36
GUYANA SAM Regional Meeting of National Continuous Monitoring Coordinators (NCMC) Amanza Walton-Desir, NCMC 7 th June, 2015

13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

GUYANASAM Regional Meeting of National Continuous Monitoring 

Coordinators  (NCMC)  

Amanza Walton-Desir, NCMC

7th June, 2015

Page 2: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

2

OVERVIEW Background Current status‐ ICAO Findings Compliance Action Plan Main obstacles Needs to complete CAP and PQs Technical assistance received Comments on the USOAP CMA On‐Line

Framework

Page 3: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

3

BACKGROUND

Audit under the Comprehensive Systems Approach (CSA)

Date: 12 to 21 of February 2007

Effective implementation (EI): 44.21%

The audit generated: 431 Not satisfactory PQs

Page 4: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

4

Background (Cont.)

Areas with lowest level of effective implementation:

• ANS ‐ 11%

• AIG ‐ 15%

• ORG ‐25%

Page 5: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

Current Status‐ ICAO Findings 

Page 6: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

Current effective implementation (EI): 44.21 %

6

Page 7: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

7

PQs status by audit area

Page 8: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

8

PQs status by critical element (CE)

Page 9: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

9

CAP status by audit area

Page 10: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

10

CAP status by audit area

Page 11: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

11

CAP status by audit area

Page 12: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

12

CAP status by critical element (CE)

Page 13: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

13

CAP status by critical element (CE)

Page 14: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

14

COMPLIANCE ACTION PLAN‐ PROJECT APPROACH

Page 15: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

15

COMPLIANCE ACTION PLAN‐ ICVM – Q4 2016

Overall Target – 60% EI BY  DEC 2016

Internal Target ‐ 50 %  OLF‐ by June 30, 2016

Assessment by ICAO SAM Office  to determine readiness for ICVM– July 31, 2016 .

Page 16: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

16

COMPLIANCE ACTION PLAN‐ ICVM – Q4 2016

Exported the CAP to create offline  data base and tracking system 

Sub – project officers assigned responsibility  for each audit area 

Assigned to work with ICAO Technical Experts  Weekly update meetings with Board and ICAO 

Technical Experts.

Page 17: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

17

COMPLIANCE ACTION PLAN‐ ICVM – Q4 2016

Isolated CEs‐ 1‐5 PQs = 201

Further isolated along subject areas:

E.g. Training = over 70 PQs

Page 18: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

18

COMPLIANCE ACTION PLAN‐ ICVM – Q4 2016 Focus on CAP implementation Technical Assistance – working with Assigned ICAO 

experts: Workflow Activities –

• Evaluation of Open PQs• Revision of evidence formulated • Schedule for completion of open PQs • Assistance‐ training on OLF to complete SAAQ, 

EFOD

Page 19: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

19

COMPLIANCE ACTION PLAN‐ ICVM – Q4 2016

Focus on CAP implementation

• All  NSPQs have been evaluated, and evidence prepared

• Content evaluation by ICAO Technical experts

• Once signed off by Technical Experts, approved and uploaded onto the OLF.

Page 20: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

20

COMPLIANCE ACTION PLAN‐ PROGRESSLEG

Primary Aviation Law • Drafted and with Attorney General for passage in 

Parliament• Some key features include

o extensive delegation and enforcement provisionso functional separation of regulator from service  

provider (ANS)o SSP o Aviation security offences, including unruly  

passenger offences

Page 21: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

21

COMPLIANCE ACTION PLAN‐ PROGRESSLEG

Primary Aviation Law 

• Establishment of Independent Accident Investigation Unit

• New AIG Act (Annex 13 Compliant)

• Regulations‐MOR etc. 

Page 22: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

22

COMPLIANCE ACTION PLAN‐ PROGRESSLEG

Specific Operating Regulations 

• Existing regulations extensively updated• New regulations drafted for AGA • New regulations for ANS (6 of 7 sub‐components 

drafted,  CNS to be prepared)

Page 23: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

23

COMPLIANCE ACTION PLAN‐ PROGRESSORG 

Functional separation of ANS 

Recruitment of technical staff‐ AIR, OPS 

Page 24: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

24

COMPLIANCE ACTION PLAN‐ PROGRESS

PEL 

All PQ’s Addressed 

Evidence uploaded to OLF. 

Page 25: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

25

CE ACTION PLAN‐ PROGRESSPEL 

Capacity Building• Implementation of Training Programme and Plan

• Installation of testing and licensing system‐COESNA 

Page 26: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

26

COMPLIANCE ACTION PLAN‐ PROGRESSOPS  

Evidence developed PQ’s

Revised by ICAO SAM OPS Expert

Approval  and uploading onto OLF 

Page 27: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

27

COMPLIANCE ACTION PLAN‐ PROGRESSAIG 

Establishment of Separate AIG Body  Draft Aircraft Accident and Incident 

Investigation Act  and Regulations  Technical guidance material developed with 

assistance of ARCM.  Completion awaiting promulgation of Act and 

Regulations by Parliament.

Page 28: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

28

COMPLIANCE ACTION PLAN‐ PROGRESSANS 

Legislation drafted for 6 of 7 ANS components(ATS, AIS, SAR, MET, MAPS,PANS‐OPS)

Reviewed by ICAO Technical Expert CNS  Regulations currently being drafted Inspector Guidance Material and Checklists 

being reviewed. 

Page 29: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

29

COMPLIANCE ACTION PLAN‐ PROGRESSANS 

Challenges• Lack of technical personnel • Recruitment will mean depleting service 

provider compliment of personnel

Immediate Solution• Exploring use of CASSOS Transnational 

Inspectors 

Page 30: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

30

COMPLIANCE ACTION PLAN‐ PROGRESSAGA  

Draft Regulations reviewed by  ICAO Technical Expert

Manual of Aerodrome Standards reviewed by Technical Expert

Inspector guidance currently being reviewed ICAO Technical Expert.

Page 31: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

31

Main obstacles

Lack of human resources

Familiarity with OLF takes time

Page 32: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

32

Completion of CAPs and PQs ‐ Needs

Further OJT in use of online framework• In Situ training arrangements concluded withICAO SAM Office

Particular need for training in the EFOD interface

Page 33: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

33

Technical Assistance ReceivedTechnical Assistance Missions –

January 2014• to assess the level of progress made inresolving the not satisfactory PQs

January 2016 – Regional Safety Officer February 2016 – Regional Safety Officer

Page 34: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

34

Technical Assistance ReceivedTechnical Assistance Projects

Project GUY 2015

SAFE Fund – CAD 80,000

• AGA Expert – March 28‐April 1, 2016• ANS Expert – April 25 to 29, 2016

Page 35: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

35

Questions?

Page 36: 13. NCMC Presentation Guyana. NCMC Pres… · Microsoft PowerPoint - 13. NCMC Presentation_Guyana.pptx Author: dcoriat Created Date: 6/9/2016 9:23:35 AM

Many thanks