2
A1 EX-DE YM TR JS YP Validity Prep. Checked Accepted Rev status Yinson Production Pte. Ltd. 3 Church Street, Samsung Hub #17-05 Singapore 049483 Supplier Logo Disc. Code Type & subtype Sequence no. client to advise client to advise client to advise Disc. code Doc. type Sequence no. - - - R - XX - 00012 FPSO Ghana OCTP Development Project OCTP Offshore YINSON PRODUCTION ENI Contract No.: For Review 10.07.2015 Doc. title : 23HA2004 A/B Supplier document no._Rev. HJ-15-2185-DWG-10-02_Rev A1 Purchase Order No.: AR/PROC/2013/08/0508 (PO issued by YP to supplier) 00 Date Reason for issue 1305 YP document number ENI Rev. client to advise Facility 3514 Project no. Orig. code VM Rev. A1 2 System Code 23 Subfacility B1 Total no. of Pages Phase 01 ENI document ID Tag no.: BUNDLE DRAWING for MP FLASH GAS COMPRESSOR SUCTION COOLER Rev.

1305-VM-23-R-XX-00012_A1_Bundle Drawing 23HA2004AB MP Flash Gas Compressor Suction Cooler MC1

Embed Size (px)

DESCRIPTION

bundle

Citation preview

Page 1: 1305-VM-23-R-XX-00012_A1_Bundle Drawing 23HA2004AB MP Flash Gas Compressor Suction Cooler MC1

A1 EX-DE YM TR JSYP Validity Prep. Checked AcceptedRev status

Yinson Production Pte. Ltd.3 Church Street, Samsung Hub#17-05 Singapore 049483

Supplier Logo

Disc. Code Type & subtype Sequence no.client to advise client to advise client to advise

Disc. code Doc. type Sequence no.

- - - R - XX - 00012

FPSO

Ghana OCTP Development ProjectOCTP Offshore

YINSON PRODUCTION

ENI

Contract No.:

For Review10.07.2015

Doc. title :

23HA2004 A/B Supplier document no._Rev.HJ-15-2185-DWG-10-02_Rev A1

Purchase Order No.:AR/PROC/2013/08/0508

(PO issued by YP to supplier)

00Date Reason for issue

1305

YP document number

ENI Rev.client to advise

Facility3514

Project no. Orig. code

VMRev.

A1 2System Code

23

SubfacilityB1

Total no. of Pages

Phase01

ENI document ID

Tag no.:

BUNDLE DRAWING forMP FLASH GAS COMPRESSOR SUCTION COOLER

Rev.

Page 2: 1305-VM-23-R-XX-00012_A1_Bundle Drawing 23HA2004AB MP Flash Gas Compressor Suction Cooler MC1

A

9 10

B

C

D

E

F

H

9 10

G

7 84 5 621 3

A

B

C

D

7 84 5 6

E

F

G

21 3

H HJ-15-2185-DWG-10-02

GHANA OCTP DEVELOPMENT PROJECT

CLIENT DOC. NO.

VENDOR DOC. NO.

TBA

REV.

NO.DESCRIPTION PREP. BY CHK. BY APPR. BY

VALIDITY

STATUS

A1 ISSUE FOR REVIEW YM THURAIN JENSON-

BUNDLE DRAWING FORMP FLASH GAS COMPRESSOR SUCTION COOLER (23HA2004 A/B)

YINSON DWG. NO. SHEET: REV:

SIZE:

SCALE:

TITLE :

PROJECT :

COMPANY : CLIENT :

1 OF 1 A1

A3

NTS

THE ORIGINAL AND ALL COPIES OF THIS

DRAWING TOGETHER WITH THE COPY RIGHT

THEREOF ARE THE SOLE PROPERTY OF

YINSON PRODUCTION PTE LTD

ENI.

REV.

10.07.2015

DTAE

-

VENDOR :

HEATEC JIETONG PTE LTD

TBATU

BE S

IDE

SHELL SIDE

TUBE HOLE DETAIL

TUBE PITCH

MATERIAL LISTMARK ITEM DESCRIPTION MATERIAL QTY REMARK

1 TUBESHEET 1 AS SHOWNSA266 Gr.2

(NORMALIZE)+(WOL)1x2

2 TUBESHEET 2 AS SHOWNSA266 Gr.2

(NORMALIZE)+(WOL)1x2

3 BAFFLE PLATE 1 AS SHOWN SS 316L 8x24 BAFFLE PLATE 2 AS SHOWN SS 316L 8x25 TIE ROD 1 AS SHOWN SS 316L 4x26 TIE ROD 2 AS SHOWN SS 316L 2x27 TIE ROD NUTS 1/2" 13 UNC SA194 Gr.8 12x2

8 SPACER TUBE 1OD=19.05, AVG

THK.=1.651, L=692SA213 TP316L 30x2

9 SPACER TUBE 2OD=19.05, AVG

THK.=1.651, L=342SA213 TP316L 32x2

10 TUBEOD=19.05, AVGTHK.=1.651,

LENGTH=6000SA213 TP316L 254x2

11IMPINGEMENT

PLATEAS SHOWN SS 316L 1x2

TIE ROD 1 TIE ROD 2

12,7

O

1/2"-13 UNC 1/2"-13 UNC1/2"-13 UNC 1/2"-13 UNC

5310

12,7

O

25,4 TO TUBESHEET 50,8

1.5

12

5 6

2

1

3

4

1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED.2. ALL BOLT HOLES SHALL STRADDLE TO THE CENTRE LINE UNLESS OTHERWISE SPECIFIED.3. ALL GASKET SEATING FACE SHALL HAVE SERRATED CONCENTRIC SURFACE FINISH.4. B.C.D. - BOLT CIRCLE DIAMETER O.T.L. - OUTER TUBE LIMIT. WOL - WELD OVER LAY. TBA - TO BE ADVISED BY CLIENT.5. TUBE EXPANSION SHALL START A DISTANCE OF 14mm MEASURED FROM THE TUBESHEETSURFACE.6. WELD OVERLAY MATERIAL SHALL BE SS316L.

GENERAL NOTES

25,4 TO TUBESHEET

5660

6-1/2-13 UNC - 25,4 DEEP(APPLY TO TUBESHEET 2 ONLY)

11

CHANNEL SIDE VIEWTUBESHEET 1 & 2

SHELL SIDE VIEW

BUNDLE ASSEMBLYVIEW A-A

270v

0v

90v

180v

63 63342280

5998

525015 X 350 =

8

IMPINGEMENGT PLATE

1516

1716

17

1716

1716

1716

1514

13

O 550BCD

O 431,66O.T.L

600

OD O

500

O

435

O

435

O

20-O 22

204

60 60

204

166,28

168

1(TUBE PROTRUSION)

40(TUBE EXPANSION LENGTH)

SEE "DETAIL A"

DETAIL A

19,05

O TUBE

OD

0.5mmg45v(CHMFER)8 WOL

8 WOL

4,8

6,4 4,847

63

IMPINGEMENGT PLATE

60 60

7120

071

342

A

A

3D VIEW

TUBE

WAL

L TH

ICKN

ESS

REDU

CTIO

N 2%

~3%

11

1

6

1 2

45

67

8

910 11

16

8

1413

86

254-O19.25u0.05 TUBE

20,7

8

24

24

66

6

130

19,25

O TUBE

HOL

E OD

BAFFLE PLATE 1 BAFFLE PLATE 2

SEE DETAIL B

DETAIL B

90°

10

SEE DETAIL C

DETAIL C

R 1.5

204 204

60 60

168

O 435OD

O19.7

4-O 13,1

204

60 60

204

103,9

216

6,28

O19.7

4-O 13,1

3

34

103,9

2