1
Success criterion Get out of the building Result & decision Learning Date: Responsible person: Project name: Step of cycle Phrase the problem from your customers' perspective. Include the proof point. Is this really a problem? (validate with clients/data) Is this one of the most important problems? (estimate impact and apply Pareto principle) Define the possible solution Is the solution easy to implement? Is there a balanced mix of iterative improvements (±80%) and major leaps (±20%)? Design the test (“I will run experiment #X with Y% of customers in period Z”) Is this this the fastest way to test my solution with minimal amount of resources (time, people, money)? Do actual users give feedback, implicitly or explicitly? Is the test time-boxed? Experiments 1 2 3 4 5 Problem Solution Test method The one metric that matters Control metric Draw a line in the sand: the one metric you want to impact, with how much, by when If there is a control metric you want to keep an eye on, specify here Current value of metric Current value of metric Determine what success looks like (“During the test, I expect strong signal from X% of customers”/visitors) Describe the results of your tests. Based on the results, take a decision Describe the lessons learned from the experiment Did we change the one metric that matters significantly? Are control variables still ok? If yes: pop champagne, and build the actual solution. If not: pivot/persevere. LEAN ENTERPRISE EXPERIMENT CANVAS Enterprise Canvas is based on Javelin's Experiment Board, it can be distributed freely and derivative work can be created as long as it also references Javelin's Experiment Board. This work is complementary to the Lean Analytics approach as described by Alistair Croll and Ben Yoskovitz. Goal: to learn More about BLOOM services at www.bloomamsterdam.com

140515 Lean enterprise experiment canvas - BLOOM · This work is complementary to the Lean Analytics approach as described by Alistair Croll and Ben Yoskovitz. Goal: to learn

Embed Size (px)

Citation preview

Page 1: 140515 Lean enterprise experiment canvas - BLOOM · This work is complementary to the Lean Analytics approach as described by Alistair Croll and Ben Yoskovitz. Goal: to learn

Success criterion

Get out of the building

Result & decision

Learning

Date: Responsibleperson:

Projectname:

Step of cycle

Phrase the problem from your customers' perspective. Include the proof point. ☐ Is this really a problem? (validate with clients/data) ☐ Is this one of the most important problems? (estimate impact and apply Pareto principle)

Define the possible solution ☐ Is the solution easy to implement? ☐ Is there a balanced mix of iterative improvements (±80%) and major leaps (±20%)?

Design the test (“I will run experiment #X with Y% of customers in period Z”) ☐ Is this this the fastest way to test my solution with minimal amount of resources (time,

people, money)? ☐ Do actual users give feedback, implicitly or explicitly? ☐ Is the test time-boxed?

Experiments 1 2 3 4 5

Problem

Solution

Test method

The one metric that matters Control metric

Draw a line in the sand: the one metric you want to impact, with how much, by when

If there is a control metric you want to keep an eye on, specify here

Current value of metric Current value of metric

Determine what success looks like (“During the test, I expect strong signal from X% of customers”/visitors)

Describe the results of your tests. Based on the results, take a decision

Describe the lessons learned from the experiment !Did we change the one metric that matters significantly? Are control variables still ok?If yes: pop champagne, and build the actual solution. If not: pivot/persevere.

LEAN ENTERPRISE EXPERIMENT CANVAS

Enterprise Canvas is based on Javelin's Experiment Board, it can be distributed freely and derivative work can be created as long as it also references Javelin's Experiment Board.This work is complementary to the Lean Analytics approach as described by Alistair Croll and Ben Yoskovitz.

Goal: to learn

More about BLOOM services at www.bloomamsterdam.com