    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    DESIGN EXAMPLES—SECTION 4

    CONTENTS

    Section PageDE-

    4.0  CASE STUDY—ROCK CREEK .................................................................................................... 50 

    Figures for Section 4

    Figure 1—Flor Storage Facility Plan View.................................................................................................. 53 

    Figure 2—Typical Pond Edge Adjacent to Community Ditch ..................................................................... 54 

    Figure 3—Typical Embankment Crest........................................................................................................ 54 

    Figure 4—Typical Pond Edge Adjacent to Filing No. 13 ............................................................................ 55 

    Figure 5—Typical Clay Cutoff Trench......................................................................................................... 55 

    Figure 6—Profile Pond Outlet Works.......................................................................................................... 56 

    Figure 7—Plan Drop Box............................................................................................................................ 56 

    Figure 8—Section Drop Box....................................................................................................................... 57 

    Figure 9—Plan 78" RCP Outlet .................................................................................................................. 58 

    Figure 10—Section 78” RCP Outlet............................................................................................................ 58 

    Figure 11—Rock Creek Flor Storage and Landscape Plan ....................................................................... 59 

    Figure 12—Landscape Plan Construction Notes and Plant Legend .......................................................... 60 

    Figure 13—Planting and Trail Details......................................................................................................... 61 

    Figure 14—Grouted Boulder Drop Structures ............................................................................................ 64 

    Figure 15— LB3 Channel Profile ................................................................................................................ 65 

    Figure 16—Typical Drop Structure ............................................................................................................. 65 

    Figure 17—Grout Cutoff Section ................................................................................................................ 66 

    Figure 18—Drop Structure Profile .............................................................................................................. 66 

    Figure 19—Typical Drop Basin Section and Sill......................................................................................... 67 

    Figure 20—Typical Drop Face Section....................................................................................................... 67 

    Figure 21—Drop Structure Measurement Table ........................................................................................ 68 

    Figure 22—LB3 Channel Plan.................................................................................................................... 72 

    Figure 23—Typical Wetland Channel Section and LB3 Channel Profile.................................................... 72 

    Figure 24—Check Structure Plan............................................................................................................... 73 

    Figure 25—Check Structure Profile ............................................................................................................ 73 

    Figure 26—Check Structure Layout Table ................................................................................................. 74 

    Figure 27—Check Structure Details ........................................................................................................... 75 

    Figure 28—Stream Stabilization Plan......................................................................................................... 79 

    Figure 29—Grouted Boulder Check Structure with Low-Water Crossing Site Plan................................... 80 

    Figure 30—Typical Stream Stabilization Detail .......................................................................................... 81 

    Figure 31—Stream Stabilization Site Plan ................................................................................................. 81

    06/2001 DE-iUrban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    2/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    4.0 CASE STUDY—ROCK CREEK

    The purpose of this case study is to demonstrate the following features:

      Detention facility

    •  Grouted boulder drop structure

    •  Grouted boulder check structures and wetland bottom channels

    •  Stream bank stabilization including grouted boulder check structure with low-water crossing,

    slope flattening and revegetation

    McLaughlin Water Engineers, Ltd. (MWE) and the Norris/Dullea Company (both based in Denver)

    prepared the attached drawings. Photographs are provided for each of the facilities featured in this case

    study.

    The formal names of these projects are:

    1. Tributary LB-3 Channel and Flor Storage Facility

    2. Rock Creek Stabilization, Tributary RB-3 Outfall Pipe, and Community Pond East

    The client for MWE and Norris/Dullea Company was Superior Metropolitan District No. 1 and the relevant

    drawings were prepared in 1994 and 1997.

    Public reaction to the facilities shown on the attached pages and to the overall drainage plan has been

    extremely positive due to the aesthetic nature of the facilities, the fact that they nicely integrate into the

    community, their environmentally-sensitive nature and multi-purpose benefits. There is no question that

    the drainage system in Rock Creek substantially enhances community character and the value of

    residential properties.

    DE-50 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    3/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Detention Facility—Flor Storage Facility

    06/2001 DE-51Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    4/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Detention Facility—Flor Storage Facility

    and Interpretive Sign

    DE-52 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    5/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Figure 1—Flor Storage Facility Plan View

    06/2001 DE-53Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    6/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    6”

    Figure 2—Typical Pond Edge Adjacent to Community Ditch

    Figure 3—Typical Embankment Crest

    DE-54 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    7/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Figure 4—Typical Pond Edge Adjacent to Filing No. 13

    Figure 5—Typical Clay Cutoff Trench

    06/2001 DE-55Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    8/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Figure 6—Profile Pond Outlet Works

    Figure 7—Plan Drop Box

    DE-56 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    9/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Figure 8—Section Drop Box

    06/2001 DE-57Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    10/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Figure 9—Plan 78" RCP Outlet

    Figure 10—Section 78” RCP Outlet

    DE-58 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    11/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Figure 11—Rock Creek Flor Storage and Landscape Plan

    06/2001 DE-59Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    12/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Figure 12—Landscape Plan Construction Notes and Plant Legend

    DE-60 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    13/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Figure 13—Planting and Trail Details

    06/2001 DE-61Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    14/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Grouted Boulder Drop Structures on Tributary LB-3 Channel

    DE-62 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    15/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Grouted Boulder Drop Structures on Tributary LB-3 Channel

    06/2001 DE-63Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    16/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Figure 14—Grouted Boulder Drop Structures

    DE-64 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    17/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Figure 15— LB3 Channel Profile

    Figure 16—Typical Drop Structure

    06/2001 DE-65Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    18/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Figure 17—Grout Cutoff Section

    Figure 18—Drop Structure Profile

    DE-66 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    19/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Figure 19—Typical Drop Basin Section and Sill

    Figure 20—Typical Drop Face Section

    06/2001 DE-67Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    20/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Figure 21—Drop Struc ture Measurement Table

    DE-68 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    21/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Grouted Boulder Check Structures And Wetland Bottom Channels

    06/2001 DE-69Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    22/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Grouted Boulder Check Structures And Wetland Bottom Channels

    DE-70 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    23/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Wetland Bottom Channel

    06/2001 DE-71Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    24/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Figure 22—LB3 Channel Plan

    Figure 23—Typical Wetland Channel Section and LB3 Channel Profi le

    DE-72 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    25/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Figure 24—Check Structure Plan

    Figure 25—Check Structure Profile

    06/2001 DE-73Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    26/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Figure 26—Check Structure Layout Table

    DE-74 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    27/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Figure 27—Check Structure Details

    06/2001 DE-75Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    28/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Stream Bank Stabilization Including Grouted Boulder Check Structure With

    Low-Water Crossing, Slope Flattening, And Revegetation

    DE-76 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    29/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Stream Bank Stabilization Including Grouted Boulder Check Structure With

    Low-Water Crossing, Slope Flattening, And Revegetation

    06/2001 DE-77Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    30/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Stream Bank Stabilization Including Grouted Boulder Check Structure With

    Low-Water Crossing, Slope Flattening, And Revegetation

    DE-78 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    31/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Figure 28—Stream Stabilization Plan

    06/2001 DE-79Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    32/33

    DESIGN EXAMPLES DRAINAGE CRITERIA MANUAL (V. 2)

    Figure 29—Grouted Boulder Check Structure with Low-Water Crossing Site Plan

    DE-80 06/2001Urban Drainage and Flood Control District

  • 8/18/2019 130 Chapter 13 Design Examples part 4 2001-01.pdf

    33/33

    DRAINAGE CRITERIA MANUAL (V. 2) DESIGN EXAMPLES

    Figure 30—Typical Stream Stabilization Detail

    Figure 31—Stream Stabilization Site Plan