Tailingspipelines
Pipeline systems
7/28/2019 1361162524-25_Tailings_Pipelines_V1_070213_WEB
2/4
Ausenco is a leading global providerof engineering and project managementservices to the resource and energy sectors.We combine ingenuity with insight to delivereffective end-to-end solutions for our clients.
Our pro essionals o er expertise across everyaspect o the resource and energy sectors
in areas including mineral processing;pipelines; transportation systems; ports andterminals; in rastructure; and conventional,renewable and alternative energies. Were alsoexperts in optimising per ormance throughtailored operations and maintenance solutions,and in providing environmental andsustainability strategies that deliver bene ts
or projects, communities and the environment.
Were skilled in every phase o the projectli ecycle. From initial concept through tooperation, our people can assess, plan, cost,design and construct ingenious solutionsthat add value and support your returnon investment.
With expertise in complex hydraulics andtailings management, we tailor our solutionsto meet your unique requirements.
With expertise in complex hydraulics andtailings disposal, we tailor our solutions to
meet your unique requirements.
Tailings
01
7/28/2019 1361162524-25_Tailings_Pipelines_V1_070213_WEB
3/4
7/28/2019 1361162524-25_Tailings_Pipelines_V1_070213_WEB
4/4
Our experience
ProjectCerro VerdeLocationArequipa, PeruClientSociedad Minera Cerro VerdeS.A.A./Fluor Canada LtdYear20042010DescriptionCerro Verde is an open-pitcopper mine near Arequipa,Peru, 2,700 m above sea level.
Ausenco provided services,
directly and through agents,or the tailings handling,reclaim water and seepagewater collection systems,beginning with a easibilitystudy and continuing throughengineering services andexpansion studies.
The system design includes a3.9 km, 48-inch diameterhigh-density polyethylenelaunder with a 34 Mt/ythroughput to deliver tailings
rom the thickeners to acyclone station near the dam.
The tailings handling systemis designed to transport37.4 Mt/y o whole tailings
rom the mine site to theimpoundment dam.
ProjectPerseverance MineZinc TailingsLocationSaskatoon, CanadaClientXstrata ZincYear2007DescriptionAusenco was selected byXstrata Zinc to per orm a
ull range o services on thePerseverance Mine project,located in Quebec, Canada.Our scope o work includeda comprehensive hydraulicanalysis and optimisationstudy or a slurry pipelineto trans er tailings rom anexisting concentrator to anew paste preparation plant.
Our study includedoptimisation o pipe andpump size, basic operatingphilosophy, reeze protectionstudy, pipe stress analysisand support recommendation.
The tailings trans er pipelinesystem is designed or thetransportation o a maximumo 65 t/h o zinc tailings, andincludes a 7.2 km, 5-inchdiameter pipeline with HDPEinsulation and heat tracing.
ProjectLos Pelambres Mauro/Quillayes DamLocationChileClientMinera Los PelambresYear1996planned 2013DescriptionAusencos relationship withthis client began in 1996,when we provided a designaudit, construction supportand commissioning services
or their original tailingspipeline to Quillayes Dam.
Our ongoing involvementhas continued to include aproject to redirect the tailingspipeline to Mauro Dam aswell as a system expansion,various system updates,and a debottlenecking study.
The unlined, 49 km, 36/28-inchdiameter copper tailingspipeline currently transports62.3 Mt/y o whole tailings
rom the thickener at theconcentrator to Mauro Dam.
To learn more about our tailings pipeline experience, contact us viaemail [email protected] or visit our website www.ausenco.com