lead has reviewed the

Project Plan to ensure that the project is on target

with budgets, milestones and timeline. Verify that

Project Lead has reassessed the project risks for

the activities in this phase. Verify the Project

Lead has updated the Project Plan, if necessary.

BAI01.10,

BAI01.11

Review the project actual cost, labor hours and

timeline in comparison with the budget.

Determine if there are any risks that may impact

the project in the go-live phase.

BAI01.05

Prepare an audit memorandum of the results of

this phase of testing and distribute to the Project

Team and Project Sponsor.

Verify that an Implementation Plan has been

created and includes:

- implementation schedule

- development of production environment

- testing of production environment

- securing production environment

- data conversion

- data back-up

- contingency / fallback plan

- approvals to go live

- resolution of any issues identified prior to go-live

- acceptance of any unresolved issues identified

- tracking go-live tasks (e.g. checklist)

- go / no-go criteria

BAI01.09,

BAI07.01,

BAI07.06

11

Verify that the Implementation Plan is in

compliance with company policy and procedures.

BAI01.01 12

Section E - Pre-Implementation: System Pre Go-live & Data Conversion

Verify that the Implementation Plan has been

reviewed and approved by the Project Lead,

Project Sponsor, and System Implementor.

BAI07.01 11

Evaluate the implementation schedule and

determine if it is reasonable and achievable.

Verify that the data in the current system is

backed up prior to converting data to the new

system.

BAI07.02

Verify that data converted to the production

system is complete, accurate, and has integrity.

- batch and control totals

- check sums / digits

- range checks

- date and time stamps

- user reconciliations / data validation

- use a data analysis tool to compare a sample of

data from the old system and the new system

- verify a test sample of data to source

documentation

BAI01.09,

BAI07.02

11

Verify that appropriate controls are in place to

prevent or detect any data manipulation during

the conversion process and that they are

operating effectively.

BAI01.09,

BAI07.02

11

Verify that the Project Team addresses any

errors or omissions identified as part of testing

the data conversion prior to going live with the

system.

BAI01.09,

BAI07.02

11

Verify that all test scripts have been completed

and any issues identified during the testing phase

have been resolved prior to the system going live.

BAI01.09 11

Verify that tests scripts performed on the

production environment have been completed

and any issues identified have been resolved

prior to the system going live.

BAI01.09 11

Verify that unresolved issues have been identified

by the Project Lead and are being tracked.

BAI07.05

Verify that any unresolved issues that will not be

addressed prior to go live will not have a

significant impact on the production system.

BAI07.05

Verify that unresolved issues have been reviewed

and approved by the Project Sponsor and Project

Steering Committee prior to going live.

BAI07.05

Verify that the production environment has the

appropriate security controls to prevent access to

the system by administrators or the system

implementors once the system is live.

BAI01.09 11

Verify that the Security group has reviewed the

security specifications of the system and has

approved it to go-live.

BAI01.09 11

Verify that the system owner has reviewed and

approved the access rights of end users and

assignment of user groups.

BAI01.09 11

Verify that the Project Lead has communicated

the results of the system build and testing phases

to the Project Steering Committee, along with any

issues that are expected to be unresolved by the

go-live date.

11

Verify that the Project Steering Committee has

approved the system to go live.

3

Verify that all tasks on the go-live checklist have

been signed-off on prior to going live.

BAI01.09

Verify that any milestone(s) achieved during this

phase have been reviewed and approved by the

Project Sponsor.

BAI01.08,

BAI01.11

Verify that the Project Lead has reviewed the

Project Plan to ensure that the project is on target

with budgets, milestones and timeline. Verify that

Project Lead has reassessed the project risks for

the activities in this phase. Verify the Project

Lead has updated the Project Plan, if necessary.

BAI01.10,

BAI01.11

Review the project actual cost, labor hours and

timeline in comparison with the budget.

Determine if there are any risks that may impact

the project and consider discussing with the

Project Steering Committee.

BAI01.05

Prepare an audit memorandum of the results of

this phase of testing and distribute to the Project

Team and Project Sponsor.

Section F - Pre-Implementation: Training

Verify that the Project Team has developed a

training program based off of the User Manual

and Operations Manual.

BAI08.04 4

Verify that end users, super users, and technical

support personnel are properly trained on the new

system.

BAI08.04 4, 14

Review training schedule and attendance sheets

to determine that users attended the training.

Verify that surveys were provided to users

regarding feedback on the training materials.

Verify that comments are incorporated into the

training program and / or User Manual.

14

Prepare an audit memorandum of the results of

this phase of testing and distribute to the Project

Team and Project Sponsor.

Verify that management has committed the

appropriate additional resources to support the

system and respond to end users' needs post go-

live for a predetermined amount of time (e.g 3

months).

BAI03.10,

BAI07.07

Verify that in-house support personnel have

stated service level agreement metrics to meet

the needs of the end users timely.

BAI01.06,

BAI03.11

13

Determine if the level of support is meeting its

SLA metrics.

BAI01.06,

BAI03.10,

BAI03.11

Determine if management will be relying on

vendor support for the system. If so, obtain and

review support contract for terms and agreement,

confidentiality, and access rights. Determine

level of support during an incident / disaster.

BAI03.11

Verify that all support personnel have received

training on the Operations Manual.

BAI02.01

Verify that any changes made to the system by

support personnel follow the company's change

management policy and procedures.

BAI03.10,

BAI06

11

Verify that there is a process in place to update

the Operations Manual based on changes

made.Verify that there is a process in place to

update the Operations Manual based on changes

made.

BAI03.10 11

Verify that the system is included in the patch

management policy and procedures.

BAI03.10 11, 12

Section G - Post Implementation: Support & Maintenance

Verify that the hardware and software associated

with this implementation project have been

included in the company's inventory listing of IT

assets.

BAI03.04,

BAI09.01

Verify that the Project Lead has performed a post

implementation assessment. The assessment

should include:

- determination if project objectives were

achieved

- assessment on cost benefit analysis presented

in business case

- assessment of project budgets (cost, labor

hours, timeline) in comparison with actual results

- project metrics, KPIs

- feedback from end users on acceptance of

system

- identifying lessons learned

BAI01.05,

BAI01.06,

BAI01.11,

BAI01.13,

BAI07.08

11, 13, 14

Evaluate the lessons learned identified by the

Project Lead and determine if they address the

findings noted in the audit memorandums issued.

BAI01.13,

BAI07.08

For any unresolved issues, verify that they have

been assigned an owner and estimated

completion date. Verify that unresolved issues

are tracked and closed out timely.

BAI01.13,

BAI07.08

Verify that the Project Lead presented the post

implementation assessment results to the Project

Steering Committee.

BAI01.06,

BAI01.11

11, 13, 16, 17

Verify that project documentation is properly

secured and retained according to retention

policy and procedures.

BAI01.14

Verify that the Project Lead has obtained

approval from the Project Steering Committee to

close the project.

BAI01.14

Verify that the ITGC and business process

internal control documentation (e.g. narrative,

flow charts, matrices) have been created or

modified to accommodate the new system.

11

Verify if policies, procedures, and internal controls

have been revised based on the project's lessons

learned.

11, 12, 17

Test the internal controls to verify that they are

operating effectively.

11

a. Test the ITGC controls.

b. Test the Business Process controls.

Section H - Post Implementation: Review of Project Results & Close Out

Secion I - Post Implementation: Internal Controls Assessment

Verify that the new system has been added to the

Disaster Recovery Procedures Manual. (Note:

based on the criticality of the system, the

company may decide not to include it in the DRP.

In this situation, assess if the system owner

needs to consider a business continuity plan).

BAI09.02 11

20 Critical

Security

ControlsSection A - Governance

Section B - Pre-Implementation: Business Case and Project Planning

Section C - Pre-Implementation: System Development -- Design & Build

CSC 17-3

CSC 3-1, 3-3,

3-4, 12-1, 12-3,

12-4

CSC 3-7, 12-6,

12-8, 12-9, 17-

1, 19-4

CSC 6-6

Section D - Pre-Implemetntation: Test

CSC6-3

Section E - Pre-Implementation: System Pre Go-live & Data Conversion

Section F - Pre-Implementation: Training

CSC 6-1

Section G - Post Implementation: Support & Maintenance

CSC 1 & 2

Section H - Post Implementation: Review of Project Results & Close Out

Secion I - Post Implementation: Internal Controls Assessment

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

A1 Obtain and examine policy, procedures and

templates. Verify that they address the following:

- Business Case Analysis

- Project risk assessment

- Roles and responsibilities

- System documentation

- System specification

- User specification

- Security specification

- System development plan

- Change requests

- Developing internal controls

- Project issue procedures

- Data conversion plan

- Test plan

- Pre Go-live plan

- Training

- Organizational change management plan

- Project monitoring & status updates

- Post implementation project review

A2 Examine training records and verify that

employees on the project team have been trained

on company IT project management procedures.

A3 Verify that a Project Steering Committee exists,

as evidenced by the committee charter.

A4 A member of the Audit Team should attend the

Project Steering Committee meetings.

A5 Obtain and examine Project Steering Committee

meeting minutes to verify that committee is

reviewing project status, achievement of project

milestones, monitoring budget-to-actual costs,

and results of project measurements (i.e. KPIs).

Audit Procedures

Section A - Governance

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

A6 Verify that the Project Team Lead is submitting

status reports on a periodic basis and any other

required documentation to the Project Steering

Committee throughout the lifecycle of the project.

Status reports should contain budget-to-actual

comparison & variation analysis, monitoring of

milestones & KPIs, description of achievements

and any issues effecting the progress of the

project.

A7 Verify that the Project Steering Committee has

reviewed the post implementation project results

report and develops an Action Plan to address

any actionable lessons learned.

A8 A member of the Audit Team should attend the

Project Team status meetings.

A9 Examine the Project Team's status meeting

minutes and verify that the team discusses tasks

completed / to be completed and issues identified

/ assigned / resolved.

A10 Verify that an organizational change

communication plan has been developed and

should address:

- Assessing company's readiness to accept

change

- Educating end users on the reason and timing

behind the change

- Roles and responsibilities of organizational

change management team

- Vision and strategy for change

- Communication of vision and strategy to end

users

- Remove barriers / silos that inhibit end user

acceptance

- Short-term and long-term goals identified and

monitored

- Identify training needs

- Other communication activities (newsletter,

posters, intranet site, etc.)

- Continuous feedback

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

A11 Verify that an external communication plan has

been created to provide information to customers

and / or business partners regarding the

implementation of the system (if system will be

used by these parties).

A12 Verify that the Communication Plan has been

approved by the Project Sponsor.

A13 Verify that the communication plan has been

implemented.

A14 Interview a sample of employees to determine the

effectiveness of the communication plan and end

user acceptance of system.

B1 Verify that a Business Case Report has been

developed and approved by the appropriate level

of management and governance committee(s)

(e.g. IT Steering Committee, Capital Assets

Committee, etc.).

B2 Verify that the Business Case Report includes:

- Current state of business process, identifying

any control weaknesses

- Expected future state of business process

(consider future growth)

- Addresses corporate / department strategic

goals

- Description of the application systems reviewed

(e.g. proof of concepts, demos)

- Reason behind system recommended to be

implemented (e.g. feasibility study)

- Cost benefit analysis (dollar & labor cost /

benefits, other benefits)

- Potential risks of the project and significance of

risks

- Potential impact to critical systems

- Regulatory concerns / approvals

- End User feedback

Section B - Pre-Implementation: Business Case and Project Planning

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

B3 Verify that a Request for Proposal was prepared

and sent to selected vendors.

B4 Verify that Vendor proposals were reviewed for:

- Reputation and experience of vendor

- Experience of vendor personnel

- Proposal content met scope of the project

- Rates for time and expense

- Ability to respond to system vulnerabilities and

provide patches to customers timely

B5 Verify that the vendor contract addresses the

following:

- Vendor expectations

- Deliverables

- System requirements

- Warranties and liabilities

- Rates for time and expense (pymt terms based

on achievement of milestones)

- Change request process

- Confidentiality / Non-Disclosure

- Terms and conditions

- Project timelines and milestones

- Insurance requirements

- Adherence to company policies and procedures

in developing system

- Terms to restore back to current system

B6 Verify that the vendor contract has been

approved by the appropriate level of

management.

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

B7 Verify that a Project Plan has been created and

includes:

- Project objectives

- Project scope

- Project risk assessment

- Identifies stakeholders

- Project Sponsor

- Team members

- Roles and responsibilities

- Budgets and timelines

- Project milestones and KPIs

- Communication plan

- Deliverables

- Change in scope procedures

B8 Verify that the Project Plan has been approved by

the Project Team Lead and Project Sponsor.

B9 Verify that a project kick-off meeting has been

held to review the Project Plan with team

members by obtaining the meeting minutes.

B10 Assess project timelines and determine if timeline

is reasonably acheivable.

B11 Assess project pesonnel resources for:

- Availability

- Cross functional respresentation of all

departments impacted by system

- Experience

B12 Review prior project lessons learned and

determine if they have been properly incorporated

into the Project Plan.

B13 Verify that the Project Plan is in compliance with

company procedures.

B14 Verify that employees involved in the design and

build of the application system have been

properly trained to configure / customize the

system and ability to use the system when

performing tests.

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

B15 Prepare an audit memorandum of the results of

this phase of testing and distribute to the Project

Team and Project Sponsor.

C1 Verify that project design / blueprint meetings

have been held to develop the System

Development Plan and Data Conversion Plan by

obtaining the meeting minutes.

C2 Verify that the appropriate employees are

participating in the project design meetings:

- Project team

- System implementors

- Subject matter experts

- Super users

- End users

- Network administrators

- System administrators

- Security administrators

C3 Verify that a System Development Plan has been

created and includes:

- System documentation

- System specification

- User specification

- Functional requirements

- Reporting requirements

- Customization

- Security and internal controls requirements

- Interfaces with other systems (consider impact

on inter-operability)

- Process and data flowcharts

- Data storage

- Issue identification and resolution

- Constraints

- Backout / Contingency Plan

Section C - Pre-Implementation: System Development -- Design & Build

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

C4 Verify that security and internal control

requirements consider the following:

- access rights based on least privilege

- segregation of duties

- system authorizations

- edit checks

- audit logs

- input checks

- matching checks

- sequence checks

- duplication checks

- output

- exception reporting

C5 Verify that the System Development Plan has

been approved by the Project Team Lead, Project

Sponsor, and System Implementor.

C6 Verify that a Data Conversion Plan has been

created and includes:

- Identification of data to be transferred /

converted

- Data cleansing procedures

- Error tolerances

- Data mapping

- Data extraction

- Data transfer

- Data validation test plans

- Issue identification and resolution

- Conversion timeline

- Conversion tasks included in go-live checklist

- Required approvals

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

C7 Verify that the Project Team has developed the

data map. Determine if data map is in sufficient

detail to assist IT in converting the data and for

testers in testing the system.

- flow chart of data movement

- identification of common data elements

- identification of field mapping between old

system and new system

- determine file format and layout for import: field

length, format, name, values, etc.

- translation of data values

- identification of confidential / key data

C8 Assess whether the data to be converted is

confidential and whether appropriate security

measures have been implemented to protect that

data where it resides (e.g. dev / test / prod

environments).

C9 Verify that the Data Conversion Plan has been

approved by the Project Team Lead, Project

Sponsor, and System Implementor.

C10 Verify that the System Development Plan and

Data Conversion Plan are in compliance with

company procedures.

C11 Verify that the System Development Plan and

Data Conversion Plan have been discussed with

applicable employees involved in implementing

these plans.

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

C12 Verify that any servers and operating systems

pertaining to the new system have been

configured according to the company's

configuration management procedures.

- default and unncecssary accounts / services are

disabled, if possible

- disable local admin account

- default passwords are changed and made

complex for admin accounts, application /

operating systems and any other new networked

device

- limiting admin privileges to those who have a

business need to modify configuration

- enable logging

C13 Verify that any servers and operating systems

pertaining to the new system have been secured

according to the company's security procedures.

Examples are:

- anti-virus / malware on server

- password management enabled (log-on

attempts, password change timeframe, password

history)

- admins have different passwords for admin

accounts and non-admin accounts

- disabling LM hashes

- encryption

- network segmentation

- enable firewall

- remote administration of servers over secure

channels

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

C14 Verify that changes made to current systems

(setting up interfaces, extracting data, importing

data) follow the company's change management

procedures.

- changes are documented

- changes are tested

- changes are approved by business and IT prior

to migration into production environment

- quality assurance review

C15 Verify that the data cleansing has been performed

by determining if the Project Team verified that:

- All mandatory fields are populated

- All records are present

- Default or dummy values cannot be inserted

where there is missing data

- Data is complete

- No duplication of data fields

C16 For data that has not been cleansed, determine

potential risks and impacts to the project.

Determine if error tolerances have been

evaluated against the approved thresholds stated

in the Data Conversion Plan.

C17 Verify that the Project Team has verified the

accuracy, integrity and completeness of data

conversion to the test system by reviewing test

documentation.

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

C18 Verify that data converted to the test system is

complete, accurate, and has integrity.

- batch and control totals

- check sums / digits

- range checks

- date and time stamps

- use a data analysis tool to compare a sample of

data from the old system and the new system

- verify a test sample of data to source

documentation

C19 Verify that the Project Team addresses any errors

or omissions identified as part of testing the data

conversion.

C20 Verify that appropriate controls are in place to

prevent or detect any data manipulation during

the conversion process and that they are

operating effectively.

C21 Verify that the Project Team has maintained

documentation of process design, configuration,

and customization.

- flow charts

- screenshots

- exhibits of code

- online and batch operating instructions

- system narratives

- configuration baselines

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

C22 At the end of the system build phase, verify that

the Project Team has created the User Manual.

The manual may include:

- description of the system

- use of the system

- input data and parameters

- output data

- operating procedures

- error identification and resolution

- user responsibilities related to security, privacy

and internal controls

C23 At the end of the system build phase, verify that

the Project Team has created the Operations and

Maintenance Manual. This manual may include:

- description of software

- instructions to operate software

- technical flow charts

- exhibits of code

- technical specifications

- security specifications

- description of internal controls

- description of non-routine procedures and

security requirements

- procedures for error resolution

- maintenance procedures

- configuration baselines

C24 Determine if any change orders have been

approved. If so, verify if the project budget cost,

labor hours and timeline have been updated.

Determine if there is any risk due to scope creep.

C25 Verify that any milestone(s) achieved during this

phase have been reviewed and approved by the

Project Sponsor.

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

C26 Verify that the Project Lead has reviewed the

Project Plan to ensure that the project is on target

with budgets, milestones and timeline. Verify that

Project Lead has reassessed the project risks for

the activities in this phase. Verify the Project

Lead has updated the Project Plan, if necessary.

C27 Review the project actual cost, labor hours and

timeline in comparison with the budget.

Determine if there are any risks that may impact

the project in the testing phase (e.g. going over

budget in the design and build phase may lead to

decreasing hours dedicated to testing system).

C28 Prepare an audit memorandum of the results of

this phase of testing and distribute to the Project

Team and Project Sponsor.

D1 Verify that a Test Plan has been created and

includes the following:

- testing methodology, including types of tests to

be performed (e.g. functional, unit, integration,

end-to-end, acceptance, performance, parallel /

pilot, volume / stress, regression, quality

assurance, penetration, scanning, fuzzing, testing

for failures, security)

- Testing procedures

- Testing templates / scripts (purpose, procedure,

conclusion, sign-off)

- Testing documentation to be maintained, along

with retention period

- Reporting, tracking and remediating issues

identified during testing

- Acceptance and approval of test results

- test location and preparation

D2 Verify that the Test Plan is in compliance with

company policy and procedures.

Section D - Pre-Implemetntation: Test

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

D3 Verify that the Test Plan has been reviewed and

approved by the Project Leader and Project

Sponsor.

D4 Verify that there is a separate test environment

from the development and production

environment.

D5 Verify that the test environment simluates the

production environment.

D6 Verify that the Project Team has identified all

employees to be used in the testing process.

Verify that these employees:

- have been provided training on how to use the

system

- have been provided a copy of the Test Plan

- understand their roles and responsibilities

regarding testing the system

- have the availability to perform the required test

scripts and retest if necessary

- are from business areas in the company that will

be using the system

D7 Verify that test scripts have been created for all

tests that are to be performed and have been

mapped back to System Development Plan

specifications.

D8 Verify that the test scripts created are testing for

failures in the process or negative testing where

users can't perform functions that are beyond

their authorization or responsibilities.

D9 Verify that test scripts include testing of security

and system controls.

D10 Verify that the Project Team is tracking the

performance and completion of all test scripts.

D11 Verify that the Project Team is tracking all issues

identified on a log where the issue is assigned to

an owner for resolution. Verify that the

remediated issue is retested with a satisfactory

result.

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

D12 Verify that the Project Team is tracking testing

documentation and ensuring it is being

maintained for all test scripts.

D13 Select a sample of test scripts and observe the

Testers performing the tests. Verify that the

Testers are performing the tests in accordance

with the Test Plan.

D14 Select a sample of test scripts and reperform.

Compare the audit results to the Tester's results.

D15 Use a data analysis tool to identify any gaps in

the security or internal control requirements.

D16 Verify that the User Manual and / or Operations

Manual have been updated for any changes that

occurred during the testing phase to ensure

complete and accurate system documentation.

D17 Determine if any change orders have been

approved. If so, verify if the project budget cost,

labor hours and timeline have been updated.

Determine if there is any risk due to scope creep.

D18 Verify that any milestone(s) achieved during this

phase have been reviewed and approved by the

Project Sponsor.

D19 Verify that the Project Lead has reviewed the

Project Plan to ensure that the project is on target

with budgets, milestones and timeline. Verify that

Project Lead has reassessed the project risks for

the activities in this phase. Verify the Project

Lead has updated the Project Plan, if necessary.

D20 Review the project actual cost, labor hours and

timeline in comparison with the budget.

Determine if there are any risks that may impact

the project in the go-live phase.

D21 Prepare an audit memorandum of the results of

this phase of testing and distribute to the Project

Team and Project Sponsor.

Section E - Pre-Implementation: System Pre Go-live & Data Conversion

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

E1 Verify that an Implementation Plan has been

created and includes:

- implementation schedule

- development of production environment

- testing of production environment

- securing production environment

- data conversion

- data back-up

- contingency / fallback plan

- approvals to go live

- resolution of any issues identified prior to go-live

- acceptance of any unresolved issues identified

- tracking go-live tasks (e.g. checklist)

- go / no-go criteria

E2 Verify that the Implementation Plan is in

compliance with company policy and procedures.

E3 Verify that the Implementation Plan has been

reviewed and approved by the Project Lead,

Project Sponsor, and System Implementor.

E4 Evaluate the implementation schedule and

determine if it is reasonable and achievable.

E5 Verify that the data in the current system is

backed up prior to converting data to the new

system.

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

E6 Verify that data converted to the production

system is complete, accurate, and has integrity.

- batch and control totals

- check sums / digits

- range checks

- date and time stamps

- user reconciliations / data validation

- use a data analysis tool to compare a sample of

data from the old system and the new system

- verify a test sample of data to source

documentation

E7 Verify that appropriate controls are in place to

prevent or detect any data manipulation during

the conversion process and that they are

operating effectively.

E8 Verify that the Project Team addresses any errors

or omissions identified as part of testing the data

conversion prior to going live with the system.

E9 Verify that all test scripts have been completed

and any issues identified during the testing phase

have been resolved prior to the system going live.

E10 Verify that tests scripts performed on the

production environment have been completed

and any issues identified have been resolved

prior to the system going live.

E11 Verify that unresolved issues have been identified

by the Project Lead and are being tracked.

E12 Verify that any unresolved issues that will not be

addressed prior to go live will not have a

significant impact on the production system.

E13 Verify that unresolved issues have been reviewed

and approved by the Project Sponsor and Project

Steering Committee prior to going live.

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

E14 Verify that the production environment has the

appropriate security controls to prevent access to

the system by administrators or the system

implementors once the system is live.

E15 Verify that the Security group has reviewed the

security specifications of the system and has

approved it to go-live.

E16 Verify that the system owner has reviewed and

approved the access rights of end users and

assignment of user groups.

E17 Verify that the Project Lead has communicated

the results of the system build and testing phases

to the Project Steering Committee, along with any

issues that are expected to be unresolved by the

go-live date.

E18 Verify that the Project Steering Committee has

approved the system to go live.

E19 Verify that all tasks on the go-live checklist have

been signed-off on prior to going live.

E20 Verify that any milestone(s) achieved during this

phase have been reviewed and approved by the

Project Sponsor.

E21 Verify that the Project Lead has reviewed the

Project Plan to ensure that the project is on target

with budgets, milestones and timeline. Verify that

Project Lead has reassessed the project risks for

the activities in this phase. Verify the Project

Lead has updated the Project Plan, if necessary.

E22 Review the project actual cost, labor hours and

timeline in comparison with the budget.

Determine if there are any risks that may impact

the project and consider discussing with the

Project Steering Committee.

E23 Prepare an audit memorandum of the results of

this phase of testing and distribute to the Project

Team and Project Sponsor.

Section F - Pre-Implementation: Training

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

F1 Verify that the Project Team has developed a

training program based off of the User Manual

and Operations Manual.

F2 Verify that end users, super users, and technical

support personnel are properly trained on the new

system.

F3 Review training schedule and attendance sheets

to determine that users attended the training.

F4 Verify that surveys were provided to users

regarding feedback on the training materials.

Verify that comments are incorporated into the

training program and / or User Manual.

F5 Prepare an audit memorandum of the results of

this phase of testing and distribute to the Project

Team and Project Sponsor.

G1 Verify that management has committed the

appropriate additional resources to support the

system and respond to end users' needs post go-

live for a predetermined amount of time (e.g 3

months).

G2 Verify that in-house support personnel have

stated service level agreement metrics to meet

the needs of the end users timely.

G3 Determine if the level of support is meeting its

SLA metrics.

G4 Determine if management will be relying on

vendor support for the system. If so, obtain and

review support contract for terms and agreement,

confidentiality, and access rights. Determine

level of support during an incident / disaster.

G5 Verify that all support personnel have received

training on the Operations Manual.

G6 Verify that any changes made to the system by

support personnel follow the company's change

management policy and procedures.

Section G - Post Implementation: Support & Maintenance

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

G7 Verify that there is a process in place to update

the Operations Manual based on changes

made.Verify that there is a process in place to

update the Operations Manual based on changes

made.

G8 Verify that the system is included in the patch

management policy and procedures.

G9 Verify that the hardware and software associated

with this implementation project have been

included in the company's inventory listing of IT

assets.

H1 Verify that the Project Lead has performed a post

implementation assessment. The assessment

should include:

- determination if project objectives were

achieved

- assessment on cost benefit analysis presented

in business case

- assessment of project budgets (cost, labor

hours, timeline) in comparison with actual results

- project metrics, KPIs

- feedback from end users on acceptance of

system

- identifying lessons learned

H2 Evaluate the lessons learned identified by the

Project Lead and determine if they address the

findings noted in the audit memorandums issued.

H3 For any unresolved issues, verify that they have

been assigned an owner and estimated

completion date. Verify that unresolved issues

are tracked and closed out timely.

H4 Verify that the Project Lead presented the post

implementation assessment results to the Project

Steering Committee.

Section H - Post Implementation: Review of Project Results & Close Out

Testing Comments / Conclusions W/P Ref Findings Preparer

Sign-off

Reviewer Sign-

off

Audit Procedures

H5 Verify that project documentation is properly

secured and retained according to retention policy

and procedures.

H6 Verify that the Project Lead has obtained

approval from the Project Steering Committee to

close the project.

I1 Verify that the ITGC and business process

internal control documentation (e.g. narrative,

flow charts, matrices) have been created or

modified to accommodate the new system.

I2 Verify if policies, procedures, and internal controls

have been revised based on the project's lessons

learned.

Test the internal controls to verify that they are

operating effectively.

a. Test the ITGC controls.

b. Test the Business Process controls.

I4 Verify that the new system has been added to the

Disaster Recovery Procedures Manual. (Note:

based on the criticality of the system, the

company may decide not to include it in the DRP.

In this situation, assess if the system owner

needs to consider a business continuity plan).

Secion I - Post Implementation: Internal Controls Assessment

I3

Audit Name: ________________________________

Evaluation Criteria Excellent Good Fair Poor

Not applicable /

Don't Know

Objectivity of auditor team

Understanding the business & your department

Technical proficiency of audit team

Uses technology appropriately

Professionalism of audit team

Communication skills of audit team

Interpersonal skills of audit team

Works well with your team

Helps you manage and implement change

Notification of the audit purpose and scope

Audit focused on key areas & risks

Department's concerns and perspective considered

Duration of the audit

Level of creativity

Usefulness of the audit

Disruption of activities was minimal

Sharing of best practices

Feedback of findings during the audit

Timeliness of the audit report

Clarity of the audit report

Accuracy of the audit findings

Value of the audit recommendations

Provides workable solutions for audit recommendations

Timely follow-up on corrective action

Improved

Significantly Improved

Stayed

the same Declined

Declined

significantly

How has the quality of service you received changed from

previous audits you experienced?

Internal Audit Quality Assurance

In an effort to provide continuous improvement in the service we provide to you and the organization, would you please take a

few moments to complete this short survey and return it promptly as indicated below? Thank you!

Independence

Professional Proficiency

Scope of Work

Performance of Audit Work

Was there anything about the audit you especially liked?

Please return survey to: ________________________

Are there any recommendations for improvement that you would like us to consider?

Was there anything about the audit you especially disliked?

Additional Comments:

Name: _____________________________________

Date: ______________________________________

Below is a list of resources that may be used during an SDLC audit: ISACA

• COBIT 5 Enabling Processes • COBIT 5 - Governance and Management Practices Activities (COBIT 5 Toolkit) • COBIT 5 for Assurance • Systems Development and Project Management Audit / Assurance Program (based off

of COBIT 4.1) IIA

• GTAG 12: Auditing IT Projects • GTAG 14: Auditing User-developed Applications • GTAG 5: Managing and Auditing Privacy Risks • GTAG 8: Auditing Application Controls • GAIT for Business and IT Risk • GAIT for IT General Control Deficiency Assessment • GAIT Methodology • Top 10 System Implementation Audit Considerations (by PwC)

COSO Internal Control -- Integrated Framework National Institute of Standards and Technology (NIST)

• SP 800-53 rev.4: Security and Privacy Controls for Federal Information Systems and Organizations.

• SP 800-64 rev.2: Security Considerations in the System Development Life Cycle Twenty Critical Security Controls (maintained by Council on Cyber Security) Project Management Body of Knowledge (aka PMBOK - maintained by Project Management Institute) AuditNet (subscription based) Protiviti's Knowledgeleader (subscription based)

{a}

{b}

{c}

{d}

{e}

{f}

{g}

{h}

{i}

{j}

{k}

{l}

{m}

{n}

{o}

{p}

{q}

{r}

{s}

{t}

{u}

{v}

{w}

{x}

Tickmarks

{y}

{z}