    r;LEMENTAL COST ANALYSIS - Fonn 1 I 8 - Residential BuildingsI A - 1 - 63,uJQBIITLE; 130 Units medium Cost Terrace House CLIENT : Privatet:'X::ATION Kulim. Kedah Darul Aman TENDER DATE ; 671171995

    ~ - - - ~ . INFORMATION ON TOTAL PROJECTProject and contract inf'onnationProject Details and Site Conditions.; Contract ;Proposed 130 units Medium Cost Terrace house. Earthworks &: Infra by others. STD. PAM/IS M FORM OF CONTRACT (With Quantities)Single storey R.C. Framed building on cut ground with ready access.New housing estate.Market Conditions ; Competitive; lahour &: material readily available.Contract Particulars: Competitive Tender ListType ot o n t T ~ : STD. PAM/ISM FORM OF CONTRACT Cost fWctuation Yes D No m RM lnt(JV)/L(With Quantities)

    Government D UNKNOWNBasis of Temier :Bills of Quan,ities U ~ Open/selected ITJcompetition Private m ThisECAwas

    c=:J c=:J prepared by theBills of Approx Negotiated successfulQuantities Provisional Sums RM - tendererof Rates/ CJ Serial c=:J Prime Cost Sums RM -I ,_. &: Drawings Preliminaries RM 319,500.00

    iCuntract Period Stipulatedby Client: 14 months Contigencies RM 100,000.00Contract Period Offered Contract Sum RM 4,600,000.00by Builders: 18 monthsNumber " f Tenders Issued : 9Number of Tenders Received: 9

    ANALYSIS OF SINGLf..BUILDING (Inten nediate Unit)Design/Shape InfonnationAccommodationan d Desi&!! Features: Rectangular shaped single storey r.c. framed build ing consisting of living &: dining area, bedrooms, kitchen and toilets.- ; --Areas (per unit terrace house) Desi&!! I Shape :

    functional Unit: 63m2 (per unit terrace house).Lower Ground Floor - m2 Percentage of Gross Floor AreaGround Floors 63.00 m2 External Wall Area - 46.00 ~ a) Below Ground Floor - %Gross Floor Area 63.00Upper Floor Area - m2 0 b) Single -Storey- 0.730 Construction 100 %OORAREA 63.00 m2

    c) Two-storeyUsable Area 60 m2 S t o ~ Heights : Construction - %Average Below Ground Floor - mCirculation Area - m2 d) 3 -Storey

    at Ground Floor 3.00 m Construction . %Ancillary Area m2 Above Ground Floor - m e) StoreyInternal Division 3m 2 Construction - %

    ( " ~ O S S K 00R AREA 63 m2Floor Space NOT Enclosed 11.00 m2Roof Area 83.00 m2(Structural and Plant Rooms)

    Brief Cost InfonnationContract Sum RM 37,551.89 Functional Unit Costexcluding external works :Provisional Sums RM (Tender RM 613.29 per m2)Prime Cost Sums RM PrelirrUnaries RM 2,457.70 being 7.00 % II of remainde r of Contract Sum.Contingencies RM 754.72 being 2.0500 % I

    !ContractSum less Contingendes 36,797.17

    lOS If '"130.r/s

  • 7/27/2019 130 Units Medium Cost Terrace House

    2/2

    \ ~ . ) ,.... 1 j

    " t:EnT.UTION SURVEYORS, MALAYSIA, BliiU)JNG COST INFORMAnO N CENTRE

    rELEMENTALCOST ANALYSIS - Form 2i-JGROSS FLOOR AREA: 63m2/ unit

    1 Substructure1.A Piling1.B Work Below Lowest Floor Finish

    Group Element Total:2 SUEerstructure

    2.A Frame2.B Upper Floors2.C Roof2. 0 Stairs2.E External Walls2.F Windows & External Doors2.G Internal walls & Partitions

    . f Internal DoorsGroup Element Total :

    - - . ~ . -

    Finishes3.A Internal Wall Finishes3.B Internal Floor Finishes3.C Internal Ceiling Finishes3. 0 External Finishes

    _____ Group Element Total:4 Fittings and Furnishings

    S ServicesS.A Sanitary AppliancesS.B Plumbing InstallationS.C Refuse Disposa l5. 0 Air conditioning an d

    VentilationSystemS.E Elecbical InstallationS.F Fire Protection InstallationS.G Lift and Conveyor InstallationS.H Communication Installation

    -51 Special Installation(e.g. kitchen equipment, laundry,

    building automation, securitysystem, gas installa tion, etc)

    S.K Builder's Profit an d Attendanceon Services

    5.L Builder's Work in Connectionwith ServicesGroup Element Total :

    Subtotal excluding External Works,Preliminaries an d Contigencies.

    6 External Works6.A Site Work6.B Drainage6.C External Services6.D Ancillary Buildings6.E Recreational Facilities

    Group Element Total :PreliminariesTOTAL (Less Contigencies)

    Total Costof ElementRM

    -6,554.586,554.58

    3,690.70

    3,936.26723.75

    1,811.402,131.232,164.72

    14,458.06

    3,472.472,293.87

    995.531,002.707,764.57

    995.002,169.14..1,021.52-

    4,185.66

    32,962.87----1,376.60

    ..

    1,376.602,457.70

    36,797.17

    I 8 - Residential BuildingsJ A-1-63SUMMARY OF ELEMENT COSTS

    TENDER DATE: 06/11/95Preliminaries Shown Separately

    Costperm2 Element Element Element ReinfoKed ReinfoKe Fonnworkgross floor unitQty. unit rate Ratio Concrete ment m2area RM RM perm2GFA m3 kg

    . . ..104.04 63.00 104.04 1.00 61 744 59104.04

    - . .58.58 63.00 58.58 1.00 5 565 97

    . - .. ..62.48 98.00 40.17 1.56 .. .. .. .. .. ..1}.49 36.00 20.10 0.57 ..

    28.75 10.00 181.14 0.16 ..33.83 77.00 27.68 1.22 ..34.36 6.61 327.49 0.10 ..

    229.49 565 97

    55.12 202.00 17.19 3.2136.41 48.00 47.79 0.7615.80 50.00 19.91 0.7915.92 72.00 13.93 1.14 - -23.25

    P.CSums TenderedAllowed Sums" -15.79 7 142.14

    34.43 ......, .. N/A N/A

    16.21 ..

    66.44

    523.22,.....- - - - ~ . - - ..

    21.85

    21.8539.01

    584.08