Pipe Line Construction
Citation preview
PERMIAN EXPRESS II
GARDEN CITY TO COLORADO CITY
20” Crude Oil Pipeline &
COLORADO CITY TO CORSICANA 24” Crude Oil Pipeline
PIPELINE CONSTRUCTION
SCOPE OF WORK
EXHIBIT A4
B Issued for Bid DAB MBJ 7/8/14
REV DESCRIPTION BY CHECK APRVD DATE
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 1 of 46 02949‐GS‐9005
TABLE OF CONTENTS
1.0 PROJECT DESCRIPTION 2
1.1 GARDEN CITY TO COLORADO CITY 20” CRUDE OIL PIPELINE .................................................... 2
1.2 COLORADO CITY TO CORSICANA 20” CRUDE OIL PIPELINE ........................................................ 4
1.3 PIPELINE CONSTRUCTION SPREADS .............................................................................................. 7
2.0 PROJECT SCHEDULE 25
2.1 REQUIRED COMPLETION DATES ................................................................................................... 25
2.2 DEFINITIONS ...................................................................................................................................... 25
2.3 DETAILED CONSTRUCTION & KEY MILESTONE SCHEDULE ...................................................... 25
3.0 COMPLIANCE 26
3.1 HEALTH & SAFETY ............................................................................................................................ 26
3.2 ANTI-DRUG PLAN AND TESTING REQUIREMENTS ...................................................................... 27
3.3 IMMIGRATION REFORM AND CONTROL ACT OF 1986 ................................................................. 27
3.4 REFERENCED DRAWINGS, PLANS, CODES AND STANDARDS .................................................. 27
4.0 PIPELINE DETAILED SCOPE OF WORK 28
4.1 REPORTS & SUBMITTALS ................................................................................................................ 28
4.2 CONSTRUCTION SUPERVISION ...................................................................................................... 30
4.3 PROPOSED SUB-CONTRACTORS .................................................................................................. 31
4.4 GENERAL REQUIREMENTS ............................................................................................................. 31
4.5 WORKSITE MANAGEMENT .............................................................................................................. 32
4.6 ACCEPTANCE STANDARDS ............................................................................................................ 34
4.7 SURVEY SERVICES & CONSTRUCTION DATA .............................................................................. 35
4.8 MATERIALS & EQUIPMENT .............................................................................................................. 35
4.9 PIPELINE CONSTRUCTION .............................................................................................................. 37
4.10 COMPANY REPRESENTATION ........................................................................................................ 46
20” Garden 24” ColoradSCOPE OF W
Prepared by:
1.0 PRO
The cons24” cthe pin the
Whetheseconscons
1.1
City to Coloro City to CorWORK
OJECT DESC
Sunoco Logtruction of tw
crude oil pipepipelines are ae following se
re quantities,e indications truction requtruction price
GARDEN
The Gard20-inch cSterling, H
Line pipe fusion bo0.500” wawill be 0.3
In generacrossings
The depth
L1.1.1
Mpoa
Tco
Inthb
Rm
B1.1.2
T2bo
Cin
Ap
Bin
rado City Piprsicana Pipe
RIPTION
gistics Partnwo (2) separat
line from Coloarranged intoections.
lengths and shall be con
uirements, an. Refer to the
CITY TO CO
en City to Coonstruction, tHoward and M
for the ANSnd epoxy. T
all thickness a344” WT.
al, quadruple and double r
h-of-cover for
and Use
Much of the portion south oreas of steep
he 30’ of addonstruction, o
n excess of 1hese fence reracing.
Right-of-way rmust be chisel
Bored & Drille
he 20” pipelin0; all of whichored crossing
COMPANY stnstallation.
At bored and ieces to be w
Bored crossingndicated on th
peline eline
ers, L.P. (Cte pipelines, orado City to (5) spreads –
other characnstrued as gend not to bee Uniform Bid
OLORADO CI
olorado City ctraversing neMitchell.
I 600# systemhe pipe spec
and protected
e random lenrandom length
the main pip
pipeline routeof I-20, and cer slopes and
ditional constother than a ~
00 barbed anestorations w
revegetation ied, disked or
ed Crossings
ne route encoh must be diregs of county a
tipulates that
drilled crossinwelded betwee
gs will generahe project dra
Page 2 of 4
COMPANY) Pa 20” crude oCorsicana.
– (1) for the 2
cterizations ofeneral in natue relied upond Sheets, Cro
ITY 20” CRUD
rude oil pipelw rights-of-w
m is specifiedcification for b with dual coa
ngths will behs will be utili
eline is 4’ in m
e involves nacultivated fieldd valleys.
truction right-o~5-mile sectio
nd wire fencewill require a
is included inr otherwise de
s
ounters 1 railrectionally dril
and TXDOT ro
t all pipe us
ngs, COMPAen the 0.500”
ally be installewings.
46
Permian Expoil pipeline froFor the purpo20” pipeline a
f the project aure, for the pn as the dessing List and
DE OIL PIPE
ine consists oway through t
d as 20” OD bored and driat FBE / ARO
utilized for ized for bored
most cases.
ative vegetatids. Overall,
of-way is mon where the r
es will be gappermanent g
n the pipelinee-compacted
road, 2 signifiled. In additioads.
sed for bore
ANY will furnisWT crossing
ed with a min
press II (PEom Garden Cose of biddingand (4) for the
are provided purpose of pfinitive basisd Drawings fo
LINE
of approximathe West Tex
x 0.344” WTilled crossing
O or FBE / Po
the main lind crossings.
ion including the terrain is
ostly laid out froute parallels
pped and restgate with eith
e constructionprior to comp
cant waterwaion, the route
es and drills
sh shop-tapeg pipe and the
imum cover d
Rev. B,
EXII) project City to Colorag, awarding ae 24” pipeline
within this Scroviding a na
s for compilinor definitive q
tely 59 milesxas counties
T, API 5LX-65gs is also APIowercrete. Fa
ne and direc
mesquite, ps relatively m
for an easters a 3rd party p
tored. Many her wood or
n scope. Cupletion.
ays, FM 33 an requires app
s be hydrote
ered, FBE-coae 0.344” WT li
depth of 5’, or
Exhibit A4, July 8, 2014
02949‐GS‐9005
includes theado City and aand execution, as described
cope of Workarrative of theng a detaileduantities.
or 311,914’ oof Glasscock
5, coated withI 5LX-65, withabrication pipe
ctionally-drilled
articularly theild, with some
rly direction opipeline.
if not most osteel pipe H
ultivated field
nd Interstate Iproximately 22
ested prior to
ated transitionine pipe.
r as otherwise
4 4
5
e a n, d
k, e d
of k,
h h e
d
e e
of
of -
s
-2
o
n
e
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
O1.1.3
O
Odw
Cofano
T1.1.4
It crnAbp
E1.1.5
Rppbp
Radid
C
P1.1.6
Fdbse
G1.1.7
Pcop
Cco
PCsh
H1.1.8
H
rado City Piprsicana Pipe
Open-Cut Cro
Open-cut cross
Open-cut servay. Since sp
will not be con
Certain open-cf-cover and, pproved in adon-cathodic p
hird-Party P
is anticipaterossings – pipear active an
Although the roe paralleled fipeline projec
Excavation, P
Rock excavatioadding for theadding mache subject to placed on spoi
Rock sizes reddressed in
dentified and c
COMPANY sta
Pipeline PI’s
BE-coated, suring construending. Walegmentable e
Girth Welds, C
Pipeline girth oating will berior to coating
Cathodic protomplete insta
Portions of theCOMPANY mhaded pipelin
Hydrostatic T
Hydrostatic te
peline eline
ossings
sings of an es
ice road crospecial backfillducive to exc
cut waterwayin some ca
dvance by Cprotection shie
ipelines
ed that constpelines, flow lnd inactive ooute does nofor approximacts in the area
Padding, Sha
on is expectee pipeline, poine or shakerprior approvail pillows havi
equiring dispothe Pipeline
communicate
andards requ
segmentable, uction to addrll thickness trelbows will be
CP Test Stat
welds are toe 2-part epoxyg application.
ection test sallation will be
e 20” route paay instruct th
ne, lead wires
Testing
esting of the
Page 3 of 4
stimated 19 s
sings will utili, compaction
cavation by tre
s are noted oases, pipelineOMPANY; if elding materia
truction will lines, cables, ilfield gatherit follow corridately 9 miles,a.
ading & Back
ed for some possibly in conr bucket genel by COMPANng the same
osal versus pConstruction
ed for COMPA
ire that warni
3D, 90° elboress pipeline ransitions be
e field-tapered
ions, Zinc R
o be coated y. All welds
stations, leade the responsi
arallel high vohat zinc ribbo run above-gr
e installed
46
service roads
ize line pipe a and compacenching equip
on the alignme weights. Tsaddlebag tyal.
involve a lar water lines, eng systems,
dors containin, a figure wh
kfill
portion of the njunction witherated or impoNY. In rockyspecification
placement inn SpecificatioANY approva
ng tape be pl
ows will be suPI’s of 23° o
etween the 0.d.
ibbon
with field-apmust be allow
d wire, cadwibility of the co
oltage electricon be supplierade and term
pipeline will
and 37 water
and each muction testing apment.
ment sheets toThe type of ype, the bags
rge number etc. The aligwind turbine
ng multiple pipich will increa
route. In theh rock shield, orted if necesy locations, th
as the beddin
n the upper ons. Disposl.
laced above t
upplied by COr greater; all .344” WT line
pplied FBE. wed to cool f
welded connonstruction C
c transmissioned, placed abminated at mo
be perform
Rev. B,
rways are als
st be installedare required,
o consider foweights utili
s must be ma
of 3rd party nment passe
e areas and pelines, otherase as a res
ese locationswill be neces
ssary. Importhe lowered pipng and paddi
portion of thsal site locat
the pipeline d
OMPANY andother PI’s wi
e pipe and th
Crossing pifor a minimum
ections, termCONTRACTO
n lines. In thbove and cononitoring statio
med by othe
Exhibit A4, July 8, 2014
02949‐GS‐9005
so necessary.
d in 1 workingthe crossings
or extra depthized must beanufactured o
buried facilityes through androck quarriesr pipelines wiult of ongoing
, bedding andssary -- eitheted backfill wipeline is to beng.
he backfill areions must be
uring backfill.
d field-trimmedill require fieldhe 0.375” WT
pe girth weldm of 24 hours
minations andOR.
ese locationsnnected to theons.
ers; however
4 4
5
g s
h-e
of
y d s. ll g
d er ll e
e e
.
d d T
d s
d
s, e
r,
20” Garden 24” ColoradSCOPE OF W
Prepared by:
1.2
City to Coloro City to CorWORK
cogp1rothte
Ppofo
B1.1.9
Toat
Ingcopex
Teqthth
P1.1.10
Ap(aa
If Cd
COLORA
The 24” pconstructicorridors; from the these par
API 5LX-6WT, coatepipe, coat
Quadruplerandom le
The depth
L1.2.1
rado City Piprsicana Pipe
onstruction Cauging platesroceed from 8.1. The Sproute water inthe 20” line is est section bre
Potentially, thartially or comn-site during
ollowing the te
Block Valve S
he 20” pipelinperated. Pipt Colorado Ci
n addition to pround mainlinonstruction olatform; fabrixisting landow
he 5 electricquipment rac
he rack equiphe electrical ra
Permanent Ac
A number of ermanent accand also thosnd restore as
required byCONTRACTO
imensions, tu
ADO CITY TO
pipeline from ion. Route pnearly 190 mclosest identalleling lines.
65 pipe will beed with fusionted with FBE
e random lenengths have b
h-of-cover for
and Use
peline eline
CONTRACTOs, installing tColorado Cit
read 20-1 conto the line at Cready for tes
eak, and the
e hydrotest mpletely demo
the hydroteest and perfor
Sites
ne includes thing to route toty are also co
piping fabricane valves reqf reinforced ccation of thewner fencing
cally operatedck foundationsment and theack and instru
ccess Roads
existing roadcess to the pe identified as
s stated in the
y the termsR’S scope
urning radius,
CORSICANA
Colorado Citlanning was
miles of the altified line. P
e utilized for tn bond epoxy/ ARO or FBE
ngths have bbeen ordered
the main pip
Page 4 of 4
OR is requiredtest heads aty to Garden nstruction conColorado Citysting, contractlauncher will
will be condobilized.st and will brm final clean
he constructioo and the insomponents of
ation, installatquire site andconcrete suppe valve accesto the valve s
d valve sitess and rack in
e valve operatumentation; a
s
ds have beeipeline ROW.s temporary a
e Pipeline Con
of the TXof work wildrainage, su
A 24” CRUDE
ty to Corsicabased on utilignment para
Pre-constructi
the ANSI 600y. Bored and E / Powercret
been ordered for the bored
eline is 4’ in m
46
d to prepare tand jumpers, City and req
ntractor will by and out of thtor will also abe pre-loaded
ducted after Regardless
be required tn-up in those a
on of 6 block vstallation of 1 f the project s
tion, painting d access roadports for pipinss platform; site fencing.
s will also invnstallation; cotor; conduit frand area light
n designated. CONTRACaccess roadsnstruction Spe
DOT drivewl include uprfacing, etc.
E OIL PIPELI
na, Texas invlizing existing
allels 1 or morion routing in
0# system. L drilled crosste. Fabricatio
for the maind crossings.
most cases.
the line for te etc. The c
quires 2 test be required tohe system at affix test headd with a batch
the construcs, constructioto reassemblareas impact
valve sites, 5 launcher at G
scope.
and below-gd grading, surng, block valvand, where a
volve meter onduit, wiring rom the satellting.
d and arrangCTOR will be s) during consecifications.
ay permit(s)pgrading the
NE
volves approg pipeline righre pipelines, gncludes appr
ine pipe is spings will be c
on pipe will be
n pipeline and
Rev. B,
esting by cleacurrent hydrosections, bre
o install tempoGarden City.
ds / temporarhing pig.
ction CONTRn CONTRACle the test sed by the hyd
of which will Garden City a
rade coating,rfacing, fencive and block applicable, c
pole installatand terminat
lite communic
gements madentitled to us
struction, but
, which reme driveway a
ximately 279hts-of-way angenerally at aroximately 50
pecified as 24constructed we 0.500” WT.
d drilled cros
Exhibit A4, July 8, 2014
02949‐GS‐9005
aning, runningotest plan wieaking at ~MPorary piping to. In order thary traps at the
RACTOR hasCTOR must be
ection breaksdrotest.
be electricallyand 1 receive
, the 6 aboveng and gatesvalve access
onnecting the
tion; electrications betweencations dish to
de for use ase these roadsmust maintain
main pendingaccess apron
miles of newnd establishedan offset of 250 crossings o
4” OD x 0.406with 0.547” WT
ssings; double
4 4
5
g ll P o at e
s e s
y er
e-s; s e
al n o
s s n
g, n
w d 5’ of
6” T
e
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
TCaSst
Tcofo
Afe
Rm
B1.2.2
T(oCabow
Cineco
Ap
Bin
O1.2.3
OScr
Odw
Cofano
T1.2.4
Ccocarop
rado City Piprsicana Pipe
errain, vegetaCity and Corsi
nd 24-3 will eSpread 24-4 intreams and d
he 40’ of addonstruction;, hollows existing
About 1175 baence restorati
Right-of-way rmust be chisel
Bored & Drille
he alignmentone of which
County Road 3ll of which muored crossing
which may req
COMPANY stnstallation. Fnsure unobstoating resista
At bored and ieces to be w
Bored crossingndicated on th
Open-Cut Cro
Open-cut crosSpecial excavrossings.
Open-cut servay. Since sp
will not be con
Certain open-cf-cover and, pproved in adon-cathodic p
hird-Party P
Construction wonstruction sables, water ock quarries.ipelines; it is
peline eline
ation and lanicana. Initiallencompass anto Corsicanarainages.
ditional consthowever, mulg pipelines an
arbed, wire, pons will requi
revegetation ied, disked or
ed Crossings
t of the 24” pi includes on327, County ust be directiogs of county quire boring, w
tipulates thatFollowing insttructed passa
ance test.
drilled crossinwelded betwee
gs will generahe project dra
ossings
ssings of appation, backfil
ice road crospecial backfillducive to exc
cut waterwayin some ca
dvance by Cprotection shie
ipelines
will involve asurvey and Tlines, etc. T As stated, possible tha
Page 5 of 4
d use along ly, cultivated
a higher degrea becomes op
truction right-oltiple changesnd back-and-f
pipe and gamre a permane
is included inr otherwise de
s
peline crossene of the railRoad 340, Inonally drilled.and TXDOT
will be crossed
t all pipe ustallation, a gaage and prov
ngs, COMPAen the 0.547”
ally be installewings.
roximately 22l and compac
sings will utili, compaction
cavation by tre
s are noted oases, pipelineOMPANY; if elding materia
a large numbTXRRC databThe alignmen, the route pat constructio
46
the 24” pipelfields and m
ee of slopes pen and with
of-way is mos in working dforth crossing
e fences will ent gate with
n the pipelinee-compacted
es an estimatroad crossinterstate I-20,. Furthermorroads. An ed.
sed for boreauge plate mvisions must
ANY will furnisWT crossing
ed with a min
23 service roction measur
ize line pipe a and compacenching equip
on the alignme weights. Tsaddlebag tyal.
ber of 3rd pabase files shnt passes thropredominantly
on adjacent to
ine vary signild slopes areand native treonly intermitt
ostly laid out fdirection are ags are require
be gapped aeither wood o
e constructionprior to comp
ted 7 railroadsgs), and 5 h County Roa
re, the route rstimated 14 p
es and drillsmust be pulle
be made for
sh shop-tapeg pipe and the
imum cover d
oads and 360res are mand
and each muction testing apment.
ment sheets toThe type of ype, the bags
rty buried fahow at least ough and ney follows coro these corri
Rev. B,
ificantly betwe prevalent. ees, brush antent slopes as
for an easterassumed likeled.
and restored. or steel pipe H
n scope. Cupletion.
s, 14 significahighways / pd 4281 and Irequires appropipeline corrid
s be hydroteed through thr COMPANY
ered, FBE-coae 0.406” WT li
depth of 5’, or
0 waterways datory for the
st be installedare required,
o consider foweights utili
s must be ma
cility crossing350 pipelinear wind turbirridors contadors will reve
Exhibit A4, July 8, 2014
02949‐GS‐9005
ween ColoradoSpreads 24-2nd vegetationssociated with
rly direction oly as the route
Many f theseH-bracing.
ultivated field
ant waterwayaved roads –nterstate I-35oximately 215dors, some o
ested prior tohe crossing to
to conduct a
ated transitionine pipe.
r as otherwise
are expectede service road
d in 1 workingthe crossings
or extra depthized must beanufactured o
gs – the prees, flow linesne areas and
aining multipleeal previously
4 4
5
o 2 n. h
of e
e
s
s – 5; 5 of
o o a
n
e
d. d
g s
h-e
of
e-s, d e y
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
u
E1.2.5
Rppbp
Radid
C
P1.2.6
FbyP
Othtr
G1.2.7
Pcop
Cco
PCsh
H1.2.8
Hcogpcoatofbth
Ppofo
B1.2.9
rado City Piprsicana Pipe
ndetected thi
Excavation, P
Rock excavatioadding for theadding mache subject to placed on spoi
Rock sizes reddressed in
dentified and c
COMPANY sta
Pipeline PI’s
BE-coated, sy CONTRAC
PI’s will require
One end of thickness; for ransition piece
Girth Welds, C
Pipeline girth oating will berior to coating
Cathodic protomplete insta
Portions of theCOMPANY mhaded pipelin
Hydrostatic T
Hydrostatic teonstruction Cauging platesroceed from onstruction cot Corsicana af the system e required to
he outbound t
Potentially, thartially or comn-site during
ollowing the te
Block Valve S
peline eline
rd-party facilit
Padding, Sha
on is expectee pipeline, poine or shakerprior approvail pillows havi
equiring dispothe Pipeline
communicate
andards requ
segmentable, CTOR during e field bendin
the segmentathe trimmed
es.
CP Test Stat
welds are toe 2-part epoxyg application.
ection test sallation will be
e 24” route paay instruct th
ne, lead wires
Testing
esting of theCONTRACTOs, installing tCorsicana toontractor will and the Spreaat Colorado C install test test head with
e hydrotest mpletely demo
the hydroteest and perfor
Sites
Page 6 of 4
ties.
ading & Back
ed for some possibly in conr bucket genel by COMPANng the same
osal versus pConstruction
ed for COMPA
ire that warni
3D, 90° elboconstruction g.
able elbows end, COMPA
ions, Zinc R
o be coated y. All welds
stations, leade the responsi
arallel high vohat zinc ribbo run above-gr
e installed OR is required
test heads ao Colorado Ci
be required tad 24-1 consCity. In orderheads / temph batching pig
will be condobilized.st and will brm final clean
46
kfill
portion of the njunction witherated or impoNY. In rockyspecification
placement inn SpecificatioANY approva
ng tape be pl
ows will be suto address p
will be shopANY has pro
ibbon
with field-apmust be allow
d wire, cadwibility of the co
oltage electricon be supplierade and term
pipeline will d to prepare tand jumpers, ity and requirto install temptruction contrr that the 24” porary traps ags.
ducted after Regardless
be required tn-up in those a
route. In theh rock shield, orted if necesy locations, th
as the beddin
n the upper ons. Disposl.
laced above t
upplied by COpipeline PI’s o
p-tapered to ocured FBE-c
pplied FBE. wed to cool f
welded connonstruction C
c transmissioned, placed abminated at mo
be performthe line for te etc. The cres 17 test seporary piping ractor will affiline is ready
at the test se
the construcs, constructioto reassemblareas impact
Rev. B,
ese locationswill be neces
ssary. Importhe lowered pipng and paddi
portion of thsal site locat
the pipeline d
OMPANY andof 23° or gre
match the lcoated 0.500”
Crossing pifor a minimum
ections, termCONTRACTO
n lines. In thbove and cononitoring statio
med by otheesting by cleacurrent hydroections. Theto route wate
ix piping to rofor testing, a
ection breaks,
ction CONTRn CONTRACle the test sed by the hyd
Exhibit A4, July 8, 2014
02949‐GS‐9005
, bedding andssary -- eitheted backfill wipeline is to beng.
he backfill areions must be
uring backfill.
d field-trimmedeater; all othe
line pipe wa” / 0.406” WT
pe girth weldm of 24 hours
minations andOR.
ese locationsnnected to theons.
ers; howeveraning, runningotest plan wie Spread 24-4er into the lineoute water ouall spreads wi, and pre-load
RACTOR hasCTOR must be
ection breaksdrotest.
4 4
5
d er ll e
e e
.
d er
ll T
d s
d
s, e
r, g ll 4 e
ut ll d
s e s
20” Garden 24” ColoradSCOPE OF W
Prepared by:
1.3
City to Coloro City to CorWORK
Tofurero
Tinfebco
Inmwina
P1.2.10
Ap(aa
If Cd
PIPELINE
S1.3.1
SCmin
TU225
TMCsu
rado City Piprsicana Pipe
he 24” pipelperated block
uture midpoinequired. Oneoute to each a
he Work at enstallation, paencing and galock valve aconnecting the
n addition, themeter pole inswiring and tenstrumentatiorea lighting.
Permanent Ac
A number of ermanent accand also thosnd restore as
required byCONTRACTO
imensions, tu
E CONSTRUC
Spread 20-1: G
Spread 20-1 wCity, which invmanual valve nstallation with
he spread inUnion Pacific R
2 road bores;3 third-party p
he 20-1 SpreMOV-53.6 andCity / Coloradubsections:
Garde
MP 12
MP 33
MP 43
MP 46
MP 48
MP 53
peline eline
line includesk valve sitesnt pumping se (1) launcherare additional
each valve sitainting and bates; constru
ccess platforme existing land
e 11 electricastallation; elecerminations n; conduit fro
ccess Roads
existing roadcess to the pe identified as
s stated in the
y the termsR’S scope
urning radius,
CTION SPRE
Garden City
will consist of volves ~59 msite, launcheh the associa
cludes the knRailroad, Mor; no pipeline cpipelines / fac
ead includes d the installatdo City. A f
en City to MO
2.2 to MOV-3
3.8 to MOV-4
3.0 to BV-46.
6.5 to MOV-4
8.6 to MOV-5
3.6 to Colorad
Page 7 of 4
the constru. The installatation, as wer at Colorado l items of the
e and the futbelow-grade ction of reinfo
m; fabrication downer fencin
lly-operated vctrical equipmbetween the
om the satell
s
ds have beeipeline ROW.s temporary a
e Pipeline Con
of the TXof work wildrainage, su
EADS
to Colorado
the constructmiles of piper installation
ated piping at
nown crossinrgan Creek, Incorridors, 19 ocilities.
the construction of the lafurther overvi
OV-12.2
33.8
43.0
5
48.6
53.6
do City Recei
46
uction of 11 ation of pig laell as the ove
City and (1) project scope
ure midpoint coating; site
forced concreof the valve a
ng to the valve
valve sites anment rack foue rack equilite communic
n designated. CONTRACaccess roadsnstruction Spe
DOT drivewl include uprfacing, etc.
o City
tion of the 20line base layand connectColorado City
ngs stated prenterstate I-20open-cut road
ction of MOVauncher / recew follows fo
iver
electrically oaunching anderall developreceiver at C
e.
station will coe and accessete supports faccess platfoe site fencing
nd the future mundations andpment and cations dish
d and arrangCTOR will be s) during consecifications.
ay permit(s)pgrading the
” pipeline fromy, 5 electricaing piping at y.
eviously – 5 0 and the Colods, 37 open-c
V-12.2, MOV-eiver and co
for these rela
Rev. B,
operated andd receiving fa
pment of the Corsicana and
onsist of pipins road gradinfor piping, blo
orm; and, wheg.
midpoint statid rack installa
the valve to the electr
gements madentitled to us
struction, but
, which reme driveway a
m Garden Citlly-operated Garden City
directional drorado River; acut waterways
-33.8, MOV-4nnecting pipi
ated valve-to-
Exhibit A4, July 8, 2014
02949‐GS‐9005
d 6 manuallyacilities at thesite, are also
d the piping to
ng fabricationng, surfacingock valve andere applicable
on will requireation; conduitoperator andical rack; and
de for use ase these roadsmust maintain
main pendingaccess apron
ty to Coloradovalve sites, , and receive
rills of FM 33approximatelys, and at leas
43.0, BV-46.5ng at Garden-valve spread
4 4
5
y e o o
n, g, d e,
e t, d d
s s n
g, n
o 1
er
3, y
st
5, n d
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 8 of 46 02949‐GS‐9005
Garden City to MOV-12.2
The 20” alignment from Garden City to MOV-12.2 will parallel 1 or more existing pipelines for ~7 of the initial 8.8 miles and will also cross these paralleling lines at 1 location, ~MP 3.6. As a result, the construction ROW is configured for northeasterly progress until ~MP 4.6 but involves reverse lay for the ensuing ~4.2 miles. At ~MP 8.8, the routes diverge and the working side reverts to a northeasterly direction and remains so for the duration.
Other than oilfield facilities and wind farms, land use enroute to the first valve site is generally native / sparse vegetation / undisturbed, with ~1 mile of cultivated fields that abut MOV-12.2. The topography is flat with few areas of even mild slopes.
Approximately 16 barbed wire and 2 wire fences will intersect the route, requiring gapping for and restoration following construction, in some cases including a permanent gate (see Construction Line List).
The schedule of crossings consists of the directional drill of FM 33, 2 road bores, 7 service road open-cuts, 13 drainage area open-cuts and a minimum of 19 foreign pipeline crossings, including those of the paralleling pipelines. Eight (8) PI’s of 23° and greater will be required, with the associated field-fitting and installing of segmentable elbows and 1 pipe wall transition piece per PI.
According to publically available surface geology mapping information, limestone formations will be encountered for ~ 5 miles of this section. The reliability of this mapping information is uncertain.
The installation of the receiver and connecting piping at Garden City and the construction of MOV-12.2 are included. CONTRACTOR will complete only the piping installation at Garden City but will be responsible for all grading, access road construction, structural, fencing, electrical, piping, painting, etc. at MOV-12.2.
Other than the valve site, there are 3 right-of-way permanent access roads that service the pipeline ROW at ~MP 2.3, ~MP 3.5 and ~MP 9.8.
The baseline hydrotesting plan calls for no test section breaks within this portion of the pipeline.
MP 12.2 to MOV-33.8
The 21.6-mile section from MOV-12.2 to MOV-33.8 involves only ~1.8 miles of paralleling pipelines, located between ~MP 25.9 and ~MP 27.7. No crossings of these paralleling lines will be required; however, at least 29 foreign pipeline crossings have been identified via pre-construction activities.
Construction ROW is arranged for a northeasterly progression.
Land use consists of minimal farming, oilfield gathering facilities and flow lines and undeveloped terrain. The few drainage basins are associated with slight topographic relief that becomes a bit more appreciable in 2 or 3 locations.
Approximately 26 barbed wire and 2 wire fences will cross the route, requiring gapping for and restoration following construction, in some cases including a permanent gate (see Construction Line List).
An estimated 4 road bores, no directional drills, no pipeline corridor crossings, 10 open-cut road crossings and 15 open-cut stream / drainage area crossings will be necessary. Twelve (12) PI’s of 23° and greater will be required, with the associated field-fitting and installing of segmentable elbows and 1 pipe wall transition piece per PI.
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 9 of 46 02949‐GS‐9005
The surface geology mapping information calls for limestone formations along ~ 11 miles of this section. The reliability of this mapping information is uncertain.
The connection of MOV-12.2 to the main 20” pipeline and the construction of MOV-33.8 are included. CONTRACTOR will complete all civil, structural, fencing, electrical, piping, painting, etc. at MOV-33.8.
Other than the valve site, there are 4 right-of-way permanent access roads that service the pipeline ROW at ~MP 15.5, ~MP 16.9, ~MP 23.2 and ~MP 23.4. TXDOT FM 2183 feeds the ~MP 23.2 & ~MP 23.4 access roads; potentially, it may be determined necessary to upgrade the existing driveway apron at FM 2183 to meet TXDOT requirements
The baseline hydrotesting plan calls for 1 test section break within this portion of the pipeline, to be located at ~MP 18.1.
MP 33.8 to MOV-43.0
The 21.6-mile section from MOV-12.2 to MOV-33.8 involves only ~1.8 miles of paralleling pipelines, located between ~MP 25.9 and ~MP 27.7. No crossings of these paralleling lines will be required; however, at least 29 foreign pipeline crossings have been identified via pre-construction activities.
Construction ROW is arranged for a northeasterly progression.
Land use consists of minimal farming, oilfield gathering facilities and flow lines and undeveloped terrain. The few drainage basins are associated with slight topographic relief that becomes a bit more appreciable in 2 or 3 locations.
Approximately 26 barbed wire and 2 wire fences will cross the route, requiring gapping for and restoration following construction, in some cases including a permanent gate (see Construction Line List).
An estimated 4 road bores, no directional drills, no pipeline corridor crossings, 10 open-cut road crossings and 15 open-cut stream / drainage area crossings will be necessary. Twelve (12) PI’s of 23° and greater will be required, with the associated field-fitting and installing of segmentable elbows and 1 pipe wall transition piece per PI.
The surface geology mapping information calls for limestone formations along ~ 11 miles of this section. The reliability of this mapping information is uncertain.
The connection of MOV-12.2 to the main 20” pipeline and the construction of MOV-33.8 are included. CONTRACTOR will complete all civil, structural, fencing, electrical, piping, painting, etc. at MOV-33.8.
Aside from the valve sites, there are no right-of-way permanent access roads and no hydrostatic test section breaks called for in the baseline testing plan.
MP 43.0 to BV-46.5
This short section is characterized mainly by the directional drills of the Union Pacific Railroad and Morgan Creek. Otherwise, the segment contains approximately 9 barbed wire fence crossings, 3 road bores, 2 open-cut waterway crossings, 1 foreign pipeline crossing and (7) PI’s of 23° and greater.
Construction ROW continues to be arranged for a northeasterly progression.
Work will also involve the connection of MOV-43.0 to the main 20” pipeline and the construction of BV-46.5, including all civil, structural, fencing, piping, painting, etc.
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
Ahy
M
T1o
T
ABfe
Ahy
M
TwM
Sco
Cdop
Thy
M
Tde
Sco
Ca
Thy
S1.3.2
CMmhstrocr
rado City Piprsicana Pipe
Aside from thydrostatic tes
MP 46.5 to MO
he section be.8 miles of cupen-cuts, 1 d
he constructio
As with other BV-46.5, and encing, piping
Aside from thydrostatic tes
MP 48.6 to MO
he directionawire fences, aMOV-48.6 to M
Slopes and laonstruction w
Connection ofownstream Mainting, etc.
here are no rydrostatic tes
MP 53.6 to Co
he final 5.4 rainage area lbows and tra
Slopes and laonstruction w
Connection of nd connecting
he Spread 2ydrotesting th
Spread 24-1: C
Construction SMOV-78.1. Tmanual valve
ead / temportated previouoad bores; arossings.
peline eline
he valve sitesst section brea
OV-48.6
egins with theultivated croprainage open
on working si
segments, cothe construc
g, electrical pa
he valve sitesst section brea
OV-53.6
al drill of the Cand (3) PI’s MOV-53.6 rou
nd use are nworking side w
f the 20” pipMOV-53.6 are
right-of-way pst section brea
olorado City
miles into Copen-cuts, 1
ansition piece
nd use are nworking side w
the 20” pipelg piping at Co
20-1 contracthe 20” pipelin
Colo. City to
Spread 24-1 bThis portion o
site, launcherary trap to thsly – 5 direc
and an estim
Page 10 of
s, there are aks called for
e directionally land. Approx
n-cut and 3 sig
ide will not ch
onnection of ction of MOVainting, etc.
s, there are aks called for
Colorado Riverequiring trim
uting.
not significantwill not change
peline to the e involved, in
ermanent accaks are called
Colorado City2 barbed wires.
not significantwill not change
ine to the upsolorado City a
tor will be ree.
o 40’-60’ Beyo
begins at Coloof the projecer installationhe east of MOtional drills o
mated 42 op
46
no right-of-wr in the baseli
drilled crossiximately (7) bgnificant PI’s
hange.
the 20” pipelV-48.6 are re
no right-of-wr in the baseli
er, 1 road bormmed segme
t factors and e.
upstream Mcluding all ci
cess roads otd for in the ba
y includes ape fences and
t factors and e.
stream MOV-are componen
equired to p
ond MOV-78
orado City anct will includen and connecOV-78.1. Theof railroads, wpen-cut cross
way permanene testing pla
ing of Interstabarbed wire feof 23° and gr
line to the upequired - inc
way permanene testing pla
re, 1 open-cuentable elbow
rock excava
MOV-48.6 anvil, structural
ther than thosaseline testing
pproximately (9) PI’s requ
rock excava
-53.6 and thents of the wor
repare the C
8.1
nd ends approe 5 electricalcting piping ae spread incl
waterways ansings road a
Rev. B,
ent access ran.
ate I-20 and cences, 1 roadreater are inv
pstream valvecluding all ci
ent access ran.
ut drainage, 1ws are conta
ation is not ex
nd the constr, fencing, pip
se to the valveg plan.
4 road boresiring trimmed
ation is not ex
e installation ork.
Colorado City
oximately 40’lly-operated vat Colorado ludes the knod roads; appand waterwa
Exhibit A4, July 8, 2014
02949‐GS‐9005
roads and no
completes withd bore, 2 roadvolved.
e, in this casevil, structura
roads and no
10 barbed andained with the
xpected. The
ruction of theping, electrica
e sites and no
s, 3 stream d segmentable
xpected. The
of the receive
y receiver fo
to the east ovalve sites, City, and tesown crossingsproximately 59ay / drainage
4 4
5
o
h d
e l,
o
d e
e
e al
o
/ e
e
er
or
of 1 st s 9 e
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 11 of 46 02949‐GS‐9005
The 24-1 Spread includes the construction of the following valve sites:
MOV-21.8
BV-34.5
MOV-45.2
MOV-54.4
MOV-63.8
MOV-78.1
Colorado City to MOV-21.8
Between Colorado City and MOV-21.8, the route parallels the West Texas Gulf (WTG) 26” system; offset ~25’ to the north / east, until crossing WTG and Interstate I-20 on the western outskirts of Sweetwater, TX.
Additional working space provides for a westerly direction of construction. There is 1 change in the working side, at the western edge of Sweetwater.
Land use is predominantly mild topography and cultivated fields, which must be chiseled, disked or otherwise de-compacted prior to completion.
Approximately 35 barbed wire, wire and wood fences will be gapped and restored, usually with a permanent gate.
An estimated 21 road bores, 1 railroad HDD and 2 waterway open-cut crossings will be necessary. Third-party pipelines, water lines and cable crossings will total approximately 23.
Installation of the Colorado City launcher and connecting piping and the construction of MOV-21.8 are included. CONTRACTOR will complete all civil, structural, piping and electrical work at MOV-21.8; however, at Colorado City only piping and equipment installation will be required -- grading, pipe supports, access platforms, electrical work, painting, etc. will be completed by others.
There are no pipeline ROW permanent access roads and no hydrotest section breaks located between Colorado City and MOV-21.8, per the baseline hydrotesting plan.
MP 21.8 to BV-34.5
From the downstream side of MOV-21.8 to BV-34.5, the 24” route shifts to bypass Sweetwater to the south and then veers northeast to join a pipeline corridor at ~MP 30.2. Primarily native vegetation and a few miles of moderate and some areas of significant terrain will be encountered.
The temporary construction ROW is located for an easterly direction of construction. There are no changes in the working side resulting from a switch in the TWS relative position.
Approximately 30 barbed wire and 15 wire fences must be gapped for construction, restored and, where indicated in the Construction Line List, outfitted with a permanent gate.
The spread sub-section includes an estimated 5 road bores, 1 railroad HDD, 1 pipeline corridor crossing and 3 road and 10 waterway open-cut crossings. A minimum of 21 third-party pipeline, 7 water line and 1 cable crossings have been identified.
The connection of MOV-21.8 to the main pipeline and the construction of BV-34.5 are included. CONTRACTOR will complete all civil, structural, fencing, piping, painting, etc. at BV-34.5.
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 12 of 46 02949‐GS‐9005
There is 1 permanent access road which serves the pipeline ROW at ~MP 25.1 via Road 217.
The baseline hydrotesting plan calls for 1 test section break within this portion of the pipeline.
MP 34.5 to MOV-45.2
The 10.7 mile section from MP 34.5 to MOV-45.2 generally follows to the south of an existing pipeline corridor; however, slightly over half of the route moves away from the close ~25’ offset to that corridor.
Land use is mainly native with some pasture and farmed fields. Moderate and steeper topography is associated with the 12 stream and drainage area open-cut crossings identified through this section.
The temporary construction ROW is located for an easterly direction of construction. There are no changes in the working side and the route does not cross the paralleling pipeline corridor. However, some sharp changes in direction are involved – (10) PI’s of 23° and greater will require field-fitting and installing segmentable elbows and pipe wall transition pieces.
About 40 barbed wire and wire fences will be gapped for construction, restored and, where indicated in the Construction Line List, outfitted with a permanent gate.
The spread sub-section includes an estimated 7 road bores, 1 railroad HDD and 3 road open-cut crossings, in addition to the 12 waterway crossings referenced above. A minimum of 6 third-party pipeline and 4 water line crossings have been identified.
The connection of MOV-34.5 to the main pipeline and the construction of MOV-45.2 are included. CONTRACTOR will complete all civil, structural, fencing, electrical, piping, painting, etc. at MOV-45.2.
There is 1 permanent access road which connects via private road to the pipeline ROW at ~MP 41.3.
The baseline hydrotesting plan calls for 0 test section breaks within this portion of the pipeline.
MP 45.2 to MOV-54.4
Between MOV-45.2 and MOV-55.4, the alignment departs from the pipeline corridor and takes a northerly direction to bypass the city of Abilene. There is (1) crossing of the paralleling corridor associated with this alignment change, which occurs at ~MP 46.3. Aside from the initial 1.1 miles, the 24” route between MOV-45.2 and MOV-54.4 will utilize non-paralleling, new rights-of-way.
Mainly farmed fields with some native areas / pastures comprise the land use and the topography is very mild. Additional working space provides for an easterly (northerly) direction of construction. There are no changes in the working side, despite crossing the paralleling pipeline corridor as mentioned above.
The pipeline segment includes (10) PI’s of 23° and greater, which will require field-fitting and installing segmentable elbows and pipe wall transition pieces.
Approximately 30 barbed wire and 5 wire fences will be gapped and restored, usually with a permanent gate.
An estimated 9 road bores and 1 combined HDD crossing of County Road 368, the UP
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 13 of 46 02949‐GS‐9005
Railroad and Interstate I-20 will be required. Open-cut crossings will be employed for 2 waterways. In addition, a 2nd pipeline corridor crossing located at ~MP 46.4 is expected. Third-party pipeline crossings will be required; however, based on current information, only (18), along with 3 water lines, have been identified, including those associated with crossings of the paralleling pipeline corridor.
The connection of MOV-45.2 to the main pipeline and the construction of MOV-54.4 are included. CONTRACTOR will complete all civil, structural, fencing, electrical, piping, painting, etc. at MOV-54.4.
There is 1 permanent access road which serves the pipeline ROW at ~MP 48.1 via County Road 349.
The baseline hydrotesting plan calls for 1 test section break within this portion of the pipeline.
MP 54.4 to MOV-63.8
From MOV-55.4 to MOV-63.8, the route continues northeasterly, bypassing Abilene and enroute to COMPANY’S Hawley Station. No paralleling pipelines are involved and only (2) foreign line crossings have been detected.
The 9.4-mile section is nearly all agricultural. The construction working space continues to be arranged for an easterly / northerly direction of construction, with no working side changes involved.
The pipeline segment includes roughly 15 barbed wire / wire fence crossings and (7) significant PI’s which will require trimmed segmentable elbows and pipe wall transition pieces.
Approximately 9 road bores and 1 waterway open-cut crossing will be necessary. The section contains no directionally drilled crossings.
Approximately 30 barbed wire and 5 wire fences will be gapped and restored, usually with a permanent gate.
The connection of MOV-54.4 to the main pipeline and the construction of MOV-63.8 are included. CONTRACTOR will complete all civil, structural, fencing, electrical, piping, painting, etc. at MOV-63.8.
There are no permanent access roads and no hydrotest section breaks located between MOV-54.4 and MOV-63.8.
MP 63.8 to 40’-60’ Beyond MOV-78.1
The 14.3-mile section from MP 63.8 to MOV-78.1 is more varied than the previous two valve-site-to-valve-site portions of Spread 24-1. Land use begins as predominantly cultivated on both sides of the Clear Fork HDD, becomes predominantly native as the route approaches ~MP 68.2 Hawley Station and is mostly native brush-tree covered with interspersed agricultural areas from Hawley to MOV-78.1.
Also at Hawley, the 24” alignment resumes the paralleling format, taking position to the south / west of COMPANY’s 16” Hawley – Comyn pipeline. The alignment turns back to the east and slightly to the southeast to begin returning from the diversion around Abilene. Within the ~9.4 miles that the route parallels COMPANY’S existing pipeline, (2) crossings of that paralleling line and a change in working side are involved, at ~MP 70.9 and ~MP 71.7.
Aside from the 1 working side change, the construction ROW is again positioned for an
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
e
Oaa
Arein
Aaidth
Tinpple
Oth
Tp
S1.3.3
Cexpooin
TRroa
Trero
Tfu
M
TpE~
rado City Piprsicana Pipe
asterly directi
Owing largely pproximately nd installing o
Approximatelyepaired follown the Construc
An estimated long with 3
dentified a minhose of the pa
he connectioncluded. COainting, etc. ipeline 40’ –
eaving open fo
Other than thehe pipeline RO
he baseline ipeline.
Spread 24-2:
Construction Sxtends througortion of the pperated valve
nstallation and
he spread incRoad 340 and oad and 61 wnd over 140 f
his portion oesulting from ock excavatio
he 24-2 Spreurther overvie
MP 78
MP 10
MP 12
MP 78.1 to MO
he section froroceeding so
Essentially this25’ to the so
peline eline
ion of constru
to the directio(17) PI’s of
of segmentab
65 barbed wwing constructction Line Lis
8 road boresroad and 7nimum of 13 taralleling 16”
on of MOV-63ONTRACTORat MOV-78.160’ past MOVor connection
e valve sites, OW from Priv
hydrotesting
MP 78.1 to 4
Spread 24-2 gh the constproject will ince site, 1 manud associated
cludes directithe Texas &
waterway opeforeign line cr
of the alignmthe presence
on.
ead includes tew follows for
8.1 to MOV-1
05.0 to BV-12
25.7 to 40’-60
OV-105.0
om MP 78.1 outheasterly s entire portio
outh / west, e
Page 14 of
uction.
on changes a23° and grea
ble elbows and
wire, 17 wire tion. Permant.
s and 1 roadwaterway opthird-party pippipeline.
3.8 to the mR will comple1. In additioV-78.1 and, d
n by the Sprea
there is 1 rigvate Road 458
plan calls f
0’-60’ Beyon
begins apprtruction of thclude approxiual valve site piping, equipm
onally drilled Pacific Railwn-cut crossingrossings are a
ment also coe of threatene
he constructiothese valve-t
05.0
25.7
0’ beyond Eas
to MOV-105.to rejoin theon of the rou
except for the
46
at Hawley andater will be red pipe wall tra
and 2 game nent gates mu
d and 1 watepen-cut crosspeline, 12 wa
ain pipeline ete all civil,
on, the Spreadepending upad 24-2 CON
ht-of-way per8 at ~MP 64.8
for 1 test se
nd Eastland S
roximately 40he future midimately 62.2 mand site devement, structu
crossings of way. In additiogs are includanticipated as
ontains areased and endan
on of MOV-10to-valve sprea
stland Station
0 completes e pipeline cote parallels th
e segment fro
d the (2) crossequired, with ansition piece
fences will nust be installe
rway drilled csings. Pre-c
ater line and 1
and the consstructural, f
ad 24-1 scoppon the overaTRACTOR.
rmanent acce8.
ection break
Station
0’ – 60’ to thdpoint boostemiles of pipelelopment, laural, electrical
f Deadman Con, approximaed. Five (5)
s well.
s with constrngered bird ha
05.0, BV-125ad subsection
n
the Abilene rorridor exited he Hawley –
om ~MP 83.0
Rev. B,
sings of the pthe associat
es.
need to be gaed at the locat
crossings wilconstruction 1 cable crossi
struction of Mfencing, elecpe includes eall work statu
ess road whic
within this p
he east of Mer, Eastland Sline base lay,uncher installa, painting, etc
reek, Battle Cately 22 roadpipeline corr
ruction timingabitat, and th
5.7 and Eastlans:
reroute, withpreviously aComyn 16” s
0 to MP 83.4
Exhibit A4, July 8, 2014
02949‐GS‐9005
paralleling 16”ted field-fitting
apped for andtions indicated
l be requiredsurveys havengs, including
MOV-78.1 arectrical, pipingextending the
us, isolating o
ch connects to
portion of the
MOV-78.1 andStation. This 1 electricallyation, receivec. at Eastland
Creek, County bores and 10idor crossing
g restrictionse potential fo
and Station. A
the alignmenat ~MP 46.3system; offsewhich divert
4 4
5
”, g
d d
d, e g
e g, e
or
o
e
d s
y-er .
y 0 s
s, or
A
nt 3. et s
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 15 of 46 02949‐GS‐9005
farther away to avoid an existing wind turbine.
Additional working space provides for an easterly direction of construction. There are no crossings of the paralleling 16” line or changes in the working side. Approximately (4) PI’s of 23° and greater will be required, with the associated field-fitting and installing of segmentable elbows and pipe wall transition pieces.
Land use is mainly native / pasture with a small occurrence of cultivated fields. Areas containing medium to more significant slopes will be experienced within the section.
Approximately 50 barbed wire / wire will be gapped for and restored following construction, usually with a permanent gate.
An estimated 3 road bores, 2 road open-cut crossings and 30 waterway / drainage area open-cut crossings will be necessary. In addition, at least 23 third-party pipeline, 5 water line and 2 cable crossings will be conducted.
The connection of MOV-78.1 to the main 24” pipeline at the western side of Spread 24-2 and the construction of MOV-105.0 are included. CONTRACTOR will complete all civil, structural, fencing, electrical, piping, painting, etc. at MOV-105.0.
Other than the valve sites, there are no right-of-way permanent access roads located between MOV-78.1 and MOV-105.0.
The baseline hydrotesting plan calls for 4 test section breaks within this portion of the pipeline.
MP 105.0 to BV-125.7
At ~MP 105.2, the alignment crosses the paralleling Hawley-Comyn 16” and assumes a position parallel and to the north of the pipeline corridor which includes the WTG 26”.
Enroute to BV-125.7, the route involves 5 working side changes and 5 crossings of the paralleling WTG 26”. In general, the temporary construction ROW is laid out for easterly progress from:
~MP 105.0 – MP 105.2 = 0.2 miles
~MP 114.6 – MP 114.7 = 0.1 miles
~MP 123.7 – MP 123.8 = 0.1 miles
~MP 125.3 – MP 125.7 = 0.2 miles
And a westerly movement from:
~MP 105.2 - MP 114.6 = 9.4 miles
~MP 114.7 – MP 123.7 = 9.0 miles
~MP 123.8 – MP 125.3 = 1.5 miles
About 10 percent of the route section encounters cultivated fields; most of the alignment is native trees, brush and vegetation. The terrain is a primary feature between the 2 valve sites; approximately 21 waterway and drainage area open-cut crossings are included.
In addition to the waterway and drainage open-cut crossings, the 20.7 mile section will involve approximately 10 road bores, 1 pipeline corridor crossing, 1 drilled crossing of Battle Creek, 5 road open-cut crossings and at least 33 third-party pipeline, 3 water line and 1 cable crossings, including those of the WTG 26” and other paralleling lines. Based upon the pre-construction alignment, (13) PI’s of 23° and greater and the associated field-fitting and installing of segmentable elbows and pipe wall transition pieces will be required.
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 16 of 46 02949‐GS‐9005
About 70 barbed wire and wire fences and 1 game fence will need to be opened for and restored following construction, with permanent gates installed according to the Construction Line List.
T&E bird habitat exists for about 1.3 miles of this segment, scattered over about 5-6 portions of the route.
The connection of MOV-105.0 to the main pipeline and the construction of BV-125.7 are included. CONTRACTOR will complete all civil, structural, fencing, piping, painting, etc. at BV-125.7.
Other than the valve sites, there are no right-of-way permanent access roads located between MOV-105.0 and BV-125.7.
The baseline hydrotesting plan calls for 1 test section break within this portion of the pipeline.
MP 125.7 to 40’-60’ Beyond Eastland Station
The 14.6 mile section from MP 125.7 to the Eastland site continues to follow the corridor which contains WTG and other pipelines. The route crosses to the south side of the corridor shortly out of the BV-125.7 valve site, at ~MP 126.0, and for the most part occupies a position ~25’ to the south of the nearest paralleling line. About a third of the section relocates well away from the pipeline corridor.
The temporary construction ROW is largely situated for an easterly direction of construction; however, there are 3 working side changes and 4 crossings of the paralleling pipelines involved.
The sections which present a west-to-east working direction are:
~MP 126.0 - MP 136.6 = 10.6 miles
~MP 137.1 - MP 139.8 = 2.7 miles
~MP 139.8 - MP 140.3 = 0.5 miles
And an easterly construction progress layout from:
~MP 125.7 - MP 126.0 = 0.3 miles
~MP 136.6 - MP 137.1 = 0.5 miles
Land use is mainly native with some pasture and farmed fields. Relatively steeper topography is evident at isolated locations that cumulatively cover about 3 miles of the route. Some sharp changes in direction are involved, with a total of (12) PI’s of 23° and greater that will require field-fitting and installing segmentable elbows and pipe wall transition pieces.
An estimated 71 barbed wire fences will be gapped for construction, restored and, where indicated in the Construction Line List, outfitted with a permanent gate.
The spread sub-section includes an estimated 9 road bores, 4 pipeline corridor crossings and 2 drilled crossings of County Road 340 and the Texas & Pacific Railway. Open-cut crossings are planned for 3 roads and 10 waterways and drainages. No less than 86 third-party pipeline and 3 water line crossings should be expected, including those of the paralleling lines.
The possibility of rock trenching exists for this section of the route. Publically available surface geology data shows a ~1.2 mile area of limestone at and upstream of Eastland.
T&E bird habitat exists for about 1.5 miles of this segment, confined to ~5 areas along the
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
a
Tinpcola
TdS
Inad
Tp
S1.3.4
Cexam
T
Inolin
Trero
T2
4
A
rado City Piprsicana Pipe
lignment.
he connectioncluded. COainting, etc. onstruction,
aunching and
he Spread 2epending upo
Spread 24-3 C
n addition to ccess roads, etermined to
he baseline ipeline.
Spread 24-3:
Construction Sxtends throupproximately
manual valve s
he spread inv
South
Salt C
North
Dry Br
Brazos
Buck C
n addition, appen-cut crossne crossings
his portion oesulting from ock excavatio
he 24-3 Spre02.0 and BV-
MP 14
MP 16
MP 19
MP 20
MP 20
0’-60’ Beyon
At 29.1 miles,
peline eline
n of BV-125.7ONTRACTORat Eastland –security fenreceiving pip
4-2 scope alon the overa
CONTRACTO
the BV-125.7located at ~require drivew
hydrotesting
Eastland Sta
Spread 24-3gh the cons70.9 miles
sites.
volves 7 direc
Fork Palo Pin
reek
Paluxy River
ranch of the P
s River
Creek
pproximately sings are incare anticipate
of the alignmthe presence
on.
ead includes-211.2. A furt
40.4 to BV-16
69.4 to MOV-
90.1 to MOV-
00.4 to MOV-
02.0 to 40’-60
nd Eastland S
the alignmen
Page 17 of
7 to the main R will comple– where the cing, electric
ping, etc.
so includes eall work statu
OR.
7 and EastlanMP 137.6, wway apron up
plan calls fo
ation to 40’-6
begins apprtruction of Bof pipeline b
ctionally drilled
nto Creek
(twice)
Paluxy (also in
53 road borluded. Two ed as well.
ment also coe of threatene
s the construther overview
69.4
-190.1
-200.4
-202.0
0’ beyond BV-
Station to BV
nt between E
46
pipeline and ete all civil, greenfield fa
c service, s
extending theus, isolating o
nd access rowhich connectpgrades to me
or no test se
60’ Beyond B
roximately 40BV-211.2. Tbase lay, 3 e
d waterway /
ncludes railro
res, 32 road(2) pipeline c
ontains areased and endan
ction of BV-w follows for th
-211.2
V-169.4
Eastland and
the constructstructural, f
acility will reqsatellite and
e pipeline 40or leaving op
oads, there ists to TXDOT eet TXDOT re
ection breaks
BV-211.2
0’ – 60’ to tThis portion oelectrically-op
railroad cros
oad crossing)
open-cut crcorridor cross
s with constrngered bird ha
169.4, MOV-hese valve-to-
BV-169.4 is
Rev. B,
tion of Eastlafencing, elec
quire grading,cellular com
’ – 60’ past pen for conn
s 1 right-of-waroad FM 717
equirements.
s within this p
the east of of the projecperated valve
sings:
ossings and sings and ove
ruction timingabitat, and th
-190.1, MOV--valve spread
the longest s
Exhibit A4, July 8, 2014
02949‐GS‐9005
nd Station arectrical, piping, access roadmmunications
Eastland andnection by the
ay permanen7 and may be
portion of the
Eastland andct will includee sites and 2
92 waterwayer 120 foreign
g restrictionse potential fo
-200.4, MOVd subsections
span between
4 4
5
e g, d s,
d, e
nt e
e
d e 2
y n
s, or
V-:
n
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 18 of 46 02949‐GS‐9005
valve sites. Most of this section or nearly 25 miles parallels only the WTG pipeline, at the 25’ offset distance, as the other known lines in the pipeline corridor depart to the northeast just downstream of Eastland.
The construction right-of-way is aligned for progressing mainly to the east, although 5 areas of reverse lay are involved:
~MP 143.5 - MP 146.7 = 3.2 miles
~MP 150.8 - MP 151.1 = 0.3 miles
~MP 156.5 - MP 156.8 = 0.3 miles
~MP 157.8 - MP 158.3 = 0.5 miles
~MP 164.4 - MP 164.6 = 0.2 miles
Largely in conjunction with the changes in working side, 11 crossings of the paralleling WTG pipeline will be necessary. The first of these WTG crossings, which occurs prior to exiting the pipeline corridor, involves multiple lines.
Less than 10% of the land use is cultivated fields; the majority of the segment is native trees, brush and vegetation. Relatively steeper topography is also prevalent for about 40% of the route and is often associated with the 62 open-cut waterway and drainage crossings and the waterway HDD’s.
Threatened & Endangered (T&E) species bird habitat occurs at approximately 12 locations that collectively cover nearly 8 miles of the route. Other than 1 location which is fairly close to BV-169.4, the T&E habitat is found in the initial ~15 miles to the east of Eastland Station.
The routing section involves a comparatively large number of PI’s of 23° and greater, with 29 locations requiring field-fitting and installing segmentable elbows and pipe wall transition pieces.
An estimated 102 barbed wire, 12 wire, 1 wood, 1 pipe and 1 game fences will cross the alignment and require gapping for and restoration after construction, including permanent gates where called for in the Construction Line List.
The spread sub-section includes an estimated 12 road bores and 2 drilled crossings of the South Fork of Palo Pinto Creek and Salt Creek. Open-cut crossings are planned for 8 roads and the 53 waterways and drainages referenced above. No less than 59 third-party pipeline crossings should be expected, including those of the paralleling WTG 26”.
The possibility of rock trenching exists for this section of the route. Publically available surface geology data shows a ~0.5 mile area of limestone to the east of Eastland and another ~2.8 mile area intermittently between ~MP 162.6 and ~MP 166.0.
The connection of Eastland to the main pipeline and the construction of BV-169.4 are included. CONTRACTOR will complete all civil, structural, fencing, piping, painting, etc. at BV-169.4.
In addition to the Eastland and BV-169.4 access roads, there are 4 right-of-way permanent access roads planned, located at ~MP 143.9, ~MP 155.9, ~MP 160.1 and ~MP 161.4.
The baseline hydrotesting plan calls for 5 test section breaks within this portion of the pipeline.
MP 169.4 to MOV-190.1
The 20.7-mile routing section between BV-169.4 and MOV-190.1 parallels WTG for over 12 miles and more than one pipeline for nearly 2 additional miles, generally at the 25’ offset
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 19 of 46 02949‐GS‐9005
distance.
The construction right-of-way is configured for an easterly direction of construction, with the exception of the following areas:
~MP 169.9 - MP 170.5 = 0.6 miles
~MP 171.1 - MP 171.2 = 0.1 miles
~MP 172.0 - MP 172.5 = 0.5 miles
~MP 177.8 - MP 179.5 = 1.7 miles
~MP 181.9 - MP 183.2 = 1.3 miles
~MP 184.1 - MP 184.6 = 0.5 miles
Twelve (12) crossings of the paralleling WTG line will be required for the current routing. In addition, 31 PI’s of 23° and greater will necessitate field-fitting and installing segmentable elbows and pipe wall transition pieces.
The alignment will intersect approximately 109 barbed wire, 31 wire and 2 game fences, each of which must be prepared for construction equipment passage and restored following construction. Permanent gates must be installed at those locations stated in the Construction Line List.
This section of Spread 24-3 contains an estimated 18 road bores, 2 directional drills of the North Paluxy River and 1 HDD to cross the BNSF railroad and Dry Branch of the Paluxy River.
Open-cut crossings are expected for 20 roads and 19 waterways and drainages. A minimum of 37 third-party pipeline and 1 water line crossings have been identified, including those of the WTG 26” and other paralleling lines.
The possibility of rock trenching exists for this section of the route. Publically available surface geology data shows a cumulative distance of ~2.3 miles of limestone at 6 to 8 locations between ~MP 180.4 and ~MP 190.0; however, several other portions of this stretch appear to be close as well and the accuracy of the surface geology data is uncertain.
T&E bird habitat and the related construction timing restrictions must be addressed for about 2.8 miles of this segment, generally confined to ~4 areas along the alignment.
The connection of BV-169.4 to the main pipeline and the construction of MOV-190.1 are included. CONTRACTOR will complete all civil, structural, fencing, electrical, piping, painting, etc. at MOV-190.1.
In addition to the valve site access roads, there is 1 right-of-way permanent access road planned, located at ~MP 171.3.
The baseline hydrotesting plan calls for 1 test section break within this portion of the pipeline.
MP 190.1 to MOV-200.4
The alignment from MP 190.1 to MOV-200.4 has been rerouted away from the WTG 26” and consequently parallels WTG for only the last ~1.1 miles into MOV-200.4. No crossings of paralleling lines are involved and the direction of construction is primarily to the east; however, there is a section of reverse lay from ~MP 196.0 to ~MP 197.8 to avoid obstructions and tract changes. The section is also marked by scattered residential dwellings and outbuildings.
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 20 of 46 02949‐GS‐9005
Ground cover is generally native or cleared fields, with some areas of tree and brush clearing to address. One (1) or 2 instances of moderate terrain or greater will be experienced.
The section will traverse approximately 49 barbed wire, 14 wire and 2 game fences, each of which must be prepared for construction equipment passage and restored following construction. Permanent gates must be installed at those locations stated in the Construction Line List.
An estimated 10 road bores, no pipeline corridor crossings and no directional drills are expected. Open-cut crossings of 1 roads and 7 waterways have been identified, as have 4 third-party pipeline and 1 water line crossings. Twenty-six (26) PI’s of 23° and greater are contained in this short 10.3-mile section.
In addition, approximately 4.4 miles of rock excavation areas are visible from the surface geology database, between ~MP 192.3 and ~MP 197.3. T&E bird habitat is present for ~0.8 miles between ~MP 194.4 and ~MP 195.2.
The connection of MOV-190.1 to the main pipeline and the construction of MOV-200.4 are included. CONTRACTOR will complete all civil, structural, fencing, electrical, piping, painting, etc. at MOV-200.4.
Aside from the valve site access roads, there will be no ancillary right-of-way permanent access roads. There is 1 test section break required, according to the baseline hydrotesting plan.
MP 200.4 to MOV-202.0
The main feature of the MOV-200.4 to MOV-202.0 line section is the approximately 2000’ drilled crossing of the Brazos River. There are also 2 road bores and open-cut crossings of 3 roads, as well as 1 known 3rd party pipeline – which consists of the paralleling WTG 26” line. The working side is for an easterly direction from MOV-200.4 to ~MP 200.9, switching to a westerly direction at the WTG crossing and continuing in that configuration to MOV-202.0.
Other than the river, land use and ground cover can be characterized in the same manner as the previous valve-to-valve section. Fence gap requirements have been counted for 16 barbed wire and 3 wire fence crossings. Four (4) trimmed segmentable elbows and the associated transition pieces will be necessary.
Limestone surface geology appears evident for ~0.3 miles adjacent to the Brazos; reference the specific geotechnical coring results for additional information.
T&E bird habitat impacts the route in 2 locations on the southeast side of the river, for a total distance of ~0.5 miles.
The connection of MOV-200.4 to the main pipeline and the construction of MOV-202.0 are included. CONTRACTOR will complete all civil, structural, fencing, electrical, piping, painting, etc. at MOV-202.0.
In addition to the valve site access roads, 2 right-of-way permanent access roads are planned, located at ~MP 201.0 and ~MP 201.1.
The baseline hydrotesting plan calls for no test section breaks within this portion of the pipeline.
MP 202.0 to BV-211.2
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
Tmcoin
Tcua
Tof
Tshnp
TCth
TinB
TdS
Aa2
P
S1.3.5
CcoavaC
T
rado City Piprsicana Pipe
he route frommile section. onstruction; h
n working dire
~MP 2
~MP 2
~MP 2
he terrain coultivated cropnd final 2-mile
&E bird nestif the alignme
welve (12) triharper PI’s. ecessitating ermanent gat
he route sectCreek, 10 opehan 22 foreign
he connectioncluded. COBV-211.2.
he Spread 24epending upo
Spread 24-4 C
Aside from thccess road w04.5.
Per the baselin
Spread 24-4: 4
Construction Sontinues to tpproximately alve sites and
Corsicana grad
he spread co
Ham C
BNSF
Nolan
County
Interst
White
peline eline
m MOV-202.0 The majori
however, therection. Weste
202.0 - MP 20
205.9 - MP 20
209.0 - MP 2
nsists of natipland. Arease sections. S
ng habitat annt in ~6 areas
immed segmeIn addition, athe gaps fo
te where requ
tion includes 9n-cut road crn pipeline cro
on of MOV-20NTRACTOR
4-3 scope alson the overa
CONTRACTO
e valve site which connec
ne hydrotestin
40’-60’ Beyo
Spread 24-4the pipeline t68.2 miles o
d receiver insding, structur
ontains 6 direc
Creek
Railroad
River
y Road 4281
tate I-35
Rock Creek
Page 21 of
0 to BV-211.2ty of the wo
re are 5 crosserly / reverse
03.0 = 1.0 mi
07.3 = 1.4 mi
11.0 = 2.0 mi
ve trees, buss of steeper sSurface geolog
nd constructios.
entable fittingabout 44 barbor and restouired in the Co
9 road bores,rossings, 13 ossings (includ
02.0 to the mwill complete
so involves eall work statu
OR.
access roadcts to County
ng plan, no te
ond BV-211.2
4 begins appterminus at C
of pipeline bastallation andal, electrical,
ctionally drille
46
2 parallels thork space issings of the play sections r
les
les
les
shes and vegslops will be gy informatio
on timing restr
gs with transitbed wire, 9 w
oration followonstruction L
, no pipeline copen-cut streading the 5 cro
main pipelinee all civil, stru
extending theus, isolating o
ds, there will y Road 200 a
est section bre
2 to Corsican
proximately 4Corsicana. T
ase lay, 2 ele the associatpainting, etc.
ed waterway,
e WTG 26” fs laid out foparalleling WTrun from:
getation and ctraversed, pan shows no in
rictions will be
tion pieces onwire and 1 ga
wing construcine List.
corridor crossam and drain
ossings of the
and the conuctural, fencin
e pipeline 40’or leaving op
be 1 ancillaand crosses
eaks are nece
na
40’ – 60’ toThis portion ctrically-operated piping an. will be handl
railroad and r
Rev. B,
for over 8 mir an easterlyTG pipeline a
cleared fieldsarticularly dundication of li
e a factor for
n 1 end will bame fence wiction, and af
sings, 1 HDD nage crossinge paralleling W
nstruction of ng, piping, pa
– 60’ past Bpen for conn
ary right-of-wathe pipeline
essary.
o the east Bof the projecated valve sitd equipment led by others
road / highwa
Exhibit A4, July 8, 2014
02949‐GS‐9005
iles of the 9.2y direction o
and 5 change
s with minimaring the initiamestone.
about 3 mile
be installed foill be crossedffixing with a
to cross Bucgs and no lessWTG 26”).
BV-211.2 areainting, etc. a
BV-211.2 andnection by the
ay permanenROW at ~MP
BV-211.2 andct will includetes, 2 manuaat Corsicana.
ay crossings:
4 4
5
2 of s
al al
s
or d, a
k s
e at
d, e
nt P
d e al a.
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 22 of 46 02949‐GS‐9005
Approximately 71 road bores, 18 road open-cut crossings and 72 waterway open-cut crossings will be necessary. The route also contains four (4) pipeline corridor crossings and over 60 foreign line crossings.
This portion of the alignment encompasses areas with construction timing restrictions, resulting from the presence of threatened and endangered bird habitat, and the potential for rock excavation.
The 24-4 Spread also involves the construction of MOV-221.8, BV-239.5, MOV-252.9 and BV-273.5. A summary overview follows for these valve-to-valve spread subsections:
MP 211.2 to MOV-221.8
MP 221.8 to BV-239.5
MP 239.5 to MOV-252.9
MP 252.9 to BV-273.5
MP 273.5 to Corsicana
40’-60’ Beyond BV-211.2 to MOV-221.8
This 10.6 mile segment parallels WTG to the southwest except for a 3-mile reroute from ~MP 218.0 to ~MP 221.0. There are 2 crossings of WTG associated with this reroute; however, the working space layout provides for an easterly progression and there are no changes in the working side.
Some significant slopes and clearing will be involved with portions of the first ~7 miles. This stretch also contains ~4 locations and ~3.6 miles of T&E bird species habitat – which is the entirety of the related construction timing restrictions for Spread 24-4. No rock construction is suggested according to the surface geology database information, although that source is not to be considered conclusive.
Fence crossings will again be prevalent; survey information noted 32 barbed wire, 2 wire and 2 game fences that will be gapped for construction and will require restoration following completion of the work, possibly with the installation of a permanent gate (see Construction Line List).
The schedule of crossings consists of approximately 12 road bores, no pipeline corridors, directional drills of Ham Creek, BNSF railroad and Nolan River, open-cuts of 3 roads and 7 waterways / drainages, and a minimum of 10 third-party pipelines (2 of which involve the paralleling WTG). The section also contains (11) PI’s of 23° and greater, which will utilize trimmed segmentable elbows and 1 transition piece per PI.
The connection of BV-211.2 to the main pipeline and the construction of MOV-221.8 are included. CONTRACTOR will complete all civil, structural, fencing, piping, electrical, painting, etc. at MOV-221.8.
Aside from the valve site access roads, there will be no ancillary right-of-way permanent access roads and no test section breaks required, according to the baseline hydrotesting plan.
MP 221.8 to BV-239.5
The majority of the route from MOV-221.8 to BV-239.5 continues to parallel the WTG 26” at the ~25’ offset distance to the southwest. However, the 24” pipeline will depart from the WTG alignment at ~MP 235.5.
Near the end of the section at ~MP 238.9, the route will begin to follow and existing corridor
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 23 of 46 02949‐GS‐9005
containing multiple pipelines.
Working space is positioned for an easterly direction of construction but 8 crossings of the paralleling WTG result in 4 working side changes and reverse lay for the following areas:
~MP 222.9 – MP 223.3 = 0.4 miles
~MP 225.3 – MP 225.8 = 0.5 miles
~MP 229.6 – MP 226.9 = 0.3 miles
~MP 233.9 – MP 234.3 = 0.4 miles
Land use through the section is primarily open fields and native / pasture acreage, with scattered residential dwellings and outbuildings. Some treed areas and moderate terrain will be crossed.
A large number of private fences will need to be gapped and restored, in some cases with a permanent gate (see Construction Line List). Survey activities picked up approximately 108 barbed wire and 8 wire fences along the route.
Crossings will consist of 15 road bores, no pipeline corridors, directionally drilling County Road 4281, open-cutting 11 roads and 18 streams / drainages, and an estimated 34 third-party pipeline and 1 water line crossings (including the 8 crossings of the paralleling WTG pipeline).
The section contains (28) PI’s of 23° and greater, which will utilize trimmed segmentable elbows and 1 transition piece per PI.
The connection of MOV-221.8 to the main pipeline and the construction of BV-239.5 are included. CONTRACTOR will complete all civil, structural, fencing, piping, painting, etc. at BV-239.5.
Aside from the valve site access roads, there will be no ancillary right-of-way permanent access roads and no test section breaks required, according to the baseline hydrotesting plan.
MP 239.5 to MOV-252.9
From BV-239.5 to MOV-252.9, the alignment primarily follows the utility corridor joined at ~MP 238.9 and will be positioned ~25’ to the north of the closest pipeline. One significant reroute, to cross Interstate I-35, and a number of smaller alignment changes will move the 24” significantly away from the pipeline corridor in some cases.
The construction ROW layout accommodates an easterly path for the initial ~5.1 miles, beginning with a working side change immediately to the east of BV-239.5 and continuing to ~MP 241.6. There, the position of the temporary ROW switches to a westerly progression for the remaining ~11.3 miles of the section.
Open terrain and relatively mild slopes are predominant, except for some of the stream and drainage crossing areas.
Approximately 35 barbed wire and wire fences will intersect the route, requiring gapping for and restoration following construction, including permanent gates where noted in the Construction Line List. Eight (8) PI’s of 23° and greater will be addressed with trimmed segmentable elbows and 1 transition piece.
The list of crossings for this segment contains 17 road bores, 0 pipeline corridors, directional drills of Interstate I-35 and White Rock Creek, 1 open-cut road and 16 open-cut waterways and drainages. At least 7 foreign pipeline crossings are also expected.
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 24 of 46 02949‐GS‐9005
Rock construction is possible, as the surface geology database indicates the presence of Austin Chalk between ~MP 241.8 and ~ MP 248.2. The reliability of this database information is uncertain.
The connection of BV-239.5 to the main pipeline and the construction of MOV-252.9 are included. CONTRACTOR will complete all civil, structural, fencing, piping, electrical, communications, painting, etc. at MOV-252.9.
Aside from the valve site access roads, there will be no ancillary right-of-way permanent access roads and one (1) test section break required, according to the baseline hydrotesting plan.
MP 252.9 to BV-273.5
Of the ~20.6 miles between MOV-252.9 and BV-273.5, the 24” will parallel the pipeline corridor for all but ~1.6 miles. The temporary ROW is located for a westerly direction of construction, except for ~0.3 miles at ~ MP 264.2 which was realigned to address landowner comments. No crossings of the paralleling pipeline corridor will be necessary, until the end of the section at ~MP 273.4.
No more than about 10 – 20% of the route will encounter other than mild terrain or open areas, with the exceptions typically associated with streams and drainages.
Approximately 21 road bores, 1 pipeline corridor crossing (in addition to the 1 crossing of the paralleling corridor), 3 open-cut road crossings, 20 open-cut waterway / drainage crossings and 9 foreign line crossings (including those contained in the 2 pipeline corridor crossings) have been identified.
The tally of fence lines that must be gapped for and restored following construction, including a permanent gate where indicated in the Construction Line List, stands at 95 barbed wire, 13 wire, 2 pipe and 9 game.
Seven (7) PI’s of 23° and greater will be addressed with trimmed segmentable elbows and 1 transition piece at each location.
The connection of MOV-252.9 to the main pipeline and the construction of BV-273.5 are included. CONTRACTOR will complete all civil, structural, fencing, piping, electrical, communications, painting, etc. at BV-273.5. Even though a manually-manually operated valve site, electrical service will be provided and connections made by CONTRACTOR for the preview densitometer at BV-273.5.
Aside from the valve site access roads, there will be no ancillary right-of-way permanent access roads and no test section breaks required, according to the baseline hydrotesting plan.
MP 273.5 to Corsicana
The short ~5.9-mile section from BV-273.5 to Corsicana parallels no known pipelines, is laid out for an easterly direction of construction and has only 1 short area of reverse lay, between ~MP 275.5 and ~MP 275.6.
This portion of the route contains 25 barbed wire, 9 wire and 1 game fence crossing, which must be gapped and restored and possibly gated during final clean-up.
The section will contain approximately 6 road bores, no directional drills, 0 open-cut road crossing, 11 open-cut waterway / drainage area crossings, and 2 known foreign pipeline crossings. Six (6) PI’s of 23° and greater will be addressed with trimmed segmentable elbows and 1 transition piece at each location.
20” Garden 24” ColoradSCOPE OF W
Prepared by:
2.0 PRO
2.1
2.2
2.3
City to Coloro City to CorWORK
Tpw
Aapin
OJECT SCHE
REQUIRE
The bids contingen
Constr
Septem
DEFINITI
C2.2.1
TR
T2.2.2
Tafo
S2.2.3
TbpCd
F2.2.4
Thbinfr
PENALTY
Attainmensuch, COMarch 1, headers /towards th
rado City Piprsicana Pipe
he connectioiping and valv
will complete a
Aside from thccess roads lan. Howev
ntroducing pig
DULE
ED COMPLET
for each pipnt and labor fo
ruction Start
mber 2, 2014
ONS
Construction
he term ‘ConROW by the C
ie-Ins Comp
he term ‘Tie-re complete a
or hydrotestin
Substantial C
he term ‘Subeen completeipeline has b
CONTRACTOamage detec
inal Complet
he term ‘Finaave been pereen installed
nstalled, valverom the ROW
Y CLAUSE FO
nt of the milesNTRACTOR 2015 require
/ jumpers, exhis penalty.
peline eline
on of BV-237ves to connecall civil, structu
e valve site and no test er, CONTRA
gs and water t
TION DATES
peline spreadorce required
t Tie-Ins
4 Marc
Start
nstruction StaCONTRACTO
lete
-Ins Completeand the pipelg, capped, iso
Completion
stantial Comped successfueen biocide tR), COMPANted, and the p
tion
al Completionrformed, the , pipeline wa
e site paintingW.
OR FAILURE
stone dates pwill be asses
ed to completxcept for dela
Page 25 of
7.5 to the mact to the incoural, fencing,
access roadsection brea
ACTOR will bto hydrotest t
S
d shall be bato achieve th
s Complete
ch 1, 2015
art’ shall be R.
e’ shall be deline either is olated and pla
pletion’ shall ully by othertreated, a calNY accepts tpipeline is ava
n’ shall be defROW has be
arning markeg has been co
E TO ACHIEV
provided in Sessed a penalte tie-ins, incl
ays that COM
46
ain pipeline aming 24” pipeelectrical, pa
, there will bks required, be required the pipeline fr
ased upon thhe milestone s
SubsCom
April 2
defined as t
efined as theprepared for aced under a
be defined asrs (with suppliper tool hasthe results oailable to be f
fined as the deen restored ars and cathoompleted, and
VE SCHEDUL
ection 2.1 is oty of $10,000 uding the ins
MPANY has c
and the instaeline at Corsiainting, etc. at
be no ancillaaccording toto prepare th
rom east to w
he constructischedule set
stantial mpletion
24, 2015
he date of m
e pre-hydroteshydrotesting
a 5 psig nitrog
s the date thaport provideds been run byof caliper toofilled and com
date that all cand re-seede
odic protectiod CONTRAC
LE
of critical imp for each and
stallation of hyconcurred in w
Rev. B,
llation of thecana are inclt Corsicana.
ary right-of-wao the baselinehe Corsicanaest.
on Work Plaforth below:
Final Co
May 1
mobilization to
st date that aor, if applica
gen blanket.
at all hydrostad by CONTRy others (and ol run with nmmissioned.
clean-up and ed, fencing anon test stationCTOR has dem
ortance to COd every day aydrotest sectwriting will no
Exhibit A4, July 8, 2014
02949‐GS‐9005
receiver anduded. Others
ay permanene hydrotestinga receiver fo
an, equipmen
ompletion
1, 2015
o the pipeline
all tie-in weldable, prepared
atic tests haveRACTOR), the
supported byo mechanica
finish gradingnd gates havens have beenmobilized fully
OMPANY. Aafter later thantion break tesot be counted
4 4
5
d s
nt g
or
nt
e
s d
e e y al
g e n y
s n st d
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 26 of 46 02949‐GS‐9005
2.4 DETAILED CONSTRUCTION & KEY MILESTONE SCHEDULE
CONTRACTOR shall submit a detailed construction schedule for each pipeline spread, as a component of the bid quotation, and shall update the specifics of this schedule and for each proposed job location regularly during construction.
The schedule is required to reflect all necessary activities from mobilization through finish clean-up and demobilization, along with the anticipated duration of each, as well as the overall sequence of activities.
CONTRACTOR’S Construction Schedule, which must reflect the milestone dates above, will become part of the Contract Documents. Additionally, CONTRACTOR shall include, in the project schedule, the following COMPANY holidays as Work shutdown days beginning September 1, 2014:
Holiday Date
Labor Day September 1, 2014
Day Before Thanksgiving November 26, 2014
Thanksgiving November 27, 2014
Christmas Eve December 24, 2014 – see below
Christmas December 25, 2014 – see below
New Year’s Day January 1, 2015 – see below
Christmas to New Year’s Shutdown December 26, 2014 through January 5, 2015
Memorial Day May 26, 2015
Additional/overtime work by CONTRACTOR, if necessary to comply with the milestone dates set forth above, will not be considered for any extra compensation due to CONTRACTOR by COMPANY.
CONTRACTOR is advised that any proposed changes to the start, tie-ins complete, substantial completion and final completion dates stated above must be submitted to COMPANY in writing, prior to bid submittal.
Should inclement weather delay final clean-up, CONTRACTOR will be compensated for the portion of the Work which has been completed, according to the terms of these Contract Documents.
3.0 COMPLIANCE
3.1 HEALTH & SAFETY
All Work shall be performed in strict compliance with the COMPANY’S safety policies (Exhibit B) and CONTRACTOR’S health and safety policies, procedures and plans. The most stringent policies and practices shall govern.
CONTRACTOR will take all necessary precautions to protect personnel and property from injuries or damage due to falls, fumes, fire, explosion, or other hazards presented by the Work. It shall be CONTRACTOR’S responsibility to secure, train, and provide adequate personnel to protect landowners, the public, and COMPANY properties, employees, sub-contractors, and agents.
CONTRACTOR and COMPANY shall each provide and have in place a Designated Representative, prior to commencing any Work, with the responsibility to communicate regarding safety policies and procedures and potential hazards or Hazardous Materials in the Work areas, regardless of whether such hazards are addressed by federal, state or local law and regulations.
CONTRACTOR shall immediately notify COMPANY of any hazardous substances encountered
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 27 of 46 02949‐GS‐9005
during construction and CONTRACTOR’S plan for evaluation and control. These substances include but are not limited to asbestos, arsenic, benzene, carbon monoxide, formaldehyde, spilled gasoline or other petroleum hydrocarbons, glass wool fibers, lead, polychlorinated biphenyl, radio nuclides, soot, tars, mineral oils and any unexplained or excessive gasoline engine exhaust, diesel engine exhaust, smog or tobacco smoke.
CONTRACTOR personnel will be required to wear proper PPE (such as, steel toe boots, hardhats, gloves, and eye/face protection, etc.) as described in COMPANY’S (Exhibit B) and CONTRACTOR’S Safety Manuals. Electrical PPE is also required while working around energized equipment (Specification HS-G-004: Electrical Safe Work Practices).
CONTRACTOR shall have a written Fire Protection Plan which, at a minimum, shall include the following:
Fire Retardant Clothing (FRC) and fire retardant vests, as required
One (1) designated Fire Watch individual (with spark shield) on the firing line per a maximum of six (6) welders and a minimum of one (1) / each per mini gang if less than or equal to six (6) welders, within line of sight of the work, and one (1) with the pipe gang, during all above ground welding or grinding, to be maintained for at least one-half hour after the work is completed.
One (1) designated Fire Watch individual (with spark shield) during all trench (tie-in) welding or grinding, to be maintained for at least one-half hour after the work is completed.
Operating within the vicinity of pipeline construction activities, provision shall be made for one (1) water truck with the firing line and one (1) water truck with the pipe gang. Both trucks shall have appropriate pumping capability along with necessary hoses and qualified attending operators to address potential fire events in these work areas.
3.2 ANTI-DRUG PLAN AND TESTING REQUIREMENTS
CONTRACTOR shall have in place an ‘Anti-drug Plan and Testing Requirements’ for employees and sub-contractors. COMPANY reserves the right to perform random drug and alcohol screening of all CONTRACTOR and sub-contractor employees. Refer to ‘Instructions to Bidders’ for additional information.
3.3 IMMIGRATION REFORM AND CONTROL ACT OF 1986
CONTRACTOR shall provide documentation stating compliance with the ‘Immigration and Reform Act of 1986’.
3.4 REFERENCED DRAWINGS, PLANS, CODES AND STANDARDS
The Work shall be carried out in strict accordance with:
The Contract Documents
U.S. Department of Transportation Code of Federal Regulations (CFR), Title 49 Part 195
ASME B31.4, NFPA 70 (National Electric Code) and OSHA 1926 Subpart P “Excavation Standards”, latest editions, and all federal, state, county, city, and any other local codes and regulations.
API 1102, API 1104 and API 1110
COMPANY Construction Standards, Procedures and Specifications incorporate by reference additional industry codes and standards which apply to the subject matter of the particular document.
20” Garden 24” ColoradSCOPE OF W
Prepared by:
4.0 PIPE
CONCOMcompplus ConsCOMconta
For indicrefinefrom
CONCOMcondpartieactivportio
COMcounCON
AccoAs nto pro
In geCON
4.1
City to Coloro City to CorWORK
ReferProce
ELINE DETAI
NTRACTOR MPANY, conspleting the coSpreads 24-
struction TerMPANY Standained in the C
anticipated pated pipeline ed further onthe pipeline a
NTRACTOR uMPANY statioduct and coordes. If necessities of other on of the Wor
MPANY will prnty Road OpeNTRACTOR.
ommodations ecessary, COovide adequa
eneral, the eNTRACTOR, f
REPORT
CONTRAthe Work,
D4.1.1
Inaw®
W4.1.2
CthpWC
W4.1.3
rado City Piprsicana Pipe
r to Exhibits edures and De
LED SCOPE
shall providumables, equ
onstruction, in-1 to 24-4, inrms & Conddards, MateriaConstruction B
pipeline conshorizontal dis the Pipeline as-built surve
understands tons and facildinate work insary, CONTRcontractors
rk, if necessa
rovide all envening Authori
for CONTRAONTRACTORate accommod
extent of thefor each of the
S & SUBMITT
ACTOR is requ including but
Detailed Cons
n conjunction nd provide th
which details a®, Microsoft P
Weekly Work
CONTRACTOhe activities permits, mate
Work ScheduleCONTRACTO
Weekly Progr
peline eline
B, C, D, E aetails.
E OF WORK
e all labor,uipment, supenstallation, don accordance
ditions, Scopals, Permits /Bid Package.
truction quanstance is appConstruction
ey data.
that related ality sites whin a manner th
RACTOR will and third-parry.
vironmental anizations, Agre
ACTOR and sR shall coordindations and s
e Work to be 5 pipeline s
TALS
uired to providt not limited to
struction & K
with the subhe Detailed Call phases of troject ®, or o
Schedule
R shall prepaplanned, manprial receipts, e shall be subR, throughou
ress Meeting
Page 28 of
and F1 for a
tools, thoservision and
ocumentation e with the e Of Work, / Restrictions
ntities, refer proximate. Den Alignment S
and unrelatedich are assohat does not coordinate th
rties and will
nd crossing peements For
subcontractornate efforts wservices for pe
be performedspreads, inclu
de certain repo the followin
Key Mileston
mitted bid anConstruction &the SOW. Thther COMPA
are and submpower requirematerial sho
bmitted on a t the perform
g & Report
46
a list of the C
se materials all services and testing InstructionsUniform Bi
s, Drawings, E
to the Drawesign footageSheets (Exhib
d work perforociated with
interfere withhe Work schereturn at a la
permits (Exhibr Temporary
r personnel mwith state, couersonnel.
d and compleude, but are n
ports and subg:
ne Schedule
nd biweekly th& Key Milestohis schedule NY-approved
mit to COMPAement, and aortages, etc. day and timeance of the W
Construction
not specifics for and ing of COMPANs to Bidders,d Sheet, CoExhibits and
wings and “Ue will be showbit F); exact f
rmed by othethis project
h the day-to-dedule to accoater date to
bit H), with theClosure, etc.
may be limitedunty and loca
eted and seot limited to, t
bmittals as a c
hereafter, COone Scheduleshall be prep
d software.
ANY a Weeklany other spe
for the upcoe agreed uponWork.
(
Rev. B,
Specification
cally noted ascidental to peNY’S pipeline Insurance Ronstruction Sother Contra
niform Bid Swn on the Bid footage will b
ers may be iand CONTR
day activities ommodate thresume or co
e exception o. that shall b
d in the areasal agencies an
ervices to bethe following:
component of
ONTRACTORe per Sectionpared using M
(Weekly as A
ly Work Schecial requirem
oming week. n between CO
Weekly as Ag
Exhibit A4, July 8, 2014
02949‐GS‐9005
ns, Standards
s provided byerforming ande Spread 20-RequirementsSpecificationsct Documents
Sheets”. TheDrawings and
be determined
n progress aRACTOR sha
of these othehe overlappingomplete some
of TXDOT andbe secured by
s of the Worknd businesses
e provided by
f executing
(Biweekly
shall preparen 1.2.2 aboveMicrosoft Exce
Agreed Upon)
edule showingents including The Weekly
OMPANY and
greed Upon)
4 4
5
s,
y d 1 s, s, s
e d d
at ll
er g e
d y
k. s
y
)
e e, el
)
g g y d
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
FPwexSCus
C4.1.4
CbdInch
U4.1.5
Apothsu
M4.1.6
CMeqh
U4.1.7
CC
C4.1.8
CTin
C4.1.9
Ccono
T4.1.10
Cteth
T4.1.11
CCth
S4.1.12
rado City Piprsicana Pipe
or the weeklyProgress Repoweek, includin
xecution of thSchedule shaCOMPANY an
se these repo
Construction
CONTRACTOefore 6:30 amaily activities
nspector of ahanges to the
Utility Locatio
At the beginninotential to im
he Utility Locauch facilities.
Material Test
CONTRACTOMercer, shall t
quipment. Theat, coil and j
Unpriced Cop
CONTRACTOCONTRACTO
Compaction T
CONTRACTOhe results o
ncluding the c
Concrete Mix
CONTRACTOontemplated o less than 3-
esting Labor
CONTRACTOesting laborathan 3-days pr
est Cylinder
CONTRACTOCONTRACTOhe selected te
Slump Test D
peline eline
y progress meort showing tg an itemizedhe SOW as dll be submitt
nd CONTRACorts for progre
Activities Sh
R shall submm. The shees to be perfoany changes e Daily Activity
on Procedure
ng of each Wmpact existingation Procedu
Reports (MT
R, in cooperatrack all matehe MTRs shajoint number(
pies of Purch
R shall submR-furnished e
Testing
R shall perfof the compa
coordinates of
Design(s)
R shall furnto be used. T-days prior to
ratory Inform
R shall furnitory to be utilrior to placem
rs
R shall collR shall be res
esting laborato
Documentatio
Page 29 of
eeting, CONThe scheduledd breakdown detailed by theted to COM
CTOR, througess tracking a
heet
mit a Daily Aet will reflect
ormed by eacfrom the pl
y sheet shall
e
Work day and g and buried ure form (Exh
TR’s)
ation with COerial inventorieall be legible cs).
hase Orders
mit to COMPequipment an
orm compactioaction testingf all test readi
nish COMPAThese mix de placement o
mation
sh COMPANized. This in
ment of the firs
ect test cylsponsible for ory.
on
46
TRACTOR shd progress veof the percene initial Key MPANY on a hout the perf
and documen
ctivities sheecrew locatio
ch. CONTRAlanned CONTbe approved
prior to comfacilities, CO
hibit J3) for ea
OMPANY’S mes and gathecomplete cop
PANY unpricnd materials w
on testing as shall be reings, immedia
(3-Day
NY with subesigns shall b
of the first con
(3-Day
NY with the nformation shst concrete.
inders at thcollecting the
hall prepare aerses actual pnt complete ofMilestone Sch
day and timformance of thtation of the p
et to the Chien(s) by statioACTOR shalTRACTOR Dby the Chief
mencing conONTRACTORach crew hav
material managr MTR’s for a
pies that show
ced copies owithin three (3
directed in tecorded and ately after per
ys Prior to Fir
bstantiating dbe submitted ncrete.
ys Prior to Fir
name and chall be submit
he time of e test cylinder
Rev. B,
and submit to progress fromf Key Milestohedule. The
me agreed uhe Work. COproject.
ef Inspector eoning along tll immediatelyDaily ActivitieInspector.
nstruction actiR shall preparving the poten
(U
gement subcall applicable w serial numb
(Within 3 D
of purchase 3) days of the
(At tim
the Constructsubmitted to
rforming the t
rst Placement
data of eachto COMPANY
rst Placement
contact informtted to COMP
(At time o
any concretrs and transp
(At time o
Exhibit A4, July 8, 2014
02949‐GS‐9005
COMPANY am the previous
nes within theWeekly Wor
upon betweenOMPANY sha
(Daily)
each morningthe ROW withy notify Chie
es sheet. A
(Daily
vities with there and submntial to impac
Upon Receipt)
ontractor T.Gmaterials and
ber(s) and / o
Days of Order
orders for air purchase.
me of Testing
tion Drawingso COMPANYtest.
t of Concrete)
h mix designY for approva
t of Concrete)
mation for thePANY no les
of Placement
e placementporting them to
of Placement
4 4
5
a s e k n ll
)
g h ef ll
)
e it ct
)
G. d
or
r)
ll
)
s. Y,
)
n al
)
e s
)
t. o
)
20” Garden 24” ColoradSCOPE OF W
Prepared by:
4.2
City to Coloro City to CorWORK
Creaf
C4.1.13
Cred
H4.1.14
Cp
H4.1.15
Fdoshinteth/ hy
C4.1.16
CseWbodthD
CONSTR
CONTRArequired i
D4.2.1
CMbofo
Cpco
CCco
D4.2.2
rado City Piprsicana Pipe
CONTRACTOesults of the fter performin
Compressive
CONTRACTOeports for eacays following
Hydrostatic T
CONTRACTOipe to the CO
Hydrostatic T
or HDD’s aocumentationhall include a
nfo on the froest company, he hydrostatic
certification. ydrostatic tes
Construction
CONTRACTOet of red-lined
Work which shut not be lirientation, marawings shall
he Work as aDrawings.
RUCTION SUP
ACTOR shall n execution o
Designated C
CONTRACTOManager for th
ehalf of CONr equipment,
or execution o
CONTRACTOrior consent ontinued prog
CONTRACTOCONTRACTOontractor pers
Designated E
peline eline
R shall perfoslump test s
ng the test.
Strength Te
R shall provch cylinder bre
the test.
Test Plan / Pr
R shall prepaOMPANY.
Test Records
nd bore pipn within 24-hoat a minimumnt: signature date, start an
c test equipme CONTRAC
st.
Drawing As-
R shall be red drawings (fhall be availamited to, diaterials, tag nl be submitteda record of t
PERVISION
be responsiof the SOW, in
Construction
R shall desighe performanTRACTOR inprocure mate
of the Work.
R may not reof COMPAN
gress within th
R’S ConstruR activities wsonnel.
lectrical & In
Page 30 of
orm a slump shall be reco
est Reports
vide COMPAeak. These r
rocedure
are and subm
s
pe, CONTRAours following: original hydof both the in
nd end pointsent calibration
CTOR shall c
-Built Red Li
esponsible forfor both the pable for COMmensional in
numbers, etc.d to the COMthe Work pe
ble for all cncluding but n
Manager
gnate a full tce of the Wo
ncluding, but erials and ser
eplace the indNY. This rehe execution
uction Managwith the COM
nstrumentatio
46
test at therded and sub
ANY with copreports shall b
mit a hydrosta
ACTOR shallg completion drostatic test cnspector and
s / location / nn certificationcomplete the
ine Mark-Ups
r continuouslypipeline and t
MPANY reviewnformation fo. A completeMPANY withinrformed and
construction snot limited to,
time, competeork. This indinot limited torvices, and m
dividual desigequirement isof the Work.
ger shall beMPANY, COM
on (E&I) Con
time of the bmitted to th
(Within
pies of the cbe submitted
(30 D
atic test proc
(Within
l submit all of the test. Tchart recorde
d the test techame of piece
n, and the hyde required C
s (Within 2
y maintainingthe valve sitew. Red-linedor piping fabed clean and n two (2) wee
to be used
supervision a, the following
ent individuavidual shall h
o, the authoritymake scheduli
nated as Cons intended to
e responsibleMPANY’S rep
nstruction M
Rev. B,
concrete place COMPANY
2-Days of Cy
compressive to the COMP
Days Prior to
cedure for HD
n 24 Hours Fo
required hyThe hydrostater wheel (withhnician, name
e(s) or part(s) drostatic test tOMPANY fo
2 Weeks After
g an updated es) during exd information brication, deplegible set of
eks following in preparatio
and oversighg:
l to serve ashave full authy to supply adng decisions
nstruction Mao ensure con
e for coordipresentatives
anager
Exhibit A4, July 8, 2014
02949‐GS‐9005
cement. TheY immediately
ylinder Break
strength tesPANY within 2
Hydrotesting
DD’s and bore
ollowing Test)
ydrostatic testic test result
h the followinge of the hydrobeing tested)technician OQ
orms for each
r Completion)
and accurateecution of theshall include
pth of coverf the red-linedcompletion o
on of As-Bui
t services a
s Constructionority to act ondditional laboas necessary
anager withounsistency and
ination of a, and all sub
4 4
5
e y
)
st 2-
)
e
)
st s g o ), Q h
e e
e, r, d of lt
s
n n
or y
ut d
ll b-
20” Garden 24” ColoradSCOPE OF W
Prepared by:
4.3
4.4
City to Coloro City to CorWORK
CC
D4.2.3
Cfo
C4.2.4
Cfoex
C4.2.5
CbdchA
PROPOS
30 days contact dautilization
GENERA
Refer to Preparatio
M4.4.1
CetspClo
C4.4.2
CnloeqUby
C4.4.3
Csub
AcoC
rado City Piprsicana Pipe
CONTRACTOConstruction M
Designated S
CONTRACTOor the perform
Construction
CONTRACTOoreman level,xperience sum
CONTRACTO
CONTRACTOefore 6:30 amaily activities hanges from
Activity sheet s
SED SUB-CON
prior to consata for all subof any propo
AL REQUIREM
COMPANY on”.
Mobilization /
CONTRACTOtc. from their pecified Scop
CONTRACTOocation by CO
Construction
CONTRACTOecessary to c
ocation and pquipment, sto
Upon complety CONTRACT
CONTRACTO
CONTRACTOupport and me located at o
All field officeommunication
CONTRACTO
peline eline
R shall desiManager for p
afety Officer
R shall desigmance of the W
Crews
R shall prov, that will be mmary for ea
OR Daily Coo
R shall submm. The sheeto be performthe planned
shall be appro
NTRACTORS
struction startb-contractors
osed sub-cont
MENTS
Construction
/ Demobilizat
R shall transoriginating lo
pe of Work. FR, all equip
ONTRACTOR
Staging Are
R shall locatecomplete the rovide adequockpiled pipeion of construTOR.
OR Field Offic
R shall provimanage constor near the sta
e temporary ns, sanitatioR. Upon com
Page 31 of
ignate a full performance o
r
gnate a full tiWork.
vide the namutilized, if a
ach of the key
rdination
mit a daily aet will reflect med by each.CONTRACT
oved by the C
S
t, CONTRAC proposed totractors is sub
Standards N
tion
sport all equiocation(s) to tFollowing conment, labor,
R.
ea(s)
e, provide, seproject. The
ate space, site, materials, uction, the st
ce(s)
de, set up, sruction activitaging area(s)
services suon facilities,mpletion of co
46
time, compof E&I work.
me, compete
es of the keawarded the y supervisory
activity sheet crew locatio
. CONTRACTOR Daily AcChief Inspecto
CTOR shall so assist if CObject to COMP
Nos. 100, “G
ipment, laborthe respectivenstruction or w
tools, etc. s
et up, and me staging arete drainage, afield offices
taging area(s
secure and mties. Prefera).
uch as acce potable wonstruction, a
petent individ
ent individual
ey supervisorWork, as wepersonnel ide
to the Chien(s) by statio
CTOR shall noctivities sheetor.
upply COMPNTRACTOR PANY approv
General Requ
r, tools, conte job site as rwhen determshall be tran
aintain the coea(s) must beaccess and re, conducting
s) shall be res
maintain the fbly, CONTRA
ess, parkingwater, etc. all field office(
Rev. B,
dual to serve
to serve as
ry personnel,ell as a shortentified.
ef Inspector eoning along totify Chief Ins. All change
PANY with this awarded t
val.
uirements”, a
tractor-furnishrequired for c
mined no longensported from
onstruction ste convenient elated accom
fabrication astored to orig
field office(s) ACTOR’S fiel
, power, ligshall be
(s) and tempo
Exhibit A4, July 8, 2014
02949‐GS‐9005
e as the E&
Safety Office
down to thet work-related
each morningthe ROW withspector of anyes to the Daily
e names andthe Work. The
nd 300, “Site
hed materialscompleting theer required bym the projec
taging area(sto the projec
mmodations foactivities, etcginal condition
necessary tod office(s) wi
hting, HVACprovided by
orary services
4 4
5
&I
er
e d
g h y y
d e
e
s, e y ct
s) ct or c. n
o ll
C, y s
20” Garden 24” ColoradSCOPE OF W
Prepared by:
4.5
City to Coloro City to CorWORK
shC
C4.4.4
CCof
Aapteco
Cwof4ofh
WORKSIT
W4.5.1
Csa
Pestrefa“EC
S4.5.2
Cpmho
R4.5.3
Dpbyw
TaCcoco
T
rado City Piprsicana Pipe
hall be remCONTRACTO
COMPANY Fie
CONTRACTOCOMPANY an
ffice will be lo
All field office tnd high-speerovided by C
emporary serondition by C
COMPANY’S twide office tra
ffices and wil’ folding tableffice), twenty igh speed inte
TE MANAGE
Waste Manag
CONTRACTOanitation facil
Portable, chemnvironmental taging area(segularly mainacilities. ThEnvironmenta
C1).
Security
CONTRACTOersonnel if
materials, etc.ours.
Road Safegua
During construrotect the roay installing s
warning signs
o minimize mccess roads
CONTRACTOomprised of 6ompletion of c
hroughout th
peline eline
moved / disR.
eld Office
R shall provnd COMPANYocated at or n
temporary seed Internet coCONTRACTOrvices shall ONTRACTOR
temporary fieailer. At a ml be fully equies, six (6) “sw
(20) folding ernet, toilet, a
MENT
ement & San
R shall provities for use b
mical toilets and health im
s), along andntain these fahese facilitieal Best Manag
R shall be renecessary, f. and for all
ards & Maint
uction activitiead surface froteel plating, and flagmen
mud tracking s which enteR designed t6-8” rock. Thconstruction.
he project an
Page 32 of
connected a
vide, set upY inspectors,ear the stagin
rvices such aommunicationOR. Upon be removed R.
eld office shalminimum, the ipped with cowivel” office cchairs, 2 x w
and daily clea
nitation Faci
vide and maby CONTRAC
shall be usempacts from d always withacilities to ens shall be gement Pract
esponsible fofor all COMareas of con
tenance
es across anm constructioor as stipulawill also be p
on TXDOT her / exit oftire scrubber hese are to b
nd near all c
46
and the site
, secure an, representatng area(s) an
as access, pans, sanitationcompletion o/ disconnec
ll consist of otrailers shal
opy machineschairs, four (4water coolersaning services
lities
aintain the nCTOR and CO
ed to eliminathe disposal
hin the ROWnsure the op
furnished atice” provided
or furnishing sPANY and nstruction ac
nd adjacent toon equipmentated otherwisprovided by C
highways anff said highentrances ge
be removed a
construction
e restored
d maintain tives, etc. Pnd CONTRAC
arking, power,n facilities, poof constructiocted and the
one (1) doubll collectively , desks, four 4) locking 4-d
s, 2 x refrigers.
necessary trOMPANY per
ate water poof human wa
W as necessaerating and
and located under the Co
site security, CONTRACTO
ctivity, during
o blacktop rot and shall gue in the perm
CONTRACTO
d paved couhways and enerally not land restored t
activity, CON
Rev. B,
to original
a field officereferably, CO
CTOR’S prima
, lighting, HVAotable water,on, all field e site restore
e-wide and ocontain a fo(4) x 6’ foldindrawer file carators, six (6)
rash disposasonnel.
llution and oaste and wasary. CONTRsanitary condin accordan
ontract Docum
including 24OR furnisheworking and
oads, CONTRuard or span tmit requiremeR.
nty roads, alpaved roadsess than 50’ to previous c
NTRACTOR
Exhibit A4, July 8, 2014
02949‐GS‐9005
condition by
e for use byOMPANY fieldary field office
AC, telephone etc. shall beoffice(s) and
ed to origina
one (1) singleour (4) privateng tables, (4) xabinets (1 pe) phone lines
al, waste and
other potentiatewater at the
RACTOR shadition of suchnce with thements (Exhib
-hour securityd equipmentd non-working
RACTOR shathe open ditchents. Traffi
ll constructions shall havein length and
condition upon
shall provide
4 4
5
y
y d
e.
e e d al
e-e x
er s,
d
al e ll h e it
y t, g
ll h c
n e d n
e
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
p
Sproofin
Ca
P4.5.4
Csta
CCCMflad
C(Eulalethth
Cfambre
Wthnsu
rado City Piprsicana Pipe
aved highway
Subject to peeriodic mainteoads along wf construction
ntervals throug
CONTRACTOpproval from
Property Prot
CONTRACTOtringing, bendnd usage) an
The w
Any ad
Specifapprov
In isoland ar
CONTRACTOCOMPANY. COMPANY, aMaps (Exhibit ag all drivewaestruction.
CONTRACTOExhibit G) Rnnecessary d
andowners oreave or operahe alignment he ROW.
CONTRACTOacilities, pipelmeans is requ
arriers, placinelocating the p
Whenever, whhe ROW or no additional ubsequent re
peline eline
y sweepers a
rmit restrictioenance and r
with other gradn. These aghout execut
R shall not mCOMPANY a
tection
R clearing, gding, weldingd other const
idth of the co
dditional work
fic temporary val by COMP
lated cases, rranged by CO
R shall useConstruction
s shown on F); however
ays and acce
R’s pipeline ROW restrictiodamage or inr tenants of pate off of the c
sheets (Exhi
R shall commlines, utilities,uired, includinng all timberplanned align
herever and hear the ROWcharge to
location.
Page 33 of
s required to
ons and requrepair of all sded and agricreas shall bion of the Wo
modify any pand the gover
grading, grubb, coating, laytruction activit
nstruction RO
king space pro
access routeANY
specific temOMPANY.
e only publicn access roathe Pipeline
r, prior to conss roads ass
construction ons and req
nconvenience property. At nconstruction Ribit F) except
municate with etc. and sha
ng providing ar mats or conment, etc.
however timbW, CONTRAC
COMPANY
46
maintain a cl
uirements, COstate, county, cultural arease rigorously
ork and again
ublic road (Crning agency.
bing and hauying, drilling, ties along the
OW.
rovided by CO
es arranged
porary acces
c and non-pads have beAlignment Sh
nstruction, COuring such m
operations squirements a is caused tono time will CROW or additt by designat
th the ownersall protect thoadditional buonstructing be
ber mats are CTOR shall pr
for the initia
lean road surf
ONTRACTORprivate, and
s which are dmaintained prior to final
County, State
uling away deback-filling, ce pipeline rou
OMPANY.
for by CONT
ss routes ide
public accesseen identifieheets (ExhibONTRACTORarking / flagg
hall comply wand shall be o the public, CONTRACTOtional work spted access ro
s of existing ose facilities ffer zone, coerms before
required throrovide at all tial supply an
Rev. B,
rface.
R shall be reCOMPANY oamaged duriand restoredCOMPANY a
e, etc.) withou
ebris, ditchingchemical toilete shall be co
TRACTOR, su
entified by CO
s roads pre-d and numbit F) and proR shall identifging are positi
with Construcconducted
public roads OR personnel pace locationoads (Exhibit
above-grounfrom damagenstruction fencrossing wit
oughout the ptimes and thend placemen
Exhibit A4, July 8, 2014
02949‐GS‐9005
esponsible foowned accesng the coursed on frequenacceptance.
ut written pre
g, boring, pipeets (placemenonfined to:
ubject to prio
ONTRACTOR
-approved bybered by the
oject Overviewfy and mark ioned to avoid
ction Line Lissuch that noand facilitiesor equipmens as shown inF) and along
nd and buriede by whatevencing or otheth equipment
projects alongese shall be ant or for any
4 4
5
or s e nt
e-
e nt
or
R
y e w /
d
st o s, nt n g
d er er t,
g at y
20” Garden 24” ColoradSCOPE OF W
Prepared by:
4.6
City to Coloro City to CorWORK
E4.5.5
CMa
Cst
Cd
Cstwm
E4.5.6
PCawtr
D4.5.7
Cadreaad
E4.5.8
APfocoCth
S4.5.9
Cstcoex
ACCEPTA
In4.6.1
Atoshad
rado City Piprsicana Pipe
Environmenta
CONTRACTOManagement P
daily basis, a
COMPANY wtorm water m
CONTRACTOistribution of w
CONTRACTOtipulations, a
washing beforminimize, as p
Environmenta
Prior to any coCOMPANY’S
n environmenwho will not raining, which
Designated S
CONTRACTOllowable usesaily to ensureefueling areasnd in a mandjacent water
Emergency R
After a contracPlan to the COor both mediconstruction.
CONTRACTOhis plan.
Site Clean-Up
CONTRACTOtaging area(sonstruction dxecution of th
ANCE STAND
nstallation Re
All pipeline faco the satisfacthall be repairdditional cost
peline eline
al Best Mana
R shall be resPractice”, incall erosion con
ill furnish Enitigation meas
R shall exercwater in irriga
R is to be awas noted on re any entry
practical, the n
al Awareness
onstruction acEnvironmentantal awarenesattend the i shall be pre-
ervice and R
R shall idents of service ae no refuse s shall be loc
nner that will rs in the even
Response Pla
ct has been aOMPANY for acal and fire eIn remote locR shall work
p
R shall conds) and assocdebris, trash,he Scope of W
DARDS
equirements
cilities shall betion of COMPred or replacet to COMPAN
Page 34 of
agement Prac
sponsible for luding but nontrol outlined
nvironmental sures to ensu
cise every carated lands.
ware that certhe Constru
y on to that number of tim
s
ctivity on the al Inspector tss review. Foinitial meetin-approved by
Refueling Are
tify the locatand refueling is left on thecated at leas
prevent the nt of a spill.
an
awarded, COapproval. Thmergencies wations, CONT
k with the loc
duct daily cleciated work , and waste
Work.
s
e fabricated aPANY. All faced by CONTR
NY.
46
ctice
the day-to-daot limited to, fu
(Exhibit C1).
Inspection foure daily com
re to prevent
rtain ROW lauction Line L
parcel. Onmes vehicles m
ROW, all COto review env
or any CONTRng, CONTRA
the Chief Ins
eas
tion, size, incareas. These
e ground or tt 100’ from ddirect entra
NTRACTOR he plan shall iwithin and beTRACTOR shcal emergenc
eanup and marea(s), inclu
e materials w
and installed cilities deemeRACTOR to t
ay execution urnishing, ins
or monitoringpliance.
interference w
and parcels hList (Exhibit Gn these parcmust make en
ONTRACTORvironmental cRACTOR per
ACTOR will pspector.
clusion of see areas shall that spills havdesignated Rinment of an
shall provideinclude a comeyond the immhall provide dicy response a
maintenance uding but nowhich are p
square, leveled to be out othe satisfactio
Rev. B,
of the “Envirostalling, and m
g CONTRAC
with the norm
have noxious G), which reels, CONTRAntrance to the
R personnel sconcerns andrsonnel hired provide simil
econdary conbe cleaned a
ve occurred. iparian Zones
ny fuels or s
e an Emergenmprehensive rmediate vicinirect availabilagencies whe
of the constot limited to, produced dur
, plumb, and of tolerance bon of COMPA
Exhibit A4, July 8, 2014
02949‐GS‐9005
onmental Besmaintaining on
CTOR-installed
mal supply and
weed controequire vehicleACTOR is to
e ROW.
hall meet with participate insubsequentlyar orientation
ntainment andand inspected Service and
s (Exhibit C1ubstance into
ncy Responseresponse plan
nity of pipelineity of an EMTen developing
ruction ROWdisposing o
ring the daily
perpendiculaby COMPANYANY and at no
4 4
5
st n
d
d
ol e o
h n y n
d d d ) o
e n e
T. g
W, of y
ar Y o
20” Garden 24” ColoradSCOPE OF W
Prepared by:
4.7
4.8
City to Coloro City to CorWORK
C4.6.2
CasC
W4.6.3
ACp
SURVEY
P4.7.1
CascowPare
Sa
Dinp
Cinn
Cco
Caco
C4.7.2
DthTre
CdoD
A
MATERIA
A portion shall prov
rado City Piprsicana Pipe
Construction
CONTRACTOssociated pi
Construction S
Working Syst
All foundationCONTRACTO
urpose of tran
SERVICES &
Pre-Construc
COMPANY shs-built surveyonstruction R
will utilize realPI’s, existing
ccording to equirements.
Stakes and mand to ensure
During construnformation; protection test
CONTRACTOncluding weldumber, to pro
CONTRACTOollection prior
CONTRACTOnd shall provompleted HD
Construction
During construhoroughly gatransportationequirements.
CONTRACTOocumentation
DOT audit.
All regulatory d
ALS & EQUIP
of the requirvide all othe
peline eline
& Contract F
R shall be rpeline facilit
Schedule.
tem
ns, pipe andR shall funcnsporting and
& CONSTRU
tion, Constru
hall provide ay services r
ROW and worl-world coordfacilities, etcCOMPANY
arkers shall bthat all Work
uction, surveproviding rea
stations, pipe
R shall prover identificati
ovide an as-bu
R shall provr to backfill.
R shall dailyvide to said suD’s and bores
Documentat
uction, CONTther and organ (DOT), CFR
R shall coordn and shall a
documentatio
PMENT
red materials er required
Page 35 of
Fulfillment
responsible fties in acco
fittings, valction togethed handling cru
CTION DATA
uction and A
ll pre-construrequired, inclrking space, cinates to pre
c. All constrfeature code
be placed as nremains with
ey crews shal world cooreline crossing
vide to surveyon, x-ray numuilt survey of
vide COMPA
y coordinate aurvey staff cos.
tion
TRACTOR shanize all inforR, Title 49 Pa
dinate with COassist COMPA
on shall be ma
will be supplmaterials for
46
for the compordance with
ves, instrumr as a prop
ude oil.
A
As-Built Surv
uction, construluding those collect constr
ecisely documruction informes, data dict
necessary to hin the acquire
all capture ardinates for gs, appurtena
y crews all amber, pipe jothe pipeline a
ANY surveyo
and communonstruction an
hall coordinatrmation necesrt 195 and AS
OMPANY to ANY, as nec
aintained on-s
lied by COMPr construction
plete construh the Contr
mentation, anerly working
vey
uction, site elto set cont
ruction data, ment depth-ofmation will betionary, data
ensure propeed working ar
ll girth weld,the location
ances and oth
applicable dooint number, and each app
ors adequate
nicate with thnd as-built su
te and suppossary to comSME B31.4 c
prepare, maicessary, in th
site.
PANY (Exhibn of the pip
Rev. B,
uction of the act Docume
d equipmentsystem for
levation andtrol, stake cetc. Survey sf-cover, welde collected aabase symbo
er alignment oreas and ROW
, x-ray, pipeof welds, P
her features.
ocumentationpipe coil num
purtenant faci
e time to co
he COMPANYurvey informa
rt all COMPAply with the D
construction d
intain and filehe initial pos
it K1) and COpeline and v
Exhibit A4, July 8, 2014
02949‐GS‐9005
pipeline andents and the
t installed bythe intended
boundary andcenterline andsub-contractos, pipe joints
and organizedols and othe
of the pipelineW.
, welder, etcPI’s, cathodi
n of the weldmber and heality.
omplete data
Y survey staftion for all the
ANY efforts toDepartment odocumentation
e this requiredst construction
ONTRACTORvalve sites in
4 4
5
d e
y d
d d
or s, d
er
e
c. c
d, at
a
ff e
o of n
d n
R n
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
accordanc
CONTRACity Statio
R4.8.1
PcomCaE
CpcuaCb
Csuas
Aco
Cpstinby
Cfu
G4.8.2
SmCaceC
Ca
rado City Piprsicana Pipe
ce with the C
ACTOR shall on, Abilene, G
Receipt, Hand
Prior to acceonduct an ins
may assist witCONTRACTO
nd installing Exhibit K1 for a
CONTRACTOerform the nurrent recordnd damages
COMPANY-fure returned to
CONTRACTOupplied matessembly, test
All COMPANYonstruction, to
Garde
Abilen
Granb
Hillsb
CONTRACTOreventative otorage. Equ
nstrumentatioy the manufa
CONTRACTOurnished equi
General Requ
Should miscelmaterials shallCONTRACTO
ccompanied ertification, e
COMPANY sh
CONTRACTOny CONTRAC
peline eline
ontract Docum
take possessGranbury and
dling & Care
pting custodspection to idh this activityR is responsiall CONTRACan overview o
R shall be renecessary was, including b
s, and invenrnished mateCOMPANY o
R shall becorial and equipting and placi
Y supplied mo the followin
en City, TX
ne, TX
bury, TX
oro, TX
R shall takeil or covering uipment or mn or cathodiccturer or as o
R shall be spment and m
uirements for
llaneous matl be of a typeR furnished by compre
etc. Any Call be remove
R shall furnisCTOR furnish
Page 36 of
ments and Co
sion of COM Hillsboro.
of Materials
y of any Cdentify, recory; however, thble for receivCTOR and Cof the materia
esponsible foarehouse admbut not limitedtory surplus rials withdrawor shall be rep
ome familiar wpment and shng equipmen
material will bg locations:
Spread
Spread
Spread
Spread
necessary sto protect ma
materials whc protection eotherwise app
solely responsmaterials once
r CONTRACT
terial be requ, grade, and materials sh
ehensive maCONTRACTOed at CONTR
sh the Manuhed materials,
46
onstruction D
MPANY-suppli
& Equipmen
OMPANY-surd any damaghe inspection ving, inspectinCOMPANY-fuals and equipm
or proper conministrative dd to, tally of m
remaining uwn from invenplaced or paid
with manufachall follow mat into operatio
be delivered
20-1
24-1
24-2, Spread
24-4
steps such aaterial from mhich are senequipment shproved by CO
sible for anye CONTRACT
TOR Purchas
uired of CONquality equal
hall be pre-aanufacturing
OR provided RACTOR’S so
ufacturer’s Ma, as required
Drawings (Exh
ied pipe, valv
nt
pplied materge and notifyis CONTRAC
ng, loading, hrnished equipment provide
ntrol and careduties to tabmaterial receiupon complentory but not d for by CON
cturer’s shopanufacturers’ on.
either prior
d 24-3
as painting, mechanical dansitive to theall be suitabl
OMPANY.
y damage, losTOR has take
sed Material
NTRACTOR t to applicable
approved by documentatimaterials th
ole expense.
aterial Safetyby law, to be
Rev. B,
hibit F).
ves and fittin
rial, CONTRAy COMPANYCTOR’s sole auling, offloadpment and md by both par
e of all materulate, track, ipts, reportingetion of the permanently TRACTOR.
drawings foinstructions f
to the start
greasing or amage or correir environmy stored as r
ss or theft on receipt.
that is not spe recognized
COMPANYion – MTR
hat are not
y Data Sheetused on this
Exhibit A4, July 8, 2014
02949‐GS‐9005
gs at Garden
ACTOR sha. COMPANYresponsibilityding, handling
materials. Seerties.
rials and shaand maintain
g of shortageproject. A
installed sha
r COMPANYfor inspection
of or during
installing rusrosion while inent, such arecommended
of COMPANY
pecified, suchstandards. Aand shall be
R’s, hydrotesapproved by
ts (MSDS) foproject.
4 4
5
n
ll Y y. g e
ll n s ll ll
Y-n,
g
st n s d
Y-
h ll e st y
or
20” Garden 24” ColoradSCOPE OF W
Prepared by:
4.9
City to Coloro City to CorWORK
R4.8.3
Cit
Sd
AinCWb
AFgb
PIPELINE
O4.9.1
CthumshAbyd
Cinex
Inexshcoowa
ACreco
rado City Piprsicana Pipe
Returning Su
CONTRACTOwas originally
Surplus materirected by CO
All line pipe punto nominal CONTRACTOWelder Identifi
e provided to
All line pipe pederal, Statereater than se charged ag
E CONSTRUC
One-Call Noti
COMPANY hahe pipelines (ltimately resp
municipal servhall be aware
Any such faciliy CONTRACetermination
CONTRACTOncluding (but xcavation or a
n areas wherexcavation or hall contact onfirm the locwner / operand foreign line
At least 24 hCOMPANY wiesponded to,ontacted.
peline eline
rplus Pipe an
R shall track y removed fro
rials shall beOMPANY.
ups longer thaforty (40)
R’S expenseication and Q COMPANY.
pups of less and local regix (6) feet andainst the CON
CTION
fications and
as completed (Exhibit F); hponsible to dvices and foree that no addiities not ident
CTOR’s invesof an excavat
R shall notifnot limited t
any activity w
e the new pipany activity wand coordina
cation and detor, pot-holine crossings a
hours prior tith written co, including th
Page 37 of
nd Materials
and return alom or as othe
cleaned and
an twenty (20foot length
e. Proper mQualification, e
than six (6) gulations by Cd less than twNTRACTOR
d Line Locat
advance worhowever, no determine theign pipelinestional pricing tified on the Pstigations shation plan.
fy all undergo) the State
which has the
peline will pawhich has theate with the pth of these pg shall, with
and at interval
to performingonfirmation thhe date and
46
ll surplus materwise directe
d all materia
0) feet shall bhs, welds cmaterial docuetc.) associate
feet in lengtCONTRACTOwenty (20) fefor the full ma
ting
rk to identifydepths have
he location as prior to anywill be provid
Pipeline Alignall be brough
ground utilitiOne-Call Sypotential to im
arallel other pe potential to
owners of sparalleling facCOMPANY pls as instructe
g work in anat all 3rd pa time of con
terial to the Ced by COMPA
als re-racked
be re-beveledcoated and umentation (Ned with these
th shall be dOR at no coset in length waterial cost pl
potential utilit been determ
and depth ofy excavation ded for excesment Sheets ht to COMPA
es and munystem, a minimpact buried
pipelines or bimpact these
such facilitiescilities. If notpre-approval,ed by 3rd part
n area, CONarty notificationtact and th
Rev. B,
COMPANY stoANY.
or stacked o
d, welded (NDexternally m
NDE, MTR’se fabricated pi
disposed of ust to the COMwhich are dispus transporta
ties that will bmined. CONf all undergractivities. CO
ssively deep l(Exhibit F) an
ANY’s Chief
nicipal servicimum of 72 or surface fa
buried facilitiee facilities, COs to pot-holet specified oth, be conducteies.
NTRACTOR ons have beee name of
Exhibit A4, July 8, 2014
02949‐GS‐9005
orage location
on pallets, as
DE performedmarked - a, weld mapsipe joints sha
under existingMPANY. Pupposed of sha
ation.
be crossed byNTRACTOR isround utilitiesONTRACTORine crossingsnd discoveredInspector fo
ces providershours prior tocilities.
s and prior toONTRACTORe and visuallyherwise by theed at all P.I.’s
shall provideen placed andthe individua
4 4
5
n
s
d) at s, ll
g s ll
y s s, R s. d
or
s, o
o R y e s
e d al
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
R4.9.2
CnCRuofCcld
CpesCC
R4.9.3
Cseotathla
Twdse
Wredo
D4.9.4
CaD
Tcrwb
Crere
Dro
Cmco
rado City Piprsicana Pipe
Route Verifica
CONTRACTOew pipeline
COMPANY suROW to exist
nderground fffsets necess
COMPANY tolearances anisturbing any
COMPANY surior to the sstablish these
CONTRACTOCONTRACTO
Right-of-Way
CONTRACTOeparating of tther facilities nd exit the RO
he CONTRAandowners.
hroughout thwater truck or
ust generateeparate from
When prepariequirements ocuments.
Ditching & Ex
CONTRACTOccordance w
Drawings.
he pipeline mrossings and
with prescribeuoyancy are
CONTRACTOequired to exegardless of t
Due to the proock will not be
CONTRACTOmaintenance ooffer dams, tr
peline eline
ation and Av
R’S scope-of(as depicted
urvey crews),ing buried orfacilities, notifsary to safelyo realign thend offsets arexisting facili
urvey crews wstart of conste stakes and R constructioR at CONTRA
(ROW) Prep
R shall providtop soil, gradand traffic w
OW. No temCTOR since
he project antrucks and pd by equipmthose provide
ing and woof the permi
xcavation
R’S scope owith the ditc
minimum depcertain stream
ed clearancesindicated on t
R shall emploxcavate the the depth of e
oximity of exise acceptable.
R shall furnisof the ditch arench breaker
Page 38 of
voiding Exist
f-work included by centerlin
evaluating thr above-groufying COMPAy construct th affected pore not adequities.
will place thetruction andmarkers. An
on activities ACTOR expe
paration
de all ROW aing and the in
warning signs porary fencin
e this activity
d near all coaved highway
ment. As coed on the firin
rking along its (Exhibit H
of work incluh dimension
pth-of-cover isms and wet as. Areas of the Pipeline A
oy the appropditch regard
excavation.
sting pipeline
sh all materiaand other arers (Exhibit F),
46
ting Facilities
es verifying tne and edgehe proximity nd parallelingANY in the ehe new pipelortion of the uate to safe
e centerline aas necessar
ny survey stashall be imm
ense.
access, mownstallation of and personn
ng - to isolate y has been
onstruction ay sweepers ancerns water
ng line.
the ROW, H), ROW agr
udes excavans shown in
s typically 48areas, or as repossible and
Alignment She
priate equipmless of the t
s, CONTRAC
als and suppeas of excav, sheet piling,
s
the planned le-of-ROW staof this planneg or crossed
event that theine are not proute in the
ly construct
and edge-of-ry to subseqkes damaged
mediately re-s
wing, clearing all temporary
nel necessarylivestock frompreviously
ctivity, CONTas required tor trucks, thes
CONTRACTreements (Ex
ation and ditcthe Constr
8”, increasingequired to crod likely pipelieets (Exhibit
ment and indutype of soil
CTOR is to pl
plies necessavation, includi etc.
Rev. B,
ocation of theakes and maed centerline COMPANY
e minimum clprovided ande event thatthe new pip
ROW stakesquently and ad or removedsurveyed and
trees / brushy roads, fenc
y to safely accm the ROW -negotiated w
TRACTOR sho minimize anse additional
TOR shall adxhibit G) and
ching along ruction Speci
g to 60” minimoss existing bine weightingF).
ustry best praor rock enc
lan that blast
ary for the coing water co
Exhibit A4, July 8, 2014
02949‐GS‐9005
e route of thearkers set by and edge-ofor third-party
earances andd working witht the plannedpeline withou
and markersaccurately re as a result od replaced by
h / vegetationces, gates andcess, work on- is required owith impacted
hall provide and / or removel vehicles are
dhere to thed construction
the ROW inifications and
mum for roadburied facilitieg for negative
ctice methodsountered and
ting to remove
ompletion andntrol, shoring
4 4
5
e y f-y d h d
ut
s e-of y
n, d n of d
a e e
e n
n d
d s e
s d
e
d g,
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
Ctie
T4.9.5
Cthafie
S4.9.6
Csk
CpG
P4.9.7
Ca
Pnw
Ca
W4.9.8
CwAC
Wma
Cw
W4.9.9
CvaaW
OraC
Cp
rado City Piprsicana Pipe
CONTRACTOed-in and the
opsoil Segre
CONTRACTOhe entire widtlignment, to aelds.
Stringing
CONTRACTOkids, unloadin
CONTRACTOipe (and othe
Garden City, A
Pipeline PI’s,
CONTRACTOligning and co
Pipeline horizoecessary to f
with field bend
COMPANY wind CONTRAC
Welding
CONTRACTOwelding procedAll pipe requireCOMPANY.
Welder single multiple qualifi
rranged by C
CONTRACTOwelding proced
Weld Inspecti
COMPANY shalve site assectivities and
Work Plan and
On this projecadiographical
COMPANY sta
CONTRACTOroject location
peline eline
R shall keep ditch is back
egation
R shall separth of the ROan anticipated
R’S scope-ong and stringi
R shall obtaier equipment Abilene, Gran
Bending & A
R will perforonfirm pipe ex
ontal PI’s witfollow the ters.
ll provide 3D CTOR shall fi
R shall welddures and weed for welding
qualification tcation testingONTRACTOR
R’S scope-ofdures, as wel
ion
hall be responembly weldinstaffing level
d rate of progr
ct, 100% of ly inspected.andards and s
R shall assisn which is diff
Page 39 of
the ditch in gkfilled.
rate, store, prOW in accordd depth of 2-4
f-work includng pipe from
n all permits and materialsbury & Hillsbo
Alignment
rm the necexterior identifi
h a deflectiorrain and ditc
segmentableeld-cut / trim
all pipe, pipelding persong procedure a
testing shall og shall be conR..
f-work includl as performin
nsible for theg, including gl of the NDEress.
all girth we Fillet welds
specifications
st COMPANYficult to acces
46
good working
rotect and repance with th4” for non-cu
des loading, the storage y
required for s) once initialoro by COMP
ssary calculaication markin
n angle of lech depth, sha
e 90° elbows f/ taper-bevel
peline fittingsnnel qualified and welder q
occur at CONnducted at a
des the verifing weld repai
e non-destrucgirth welds an
E sub-contrac
lds for 100%s shall also bs.
Y’s NDE subss due to road
g condition un
place topsoil ie bid / constltivated locati
handling, seyard to the RO
the transporlly made avai
PANY or COM
ations and cngs.
ess than 23°,all be accomp
for deflection these fittings
and appurtein accordancualification te
NTRACTOR’Stesting lab se
ication of coir or replacem
ctive examinand fillet weldsctor to accom
% of the webe 100% insp
b-contractor ad and/or weat
Rev. B,
ntil the pipe is
in all constructruction docuions and 6-8”
ecuring, haulOW.
rtation of lineilable to CON
MPANY suppl
conduct field
as well as vplished by CO
angles of 23s as necessar
enances usince with API Stesting shall be
S pipe yard; welected by CO
mpliance witment if require
tion (NDE) os, and shall c
mmodate CON
ld circumferepected, in acc
as required tother condition
Exhibit A4, July 8, 2014
02949‐GS‐9005
s laid and / o
ction areas onuments and in” for cultivated
ing, providing
and crossingNTRACTOR a
ier.
bending and
vertical bendONTRACTOR
3° and greaterry.
ng COMPANYtandard 1104e furnished by
welder branch OMPANY and
th COMPANYed.
of pipeline andcoordinate theNTRACTOR’
ence shall becordance with
o access anyns.
4 4
5
or
n n d
g
g at
d
s R
r,
Y 4. y
/ d
Y
d e s
e h
y
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
C
D4.9.10
Cra
CpC
Cp
CtowpS
Eas
CresuCda
DC
O4.9.11
Crein
It diw
Cco
Ap
G4.9.12
Csh
rado City Piprsicana Pipe
COMPANY wi
Drilled & Bore
CONTRACTOailroads, irriga
COMPANY strlanned flat b
CONTRACTO
Crossing pipe ipe for conve
COMPANY reqo installation. water in accord
ermit (which Section 4.9.22
Each bored assure unobst
COMPANY metains the opurvey at any
CONTRACTOiscovered wilnd document
Directional drilConstruction B
Open-Cut Cro
CONTRACTOesurfacing ronstructions an
is planned tirectionally dr
will involve spe
CONTRACTOorridors, mun
As-built drawinart of CONTR
Girth Weld Co
CONTRACTOhall attend ma
peline eline
ll provide a Le
ed Crossings
R’S scope-oation ditches,
rongly prefersbores. AddR until drilling
for directionntional bores
quires that al CONTRACTdance with rewill be obta
2) and “Enviro
nd drilled croructed passag
ay perform aption to condy time to detR with respell be excavatted for final C
ll design drawBid Document
ossings
R’S scope-ooads in accnd to the satis
that all road rilled. Howeecific backfill
R’S scope aicipal facilities
ngs of all croRACTOR’s fin
oating Traini
R shall makeanufacturer-s
Page 40 of
evel III Audit
s
f-work includstreams, pipe
s that surfaceditionally, no g or boring pro
al drills will, will usually b
l pipe utilizedTOR shall supequirements oained followinonmental Best
ossing also rge of the line
a coating resuct an abovetermine the eect to the pted, repaired OMPANY ap
wings and sets as Exhibits
of-work inclucordance witsfaction of the
crossings otver, open-cuand compacti
also involves s, wind farm c
ssings, descrnal documenta
ng
e arrangemensponsored girt
46
Inspector who
des drilling oelines buried
e-mounted ddrills, bores
rofiles are app
in general, bbe double ran
d for bored anpply all test wof the COMPAng receipt of t Managemen
requires that .
sistance test e ground Direffectiveness
pipeline coati(witnessed b
proval at CON
elected geotes F and L2.
udes open th the Conse owner or the
ther than fielt crossings otion requireme
open-cut crcables, etc.
ribed in the fiation package
nts for and all th weld coatin
o shall have f
or conventionfacilities, etc
rilling equipms or tie-in wproved by CO
be quadruple dom length.
nd drilled croswater and shaANY suppliedf CONTRACTnt Practice”.
a post-pullba
of the instalrect Current s and quality ing. Any daby Chief InspNTRACTOR
echnical inform
cutting, bacstruction Doce governing b
ld roads or dof service roaents.
rossings of e
irst paragraphe.
of CONTRACng application
Rev. B,
final approval
nal boring to .
ment not be uwelds will beOMPANY.
random leng
ssings be hydall dewater / dd hydrotest waTOR’S testin
ack gauge pl
lled crossing.Voltage Gra of the workamaged coapector), propecost.
mation are in
ckfilling, comcuments and
body.
driveways wilads and priva
existing pipel
h of this sect
CTOR’S coatn field training
Exhibit A4, July 8, 2014
02949‐GS‐9005
l of all welds.
cross roads
utilized for thee allowed by
gth. Crossing
drotested priodispose of tesater dischargeg plan – see
late be run to
. COMPANYdient (DCVGk provided byting locationerly backfilled
ncluded in the
mpacting andd COMPANY
ll be bored oate driveways
lines, pipeline
tion, are to be
ting personneg.
4 4
5
s,
e y
g
or st e e
o
Y G)
y s d
e
d Y
or s,
e
e
el
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
C4.9.13
Clinco
Fsaco
Cp
W
H4.9.14
Ca
Cinho
C(Dbyda
R4.9.15
If tosimin
S4.9.16
Ashreco
If ww
P
R4.9.17
Cgo
Are
rado City Piprsicana Pipe
Coating of Gi
CONTRACTOne pipe girth oated in acco
or all line pandblasting toating and ho
Crossing pipe art epoxy in c
Welds shall no
Holiday Detec
CONTRACTOnd shall apply
COMPANY adn activities (oroliday testing
COMPANY reDCVG) survey CONTRACiscovered wilnd document
Rock Shield o
rocky condito either applyift or segrega
methods to prnclude supply
Sandbag Sup
After providinghielding mateesult of rockyonduct any re
required, COwill be shadedwill be backfille
Potential trenc
ROW Continu
CONTRACTOrading, restorr tenant, in ac
As soon as poeturn terracin
peline eline
rth Welds
R shall proviwelds and to
ordance with C
pipe girth wthe girth weloliday testing
girth welds acompliance w
ot be coated w
ction & Coati
R shall conduy fusion bond
dvocates pre-jr prior to the a as the pipe i
tains the optiy at any time
CTOR with rell be excavatted for final C
or Padding
ions or gradey rock shield ate rocks fromrotect pipe aing all rock sh
pport, Loweri
g and placing erial to comp conditions a
equired coatin
ONTRACTORd (including sed and compa
ch breaker loc
uous Clean-U
R’S scope-oring and cleanccordance wit
ossible followg and water
Page 41 of
de all materiao epoxy coat COMPANY C
welds, CONTd area, appthe coated w
and tie-in weldwith COMPAN
within 24 hour
ing Repairs
uct holiday de epoxy coatin
jeeping all coapplication ofs lowered into
ion to conduce to determineespect to the ted, repaired OMPANY ap
ed soils are e(Coating Mat
m backfill placnd pipe coathield, padding
ng-In & Back
bedding, dirt ply with cathond to support
ng repairs and
R shall install tsupplying andacted by CON
cations are ind
Up
of-work includning-up the Rth the permits
wing pipeline crossing ban
46
als, labor andall crossing
Construction S
TRACTOR’S lying CONTR
weld.
ds shall be clY Coating Ma
rs of weld com
etection testinng repair mate
oated piping pf rock shield, o the ditch.
ct an above ge the effectiv pipeline coa(witnessed b
proval at CON
ncountered, Ctrix – Exhibit ced close to tting. In this g or equipme
kfilling, Tren
plugs or sandodic protectiort the installedd lower-in the
trench breaked placing anyNTRACTOR.
dicated on the
des, as sectROW to the sas, ROW agree
installation innks to the or
d equipment pipe girth we
Standards.
scope-of-worRACTOR-furn
leaned, sandatrix (Exhibit
mpletion.
ng of all pipelerial to all det
prior to the coif applicable)
ground Directveness and qating. Any dby Chief InspNTRACTOR
COMPANY wE), furnish anthe pipe, or ssituation, COnt to segrega
nch Breakers
dbags (bag mon) in the ditd pipeline, COe welded and
ers or plugs fy necessary p
e Pipeline Ali
tions are lowatisfaction of ements and c
n each area, riginal profile
Rev. B,
necessary toelds. Tie-in w
rk includes nished fusion
blasted and cE).
ine and girth tected holiday
ommencemen, in addition t
t Current Voluality of the w
damaged coapector), propecost.
will instruct COnd place padsome combinONTRACTORate the backfil
s
must be consttch where neONTRACTORcoated pipeli
following whicpadding) and
gnment Shee
wered-in, conCOMPANY a
construction d
CONTRACT, including th
Exhibit A4, July 8, 2014
02949‐GS‐9005
o FBE-coat awelds shall be
cleaning andn bond epoxy
coated with 2
weld coatingys.
nt of loweringo the required
tage Gradienwork providedating locationserly backfilled
ONTRACTORdding materiaation of these
R’S scope wil.
tructed of nonecessary as aR will lift, jeepne.
ch the pipelinethe ditch line
ets, Exhibit F.
ntinuously reand landownedocuments.
OR shall alsohe acquisition
4 4
5
ll e
d y
2-
s
g-d
nt d s d
R l, e ll
n-a
p,
e e
e-er
o n,
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
trriv
P4.9.18
Tbthd
C4.9.19
Cco
Cppinst
Twdnoco
M4.9.20
Rpsu
4
rado City Piprsicana Pipe
ransport and pver banks and
Pipeline Warn
he installatione conducted
he new pipeliuring final RO
Cathodic Prot
CONTRACTOonstruction be
CONTRACTOerforming OQipelines upon
nstalling cathotation termina
est stations swires buried a
istance from o test stationountry shall b
Mainline Bloc
Refer to Exhibackages. COurface and pi
.9.20.1 Civi
CONfenc
CONaccevalveroadcouncoun
CONfinisLineacceequiworkall rwas
CONWorsupphand
peline eline
placing of riprd other locatio
ning Markers
n of pipeline by CONTRACine. Final w
OW clean-up e
tection Test
R’s cadweldiegins.
R’S scope cQ cadwelding n 3rd party coodic protectioations. (locatio
shall be instaalong the pipethe cadweld s
n shall be insbe secured to
ck Valve Asse
bit F for indivONTRACTOR
ping elevation
l & Structural
NTRACTOR scing and gates
NTRACTOR ess roads ande site and su
d, access ronty’s specificanty roads will
NTRACTOR sh all concrete
e pipe supporess platformpment, instru
k shown in threquired selehers, etc.
NTRACTOR rk necessary tport bracketsdrails, instrum
Page 42 of
rap and erosions along the
s
aerial and waCTOR as soo
warning markeefforts. Warn
Stations
ing personne
consists of pof test leads
ompletion of tn test leads aons shown in
alled at neareline at 36” desite to the netalled upon Ca 2” pipe in c
emblies & Va
vidual site civshall make a
ns are mainta
Construction
shall lay out, ss required to e
shall provided entrances (pply, haul anads and entations. All corequire perm
shall form, ree foundationsrts, valve sup and stile,
umentation ree Drawings (
ect backfill, c
shall fabricatto construct s
s, valve suppmentation rem
46
ion control me ROW.
arning markeon as possibleer installationning markers
el will be trai
providing andto COMPANYtheir cadweldand foreign linPipeline Alig
rby fence lineepth beginnin
earest fence liCOMPANY aconcrete as g
alve Sites
vil, structural, adjustments
ained.
n
survey, clearestablish the
e and install (per TXDOT sd place gravetrances shalonstruction a
mits to be secu
einforce, poss, including tpport (bonded
electrical pemote mounti(Exhibit F). Cconcrete, rein
te, erect, prostructural steeport baseplatemote mounting
aterials on irr
ers (line of sitee following then will be comwill be suppli
ined, certified
d installing alY pipelines, c
ds, providing ne crossing stgnment Sheet
es, when at ang at the cadine along the
approval. Tesuided by COM
piping and ein the field to
r, grade and pmain line val
drain culvespecificationsel surfacing. l be constructivities assoured in advan
ition anchor those for COd FRP glass panel, area ng (if applica
CONTRACTOnforcing steel
ocure, coat ael componente / bracket, g panels (if a
Rev. B,
rigation canal
e spacing - Ee backfill of e
mpleted by COed by COMP
d and OQ-qu
ll test stationcoating both cand installingtations and cots, Exhibit F).
all possible, dwelds to the
ROW is greast stations locMPANY (Exh
electrical & ino ensure des
perform all sitve sites.
rts (if any) as), level and cWhen comin
ucted per theociated with Tnce by CONTR
bolts, pour, tONTRACTOR
mesh on tolighting, co
able) and all oOR shall procul, anchor bo
nd otherwisets, including vaccess platfopplicable), et
Exhibit A4, July 8, 2014
02949‐GS‐9005
s, stream and
Exhibit E) is toach section oONTRACTOR
PANY.
ualified before
ns, wires andconnections tog T-posts andompleting tes
with test leadfence line.
ater than 500cated in openibit F1).
nstrumentationsigned vertica
e preparation
and construcclean-up each
ng off a countye appropriate
TXDOT and/oRACTOR.
test, cure andsupplied E-Z
p of support)mmunications
other concreteure and instalts, nuts, and
e complete avalve site pipeform / stairs tc. and related
4 4
5
d
o of R
e
d o d st
d If ’, n
n al
n,
ct h y e
or
d Z ), s e ll d
ll e / d
20” Garden City to Colorado City Pipeline 24” Colorado City to Corsicana Pipeline Exhibit A4 SCOPE OF WORK Rev. B, July 8, 2014
Prepared by: Page 43 of 46 02949‐GS‐9005
to the construction of the pipeline valve sites, Garden City, Colorado City, Eastland and Corsicana facilities.
4.9.20.2 Process & Piping Construction
CONTRACTOR shall fabricate, position, install and tie in pipe, fittings, valve, flanges, drain connections, etc.
CONTRACTOR shall provide and install Armour Plate coating (Coating Matrix – Exhibit E) at all above and below ground piping air-soil interface. This additional protection will extend from 2’ below ground to 1’ above ground.
CONTRACTOR shall provide all labor and material to paint all above ground piping and appurtenances to the requirements of Construction Standard 1100, “Painting of Tanks, Piping, Equipment & Steel Structures”.
4.9.20.3 Electrical and Instrumentation (E&I) Construction
CONTRACTOR shall take possession of COMPANY supplied E&I equipment at Garden City Station.
At the powered valve sites, E&I work is to include, but not necessarily be limited to, providing all power, control, lighting and instrumentation conduit, wire, cable and terminations for the work identified in the Construction Specifications and Construction Drawings (Exhibit F).
Warning tape shall be installed above all buried conduit and cables.
CONTRACTOR shall furnish all labor, equipment and material necessary to install, connect and test the valve site E&I equipment, per the following overview. The overview is not meant to be inclusive of all work, but is intended to identify and express CONTRACTOR’S general scope of responsibility.
Site Grounding Grid
CONTRACTOR shall supply materials and install a grounding grid for the motor operated valve sites, in accordance with the Construction Drawings and Standards.
Power Supply, Electrical Equipment Cabinet & Cabinet Equipment
Each site will have a power connection to the electrical utility; CONTRACTOR shall supply and install an inside the fence site power pole along plus electrical disconnect, meter and related equipment. The power usage meter shall be mounted on the power pole and turned such that the electric utility can read the meter from outside the fence. The electric utility will complete supply-side connections.
The site power pole (see Standard 602, “Pole Line Installation”) shall be installed by CONTRACTOR according to the drawings. CONTRACTOR will be responsible to install the conduit and cable required to connect COMPANY supplied electrical equipment panel to the utility power service.
CONTRACTOR shall handle, position and secure the pre-fabricated electrical equipment panel and shall install and connect the programmable logic controller, UPS and associated equipment in the electrical cabinet, as shown in the Construction Drawings (Exhibit F). Work will include grounding connections and conduit supports as required.
Instrumentation
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
S4.9.21
Cst
Asush
BMwSla
P4.9.22
rado City Piprsicana Pipe
T
t
f
t
T
t
Station Pig La
CONTRACTOtation location
Launc
Receiv
Launc
Receiv
Launc
Receiv
At each locatupports, flanghall then clos
Buried piping aMatrix – Exhibwill be handleSpread 24-2 auncher.
Pipeline Hydr
peline eline
The motor opdevice along to be installeDocuments, (Exhibits E an
Instrument mfor pressureS_STDS_M0
Instrument mshall also beto be installeCOMPANY SF).
Site Lighting
CONTRACTOat the location
E&I Completi
CONTRACTOinstrumentaticompletion Standards, inTesting ProcInstrument ICommissionito meet COM
aunchers and
R shall instans:
her at Garden
ver at Colorad
her at Colora
ver at Eastlan
her at Eastlan
ver at Corsica
tion, CONTRges and valve up the line
and welds anbit E) will be ced by othersCONTRACT
rotesting
Page 44 of
perated valvew/ two (2) di
ed along witConstructionnd F1).
mounting, wirine transmitter060051: PIT.
mounting, wirin provided by
ed at 20” vaStandard S_S
OR shall provns indicated i
ion
OR shall eon systems according toncluding No.cedure”, No.nstallation”, ng”, and No.
MPANY’S acce
d Receivers
ll COMPANY
n City
do City
ado City
nd
nd
ana
RACTOR shaves per the Cand make it r
d the air-soil coated by CO
for Garden TOR’S scope
46
sites will incirect mount wth all necess Drawings a
ng, terminatiors shall be
ng, terminatioCONTRACT
lve site MP-5STDS_M0600
vide and instain the electric
ensure that are fully fu
o the Cons. 600, “Elect. 602, “PoleNo. 701, “17050, “Pro
eptance.
Y supplied pig
Spre
Spread 20-1
Spread 24-1
Spread 24-2
Spread 24-2
Spread 24-4
ll install 45° Construction ready for futu
piping interfaONTRACTOR
City, Colorae will include
lude an electw/ diaphragm sary fittings rand COMPAN
ons and loop installed p
ons, and loopTOR for two (53.6 and 24”048 and Cons
all valve site cal drawings.
all electricunctional andstruction Dratrical Installae Line Insta“Instrument Tcess Control
g launchers /
ead 20-1
2
2
4
elbows, riseDrawings (Exre hydrotestin
ace (Armour PR. Painting oado City ande painting th
Rev. B,
rical pig passseal pressur
required per NY Standards
checking / cper COMPAN
p checking / c(2) preview d” valve site Mstruction Draw
area lights of
cal power, d operationaawings and tion”, No. 60allation”, No.Testing, Caland Instrum
/ receivers at
er, horizontaxhibit F). COng.
Plate coating –of the above- Corsicana;
he Eastland
Exhibit A4, July 8, 2014
02949‐GS‐9005
sage detectionre transmitter
the Contracs and Detail
commissioningNY Standard
commissioningdensitometersMP-273.5 pewings (Exhib
f the type and
control andal upon wor
Construction01, “Electrica. 700, “Fieldlibration, andentation”, and
t the following
l piping, pipeONTRACTOR
– see Coating-ground pipinghowever, thereceiver and
4 4
5
n s ct s
g d
g s, er it
d
d k n al d d d
g
e R
g g e d
20” Garden 24” ColoradSCOPE OF W
Prepared by:
City to Coloro City to CorWORK
Fhyfo
H4.9.23
Ahyshpp/
Cva
Cdo
S4.9.24
AdthH
R4.9.25
Acoph
CrelimB
Tco
rado City Piprsicana Pipe
inal hydrotesydrotest cont
or final cleanin
HDD / Conven
As stated in tydrostatic teshall thence finerformed in aipe joints welBore length s
CONTRACTOalves, fittings
CONTRACTOocument the
Spare Pipe Hy
At the conclusirected by CO
he tested pipHillsboro.
ROW Final Cl
As each sectionduct final ermanently reave been retu
CONTRACTOestoration of mited tree cle
BMP guidance
he restoratioompleted by C
peline eline
sting of the practor followinng, drying and
ntional Bore
the Constructsting plan for nalize the plaa central locaded into strin
sections subse
R shall suppl, plugs, etc. n
R shall also pressure test
ydrotesting
ion of construOMPANY, hye to COMPA
ean-Up
on of the pipclean-up an
epair gates anurned to the o
R is also todisturbed ar
earing of peree (Exhibit C1)
on of all landCONTRACTO
Page 45 of
pipelines shang constructiod closure of th
Pipe Hydrot
tion Specificaa four (4) ho
an in consultaation with thegs as long asequently cut f
y any requirenecessary for
provide all ct, as well as v
uction, CONTydrostaticallyANY’S storag
peline alignmnd ROW rend fences, anoriginal profile
o complete dreas, generaennial waterw.
downer fenciOR.
46
all be provideon completionhe lines.
testing
ations, CONTour test of theation with COe test plan has required andfrom the main
ed frac tanks, the hydrosta
calibrated instvalid calibratio
TRACTOR is ttest and re-s
ge locations i
ment is tied-inestoration, rend ensure thae.
de-compactiol re-vegetatio
ways concurre
ing and perm
ed by a sepan. CONTRAC
TRACTOR she HDD and CMPANY. COaving the appd practical forn strings.
steel hard pitic test.
trumentation on certification
to fabricate (4section this pn Garden Ci
n and backfiemove tempoat all terracing
n of cultivaton, erosion cently with the
manent gate
Rev. B,
arate COMPACTOR shall b
hall prepare Conventional BOMPANY prefpropriate diamr testing with
pe, hoses, pu
necessary tons.
4) joints of supipe, re-bevety, Abilene, G
lled, CONTRorary gates, g and water c
ted fields, recontrol mease final clean-u
installation
Exhibit A4, July 8, 2014
02949‐GS‐9005
ANY selectedbe responsible
and submit aBore pipe andfers testing bemeter and WTrequired HDD
umps, meters
o monitor and
rplus pipe, ael and transfeGranbury and
RACTOR is toreplace and
rossing bank
e-seeding andsures and theup in line with
is also to be
4 4
5
d e
a d e T D
s,
d
s er d
o d s
d e h
e
20” Garden 24” ColoradSCOPE OF W
Prepared by:
4.10
City to Coloro City to CorWORK
COMPAN
C4.10.1
CthC
It pinlo
Cm
CofDrere
RdoC
UCa
E4.10.2
Cthstst
rado City Piprsicana Pipe
NY REPRESE
Construction
COMPANY wihe satisfactoConstruction D
is planned thersonnel will
ncluding clearowering-in, ba
CONTRACTOmanagement a
COMPANY ref the work pe
Drawings (Exhequired to repequirements.
Representationoes not con
CONTRACTO
Upon final coContract Docu
cceptance of
Environmenta
COMPANY shhe pipeline antaff. CONTRtaff on a daily
peline eline
ENTATION
Inspection
ll maintain sury completio
Drawings and
hat COMPANbe assigned
ring, grading,ackfilling, hydr
R shall coand inspectio
presentative(erformed by Chibit F) and Cpair and / or
n by COMPAnstitute accepR’S responsi
ompletion of ments, to COthe work in w
al Inspection
hall provide ennd CONTRAC
RACTOR shaly basis.
Page 46 of
uch representn of the WContract Doc
Y constructiod to monitor fencing, ditcrotesting, bor
ordinate andn staff on a d
(s) including iCONTRACTOContract Docureplace such
ANY and anyptance by Cbilities and co
the Work inOMPANY’S sawriting to the C
n
nvironmental CTOR shall al coordinate a
46
tation and oveWork in acco
cuments.
on managemethe various
ching, stringinring, direction
d communicaily, continua
inspectors shOR which is no
uments. In sh work as de
y associated COMPANY, nontractual obl
n complianceatisfaction, COCONTRACTO
monitoring padhere to theand commun
ersight as derdance with
ent, chief inspcomponents
ng, welding, gal drilling, etc
cate with Cal basis.
hall have the ot in conformsuch instance
etermined nec
inspection onor release ligations.
e with the COMPANY shaOR.
personnel throe direction anicate with the
Rev. B,
emed necessthe requirem
pection and cof the pipe
girth weld coac.
COMPANY’S
right to condance with thees, CONTRAcessary to me
of any portionthe CONTR
onstruction Dall issue a rele
oughout the cnd guidance e Environmen
Exhibit A4, July 8, 2014
02949‐GS‐9005
sary to ensurements of the
raft inspectionlay activities
ating, jeeping
construction
demn any pare Construction
ACTOR will beeet the stated
n of the WorRACTOR from
Drawings andease and fina
construction ogiven by said
ntal Inspection
4 4
5
e e
n s, g,
n
rt n e d
k m
d al
of d n