MEETING SUMMARY
PROJECT: Brookwood District 167 – Brookwood Middle School PROJECT NO: 14022
MEETING DATE: June 11, 2014 LOCATION: Brookwood School District Administration Office
PARTICIPANTS: Jennifer Costanzo, Colby Lewis – STR Partners (STR) Douglas Lim – Gilbane Company (GBC) Dr. Valorie Moore, Ms. Roslon Seals, Ms. Jan Barry, Mr. Alan Wilson, Mr. Robert Marcinski, Mr. Charles Anderson, Mr. Leon Fields, Ms. Onquanette Pierce, Mr. Andrew Ziegler, Mr. John Dixon, Mr. Michael Engel – Brookwood District 167 (D167)
DISTRIBUTION: To Dr. Moore and STR/GBCO/RE via email Please distribute to other participants and others as deemed necessary.
PURPOSE: Brookwood Middle School – Preliminary Building Bubble Diagrams Outline of Discussion Action by 1. STR presented 4 design concepts for consideration (options are attached
for your use) a. All options accommodate a single phase of construction
1. Option 4B – 50,800 SF • Two story with classrooms on 1st and 2nd floors on south side
• Expansion to the west
• Common spaces sized for future population
2. Option 4C – 50,800 SF • Two story with classrooms on 1st and 2nd floor on north side
• Expansion to the west
• Common spaces sized for future larger population
3. Option 5 – 49,250 SF • Two story with all classrooms and art on second floor
• Expansion to east
• Common spaces sized for current population – expansion planned with future classroom expansion
4. Option 6 – 51,220 SF • Three Story with classrooms on 2nd and 3rd floor
• Expansion to east
• Common spaces sized for current population – expansion planned with future classroom expansion
Brookwood District 167 – Brookwood Middle School Summary of Meeting 6/11/14 Page 2 of 3 STR Partners LLC 14022
2. Option Selection – Option 5 a. Gilbane advised that in order to stay on schedule, a scheme needed
to be selected so that the design team can move forward. b. The committee has selected Option 5
• It meets the needs of the school and the goals of the Board. • Best space utilization • Principal likes that all teaching spaces are on a single floor • Flexibility in securing different areas of the building for after
school use • Flexibility in accommodating a population bubble as all
classrooms are on one level
3. Decision-Making Procedures a. The Board will vote on formal approval of this option at the next
meeting schedule for June 23. b. Gilbane and STR requested permission to proceed with developing this
scheme in order to keep on schedule. c. The committee agreed this is acceptable. d. The committee discussed future decision-making procedures. Gilbane
advised that the schedule couldn’t be maintained if the Board must make formal approvals for each design decision. Mr Dixon suggested the following procedure:
• The committee will make decisions during the committee meetings while keeping the Board members apprised of the project’s progress.
• Input from the Board may be provided after these meetings • STR and Gilbane are approved to act upon the committee
decisions and shall incorporate Board decisions where required. • The BOE will provide approval at key project milestones
o Schematic Design o Design Development o 50% Construction Document Completion o 100% Construction Document Completion
D167 D167
4. Design Process – Next Steps a. Now that an option has been selected, STR will develop the concept
into a more “real” plan – changing bubbles to walls. b. Each of the Bubbles currently represents a department. c. STR will begin to fill in those bubbles with the rooms that make up each
department • Options for how these departments are arranged will be the
agenda items of the future meetings • STR will update the Design Meeting Schedule according to our
current status showing which departments will be discussed at which meetings.
• D167 will then be able to invite appropriate personnel according to the department scheduled.
STR STR STR D167
Brookwood District 167 – Brookwood Middle School Summary of Meeting 6/11/14 Page 3 of 3 STR Partners LLC 14022
5. Budget
a. Gilbane has provided an updated concept Budget. b. Option 5 is approximately $1.4 million over budget c. However, STR and Gilbane can now collaborate on the building as a
whole using Option 5, and attempt to reduce cost by reducing the cost of construction.
• Materials • height of building • structural systems • exterior wall system • mechanical systems
d. It may also be necessary to reduce the square footage of the building to align with the budget. However, STR and Gilbane would like to further develop the design as the first step.
STR/GBC
6. Next Steps a. Next Meeting: Wednesday June 25, 2014 @ 9:00am b. STR will forward an updated Design Decision Schedule in the near
future
STR
END OF SUMMARY The above summarizes the author’s understanding of the topics covered in the meeting. If exception is taken to, or additions are requested of, the above, please contact Jennifer Costanzo for a written addendum to be made. Prepared by: STR Partners LLC Jennifer Costanzo, AIA, LEED AP Principal Architect
12'-0" 274'-0" 30'-0"
8'-0
"62
'-0"
8'-0
"25
'-0"
12'-
0"14
0'-0
"12
'-0"
25'-
0"
BASKETBALL COURT
PARENT DROP-OFF
GLENWOOD LANSING ROAD
BERMIN
G O
R DETEN
TION
RHO
DES A
VEN
UE
EBERHA
RT AV
ENU
E
GLEN
WO
OD
DYER
ROA
D
GATE
30 FTSETBACK
30 F
TSE
TBA
CK
27.5
FT
SETB
AC
K
30 FTSETBACK
30 FT
SETBACK
DETENTION
ABANDONCURB CUT
ABANDONCURB CUT
NEW CURBCUT
ABANDONCURB CUT
EXISTINGCURB CUT
BUS DROP-OFF
HARD SURFACE PLAY AREA
LAWN
GATE
REPLACE CULVERT
RESURFACE EBERHART ROAD
NEW CURBCUT(EGRESS FROM
EBERHART ROAD)
NEWCURB CUTG
ATE
EXTENSION OF EBERHART ROAD
RESURFACE RHODES AVE.
PAVING OPTIONFOR NEW GARAGE
NEW PAVINGFOR GARAGE
28 SPA
CES P
ARKIN
G
61 SPACES PARKING
June 11, 2014
S T R P A R T N E R SBROOKWOOD MIDDLE SCHOOL - DISTRICT 167200 East Glenwood-Lansing Road, Glenwood, Illinois 60425
PRELIMINARY SPACE PLANNING & LAYOUTBUILDING ORGANIZATION PLAN
OPTION
GYM
ADMIN
LRC
G
1F
2F
CAFEMUSIC
KITCHEN1,350
LOADING
GIRLS
BOY
S
GYM6,700
STAGE1,500
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
EXPA
NSI
ON
840
EXPA
NSI
ON
840
CAFE3,710
CORE/MAINT.1,200
GIR
LS
BOY
S
MUSIC2,080
GIR
LS
BOY
S
PREP450
ADMIN2,980
3,900(MEDIA CENTER)
LRC
FUTURE ADDITION NEW BUILDING 2F
CORE/MAINT.1,000
1,100STEM
TEAM
TEAM
TERRACE
PREP4501,100
STEM
GIRLS
BOYS
CORE
ART1,250
A A
C
B B
C
APPROXIMATE AREA TABULATION:
SECOND FLOOR: 17,300 SFGROUND FLOOR: 33,500 SF
TOTAL AREA: 50,800 SF CLASSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
EXPA
NSI
ON
840
EXPA
NSI
ON
840
OPEN TOBELOW
2 STORY 2 CLASSROOM LEVEL
ADMIN
ART
EXPANSION
CLASSROOMCLASSROOMCLASSROOM
CLASSROOMCLASSROOMCLASSROOM
EXPANSION
G
1F
2F
EXPANSION
EXPANSION CLASSROOMCLASSROOMCLASSROOM
CLASSROOMCLASSROOMCLASSROOM
TEAM/TERRACE
LRC GYM
G
1F
2FLRC
CLASSROOMCAFE
KITCHEN
CLASSROOM
ART
STEM
STEM
00 10' 100'50'25'
BUILDING ORGANIZATION SECTION BSCALE 1/32" = 1'-0"
4
00 10' 100'50'25'
BUILDING ORGANIZATION SECTION ASCALE 1/32" = 1'-0"
3
00 10' 100'50'25'
BUILDING ORGANIZATION SECTION CSCALE 1/32" = 1'-0"
5
CLASSROOMSTEM
LRC
ADMIN
CAFE
ARTFUTURE ADDITION
GYM
MUSIC
4
4B
00 10' 100'50'25'
BUILDING ORGANIZATION PLANSCALE 1/32" = 1'-0"
1
N
EXISTING ADMIN BUILDING
NEW GARAGE
BUILDING ORGANIZATION - PERSPECTIVE NOT TO SCALE
2
12'-0" 274'-0" 30'-0"
8'-0
"62
'-0"
8'-0
"25
'-0"
12'-
0"14
0'-0
"12
'-0"
25'-
0"
BASKETBALL COURT
PARENT DROP-OFF
GLENWOOD LANSING ROAD
BERMIN
G O
R DETEN
TION
RHO
DES A
VEN
UE
EBERHA
RT AV
ENU
E
GLEN
WO
OD
DYER
ROA
D
GATE
30 FTSETBACK
30 F
TSE
TBA
CK
27.5
FT
SETB
AC
K
30 FTSETBACK
30 FT
SETBACK
DETENTION
ABANDONCURB CUT
ABANDONCURB CUT
NEW CURBCUT
ABANDONCURB CUT
EXISTINGCURB CUT
BUS DROP-OFF
HARD SURFACE PLAY AREA
LAWN
GATE
REPLACE CULVERT
RESURFACE EBERHART ROAD
NEW CURBCUT(EGRESS FROM
EBERHART ROAD)
NEWCURB CUTG
ATE
EXTENSION OF EBERHART ROAD
RESURFACE RHODES AVE.
PAVING OPTIONFOR NEW GARAGE
NEW PAVINGFOR GARAGE
28 SPA
CES P
ARKIN
G
61 SPACES PARKING
June 11, 2014
S T R P A R T N E R SBROOKWOOD MIDDLE SCHOOL - DISTRICT 167200 East Glenwood-Lansing Road, Glenwood, Illinois 60425
PRELIMINARY SPACE PLANNING & LAYOUTBUILDING ORGANIZATION PLAN
OPTION
4C
2 STORY 2 CLASSROOM LEVEL
KITCHEN1,350
LOADING
GIRLS
BOY
S
GYM6,700
STAGE1,500
CAFE3,710
CORE/MAINT.1,200
GIR
LS
BOY
S
MUSIC2,080
CLA
SSRO
OM
840
GIR
LS
BOY
S PREP450
3,900(MEDIA CENTER)
LRC
CORE/MAINT.1,000
1,100STEM
TEAM
TEAM
TERRACE
PREP4501,100
STEM
GIRLS
BOYS
CORE
ART1,250
ADMIN2,980
AA
C
B B
C
GYM
G
1F
2F
ADMIN
LRC
G
1F
2F
ADMIN
ART
EXPANSION
CLASSROOMCLASSROOMCLASSROOM
CLASSROOMCLASSROOMCLASSROOM
EXPANSION
G
1F
2F
EXPANSION
EXPANSION CLASSROOMCLASSROOMCLASSROOM
CLASSROOMCLASSROOMCLASSROOM
TEAM/TERRACE
LRC GYM
LRC
CLASSROOMCAFE
KITCHEN
CLASSROOM
ART
CAFEMUSIC
STEM
STEM
FUTURE ADDITION NEW BUILDING
APPROXIMATE AREA TABULATION:
SECOND FLOOR: 17,300 SFGROUND FLOOR: 33,500 SF
TOTAL AREA: 50,800 SF
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
EXPA
NSI
ON
840
EXPA
NSI
ON
840
OPEN TO BELOW
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
EXPA
NSI
ON
840
EXPA
NSI
ON
840
00 10' 100'50'25'
BUILDING ORGANIZATION SECTION BSCALE 1/32" = 1'-0"
4
00 10' 100'50'25'
BUILDING ORGANIZATION SECTION ASCALE 1/32" = 1'-0"
3
00 10' 100'50'25'
BUILDING ORGANIZATION SECTION CSCALE 1/32" = 1'-0"
5
CLASSROOM
STEM
LRC
ADMIN
CAFE
ART
FUTURE ADDITION
GYM
MUSIC
00 10' 100'50'25'
BUILDING ORGANIZATION PLANSCALE 1/32" = 1'-0"
1
N
EXISTING ADMIN BUILDING
NEW GARAGE
BUILDING ORGANIZATION - PERSPECTIVE NOT TO SCALE
2
12'-0" 274'-0" 30'-0"
8'-0
"62
'-0"
8'-0
"25
'-0"
12'-
0"14
0'-0
"12
'-0"
25'-
0"
BASKETBALL COURT
PARENT DROP-OFF
GLENWOOD LANSING ROAD
BERMIN
G O
R DETEN
TION
RHO
DES A
VEN
UE
EBERHA
RT AV
ENU
E
GLEN
WO
OD
DYER
ROA
D
GATE
30 FTSETBACK
30 F
TSE
TBA
CK
27.5
FT
SETB
AC
K
30 FTSETBACK
30 FT
SETBACK
DETENTION
ABANDONCURB CUT
ABANDONCURB CUT
NEW CURBCUT
ABANDONCURB CUT
EXISTINGCURB CUT
BUS DROP-OFF
HARD SURFACE PLAY AREA
LAWN
GATE
REPLACE CULVERT
RESURFACE EBERHART ROAD
NEW CURBCUT(EGRESS FROM
EBERHART ROAD)
NEWCURB CUTG
ATE
EXTENSION OF EBERHART ROAD
RESURFACE RHODES AVE.
PAVING OPTIONFOR NEW GARAGE
NEW PAVINGFOR GARAGE
28 SPA
CES P
ARKIN
G
61 SPACES PARKING
June 11, 2014
S T R P A R T N E R SBROOKWOOD MIDDLE SCHOOL - DISTRICT 167200 East Glenwood-Lansing Road, Glenwood, Illinois 60425
PRELIMINARY SPACE PLANNING & LAYOUTBUILDING ORGANIZATION PLAN
OPTION
CLASSROOM CLASSROOMSTEM
CORE
COREMUSIC CAFE
EXPANSION
EXPANSION
CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM CLASSROOM
GYM
G
1F
2F
G
1F
2F
ADMINMUSIC
5
ART1,250
EXPA
NSI
ON
840
EXPA
NSI
ON
840
MUSIC2,080
ADMIN2,980
CAFE2,600
KITCHEN1,250
CORE/MAINT.
FUTURE ADDITIONNEW BUILDING
STAGE1,500
BOY
S
GIR
LS
GIR
LSBO
YS
2,600(MEDIA CENTER)
LRC
CORE/MAINT.
BOY
S
GIR
LS
1,10
0ST
EM
450PREP
1,10
0ST
EM
EXPA
NSI
ON
840
EXPA
NSI
ON
840
EXPANSION
1,400
EXPANSION
1,400
EXPANSION
600
1,600
600
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
LOADING
A A
B
B
TRASH
APPROXIMATE AREA TABULATION:
SECOND FLOOR: 21,200 SFGROUND FLOOR: 28,050 SF
TOTAL AREA: 49,250 SF
OPEN TO
BELOW
6,700GYM
00 10' 100'50'25'
BUILDING ORGANIZATION SECTION BSCALE 1/32" = 1'-0"
4
00 10' 100'50'25'
BUILDING ORGANIZATION SECTION ASCALE 1/32" = 1'-0"
3
2 STORY 1 CLASSROOM LEVEL
FUTURE ADDITION (CLASSROOM)
CLASSROOM
ADMIN
ART
GYM
LRC
FUTURE ADDITION (LRC)
FUTURE ADDITION (CAFE)
STEM
00 10' 100'50'25'
BUILDING ORGANIZATION PLANSCALE 1/32" = 1'-0"
1
N
EXISTING ADMIN BUILDING
NEW GARAGE
BUILDING ORGANIZATION - PERSPECTIVE NOT TO SCALE
2
12'-0" 274'-0" 30'-0"
8'-0
"62
'-0"
8'-0
"25
'-0"
12'-
0"14
0'-0
"12
'-0"
25'-
0"
BASKETBALL COURT
PARENT DROP-OFF
GLENWOOD LANSING ROAD
BERMIN
G O
R DETEN
TION
RHO
DES A
VEN
UE
EBERHA
RT AV
ENU
E
GLEN
WO
OD
DYER
ROA
D
GATE
30 FTSETBACK
30 F
TSE
TBA
CK
27.5
FT
SETB
AC
K
30 FTSETBACK
30 FT
SETBACK
DETENTION
ABANDONCURB CUT
ABANDONCURB CUT
NEW CURBCUT
ABANDONCURB CUT
EXISTINGCURB CUT
BUS DROP-OFF
HARD SURFACE PLAY AREA
LAWN
GATE
REPLACE CULVERT
RESURFACE EBERHART ROAD
NEW CURBCUT(EGRESS FROM
EBERHART ROAD)
NEWCURB CUTG
ATE
EXTENSION OF EBERHART ROAD
RESURFACE RHODES AVE.
PAVING OPTIONFOR NEW GARAGE
NEW PAVINGFOR GARAGE
28 SPA
CES P
ARKIN
G
61 SPACES PARKING
June 11, 2014
S T R P A R T N E R SBROOKWOOD MIDDLE SCHOOL - DISTRICT 167200 East Glenwood-Lansing Road, Glenwood, Illinois 60425
PRELIMINARY SPACE PLANNING & LAYOUTBUILDING ORGANIZATION PLAN
OPTION
6
CLASSROOM
CLASSROOM
CLASSROOM
MUSICADMIN
EXPANSION
EXPANSION
CLASSROOM CLASSROOM CLASSROOM
CLASSROOM CLASSROOM CLASSROOM
GYM ART
EXPANSION
PREP STEM CLASSROOM
CORE
G
1F
2F
G
1F
2F
PREP STEM
ARTCAFE
GYM6,700
STAGE1,500
3,000(MEDIA CENTER)
LRC
MUSIC2,080
ART1,250
1F
CORE/MAINT.1,100
ADMIN2,950
CORE/MAINT.1,500
BOYS
GIRLS
KITCHEN1,350 CAFE
3,700
3F
2F
EXPANSION700
EXPANSION1,000
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
TEAM
PREP450
STEM1,100
BOYS
GIRLSCORE/MAINT.
TRASH LOADING
A
A
B
B
EXPANSION
EXPANSION
840
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
CLA
SSRO
OM
840
TEAM
PREP450
STEM1,100
BOYS
GIRLSCORE/MAINT.
EXPANSION
EXPANSION
840
840
APPROXIMATE AREA TABULATION:
THIRD FLOOR: 10,750 SFSECOND FLOOR: 10,750 SFGROUND FLOOR: 29,720 SF
TOTAL AREA: 51,220 SF NEW BUILDING FUTURE ADDITION
3 STORY 2 CLASSROOM LEVEL
00 10' 100'50'25'
BUILDING ORGANIZATION SECTION BSCALE 1/32" = 1'-0"
4
00 10' 100'50'25'
BUILDING ORGANIZATION SECTION ASCALE 1/32" = 1'-0"
3
CLASSROOM
STEM
ADMIN
CAFE
ART
FUTURE ADDITIONGYM
MUSIC
00 10' 100'50'25'
BUILDING ORGANIZATION PLANSCALE 1/32" = 1'-0"
1
N
EXISTING ADMIN BUILDING
NEW GARAGE
BUILDING ORGANIZATION - PERSPECTIVE NOT TO SCALE
2
Site Options_Combined.pdfA1A2A3B1B2B3C1C2C3C4C5D1D2D3D4
140611 Building Organization Plan - Options.pdf140611 Building Organization Plan - Option 4B140611 Building Organization Plan - Option 4C140611 Building Organization Plan - Option 5140611 Building Organization Plan - Option 6