    Figure 1

    NFallsParkSub

    SR 9H

    Fdr #1

    DPS 34.5 kV PlanFalls Park SubstationSite and Feeder Exits

    +++++

    = 34.5 kV No Change

  • 8/13/2019 140102 - Revised NYS DPS 34.5 kV Plan Feeder Work and Routes 12-T-0248 For__ Tech Mtg

    2/6

    Figure 2

    Stephentown

    Chatham-Hilltop

    Klinekill

    Wyantskill

    Austerlitz

    Mellenville

    SR 9H

    DPS 34.5 kV Plan

    Falls Park SubstationExtended FeederPaths

    CR 22Not Drawn to Scale

    Fdr #1

    Fdr #3

    N

    New FallsPark

    SubstationFalls Rd

    Green River

    N Hillsdale

    ++++

    ++

    k h

  • 8/13/2019 140102 - Revised NYS DPS 34.5 kV Plan Feeder Work and Routes 12-T-0248 For__ Tech Mtg

    3/6

    Revised DPS 34.5 kV Proposal Revised: 12/19/2013

    Figure 3

    Rebuild OH

    Line at

    34.5 kV

    New

    34.5 kV

    OH Line

    Replace

    UG

    New

    UG

    New

    ROW

    1 -- A #1 Feeder Exit Falls Park Sub SR 9H E Common ROW w Fdr 4 0.4 0.4

    1 -- A SR 9H Falls Indust Pk Rd Old Post Rd S West Side of SR 9H - Common ROW w Fdr #4 0.9 0.9

    1 630 A SR 9H Old Post Rd CC Airport Rd S 1.5

    1 630 A SR 9H CC Airport Rd CR 20 S 1.2

    1 630 A CR 20 SR 9H UG Riser Pole SE 0.2

    1 630 A South of Airport West Riser East Riser SE Replace Failed 34.5 kV UG South of Airport Runway 0.25

    1 630 A CR 20 East Riser SR 66 SE Ties with Craryville Feeder 611 - Mellenvile Line 0.2

    1 FALLS PARK FEEDER #1 TOTAL > 1.6 1.5 1.3 0.25 0.00 1.31 Initial Work Needed for Feeder #1 > -- 1.5 1.3 0.25 0.00 1.3

    1 Postponeable Portion of Feeder #1 Work > -- 0.0 0.0 0.00 0.00 0.0

    These Notes Apply to All Four 34.5 kV Feeders

    All existing overheads 34.5 kV circuits with 4/0 ACSR or AA conductor or larger with be re-used with no additional work required.

    All existing overhead circuits identied above that need to be rebuilt at 34.5 kV that are smaller than 4/0 ACSR or AA conductor

    should be rebuilt with 477 ACSR or at least 336.4 ACSR conductor wher e practic al.

    All new overhead 34.5 kV circ uits identified above (filling in gaps) should be 477 ACSR or at least 336.4 ACSR conduct or wher e pract ical.

    All rebuilt or new undergr ound 34.5 kV c ircuits identified above should be 500 mcm Copper conduct or in a manhole and ductline syst em

    "Seq" is gener al sequence of completion (A throug h G) for distr ibution line work - depending upon amount and location of load growt h,

    some future work (Sequences E throug h G) may not be needed or may need to be modified.Gray Shaded Areas are as sumed postponable until significant load growth materializes.

    Falls

    Park

    Fdr

    No.

    Exist-ing 34.5

    kV Fdr

    Seq Road From

    DPS 34.5 kV Alternative - Distribution Work for Falls Park 34.5 kV Feeder #1

    To Dir Comments

    Existing

    OH Miles

    to be Re-

    Used

    Miles Needed

  • 8/13/2019 140102 - Revised NYS DPS 34.5 kV Plan Feeder Work and Routes 12-T-0248 For__ Tech Mtg

    4/6

    Revised DPS 34.5 kV Proposal Revised: 1/2/2014

    Figure 4

    Rebuild OH

    Line at

    34.5 kV

    New

    34.5 kV

    OH Line

    Replace

    UG

    New

    UG

    New

    ROW

    2 -- B #2 Feeder Exit Falls Park Sub SR 9H E South Side of Ind Pk Rd 0.4 0.4

    2 -- B SR 9H Falls Indust Pk Rd CR 22 S East Side of SR 9H 0.8 0.8

    2 630 B CR 22 SR 9H Orchard Rd E South Side of CR 22 - Common ROW w UG Fdr #4 0.3 0.3

    2 630 B Orchard Rd CR 22 George Rd SE East Side of Orchard Rd 0.5

    2 630 B George Rd Orchard Rd 1 mile south SE 1.0

    2 630 B George Rd SR 66 1 mile north N 0.6 0.6

    2 630 B SR 66 George Rd Cemetery Rd NE Ties with Klinekill Feeder #630 & Village of Chatham 3.7 0.6 0.6

    Fut 2 -- E Cemetery Rd SR 66 CR 9 SE May already have lower voltage circuit on some or all 0.4 0.4

    Fut 2 -- E CR 9 Cemetary Rd Tice Hill Rd SW May already have lower voltage circuit on some or all 0.3 0.3

    Fut 2 -- E Tice Hill Rd CR 9 Harlemville Rd SE 0.2 1.4 1.4

    Fut 2 630 E Harlemville Rd Tice Hill Rd Rigor Hill Rd NE 0.5

    Fut 2 630/631 E Rigor Hill Rd Harlemville Rd West Riser Pole SE To West Side of Taconic Parkway 1.0 0.4 0.4

    Fut 2 631 E Taconic Parkway West Riser Pole East Riser Pole E Underground under Taconic Parkway 0.20

    Fut 2 631 E Rigor Hill Rd East Riser Pole CR 7/Crow Hill Rd E From East Side of Taconic Parkway 1.3

    Fut 2 631 E CR 7/Crow Hill Rd Rigor Hill Rd Schoolhouse Rd SW 0.3

    Fut 2 -- E CR 7/Crow Hill Rd Schoolhouse Rd CR 21/Cakeout S May already have lower voltage circuit on some or all 1.4 1.4

    Fut 2 -- E CR 21/Cakeout CR 7/Crow Hill Schoolhouse Rd SE May already have lower voltage circuit on some or all 1.0 1.0

    Fut 2 610 E CR 21/Cakeout Schoolhouse Rd Geller t Rd SE 1.5

    Fut 2 610 E CR 21 Gellert Rd SR 22 SE 4.8 kV - Already 4/0 AA Conductor - Fdr #610 1.8

    2Falls Park Feeder #2 Totals > 3.7 8.1 7.6 0.20 0.00 7.6

    2 Initial Work Needed for Feeder #2 > -- 1.5 2.1 0.00 0.00 2.1

    2 Postponeable Portion of Feeder #2 Work > -- 6.6 5.5 0.20 0.00 5.5

    Falls

    Park

    Fdr

    No.

    Exist-

    ing 34.5

    kV Fdr

    Seq Road From

    DPS 34.5 kV Alternative - Distribution Work for Falls Park 34.5 kV Feeder #2

    To Dir Comments

    Existing

    OH Miles

    to be Re-

    Used

    Miles Needed

  • 8/13/2019 140102 - Revised NYS DPS 34.5 kV Plan Feeder Work and Routes 12-T-0248 For__ Tech Mtg

    5/6

    Revised DPS 34.5 kV Proposal Revised: 1/2/2014

    Figure 5

    Rebuild OH

    Line at

    34.5 kV

    New

    34.5 kV

    OH Line

    Replace

    UG

    New

    UG

    New

    ROW

    3 -- C #3 Feeder Exit Falls Park Sub SR 9H E North Side of Ind Pk Rd 0.4

    3 -- C SR 9H Indust Pk Rd Falls Rd N 0.2

    3 630 C Falls Rd SR 9H Old Post Rd E 0.3

    3 630 C Old Post Rd Falls Rd CR 22 S 0.8

    3 630 C CR 22 Old Post Rd Step-Down Transf E 0.6

    Fut 3 630 F CR 22 Step-Down Transf Habeck Rd E 4.8 kV - Already Has 4/0 AA Conductor 2.7

    Fut 3 630 F CR 22 Habeck Rd CR 21/Church St E Rebuild Existing or Fill In Gaps 0.9 0.5 0.5Fut 3 630 F CR 21/21B CR 22 Shufelt Rd N 1.4

    Fut 3 630 F Shufelt Rd CR 21B Going East E 0.4

    Fut 3 -- F Shufelt Rd Fdr 630 Fdr 631 E Fill-In Gap 0.4 0.4

    Fut 3 631 F Shufelt Rd SR 203 Going West W Ties Klinekill Feeders #639 and #631 0.3

    Fut 3 -- F TBD SR 203 Chatham Sub E 1.7 1.7

    3 Falls Park Feeder #3 Totals > 0.0 8.0 2.6 0.00 0.00 2.6

    3 Initial Work Needed for Feeder #3 > -- 2.3 0.0 0.00 0.00 0.0

    3 Postponeable Portion of Feeder #3 Work > -- 5.7 2.6 0.00 0.00 2.6

    Falls

    Park

    Fdr

    No.

    Exist-

    ing 34.5

    kV Fdr

    Seq Road From

    DPS 34.5 kV Alternative - Distribution Work for Falls Park 34.5 kV Feeder #3

    To Dir Comments

    Existing

    OH Miles

    to be Re-

    Used

    Miles Needed

  • 8/13/2019 140102 - Revised NYS DPS 34.5 kV Plan Feeder Work and Routes 12-T-0248 For__ Tech Mtg

    6/6

    Revised DPS 34.5 kV Proposal Revised: 1/2/2014

    Figure 6

    Rebuild OH

    Line at

    34.5 kV

    New

    34.5 kV

    Line

    Replace

    UG

    New

    UG

    New

    ROW

    4 -- D #4 Feeder Exit Falls Park Sub SR 9H E Common ROW w Fdr 1 0.4 0.4

    4 -- D SR 9H Falls Indust Pk Rd CR 22 E West Side of SR 9H - Common ROW w Fdr #1 0.7 0.7

    4 -- D CR 22 SR 9H Old Post Road E North Side of CR 22 0.1 0.1

    Fut 4 -- G CR 22 Old Post Road Orchard Rd E UG in Manhole and Ductline 0.30 0.3

    Fut 4 630 G Orchard Rd CR 22 George Rd S West Side of Orchard Rd 0.5 0.5

    Fut 4 630 G Orchard Rd George Rd Cesterrino Ln S 0.9

    4 630 G Orchard Rd Cesterrino Ln SR 66 S 0.7

    Fut 4 630 G Ostrander Rd SR 66 Winter Hill Rd S 1.3Fut 4 630 G Winter Hill Rd Ostrander Rd CR 9 S May already have lower voltage circuit on some or all 0.8 0.8

    Fut 4 G CR 9 Winter Hill Rd Tice Hill Rd E Picks up tie to Fdr #610 Going to N Hillsdale 2.8 2.8

    4 Falls Park Feeder #4 Totals > 0.7 2.2 5.3 0.00 0.30 5.6

    4 Initial Work Needed for Feeder #4 > -- 0.0 1.2 0.00 0.00 1.2

    4 Postponeable Portion of Feeder #4 Work > -- 2.2 4.1 0.00 0.30 4.4

    Rebuild OH

    Line at

    34.5 kV

    New

    34.5 kV

    OH Line

    Replace

    UG

    New

    UG

    New

    ROW

    FALLS PARK TOTAL FOR A LL FEEDERS > 6.0 19.8 16.8 0.45 0.30 17.1

    INITIAL W ORK NEEDED FOR A LL FEEDERS > -- 5.3 4.6 0.25 0.00 4.6

    ASSUMED POSTPONABLE PORTIONS FOR ALL FEEDERS > -- 14.5 12.2 0.20 0.30 12.5

    Miles Needed

    DPS 34.5 kV Alternative - Summary of Distribution Work Required for All Four Falls Park 34.5 kV Feeders

    Existing

    Miles to

    be Re-

    Used

    Miles Needed

    DPS 34.5 kV Alternative - Distribution Work for Falls Park 34.5 kV Feeder #4

    FallsPark

    Fdr

    No.

    Exist-ing 34.5

    kV Fdr

    Seq Road From To Dir CommentsExistingOH Miles

    to be Re-

    Used