Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
FY 2013-2016 STIP
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
HIGHWAY
ATLANTA DISTRICT
AUGUST 2012
FY 2013 - 2016
TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
FOR TEXAS PORTION OF
TEXARKANA METROPOLITAN AREA
PREPARED BY TEXARKANA METROPOLITAN PLANNING ORGANIZATION
Originally Adopted by Policy Board April 24, 2012 Administrative Modification #1 May 8, 2012
P R E P A R E D I N C O O P E R A T I O N W I T H T H E T E X A S D E P A R T M E N T O F T R A N S P O R T A T I O N A N D T H E U. S . D E P A R T M E N T O F T R A N S P O R T A T I O N , F E D E R A L H I G H W A Y A D M I N I S T R A T I O N A N D F E D E R A L T R A N S I T A D M I N I S T R A T I O N
T H E P R E P A R A T I O N A N D P U B L I C A T I O N O F T H I S D O C U M E N T W A S F I N A N C E D I N P A R T B Y F U N D S P R O V I D E D
B Y T H E U N I T E D S T A T E S D E P A R T M E N T O F T R A N S P O R T A T I O N , F E D E R A L H I G H W A Y A D M I N I S T R A T I O N , A N D
F E D E R A L T R A N S I T A D M I N I S T R A T I O N . T H E P R O V I S I O N O F F E D E R A L F I N A N C I A L A S S I S T A N C E S H O U L D N O T
B E C O N S T R U E D A S D E N O T I N G U. S . G O V E R N M E N T A P P R O VA L O F P L A N S , P O L I C I E S , P R O G R A M S O R P R O J E C T S
C O N T A I N E D H E R E I N
T E X A R K A N A M E T R O P O L I T A N P L A N N I N G O R G A N I Z A T I O N
N O T I C E O F N O N D I S C R I M I N A T I O N
T H E T E X A R K A N A M E T R O P O L I T A N P L A N N I N G O R G A N I Z A T I O N ( M P O ) M A K E S E V E R Y E F F O R T T O C O M P L Y W I T H T H E A M E R I C A N S W I T H D I S A B I L I T I E S A C T O F 1 9 9 0 , S E C T I O N
5 0 4 O F T H E R E H A B I L I T A T I O N A C T O F 1 9 7 3 , T I T L E V I O F T H E C I V I L R I G H T S A C T O F 1 9 6 4 A N D O T H E R F E D E R A L E Q U A L O P P R O T U N I T Y L A W S A N D T H E R E F O R E D O E S N O T
D I S C R I M I N A T E O N T H E B A S I S O R R A C E , S E X , C O L O R , A G E , N A T I O N A L O R I G I N , R E L I G I O N O R D I S A B I L I T Y , I N A D M I S S I O N O R A C C E S S T O A N D T R E A T M E N T I N M P O P R O G R A M S A N D A C T I V I T I E S , A S W E L L A S T H E M P O ’ S H I R I N G O R E M P L O Y M E N T P R A C T I C E S . C O M P L A I N T S
O F A L L E G E D D I S C R I M I N A T I O N A N D I N Q U I R I E S R E G A R D I N G T H E M P O ’ S N O N D I S C R I M I N A T I O N P O L I C I E S M A Y B E D I R E C T E D T O B R A D M C C A L E B , P . E . , M P O S T U D Y D I R E C T O R – E E O / D B E ( A D A / 5 0 4 / T I T L E V I C O O R D I N A T O R ) , P . O . B O X 1 9 6 7 , T E X A R K A N A ,
T X 7 5 5 0 4 , ( 9 0 3 ) 7 9 8 - 3 9 2 7 , O R T H E F O L L O W I N G E M A I L A D D R E S S : M C C A L E B @ T X K U S A . O R G
FY 2013-2016 TX-TIP April 24, 2012
TABLE OF CONTENTS Page Resolution Adopting FY 2013-2016 TIP Resolution Adopting FY 2013-2016 TIP Admin Mod #1 Chapter 1 – Introduction 1 Chapter 2 – Public Participation Process 5 Chapter 3 – Glossary 7 Chapter 4 – Status of Projects From Prior Years 9 Map of Prior Year TIP Projects 13 Chapter 5 – Highway Projects 15 Federally Funded Highway Projects 15 Appendix – Grouped Statewide Projects 16 Locally Funded - Regionally Significant Projects 21 Map of FY 2013-2016 TIP Projects 23 Chapter 6 – Transit Project Listing 25 Chapter 7 – Financial Summaries 31 Highway Projects 31 Transit Projects 32 Chapter 8 – MPO Self-Certification 33 Chapter 9 – History of Revisions 35 Appendix A – Environmental Clearance Projects 36
FY 2013-2016 TX-TIP April 24, 2012
This page intentionally left blank.
TEXARKANA URBAN TRANSPORTATION STUDY RESOLUTION # 12-2012
A RESOLUTION BY THE POLICY BOARD OF THE TEXARKANA URBAN TRANSPORTATION STUDY ADOPTING THE FY 2013 - 2016 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) FOR THE TEXAS PORTION OF THE TEXARKANA METROPOLITAN STUDY AREA AND AUTHORIZING ITS SUBMISSION TO THE TEXAS DEPARTMENT OF TRANSPORTATION (TxDOT).
WHEREAS, the Texarkana Urban Transportation Study, as the Metropolitan Planning Organization (MPO) for the Texarkana metropolitan planning area, is responsible for performing transportation planning activities within the Texarkana Study Area Boundary; and
WHEREAS, the Texarkana MPO is responsible for preparing and submitting the FY 2013 - 2016 Texas TIP to TxDOT for inclusion in Texas' Statewide Transportation Improvement Program (STIP) for FY 2013 - 2016.
WHEREAS, the Texarkana MPO Technical Committee recommended for adoption and submission of the FY 2013 - 2016 Texas TIP to TxDOT for inclusion in Texas' STIP for FY 2013 - 2016.
NOW, THEREFORE, BE IT RESOLVED by the Policy Board of the Texarkana MPO that:
SECTION 1: the FY 2013 - 2016 TIP for the Texas portion of the Texarkana Metropolitan Study Area is hereby adopted.
SECTION 2: the Study Director of the Texarkana MPO is hereby authorized to submit the FY 2013 2016 TIP for the Texas portion of the Texarkana Metropolitan Study Area to TxDOT.
SECTION 3: this Resolution shall become effective immediately upon adoption.
ADOPTED in Regular Session on the 24th day of April, 2012.
TOd~~~~ Policy Board Texarkana MPO
I hereby certify that this resolution was adopted by the Texarkana Metropolitan Planning Organization for the Texarkana Metropolitan Area in regular session on April 24, 2012.
~at11d({!{__ Brad McCaleb, P.E., A.V.S. Study Director Texarkana MPO
Page 1 of 1
FY 2013-2016 TX-TIP April 24, 2012
This page intentionally left blank
TEXARKANA URBAN TRANSPORTATION STUDY RESOLUTION #15-2012
AN ADMINISTRATION MODIFICATION OF THE FY 2013-2016 TEXAS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) FOR THE TEXARKANA METROPOLITAN STUDY AREA AND AUTHORIZING ITS SUBMISSION TO THE POLICY BOARD, THE TEXAS DEPARTMENT OF TRANSPORTATION (TXDOT) AND THE FEDERAL HIGHWAYS ADMINISTRATION (FHWA).
WHEREAS, the Texarkana Urban Transportation Study (rUTS), as the designated Metropolitan Planning Organization (MPO) for the Texarkana study area, is responsible for performing transportation planning activities within the Texarkana Study Area Boundary; and
WHEREAS, the Texarkana MPO is responsible for preparing and submitting any modifications of the FY 2013-2016 Texas TIP to TxDOT and FHWA; and
WHEREAS, the Texarkana MPO Public Participation Plan delegated to the MPO Study Director the TxDOT District Engineer and/or the AHTD Director of Planning and Research the authority to approve Administrative Modifications; and
WHEREAS, the Texarkana MPO Study Director has recommended to the TxDOT District Engineer for adoption and submission of Administrative Modification One to the FY 2013-2016 Texas TIP.
NOW, THEREFORE, BE IT RESOLVED that:
SECTION 1: the comments received from TxDOT be addressed by revising Chapter 6-Transit Project Listing, correction of 80/20 split, Section 5307 Preventative Maintenance/ADA Paratransit for fiscal years 2013,2014,2015 and 2016, and Transit Financial Summary.
SECTION 2: Administrative Modification One to Metropolitan Area is hereby adopted.
the FY 2013-2016 Texas TIP of the Texarkana
SECTION 3: the Study Director of the Texarkana Metropolitan Planning Organization is hereby authorized to submit Administrative Modification One to the Policy Board by memorandum, TxDOT, and FHWA.
SECTION 4: this Resolution shall become effective immediately upon signage by all parties included below.
() 'S - 0 Cf- '2,0 I Z Date Signed
District Engineer TxDOT-Atlanta
Bl~
Brad McCaleb, P.E., A.V.S. Study Director Texarkana Metropolitan Planning Organization
FY 2013-2016 TX-TIP May 8, 2012
This page intentionally left blank
FY 2013-2016 TX-TIP May 8, 2012
FY 2013-2016 TX-TIP May 8, 2012
This page intentionally left blank
FY 2013-2016 TX-TIP 1 April 24, 2012
CHAPTER 1 – INTRODUCTION
Since May 1973, the policy directive for transportation planning has been carried out under the direction and guidance of the Policy Committee, which was established at that time by the Continuing Phase Agreement. In December 2009, the Policy Committee was renamed the Policy Board. A. PURPOSE - In accordance with the Transportation Equity Act for the 21st Century (TEA-21) and the Safe,
Accountable, Flexible, and Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), the Texarkana Metropolitan Planning Organization (MPO), in cooperation with the State of Texas and Texarkana Urban Transit District (TUTD), has developed this Transportation Improvement Program (TIP) for the Texarkana Metropolitan Area. The purpose of this document is to provide the public, Federal Highway Administration (FHWA), Federal Transit Administration (FTA) and other interested parties with a priority list of projects and project segments to be carried out within a 4-year period after the adoption of the TIP. A financial plan is part of this document. This financial plan demonstrates how the TIP can be implemented, and indicates resources from public and private sources that are reasonably expected to be made available to carry out the program. This document covers the four-year fiscal period of 2013-2016. The Texas TIP is updated every two years and is approved by the Policy Board of the MPO and the Governor of the State of Texas.
B. DEFINITION OF AREA - The Texarkana MPO study area is comprised of approximately 195 square miles
in northeast Texas and southwest Arkansas and encompasses the cities of Texarkana, Arkansas and Texarkana, Wake Village, Nash and Red Lick, Texas. The study area also includes portions of Bowie County, Texas and Miller County, Arkansas.
C. PUBLIC INVOLVEMENT PROCESS - There were six agencies that contributed to the development of this
TIP. The cities of Texarkana, Wake Village and Nash, Texas; Bowie County, Texas; the Texas Department of Transportation (TxDOT) and TUTD. All these agencies were contacted and assisted in furnishing data for the compilation of this document.
Before approval of the TIP, and in accordance with the Texarkana MPO’s Public Participation Plan, the MPO provided citizens, affected public agencies, representatives of transportation agencies, private providers of transportation, and other interested parties with reasonable notice of and an opportunity to comment on the proposed program by provision of a ten (10) day public comment period. A legal notice was published in the Texarkana Gazette newspaper at least 72 hours prior to the beginning of the 10-day comment period and notices were posted at least 72 hours before the comment period. The TIP was posted on the Texarkana MPO’s website at least 72 hours before the comment period. Additional opportunities for public involvement will be provided when and if this document is revised.
D. PROJECT SELECTION PROCESS - The TIP is consistent with the TUTS 2035 Plan for the Texarkana
MPO and is submitted to the Policy Board for adoption. Full funding is reasonably anticipated to be available for each project within the time period contemplated for completion of the project. The Texarkana MPO Policy Board approved the following Project Selection Procedures: 1) The approved TIP shall be utilized for programming projects within the urban area. 2) Any project listed in the first year of the approved TIP shall be considered the highest priority and may
be implemented as soon as plans are completed and funds are appropriated. Projects in the second, third and fourth years of the TIP are considered to have second, third and fourth priorities, respectively.
3) If a project in the first year cannot be accomplished, then a project or projects from the second year will be selected and those projects may be initiated as plans are completed and funds are appropriated.
FY 2013-2016 TX-TIP 2 April 24, 2012
These procedures were developed cooperatively between TxDOT and the MPO and were approved with this document.
E. PROGRESS FROM PREVIOUS YEAR – The progress in undertaking and completing transportation projects from prior fiscal years is presented in Chapter 3 of this document.
F. AIR QUALITY ISSUES - The Texarkana Metropolitan Area is in conformity with the Clean Air Act as
amended. G. AMERICANS WITH DISABILITIES ACT (ADA) – The following projects are proposed to be constructed
with sidewalks that will comply with ADA requirements:
1. FY 2014 – CSJ 0919-19-070: Downtown Texarkana Streetscape – reconstruct sidewalks, add pedestrian furnishings, lighting, landscaping.
H. ENVIRONMENTAL JUSTICE (TITLE VI) – To support efforts to ensure non-discrimination under Title
VI of the Civil Rights Act of 1964, FHWA and FTA issued a memorandum on October 7, 1999 identifying a series of actions to support Title VI compliance and to support environmental justice (EJ) goals. The Texarkana MPO has identified and mapped areas with at least 40 percent of the population being minority groups. These areas are considered Environmental Justice areas.
I. SAFEATEA-LU COMPLIANCE – Checklist for inclusion of Total Project Cost (TPC) and Year of
Expenditure (YOE) cost in the financial plan data of the metropolitan transportation planning process.
MPO Policy Board Adoption/Resolution – documentation that the MPO Policy Board has formally adopted a TIP or TIP revision (and if necessary an MTP revision), reflecting TPC and YOE cost and revenue estimates consistent with FHWA/FTA metropolitan planning regulations (23 CFR 450). The TUTS 2035 PLAN (MTP) was adopted on September 15, 2009 and the FY 2011-2014 Texas TIP was adopted on June 10, 2010 using TPC for highway and transit projects. See MPO Policy Board Adoption/Resolution above for more detail. MPO Public Participation – documentation of public and interagency resource agency involvement consistent with the MPOs adopted public participation plan procedures for TIP and MTP revisions. The FY 2013-2016 Texas TIP has not been amended to date. Public involvement activities related to future amendments shall be conducted in accordance with the Texarkana MPOs adopted Public Participation Plan. Public participation requirements are documented in the Texarkana MPOs Public Participation Plan as amended January 31, 2008. Documentation of the public involvement activities related to FY 2013-2016 Texas TIP will be provided in Chapter 2, Public Involvement Process, on page 5 of this document. State DOT Adoption – documentation of State DOT public participation and adoption action consistent with the most recently adopted State DOT public participation and approval procedures for STIP revisions per Texas Administrative Code under Title 43, Part 1, Chapter 15, Subchapter A, under Section 15.8 Documentation of the YOE and TPC Methodology – for both highway and transit elements utilized by the MPO and/or TxDOT including the calculation of the YOE and TPC as part of the financial plan document for the relevant MPO TIP/STIP (and MTP revision if necessary).
FY 2013-2016 TX-TIP 3 April 24, 2012
In accordance with SAFETEA-LU, the MTP and TIP contain TPC and construction estimates in YOE dollars for both highway and transit projects. YOE estimates and TPC methodologies are based upon rates of growth and rate of inflation factors recommended by TxDOT and FHWA as described in the MPO Policy Board Adoption/Resolution section above. Documentation of the Rate of Inflation (ROI) – used for determining YOE and total project cost, including all phases (e.g., PE, ROW, CONSTR) of the projects life. TxDOT has assumed a 4% rate of inflation for construction costs within DCIS. The Texarkana MPO has decided to use the 4% rate of inflation recommended by TxDOT and FHWA. This factor is based on the historical rate of inflation for federal highway projects. Documentation of the Rate of Growth (ROG) – for incoming Federal, State, and Local sources of revenues (including private sources) used to estimate total projected incoming revenues as part of the federal-aid highway and transit program. The Texarkana MPO, in consultations with TxDOTs Atlanta District, will assume a revenue inflation factor of 3% based on the Consumer Price Index to produce a fiscally constrained plan based on YOE dollars. YOE Funding Estimate – include YOE cost estimates for each project or project phase (e.g., preliminary engineering, right-of-way, construction engineering, bond financing, contingencies, and indirect costs as appropriate) included in the TIP/STIP and for each project included in the MTP (if the MTP is being revised). Total Project Cost – for each highway or transit project included in the TIP/STIP and MTP (if MTP is being revised). Total project cost should reflect estimated cost of all project phases. It is understood that not all project phases may be implemented within the time-frame of the TIP/STIP. Documentation of MPO and Transit Agency Coordination - provide adequate documentation of coordination and consultation with relevant regional transit authorities or operators within the MPO planning area regarding transit-related financial operating and capital/maintenance costs and revenues with the applicable regional transit provider(s) as found necessary for FTA-funded transit projects and programs included within the TIP. The Texarkana MPO staff and the General Manager of the (TUTD) regularly meet to discuss transportation issues and updates. Members of the MPO staff, the TxDOT Atlanta District and the General Manager of TUTD met to finalize the YOE cost estimates for transit projects as presented in this document. The operating, capital and maintenance costs for inclusion in the TIP are discussed and reviewed by the Texarkana MPO staff and TUTD General Manager. The General Manager of TUTD is a member of the MPO Technical Committee. The MPO and TUTD will work together to ensure that transit-planning activities are carried out in a cooperative, continuing, and comprehensive manner. A Memorandum of Agreement between the Texarkana Urban Transportation Study’s Policy Board, acting as the designated Metropolitan Planning Organization in the Texarkana urbanized (MPO) and TUTD was renewed on February 27, 2009.
FY 2013-2016 TX-TIP 4 April 24, 2012
This page intentionally left blank
FY 2013-2016 TX-TIP 5 April 24, 2012
CHAPTER 2 – PUBLIC INVOLVEMENT PROCESS ADOPTION OF ORIGINAL FY 2013-2016 TIP On March 30, 2012, a press release was sent to the area newspapers and radio stations regarding the public review and comment period. On March 30, 2012 public notices were posted for the public review and comment period and emails were sent to persons on the public notification list. A newspaper notice was published in the Texarkana Gazette on March 31, 2012. A public review and comment period extended from April 4, 2012 to April 13, 2012. On April 10, 2012, emails were sent to persons on the public notification list regarding the Technical Committee and Policy Board meetings. On April 10, 2012, public notices were posted for the Technical Committee meeting and press releases were sent to area newspaper, television and radio stations about the Technical Committee meeting. A newspaper notice was published in the Texarkana Gazette on April 13, 2012 for the Technical Committee meeting. On April 17, 2012, public notices were posted for the Policy Board meeting and press releases were sent to area newspaper, television and radio stations about the Policy Board meeting. A newspaper notice was published in the Texarkana Gazette on April 21, 2012 for the Policy Board meeting. The Technical Committee meeting was held on April 16, 2012 and the Policy Board meeting was held on April 24, 2012 where Resolution #12-2012 was approved adopting the FY 2013-2016 TIP. Public Comments on Original FY 2013-2016 TIP There were no public comments received.
FY 2013-2016 TX-TIP 6 April 24, 2012
This page intentionally left blank
FY 2013-2016 TX-TIP 7 April 24, 2012
CHAPTER 3 – GLOSSARY TYPES OF HIGHWAY PROJECTS FUNDING
Federally Funded Projects Projects primarily funded by FHWA. Matching funds contributed by state and/or local governmental entities.
State Funded Projects Projects primarily funded by State Transportation Agency. Matching funds
possibly contributed by local governmental entities. Locally Funded - Regionally Significant Projects Projects fully funded by local governmental entities. ARRA Funded Projects Projects funded all or in part by the American Recovery and Reinvestment
Act (ARRA) 2009. PROJECT LISTINGS
CSJ Control Section Job Number - TxDOT assigned number for projects entered into the Project Development Program (PDP).
MTP ID Metropolitan Transportation Plan Identification - Code assigned by the MPO to
identify project by the project number specified in the Metropolitan Transportation Plan.
TIP ID Transportation Improvement Program Identification – Code assigned by the MPO to
identify project.
F.CLASS Federal Functional Class - Federal classification of streets and highways into functional operating characteristics. Categories are:
Interstate Other Urban Freeways and Expressways Other Principal Arterials Minor Arterials Urban Collectors and Rural Major Collectors Rural Minor Collectors Urban and Rural Local Streets and Roads
PHASE Project Phase for Federal Funding
E - Preliminary Engineering R - Right of Way Acquisition C - Construction
YOE COSTS Year of Expenditure costs – A cost estimate that has been adjusted for inflation
through the year the project is anticipated to be contracted for construction TPC ESTIMATE Total Project Cost Estimate -Cost estimate that includes construction, right-of-
way, preliminary engineering, construction engineering, bond financing, contingencies, and indirect costs if applicable. TPC is provided for informational purposes only.
FY 2013-2016 TX-TIP 8 April 24, 2012
FUNDING CATEGORY TxDOT established 12 funding categories for its projects as specified below:
1. Preventive Maintenance and Rehabilitation 2M. Metropolitan Area (TMA) Corridor Projects 2U. Urban Area (Non-TMA) Corridor Projects 3. Non-Traditionally Funded Transportation Projects 4. Statewide Connectivity Corridor Projects 5. Congestion Mitigation and Air Quality Improvement (CMAQ) 6. Structures 7. Metro Mobility & Rehab 8. Safety 9. Transportation Enhancements 10. Supplemental Transportation Projects 11. District Discretionary 12. Strategic Priority
FY 2013-2016 TX-TIP 9 April 24, 2012
CHAPTER 4 – STATUS OF PROJECTS FROM PRIOR YEARS 1. Construct and convert IH-30 frontage roads to one-way operations, relocate ramps and
construct interchanges from 0.6 mile west of FM 989 (Kings Highway) to the Arkansas State Line.
CSJ: 0610-07-085 Federal Funds: $48,830,223 MTP ID: 26, 36, 205 State Funds: $23,721,819 Map ID: 26, 36, 205 Local Funds: $ 7,400,000 Phase: Construction Arkansas Funds: $ 9,500,000 Estimated Cost: $89,452,042
District: Atlanta Funding Category: 3, 10, 12 County: Bowie Beginning Date: October 19, 2006 City: Texarkana Completion Date (estimated): July 2013
2. Construct new 4-lane road with raised median from the horseshoe entrance to Texas A & M
campus @ University to a proposed bridge over Clear Creek.
CSJ: N/A Federal Funds: $0 MTP ID: 120 State Funds: $0 Map ID: 120A Local Funds: $2,197,506.62 Phase: Construction Estimated Cost: $2,197,506.62 District: Atlanta Funding Category: City bond funds County: Bowie Beginning Date: Sept. 26, 2012 City: Texarkana Completion Date: May 1, 2012
3. Construct 4 lane bridge over Clear Creek.
CSJ: N/A Federal Funds: $0 MTP ID: 120 State Funds: $0 Map ID: 120B Local Funds: $1,861,533.14 Phase: Construction Estimated Cost: $1,861,533.14 District: Atlanta Funding Category: City bond funds County: Bowie Beginning Date: June 6, 2011 City: Texarkana Completion Date: March 31, 2012
FY 2013-2016 TX-TIP 10 April 24, 2012
4. Construct new 4 lane road from proposed bridge @ Clear Creek to west end of Shilling Lane.
CSJ: N/A Federal Funds: $0 MTP ID: 120 State Funds: $0 Map ID: 120C Local Funds: $1,545,318.95 Phase: Construction Estimated Cost: $1,545,318.95 District: Atlanta Funding Category: City bond funds County: Bowie Beginning Date: June 6, 2011 City: Texarkana Completion Date: May 1, 2012
5. Reconstruct FM 559 from 2 lane rural to 4 lane divided urban highway from 0.1 miles N of
FM 989 to 0.2 miles N of FM 2240.
CSJ: 1020-01-038 Federal Funds: $ 8,056,465 MTP ID: 4 State Funds: $ 2,013,336 Map ID: 4 Local Funds: $ 809,900 Phase: Construction Estimated Cost: $10,879,701 District: Atlanta Funding Category: 11 County: Bowie Beginning Date: February, 2008 City: Texarkana Completion Date: May 2012
6. State Highway 93 (Lake Drive) at Union Pacific Railroad Construct railroad grade
separation and structure and approaches.
CSJ: 0218-01-070 Federal Funds: $4,403,887 MTP ID: 3 State Funds: $ 672,722 Map ID: 3 Local Funds: $ Phase: Construction Estimated Cost: $5,076,609 District: Atlanta Funding Category: 3, 10, ARRA County: Bowie Beginning Date: September, 2009 City: Texarkana Completion Date (estimated): January 23, 2012
FY 2013-2016 TX-TIP 11 April 24, 2012
7. Texarkana Northern Loop (Joint Project with Arkansas)
CSJ: 0217-01-027 Federal Funds: $611,898 MTP ID: 236 State Funds: $152,975 Map ID: 232/236 Local/Other Funds: $ 0 Phase: Construction Estimated Cost: $764,873 District: Atlanta Funding Category: 11 County: Bowie Beginning Date: November, 2010 City: Texarkana Completion Date (estimated): August, 2012
FY 2013-2016 TX-TIP 12 April 24, 2012
This page intentionally left blank
!
!
IH 30
US 67
US 67
US 59
US 67
US 71US 59
US 82
IH 30
US 82
US 67
US 59
US 59
SH 93
US 59
US 71
US 71
US 71
US 82
US 59
US 82
US 67
US 82
US 71
SH 93IH 30
US 67
IH 30
FM 989
SH 108
SH 237
FM 991
FM 559
FM 559
FM 989
FM 989
FM 558
FM 558
FM 989
AR 549
AR 549
SH 245
SH 237
SH 237
SH 196
SH 196
SH 237
SH 245
SH 245
SH 296SH 296
SH 296
FM 2148
FM 2253
FM 2516
FM 2240
FM 2878
FM 2878
FM 1297
FM 1397
FM 2148
FM 2148
FM 2148
FM 2516
FM 2516
Loop 151
120B
232/236
26, 36, 205
MAP OF PRIOR YEAR PROJECTSTexarkana Metropolitan Study AreaFY 2013 - 2016 TIP
4
3
120C120A
FY 2013-2016 TX-TIP 14 April 24, 2012
This page intentionally left blank.
FY 2013-2016 TX-TIP 15 April 24, 2012
CHAPTER 5 – HIGHWAY PROJECTS
FEDERALLY FUNDED HIGHWAY PROJECTS
FY 2013-2016 TX-TIP 16 April 24, 2012
APPENDIX – GROUPED STATEWIDE PROJECTS For projects not determined to be regionally significant in one line item, the Federal Highway Administration has allowed TxDOT to develop statewide groupings of projects that are identified by a statewide CSJ. Use of statewide groupings of projects allows for a more efficient method of programming and letting projects decreases the need to make revisions to the TIP. The following table shows the statewide groupings of projects and provides a description of the type of projects that are placed in each grouping.
CSJ STATEWIDE PROGRAM DEFINITION 5000-00-950 PE - Preliminary Engineering Preliminary Engineering for any project that is not added capacity in
a non-attainment area. Includes activities which do not involve or lead directly to construction such as planning and technical studies, grants for training and research programs.
5000-00-951 Right of way Acquisition Right of Way acquisition for any project that is not added capacity in a non-attainment area. Includes relocation assistance, hardship acquisition and protective buying.
5000-00-952 5000-00-957 5000-00-958
Preventive Maintenance and Rehabilitation
Projects to include pavement repair to preserve existing pavement so that it may achieve its designed loading. Includes seal coats, overlays, resurfacing, restoring and rehabilitation done with existing ROW. Also includes modernization of a highway by reconstruction, adding shoulders or adding auxiliary lanes (e.g., parking, weaving, turning, climbing, non-added capacity).
5000-00-953 Bridge Replacement and Rehabilitation
Projects to replace and/or rehabilitate functionally obsolete or structurally deficient bridges.
5000-00-954 Railroad Grade Separations Projects to construct or replace existing highway-railroad grade crossings and to rehabilitate and/or replace deficient railroad underpasses, resulting in no added capacity.
5800-00-950 Safety Projects to include the construction or replacement/ rehabilitation of guard rails, median barriers, crash cushions, pavement markings, skid treatments, medians, lighting improvements, railroad/highway crossing warning devices, fencing, intersection improvements (e.g., turn lanes), signalization projects and interchange modifications. Also includes projects funded via the Federal Hazard Elimination Program and the Federal Railroad Signal Safety Program.
5000-00-956 Landscaping Projects consisting of typical right-of-way landscape development, establishment and aesthetic improvements to include any associated erosion control and environmental mitigation activities.
5800-00-915 Intelligent Transportation Systems Deployment
Highway traffic operation improvement projects including installation of ramp metering control devices, variable message signs, traffic monitoring equipment and projects in the Federal ITS/IVHS programs.
5000-00-916 Bicycle and Pedestrian Construction or rehabilitation of bicycle and pedestrian lanes, paths and facilities.
5000-00-918 Transit Improvements Projects include the construction and improvement of small passenger shelters and information kiosks. Also includes the construction and improvement of rail storage/maintenance facilities, bus transfer facilities where minor amounts of land are required and there is not a substantial increase in number of users.
FY 2013-2016 TX-TIP 17 April 24, 2012
The following listing presents individual projects currently identified in the statewide grouping of projects. This listing is provided for information purposes only.
FY 2013-2016 TX-TIP 18 April 24, 2012
FY 2013-2016 TX-TIP 19 April 24, 2012
FY 2013-2016 TX-TIP 20 April 24, 2012
FY 2013-2016 TX-TIP 21 April 24, 2012
LOCALLY FUNDED – REGIONALLY SIGNIFICANT HIGHWAY PROJECTS
There are no Locally Funded – Regionally Significant Highway Projects for FY 2013-2016
FY 2013-2016 TX-TIP 22 April 24, 2012
This page intentionally left blank
!
IH 30
US 67
US 67
US 59
US 67
US 71US 59
US 82
IH 30
US 82
US 67
US 59
US 59
SH 93
US 59
US 71
US 71
US 71
US 82
US 59
US 82
US 67
US 82
US 71
SH 93IH 30
US 67
IH 30
FM 989
SH 108
SH 237
FM 991
FM 559
FM 559
FM 989
FM 989
FM 558
FM 558
FM 989
AR 549
AR 549
SH 245
SH 237
SH 237
SH 196
SH 196
SH 237
SH 245
SH 245
SH 296SH 296
SH 296
FM 2148
FM 2253
FM 2516
FM 2240
FM 2878
FM 2878
FM 1297
FM 1397
FM 2148
FM 2148
FM 2148
FM 2516
FM 2516
Loop 151
MAP OF PROPOSED TEXAS PROJECTSTexarkana Metropolitan Study AreaFY 2013 - 2016 TIP
FY 2011 - 2014 TIPPROPOSED PROJECTS
ScaleOne inch equals 2 miles
!FY 2014 TIP PROJECTS
901
FY 2013-2016 TX-TIP 24 April 24, 2012
This page left intentionally blank
FY 2013-2016 TX-TIP 25 Revised May 8, 2012
CHAPTER 6
TRANSIT PROJECT LISTING
Atlanta YOE = Year of Expenditure
Project Sponsor Texarkana Urban Transit District Federal Funding Category 5307Federal (FTA) Funds $280,284
State Funds from TxDOT 221,744
Other Funds 54,540
Apportionment Year FY 2013 Fiscal Year Cost $556,568Project Phase N/A
Total Project Cost $556,568
Trans. Dev. Credits Requested $0
Sec 5309 ID Number N/ATrans. Dev. Credits Awarded (Date & Amount) $0
Amendment Date & Action
Project Sponsor Texarkana Urban Transit District Federal Funding Category 5307Federal (FTA) Funds $250,845
State Funds from TxDOT 0
Other Funds 62,711
Apportionment Year FY 2013 Fiscal Year Cost $313,556Project Phase N/A
Total Project Cost $313,556
Trans. Dev. Credits Requested $0
Sec 5309 ID Number N/ATrans. Dev. Credits Awarded (Date & Amount) $0
Amendment Date & Action
FY 2013 TRANSIT PROJECT DESCRIPTIONS
TEXARKANA MPO TRANSPORTATION IMPROVEMENT PROGRAM
General Project Information Funding Information (YOE)
MPO Project Information(reference number, etc)
Preventative Maintenance/ADA Paratransit
850
MPO Project Information(reference number, etc)
General Project Information Funding Information (YOE)
850
Brief Project Description
Brief Project Description
Operations for small urban transit
FY 2013-2016 TX-TIP 26 Revised May 8, 2012
Atlanta YOE = Year of Expenditure
Project Sponsor Texarkana Urban Transit District Federal Funding Category 5307Federal (FTA) Funds $280,284
State Funds from TxDOT 221,744
Other Funds 54,540
Apportionment Year FY 2014 Fiscal Year Cost $556,568Project Phase N/A
Total Project Cost $556,568
Trans. Dev. Credits Requested $0
Sec 5309 ID Number N/ATrans. Dev. Credits Awarded (Date & Amount) $0
Amendment Date & Action
Project Sponsor Texarkana Urban Transit District Federal Funding Category 5307Federal (FTA) Funds $250,845
State Funds from TxDOT 0
Other Funds 62,711
Apportionment Year FY 2014 Fiscal Year Cost $313,556Project Phase N/A
Total Project Cost $313,556
Trans. Dev. Credits Requested $0
Sec 5309 ID Number N/ATrans. Dev. Credits Awarded (Date & Amount) $0
Amendment Date & Action
Funding Information (YOE)
850
FY 2014 TRANSIT PROJECT DESCRIPTIONS
TEXARKANA MPO TRANSPORTATION IMPROVEMENT PROGRAM
850
MPO Project Information(reference number, etc)
Brief Project Description
Preventative Maintenance/ADA Paratrans
General Project Information
MPO Project Information(reference number, etc)
General Project Information Funding Information (YOE)
Brief Project Description
Operations for small urban transit
FY 2013-2016 TX-TIP 27 Revised May 8, 2012
Atlanta YOE = Year of Expenditure
Project Sponsor Texarkana Urban Transit District Federal Funding Category 5307Federal (FTA) Funds $280,284
State Funds from TxDOT 221,744
Other Funds 54,540
Apportionment Year FY 2015 Fiscal Year Cost $556,568Project Phase N/A
Total Project Cost $556,568
Trans. Dev. Credits Requested $0
Sec 5309 ID Number N/ATrans. Dev. Credits Awarded (Date & Amount) $0
Amendment Date & Action
Project Sponsor Texarkana Urban Transit District Federal Funding Category 5307Federal (FTA) Funds $250,845
State Funds from TxDOT 0
Other Funds 62,711
Apportionment Year FY 2015 Fiscal Year Cost $313,556Project Phase N/A
Total Project Cost $313,556
Trans. Dev. Credits Requested $0
Sec 5309 ID Number N/ATrans. Dev. Credits Awarded (Date & Amount) $0
Amendment Date & Action
General Project Information
MPO Project Information(reference number, etc)
FY 2015 TRANSIT PROJECT DESCRIPTIONS
TEXARKANA MPO TRANSPORTATION IMPROVEMENT PROGRAM
Funding Information (YOE)
850
Brief Project Description
Preventative Maintenance/ADA Paratrans
General Project Information Funding Information (YOE)
Brief Project Description
Operations for small urban transit
850
MPO Project Information(reference number, etc)
FY 2013-2016 TX-TIP 28 Revised May 8, 2012
Atlanta YOE = Year of Expenditure
Project Sponsor Texarkana Urban Transit District Federal Funding Category 5307Federal (FTA) Funds $280,284
State Funds from TxDOT 221,744
Other Funds 54,540
Apportionment Year FY 2016 Fiscal Year Cost $556,568Project Phase N/A
Total Project Cost $556,568
Trans. Dev. Credits Requested $0
Sec 5309 ID Number N/ATrans. Dev. Credits Awarded (Date & Amount) $0
Amendment Date & Action
Project Sponsor Texarkana Urban Transit District Federal Funding Category 5307Federal (FTA) Funds $250,845
State Funds from TxDOT 0
Other Funds 62,711
Apportionment Year FY 2016 Fiscal Year Cost $313,556Project Phase N/A
Total Project Cost $313,556
Trans. Dev. Credits Requested $0
Sec 5309 ID Number N/ATrans. Dev. Credits Awarded (Date & Amount) $0
Amendment Date & Action
Funding Information (YOE)
850
FY 2016 TRANSIT PROJECT DESCRIPTIONS
TEXARKANA MPO TRANSPORTATION IMPROVEMENT PROGRAM
850
MPO Project Information(reference number, etc)
Brief Project Description
Preventative Maintenance/ADA Paratrans
General Project Information
MPO Project Information(reference number, etc)
General Project Information Funding Information (YOE)
Brief Project Description
Operations for small urban transit
FY 2013-2016 TX-TIP 29 April 24, 2012
FY 2013Funding
Capital Program
TOTAL 313,556$
FY 2014Funding
Capital Program
TOTAL 313,556$
FY 2015Funding
313,556$
FY 2016Funding
313,556$
Activity / Description
Regular preventative maintenance and complimentary paratransit services313,556
FY 2013-2016 TEXAS TIPSection 5307 Capital Equipment
Activity / Description
Attachment A
313,556$ a. Preventative Maintenance and Paratransit Services
a. Preventative Maintenance and Paratransit Services313,556
Regular preventative maintenance and complimentary paratransit services
Activity / Description
Regular preventative maintenance and complimentary paratransit services
a. Preventative Maintenance and Paratransit Services
Activity / Description
a. Preventative Maintenance and Paratransit Services
Regular preventative maintenance and complimentary paratransit services313,556
FY 2013-2016 TX-TIP 30 April 24, 2012
This page intentionally left blank
FY 2013-2016 TX-TIP 31 April 24, 2012
Category Description Programmed Authorized Programmed Authorized Programmed Authorized Programmed Authorized Programmed Authorized
1Preventive Maintenance and Rehabilitation
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0
2M or 2UUrban Area (Non- TMA) Corridor Projects
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0
3 Non-Traditionally Funded Transportation Project
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0
4Statewide Connectivity Corridor Projects
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0
5 CMAQ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
6 Structures $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
7 Metro Mobility & Rehab $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
8 Safety $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
9 Transportation Enhancements $0 $0 $677,914 $677,914 $0 $0 $0 $0 $677,914 $677,914
10Supplemental Transportation Projects
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0
11 District Discretionary $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
12 Strategic Priority $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
12C Strategic Priority RECON $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
12S Strategic Priority RECON $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
SBPEStrategy Budget PE Strategy Budget PE
$0 $0 $0 $0 $0 $0 $0 $0 $0 $0
SB 102 Strategy 102 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total $0 $0 $677,914 $677,914 $0 $0 $0 $0 $677,914 $677,914
FY 2013 FY 2014 FY 2015 FY 2016 Total
$0 $677,914 $0 $0 $677,914
$0 $0 $0 $0 $0
Local Match $0 $169,478 $0 $0 $169,478$0 $0 $0 $0 $0$0 $0 $0 $0 $0$0 $0 $0 $0 $0$0 $0 $0 $0 $0$0 $0 $0 $0 $0$0 $0 $0 $0 $0
CAT 3 - Regional Toll Revenue $0 $0 $0 $0 $0CAT 3 - Match to Regional Toll Revenue $0 $0 $0 $0 $0
$0 $0 $0 $0 $0$0 $0 $0 $0 $0$0 $0 $0 $0 $0$0 $0 $0 $0 $0
$0 $847,392 $0 $0 $847,392
Texarkana Metropolitan Planning OrganizationFY 2013 - 2016 Transportation Improvement Program
Highway Financial Summary - Year of Expenditure Costs2013 - 2016 STIP
Funding by Category
FY 2013 FY 2014 FY 2015
Federal
State
CAT 3 - Local Contributions
CAT 3 - Texas Mobility Fund
FY 2016 Total FY 2013 - 2016
Funding Participation Source
Source
Other - Stragegy 102 Budget
Total
CAT 3 - Prop 12
CAT 3 - Prop 14
CAT 3 - Unique Federal Program - Tiger II
Other - Section 5306
CAT 3 - Pass Thru Toll Revenue
Cat 3- Prop 14 SB
Other - Strategy PE Budget
FY 2013-2016 TX-TIP 32 Revised May 8, 2012
All Figures in Year of Expenditure (YOE) Dollars
FY 2013 FY 2014 FY 2015
Federal State/Local Total Federal State/Local Total Federal State/Local Total
1 Sec. 5307 - Urbanized Formula >200K 0 0 02 Sec. 5307 - Urbanized Formula <200K 531,129 338,995 870,124 531,129 338,995 870,124 531,129 338,995 870,124
3 Sec. 5309 - Discretionary 0 0 04 Sec. 5310 - Elderly &Individuals w/Disabilities 0 0 05 Sec. 5311 - Nonurbanized Formula 0 0 0
6 Sec. 5316 - JARC >200K 0 0 07 Sec. 5316 - JARC <200K 0 0 08 Sec. 5316 - JARC Nonurbanized 0 0 0
9 Sec. 5317 - New Freedom >200K 0 0 010 Sec. 5317 - New Freedom <200K 0 0 011 Sec. 5317 - New Freedom Nonurbanized 0 0 0
12 Other FTA 0 0 013 Regionally Significant or Other (incl FHWA transfers) 0 0 0
Total Funds $531,129 $338,995 $870,124 $531,129 $338,995 $870,124 $531,129 $338,995 $870,124
Requested $0 $0 $0 Awarded $0 $0 $0
FY 2016 Total
Federal State/Local Total Federal State/Local Total
1 Sec. 5307 - Urbanized Formula >200K 0 0 0 02 Sec. 5307 - Urbanized Formula <200K 531,129 338,995 870,124 2,124,516 1,355,980 3,480,496
3 Sec. 5309 - Discretionary 0 0 0 04 Sec. 5310 - Elderly &Individuals w/Disabilities 0 0 0 05 Sec. 5311 - Nonurbanized Formula 0 0 0 0
6 Sec. 5316 - JARC >200K 0 0 0 07 Sec. 5316 - JARC <200K 0 0 0 08 Sec. 5316 - JARC Nonurbanized 0 0 0 0
9 Sec. 5317 - New Freedom >200K 0 0 0 010 Sec. 5317 - New Freedom <200K 0 0 0 011 Sec. 5317 - New Freedom Nonurbanized 0 0 0 0
12 Other FTA 0 0 0 013 Regionally Significant or Other (incl FHWA transfers) 0 0 0 0
Total Funds $531,129 $338,995 $870,124 $2,124,516 $1,355,980 $3,480,496
Requested $0 $0 Awarded $0 $0
Transportation Development Credits
Transportation Development Credits
Transit Program
All Figures in Year of Expenditure (YOE) Dollars
Transit Financial Summary
FY 2013 - 2016 Transportation Improvement Program
Transit Program
Current as of March 1, 2012
TEXARKANA METROPOLITAN PLANNING ORGANIZATION
April 24. 2012
MFO SELF-CERTIFICATION
In accordance with Title 43, Part 1, Chapter 15, Subchapter A, Rule §15.5 of the Texas Administrative Code, the Texas Department of Transportation, and the Texarkana Metropolitan Planning Organization for the Texarkana urbanized area(s) hereby certify that the transportation planning process is addressing the major issues in the metropolitan planning area and is being conducted in accordance with all applicable requirements of:
(1) 23 U.s.c. 134,49 U.S.c. 5303, and this subpart;
(2) In nonattainment and maintenance areas, sections 174 and 176 (c) and (d) of the Clean Air Act, as amended (42 U.S.c. 7504, 7506 (c) and (d» and 40 CFR part 93;
(3) Title VI of the Civil Rights Act of 1964, as amended (42 U.S.c. 2000d-l) and 49 CFR part 21;
(4) 49 U.S.c. 5332, prohibiting discrimination on the basis of race, color, creed, national origin, sex, or age in employment or business opportunity;
(5) Section 1101 (b) of the SAFETEA-LU (pub. L. 109-59) and 49 CFR part 26 regarding the involvement of disadvantaged business enterprises in USDOT funded projects;
(6) 23 CFR part 230, regarding the implementation of an equal employment opportunity program on Federal and Federal-aid highway construction contracts;
(7) The provisions of the Americans with Disabilities Act of 1990 (42 U.s.c. 12101 et seq.) and 49 CFR parts 27, 37, and 38;
(8) The Older Americans Act, as amended (42 U.s.c. 6101), prohibiting discrimination on the basis of age in programs or activities receiving Federal fInancial assistance;
(9) Section 324 of title 23 U.S.c. regarding the prohibition of discrimination based on gender; and
(10) Section 504 of the Rehabilitation Act of 1973 (29 U.s.c. 794) and 49 CFR part 27 regarding discrimination against individuals with disabilities.
Texarkana Metropolitan Planning Organization
ngmeer ---Todd Lumpkiri - Chainnan
April 24, 2012 DateDate
FY 2013-2016 TX-TIP 34 April 24, 2012
This page intentionally left blank.
FY 2013-2016 TX-TIP 35 Revised May 8, 2012
CHAPTER 9 – HISTORY OF AMENDMENTS/MODIFICATIONS Adoption of Original FY 2013-2016 TIP April 24, 2012 Administrative Modification #1 May 8, 2012
FY 2013-2016 TX-TIP 36 April 24, 2012
APPENDIX A
Environmental Clearance Projects
Appendix A contains a list of projects that are not planned for construction within the four-year time frame of the Transportation Improvement Program (TIP), but are referenced in the current TIP in order to allow engineering, feasibility, or environmental clearance efforts to continue. Please note that most of these projects are preliminary and do not represent any commitment of construction funding, The intent is simply to pursue environmental clearance activities consistent with early project development.
FY 2013-2016 TX-TIP 37 April 24, 2012
FY 2013-2016 TX-TIP 38 April 24, 2012
FY 2013-2016
STIP
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
HIGHWAY
AMARILLO DISTRICT
AUGUST 2012
RURAL
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 1 OF 53
TXDOT ATLANTA DISTRICT
FY 2013
1226-04-00119 - ATLANTA TITUS
MPO PROJ NUM:CONSTRUCT 2-LANE HIGHWAY ON NEW LOCATION FROM US 271 RELIEF ROUTE TTO FM 1735PROJECT
DESCR:
FM 1000US 271LIMITS FROMFM 1735LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 13,320,000
$ 13,320,000TOTAL:
PROJECT ANCESTOR - CSJ: 1226-01-012REMARKS P7:
$ 0BND FINANCING: $ 983,016IND COSTS: $ 166,500CONTING:
$ 13,320,000CONST COST:
$ 652,680CONST ENG:
$ 10,000ROW PURCHASE: $ 652,680PRELIM ENG:
$ 16,512,148TOTAL PRJ COST:
C
$ 13,320,000LOCAL CONTR:
CONSTRUCT 2-LANE RURAL HIGHWAY ON NEW LOCATION FROM US 271 RELIEF ROUTE TO FM 1735
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 13,320,000
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 0 $ 0 $ 0 $ 13,320,000 $ 0 $ 0 $ 0 $ 13,320,000
LC
0520-02-03919 - ATLANTA UPSHUR
MPO PROJ NUM:RECONSTRUCT TO 4-LANE DIVIDED RURAL SECTION PROJECT
DESCR:
SH 155SABINE RIVER RELIEF BRIDGELIMITS FROMU.P.R.R. OVERPASSLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 4,545,000
$ 4,545,000 $ 4,545,000
3-URBAN CRDR:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 335,421IND COSTS: $ 95,445CONTING:
$ 4,545,000CONST COST:
$ 308,606CONST ENG:
$ 369,706ROW PURCHASE: $ 222,705PRELIM ENG:
$ 6,183,216TOTAL PRJ COST:
C
RECONSTRUCT TO 4-LANE DIVIDED RURAL SECTION PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 4,545,000
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 0 $ 4,545,000 $ 0 $ 0 $ 0 $ 4,545,000 $ 0 $ 0
3
0046-04-05719 - ATLANTA BOWIE
MPO PROJ NUM:RECONSTRUCT 2 LANE RURAL ROADWAY TO PROVIDE PASSING LANES PROJECT
DESCR:
US 82FM 1840LIMITS FROMSH 98LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 27,248,000
$ 28,820,000TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 2,010,902IND COSTS: $ 13,624CONTING:
$ 27,248,000CONST COST:
$ 1,335,152CONST ENG:
$ 5,000ROW PURCHASE: $ 1,335,152PRELIM ENG:
$ 33,179,440TOTAL PRJ COST:
C
$ 28,820,000LOCAL CONTR:
RECONSTRUCT 2 LANE RURAL ROADWAY TO PROVIDE PASSING LANES; BOWIE COUNTY PASS THROUGH PROJECT
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 27,248,000
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 0 $ 0 $ 0 $ 28,820,000 $ 0 $ 0 $ 0 $ 28,820,000
LC
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 2 OF 53
TXDOT ATLANTA DISTRICT
FY 2014
0919-20-03119 - ATLANTA MORRIS
MPO PROJ NUM:RECONSTRUCT SIDEWALKS, ADD PEDESTRIAN FURNISHINGS, LIGHTING PROJECT
DESCR:
VADOWNTOWN DAINGERFIELD STREETSCAPELIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,138,487
$ 1,138,487 $ 1,138,487
9-ENHANCEMTS:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 84,020IND COSTS: $ 14,686CONTING:
$ 1,138,487CONST COST:
$ 72,635CONST ENG:
$ 0ROW PURCHASE: $ 55,786PRELIM ENG:
$ 1,431,419TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,138,487
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 910,790 $ 0 $ 227,697 $ 0 $ 910,790 $ 0 $ 227,697 $ 0
9
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 3 OF 53
TXDOT ATLANTA DISTRICT
FY 2015
0520-05-04019 - ATLANTA UPSHUR
MPO PROJ NUM:RECONSTRUCT TO 4 LANE DIVIDED RURAL SECTION PROJECT
DESCR:
SH 155BIG CYPRESS CK (LAKE O'THE PINES)LIMITS FROMUS 259LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 5,000,000
$ 5,000,000TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 369,000IND COSTS: $ 99,500CONTING:
$ 5,000,000CONST COST:
$ 248,000CONST ENG:
$ 0ROW PURCHASE: $ 245,000PRELIM ENG:
$ 6,148,500TOTAL PRJ COST:
C
$ 5,000,00011-DIST DISC:
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 5,000,000
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 4,000,000 $ 1,000,000 $ 0 $ 0 $ 4,000,000 $ 1,000,000 $ 0 $ 0
11
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
Category Description Programmed Authorized Programmed Authorized Programmed Authorized Programmed Authorized Programmed Authorized
1Preventive Maintenance and Rehabilitation $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
2M or 2UUrban Area (Non- TMA) Corridor Projects $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
3 Non-Traditionally Funded Transportation Project
$55,460,000 $42,140,000 $0 $0 $0 $0 $0 $0 $55,460,000 $42,140,000
4Statewide Connectivity Corridor Projects $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
5 CMAQ $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
6 Structures $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
7 Metro Mobility & Rehab $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
8 Safety $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
9 Transportation Enhancements $0 $0 $1,138,487 $1,138,487 $0 $0 $0 $0 $1,138,487 $1,138,487
10Supplemental Transportation Projects $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
11 District Discretionary $0 $0 $0 $0 $5,000,000 $0 $0 $0 $5,000,000 $0
12 Strategic Priority $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
12C Strategic Priority RECON $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
12S Strategic Priority RECON $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
SBPE Strategy Budget PE Strategy Budget PE $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
SB 102 Strategy 102 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total $55,460,000 $42,140,000 $1,138,487 $1,138,487 $5,000,000 $0 $0 $0 $61,598,487 $43,278,487
FY 2013 FY 2014 FY 2015 FY 2016 Total
$0 $910,790 $4,000,000 $0 $4,910,790
$0 $0 $1,000,000 $0 $1,000,000
Local Match $0 $227,697 $0 $0 $227,697$0 $0 $0 $0 $0
$13,320,000 $0 $0 $0 $13,320,000$0 $0 $0 $0 $0$0 $0 $0 $0 $0$0 $0 $0 $0 $0
$42,140,000 $0 $0 $0 $42,140,000CAT 3 - Regional Toll Revenue $0 $0 $0 $0 $0CAT 3 - Match to Regional Toll Revenue $0 $0 $0 $0 $0
$0 $0 $0 $0 $0$0 $0 $0 $0 $0$0 $0 $0 $0 $0$0 $0 $0 $0 $0
$55,460,000 $1,138,487 $5,000,000 $0 $61,598,487
Atlanta - District 19FY 2013 - 2016 Transportation Improvement Program
Highway Financial Summary - Year of Expenditure Costs2013 - 2016 STIP
Funding by Category
FY 2013 FY 2014 FY 2015
Federal
State
CAT 3 - Local Contributions
CAT 3 - Texas Mobility Fund
FY 2016 Total FY 2013 - 2016
Funding Participation Source
Source
Other - Stragegy 102 Budget
Total
CAT 3 - Prop 12
CAT 3 - Prop 14
CAT 3 - Unique Federal Program - Tiger II
Other - Section 5306
CAT 3 - Pass Thru Toll Revenue
Cat 3- Prop 14 SB
Other - Strategy PE Budget
Grouping of Projects 23 CFR part 450 450.216 (f) Projects that are not considered to be of appropriate scale for individual identification in a given program year may be grouped by function, work type, and/or geographic area using the applicable classifications under 23 CFR 771.117(c) and (d) and/or 40 CFR part 93. In nonattainment and maintenance areas, project classifications must be consistent with the “exempt project” classifications contained in the EPA transportation conformity regulation (40 CFR part 93). In addition, projects proposed for funding under title 23 U.S.C. Chapter 2 that are not regionally significant may be grouped in one line item or identified individually in the TIP.
Grouped Project CSJs Definition of Grouped Projects for Use in the STIP
Revised May 18, 2005
PROPOSED CSJ
GROUPED PROJECT CATEGORY DEFINITION
5000-00-950 PE – Preliminary Engineering
Preliminary Engineering for any project that is not added capacity in a non-attainment area. Includes activities which do not involve or lead directly to construction such as planning and technical studies, grants for training and research programs.
5000-00-951 Right of Way Acquisition
Right of Way acquisition for any project that is not added capacity in a non-attainment area. Includes relocation assistance, hardship acquisition and protective buying.
5000-00-952 5000-00-957 5000-00-958
Preventive Maintenance and Rehabilitation
Projects to include pavement repair to preserve existing pavement so that it may achieve its designed loading. Includes seal coats, overlays, resurfacing, restoration and rehabilitation done with existing ROW. Also includes modernization of a highway by reconstruction, adding shoulders or adding auxiliary lanes (e.g., parking, weaving, turning, climbing, non-added capacity).
5000-00-953 Bridge Replacement and Rehabilitation
Projects to replace and/or rehabilitate functionally obsolete or structurally deficient bridges.
5000-00-954 Railroad Grade Separations
Projects to construct or replace existing highway-railroad grade crossings and to rehabilitate and/or replace deficient railroad underpasses, resulting in no added capacity.
5800-00-950 Safety (safe routes to school)
Projects to include the construction or replacement/rehabilitation of guard rails, median barriers, crash cushions, pavement markings, skid treatments, medians, lighting improvements, curb ramps, railroad/highway crossing warning devices, fencing, intersection improvements (e.g., turn lanes), signalization projects and interchange modifications. Also includes projects funded via the Federal Hazard Elimination Program and the Federal Railroad Signal Safety Program.
5000-00-956 Landscaping
Project consisting of typical right-of-way landscape development, establishment and aesthetic improvements to include any associated erosion control and environmental mitigation activities.
Grouped Project CSJs Definition of Grouped Projects for Use in the STIP
Revised May 18, 2005
PROPOSED CSJ
GROUPED PROJECT CATEGORY DEFINITION
5800-00-915 Intelligent Transportation Systems Deployment
Highway traffic operation improvement projects including the installation of ramp metering control devices, variable message signs, traffic monitoring equipment and projects in the Federal ITS/IVHS programs.
5000-00-916 Bicycle and Pedestrian Construction or rehabilitation of bicycle and pedestrian lanes, paths and facilities.
5000-00-917 Safety Rest Areas and Truck Weigh Stations
Construction and improvement of rest areas and truck weigh stations.
5000-00-918 Transit Improvements
Projects include the construction and improvement of small passenger shelters and information kiosks. Also includes the construction and improvement of rail storage/maintenance facilities bus transfer facilities where minor amounts of additional land are required and there is not a substantial increase in the number of users.
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 4 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
1381-01-01119 - ATLANTA BOWIE
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 13984.3 MI N OF US 82LIMITS FROMUS 82LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 102,826
$ 102,826 $ 102,826
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 7,589IND COSTS: $ 576CONTING:
$ 102,826CONST COST:
$ 2,612CONST ENG:
$ 0ROW PURCHASE: $ 5,038PRELIM ENG:
$ 120,409TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 102,826
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 82,261 $ 82,261
$ 20,565 $ 20,565
$ 0 $ 0
$ 0 $ 0
1
1569-01-01119 - ATLANTA BOWIE
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 13986.3 MI N OF US 82LIMITS FROMUS 82LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 153,002
$ 153,002 $ 153,002
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 11,292IND COSTS: $ 857CONTING:
$ 153,002CONST COST:
$ 3,886CONST ENG:
$ 0ROW PURCHASE: $ 7,497PRELIM ENG:
$ 179,165TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 153,002
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 122,402 $ 122,402
$ 30,600 $ 30,600
$ 0 $ 0
$ 0 $ 0
1
0010-10-02519 - ATLANTA CASS
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
US 67BOWIE C/LLIMITS FROMMORRIS C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 679,126
$ 679,126 $ 679,126
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 50,120IND COSTS: $ 3,803CONTING:
$ 679,126CONST COST:
$ 17,250CONST ENG:
$ 0ROW PURCHASE: $ 33,277PRELIM ENG:
$ 795,257TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 679,126
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 543,301 $ 543,301
$ 135,825 $ 135,825
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 5 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0218-03-08419 - ATLANTA CASS
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
US 590.1 MI S OF FM 2791LIMITS FROM0.1 MI N OF SH 43LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 35,032
$ 35,032 $ 35,032
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 2,585IND COSTS: $ 196CONTING:
$ 35,032CONST COST:
$ 890CONST ENG:
$ 0ROW PURCHASE: $ 1,717PRELIM ENG:
$ 41,023TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 35,032
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 28,026 $ 28,026
$ 7,006 $ 7,006
$ 0 $ 0
$ 0 $ 0
1
0218-04-11119 - ATLANTA CASS
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
US 590.1 MI N OF SH 43LIMITS FROM0.1 MI N OF FM 249LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 218,539
$ 218,539 $ 218,539
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 16,128IND COSTS: $ 1,224CONTING:
$ 218,539CONST COST:
$ 5,551CONST ENG:
$ 0ROW PURCHASE: $ 10,708PRELIM ENG:
$ 255,910TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 218,539
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 174,831 $ 174,831
$ 43,708 $ 43,708
$ 0 $ 0
$ 0 $ 0
1
0277-02-04619 - ATLANTA CASS
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
SH 77FM 250LIMITS FROM3.2 MI W OF SH 8LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 414,293
$ 414,293 $ 414,293
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 30,575IND COSTS: $ 2,320CONTING:
$ 414,293CONST COST:
$ 10,523CONST ENG:
$ 0ROW PURCHASE: $ 20,300PRELIM ENG:
$ 485,137TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 414,293
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 331,434 $ 331,434
$ 82,859 $ 82,859
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 6 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0277-05-01019 - ATLANTA CASS
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 250SH 77LIMITS FROMFM 1399LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 26,625
$ 26,625 $ 26,625
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 1,965IND COSTS: $ 149CONTING:
$ 26,625CONST COST:
$ 676CONST ENG:
$ 0ROW PURCHASE: $ 1,305PRELIM ENG:
$ 31,177TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 26,625
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 21,300 $ 21,300
$ 5,325 $ 5,325
$ 0 $ 0
$ 0 $ 0
1
0520-03-03119 - ATLANTA CASS
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
SH 155SH 8LIMITS FROMSH 49LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 575,333
$ 575,333 $ 575,333
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 42,460IND COSTS: $ 3,222CONTING:
$ 575,333CONST COST:
$ 14,613CONST ENG:
$ 0ROW PURCHASE: $ 28,191PRELIM ENG:
$ 673,715TOTAL PRJ COST:
C
SEAL COAT PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 575,333
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 460,266 $ 460,266
$ 115,067 $ 115,067
$ 0 $ 0
$ 0 $ 0
1
0946-01-03919 - ATLANTA CASS
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 250SH 11LIMITS FROMMORRIS C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 78,175
$ 78,175 $ 78,175
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 5,769IND COSTS: $ 438CONTING:
$ 78,175CONST COST:
$ 1,986CONST ENG:
$ 0ROW PURCHASE: $ 3,831PRELIM ENG:
$ 91,543TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 78,175
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 62,540 $ 62,540
$ 15,635 $ 15,635
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 7 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0946-01-04019 - ATLANTA CASS
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 250FM 1399LIMITS FROMSH 11LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 359,439
$ 359,439 $ 359,439
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 26,527IND COSTS: $ 2,013CONTING:
$ 359,439CONST COST:
$ 9,130CONST ENG:
$ 0ROW PURCHASE: $ 17,612PRELIM ENG:
$ 420,903TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 359,439
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 287,551 $ 287,551
$ 71,888 $ 71,888
$ 0 $ 0
$ 0 $ 0
1
0096-09-07319 - ATLANTA HARRISON
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
US 800.2 MI E OF LP 390LIMITS FROMIH 20LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 287,921
$ 287,921 $ 287,921
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 21,249IND COSTS: $ 1,612CONTING:
$ 287,921CONST COST:
$ 7,313CONST ENG:
$ 0ROW PURCHASE: $ 14,108PRELIM ENG:
$ 337,155TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 287,921
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 230,337 $ 230,337
$ 57,584 $ 57,584
$ 0 $ 0
$ 0 $ 0
1
0495-10-08519 - ATLANTA HARRISON
MPO PROJ NUM:SEAL COAT NORTHWEST FRONTAGE ROADPROJECT
DESCR:
IH 201.9 MI W OF US 80LIMITS FROMUS 80LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 51,531
$ 51,531 $ 51,531
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 3,803IND COSTS: $ 289CONTING:
$ 51,531CONST COST:
$ 1,309CONST ENG:
$ 0ROW PURCHASE: $ 2,525PRELIM ENG:
$ 60,343TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 51,531
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 41,225 $ 41,225
$ 10,306 $ 10,306
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 8 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0495-10-08619 - ATLANTA HARRISON
MPO PROJ NUM:SEAL COAT NORTH FRONTAGE ROADPROJECT
DESCR:
IH 20US 80LIMITS FROMUS 80LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 202,280
$ 202,280 $ 202,280
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 14,928IND COSTS: $ 1,133CONTING:
$ 202,280CONST COST:
$ 5,138CONST ENG:
$ 0ROW PURCHASE: $ 9,912PRELIM ENG:
$ 236,870TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 202,280
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 161,824 $ 161,824
$ 40,456 $ 40,456
$ 0 $ 0
$ 0 $ 0
1
0495-10-08719 - ATLANTA HARRISON
MPO PROJ NUM:SEAL COAT SOUTH FRONTAGE ROADPROJECT
DESCR:
IH 200.9 MI W OF US 80LIMITS FROM0.2 MI E OF SP 156LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 160,212
$ 160,212 $ 160,212
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 11,824IND COSTS: $ 897CONTING:
$ 160,212CONST COST:
$ 4,069CONST ENG:
$ 0ROW PURCHASE: $ 7,850PRELIM ENG:
$ 187,608TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 160,212
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 128,170 $ 128,170
$ 32,042 $ 32,042
$ 0 $ 0
$ 0 $ 0
1
0495-10-08819 - ATLANTA HARRISON
MPO PROJ NUM:SEAL COAT NORTHEAST FRONTAGE ROADPROJECT
DESCR:
IH 20SP 156LIMITS FROM0.7 MI E OF SP 156LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 16,063
$ 16,063 $ 16,063
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 1,185IND COSTS: $ 90CONTING:
$ 16,063CONST COST:
$ 408CONST ENG:
$ 0ROW PURCHASE: $ 787PRELIM ENG:
$ 18,810TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 16,063
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 12,850 $ 12,850
$ 3,213 $ 3,213
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 9 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0632-02-03019 - ATLANTA HARRISON
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 134MARION C/LLIMITS FROMSH 43LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 241,066
$ 241,066 $ 241,066
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 17,791IND COSTS: $ 1,350CONTING:
$ 241,066CONST COST:
$ 6,123CONST ENG:
$ 0ROW PURCHASE: $ 11,812PRELIM ENG:
$ 282,289TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 241,066
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 192,853 $ 192,853
$ 48,213 $ 48,213
$ 0 $ 0
$ 0 $ 0
1
0632-03-04319 - ATLANTA HARRISON
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 134FM 1999LIMITS FROMFM 1998LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 140,213
$ 140,213 $ 140,213
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 10,348IND COSTS: $ 785CONTING:
$ 140,213CONST COST:
$ 3,561CONST ENG:
$ 0ROW PURCHASE: $ 6,870PRELIM ENG:
$ 164,189TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 140,213
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 112,170 $ 112,170
$ 28,043 $ 28,043
$ 0 $ 0
$ 0 $ 0
1
0632-03-04419 - ATLANTA HARRISON
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 134SH 43LIMITS FROMFM 2682LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 121,039
$ 121,039 $ 121,039
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 8,933IND COSTS: $ 678CONTING:
$ 121,039CONST COST:
$ 3,074CONST ENG:
$ 0ROW PURCHASE: $ 5,931PRELIM ENG:
$ 141,736TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 121,039
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 96,831 $ 96,831
$ 24,208 $ 24,208
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 10 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0843-06-01619 - ATLANTA HARRISON
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 4500.2 MI S OF IH 20LIMITS FROMFM 968LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 31,922
$ 31,922 $ 31,922
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 2,356IND COSTS: $ 179CONTING:
$ 31,922CONST COST:
$ 811CONST ENG:
$ 0ROW PURCHASE: $ 1,564PRELIM ENG:
$ 37,381TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 31,922
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 25,538 $ 25,538
$ 6,384 $ 6,384
$ 0 $ 0
$ 0 $ 0
1
1759-01-01219 - ATLANTA HARRISON
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 1793FM 134LIMITS FROMUS 59LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 246,208
$ 246,208 $ 246,208
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 18,170IND COSTS: $ 1,379CONTING:
$ 246,208CONST COST:
$ 6,254CONST ENG:
$ 0ROW PURCHASE: $ 12,064PRELIM ENG:
$ 288,310TOTAL PRJ COST:
C
SEAL COAT PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 246,208
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 196,966 $ 196,966
$ 49,242 $ 49,242
$ 0 $ 0
$ 0 $ 0
1
3041-03-01119 - ATLANTA HARRISON
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 3001MARION C/LLIMITS FROMFM 1997LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 75,405
$ 75,405 $ 75,405
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 5,565IND COSTS: $ 422CONTING:
$ 75,405CONST COST:
$ 1,915CONST ENG:
$ 0ROW PURCHASE: $ 3,695PRELIM ENG:
$ 88,299TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 75,405
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 60,324 $ 60,324
$ 15,081 $ 15,081
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 11 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0138-11-02919 - ATLANTA MARION
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 248CASS C/LLIMITS FROMSH 49LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 186,245
$ 186,245 $ 186,245
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 13,745IND COSTS: $ 1,043CONTING:
$ 186,245CONST COST:
$ 4,731CONST ENG:
$ 0ROW PURCHASE: $ 9,126PRELIM ENG:
$ 218,093TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 186,245
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 148,996 $ 148,996
$ 37,249 $ 37,249
$ 0 $ 0
$ 0 $ 0
1
0223-01-03419 - ATLANTA MARION
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
SH 49FM 134LIMITS FROMKITCHENS CREEKLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 383,014
$ 383,014 $ 383,014
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 28,266IND COSTS: $ 2,145CONTING:
$ 383,014CONST COST:
$ 9,729CONST ENG:
$ 0ROW PURCHASE: $ 18,768PRELIM ENG:
$ 448,510TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 383,014
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 306,411 $ 306,411
$ 76,603 $ 76,603
$ 0 $ 0
$ 0 $ 0
1
0223-02-02919 - ATLANTA MARION
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
SH 49KITCHENS CREEKLIMITS FROMLOUISIANA SLLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 261,258
$ 261,258 $ 261,258
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 19,281IND COSTS: $ 1,463CONTING:
$ 261,258CONST COST:
$ 6,636CONST ENG:
$ 0ROW PURCHASE: $ 12,802PRELIM ENG:
$ 305,934TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 261,258
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 209,006 $ 209,006
$ 52,252 $ 52,252
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 12 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0843-03-01319 - ATLANTA MARION
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 7283.6 MI N OF SH 49LIMITS FROMSH 49LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 90,679
$ 90,679 $ 90,679
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 6,692IND COSTS: $ 508CONTING:
$ 90,679CONST COST:
$ 2,303CONST ENG:
$ 0ROW PURCHASE: $ 4,443PRELIM ENG:
$ 106,185TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 90,679
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 72,543 $ 72,543
$ 18,136 $ 18,136
$ 0 $ 0
$ 0 $ 0
1
1895-03-02019 - ATLANTA MARION
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 7262.7 MI W OF FM 729LIMITS FROMFM 729LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 64,752
$ 64,752 $ 64,752
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 4,779IND COSTS: $ 363CONTING:
$ 64,752CONST COST:
$ 1,645CONST ENG:
$ 0ROW PURCHASE: $ 3,173PRELIM ENG:
$ 75,825TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 64,752
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 51,802 $ 51,802
$ 12,950 $ 12,950
$ 0 $ 0
$ 0 $ 0
1
3041-02-01619 - ATLANTA MARION
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 3001FM 726LIMITS FROMHARRISON C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 160,276
$ 160,276 $ 160,276
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 11,828IND COSTS: $ 898CONTING:
$ 160,276CONST COST:
$ 4,071CONST ENG:
$ 0ROW PURCHASE: $ 7,854PRELIM ENG:
$ 187,684TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 160,276
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 128,221 $ 128,221
$ 32,055 $ 32,055
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 13 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0010-08-05219 - ATLANTA MORRIS
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
US 67CASS C/LLIMITS FROMUS 259LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 274,042
$ 274,042 $ 274,042
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 20,224IND COSTS: $ 1,535CONTING:
$ 274,042CONST COST:
$ 6,961CONST ENG:
$ 0ROW PURCHASE: $ 13,428PRELIM ENG:
$ 320,903TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 274,042
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 219,234 $ 219,234
$ 54,808 $ 54,808
$ 0 $ 0
$ 0 $ 0
1
0222-02-05219 - ATLANTA MORRIS
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
US 2590.1 MI W OF US 259 NLIMITS FROMSH 11LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 140,312
$ 140,312 $ 140,312
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 10,355IND COSTS: $ 786CONTING:
$ 140,312CONST COST:
$ 3,564CONST ENG:
$ 0ROW PURCHASE: $ 6,875PRELIM ENG:
$ 164,305TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 140,312
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 112,250 $ 112,250
$ 28,062 $ 28,062
$ 0 $ 0
$ 0 $ 0
1
0246-02-04619 - ATLANTA PANOLA
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
US 794.4 MI E OF RUSK C/LLIMITS FROMRUSK C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 207,685
$ 207,685 $ 207,685
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 15,327IND COSTS: $ 1,163CONTING:
$ 207,685CONST COST:
$ 5,275CONST ENG:
$ 0ROW PURCHASE: $ 10,177PRELIM ENG:
$ 243,200TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 207,685
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 166,148 $ 166,148
$ 41,537 $ 41,537
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 14 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
1226-02-01919 - ATLANTA TITUS
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 1735SH 49LIMITS FROMSH 11LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 253,109
$ 253,109 $ 253,109
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 18,679IND COSTS: $ 1,417CONTING:
$ 253,109CONST COST:
$ 6,429CONST ENG:
$ 0ROW PURCHASE: $ 12,402PRELIM ENG:
$ 296,391TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 253,109
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 202,487 $ 202,487
$ 50,622 $ 50,622
$ 0 $ 0
$ 0 $ 0
1
0248-05-06019 - ATLANTA UPSHUR
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
US 271SH 155 SLIMITS FROMFM 726LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 357,474
$ 357,474 $ 357,474
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 26,382IND COSTS: $ 2,002CONTING:
$ 357,474CONST COST:
$ 9,080CONST ENG:
$ 0ROW PURCHASE: $ 17,516PRELIM ENG:
$ 418,602TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 357,474
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 285,979 $ 285,979
$ 71,495 $ 71,495
$ 0 $ 0
$ 0 $ 0
1
1386-01-01919 - ATLANTA UPSHUR
MPO PROJ NUM:SEAL COAT PROJECT
DESCR:
FM 1404SH 155LIMITS FROMFM 2685LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 164,903
$ 164,903 $ 164,903
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 12,170IND COSTS: $ 923CONTING:
$ 164,903CONST COST:
$ 4,189CONST ENG:
$ 0ROW PURCHASE: $ 8,080PRELIM ENG:
$ 193,101TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 164,903
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 131,922 $ 131,922
$ 32,981 $ 32,981
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 15 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0843-02-01219 - ATLANTA HARRISON
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
FM 450AT LITTLE CYPRESS CREEKLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 8,944,000
$ 8,944,000 $ 8,944,000
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 660,067IND COSTS: $ 0CONTING:
$ 8,944,000CONST COST:
$ 666,328CONST ENG:
$ 807,185ROW PURCHASE: $ 438,256PRELIM ENG:
$ 11,729,598TOTAL PRJ COST:
C
REPLACE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 8,944,000
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 7,155,200 $ 1,788,800 $ 0 $ 0 $ 7,155,200 $ 1,788,800 $ 0 $ 0
6
0520-02-03719 - ATLANTA UPSHUR
MPO PROJ NUM:REPLACE BRIDGES AND APPROACHES PROJECT
DESCR:
SH 155AT SABINE RIVER & SABINE RIVER RELILIMITS FROMSOUTH OF BIG SANDYLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 11,431,434
$ 11,431,434 $ 11,431,434
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 843,640IND COSTS: $ 0CONTING:
$ 11,431,434CONST COST:
$ 851,642CONST ENG:
$ 659,540ROW PURCHASE: $ 560,140PRELIM ENG:
$ 14,619,608TOTAL PRJ COST:
C
REPLACE BRIDGES AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 11,431,434
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 9,145,147 $ 2,286,287 $ 0 $ 0 $ 9,145,147 $ 2,286,287 $ 0 $ 0
6
0520-02-03819 - ATLANTA UPSHUR
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
SH 155AT UNION PACIFIC RAILROAD OVERPASSLIMITS FROMS. OF BIG SANDYLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 3,212,664
$ 3,212,664 $ 3,212,664
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 237,095IND COSTS: $ 0CONTING:
$ 3,212,664CONST COST:
$ 239,343CONST ENG:
$ 181,690ROW PURCHASE: $ 157,421PRELIM ENG:
$ 4,104,995TOTAL PRJ COST:
C
REPLACE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 3,212,664
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 2,570,131 $ 642,533 $ 0 $ 0 $ 2,570,131 $ 642,533 $ 0 $ 0
6
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 16 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0392-02-08519 - ATLANTA UPSHUR
MPO PROJ NUM:REHABILITATE 4-LANE DIVIDED HIGHWAY PROJECT
DESCR:
US 259FM 726LIMITS FROM0.5 MI. S. OF FM 450LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 5,552,825
$ 5,552,825 $ 5,552,825
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 409,799IND COSTS: $ 2,776CONTING:
$ 5,552,825CONST COST:
$ 272,088CONST ENG:
$ 0ROW PURCHASE: $ 272,088PRELIM ENG:
$ 6,760,565TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 5,552,825
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 4,442,260 $ 4,442,260
$ 1,110,565 $ 1,110,565
$ 0 $ 0
$ 0 $ 0
1
0096-03-06419 - ATLANTA UPSHUR
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
US 80AT BIG SANDY CREEKLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 2,758,080
$ 2,758,080 $ 2,758,080
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 203,546IND COSTS: $ 126,320CONTING:
$ 2,758,080CONST COST:
$ 208,787CONST ENG:
$ 0ROW PURCHASE: $ 135,146PRELIM ENG:
$ 3,496,418TOTAL PRJ COST:
C
REPLACE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 2,758,080
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 2,206,464 $ 551,616 $ 0 $ 0 $ 2,206,464 $ 551,616 $ 0 $ 0
6
0248-04-06719 - ATLANTA UPSHUR
MPO PROJ NUM:REHABILITATE PAVEMENT ON EXISTING 4 LANE RURAL HIGHWAY PROJECT
DESCR:
US 271CAMP C/LLIMITS FROMFM 593LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 2,265,632
$ 2,265,632 $ 2,265,632
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 167,204IND COSTS: $ 1,133CONTING:
$ 2,265,632CONST COST:
$ 111,016CONST ENG:
$ 0ROW PURCHASE: $ 111,016PRELIM ENG:
$ 2,758,407TOTAL PRJ COST:
C
REHABILITATE PAVEMENT ON EXISTING 2 LANE RURAL HIGHWAY PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 2,265,632
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 1,812,506 $ 1,812,506
$ 453,126 $ 453,126
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 17 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0919-03-04919 - ATLANTA HARRISON
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
CRON COUNTY ROAD 1221LIMITS FROMAT CROSS BAYOU TRIBUTARYLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 318,240
$ 318,240 $ 318,240
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 23,486IND COSTS: $ 0CONTING:
$ 318,240CONST COST:
$ 23,709CONST ENG:
$ 0ROW PURCHASE: $ 15,594PRELIM ENG:
$ 388,635TOTAL PRJ COST:
C
REPLACE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 318,240
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 254,592 $ 63,648 $ 0 $ 0 $ 254,592 $ 63,648 $ 0 $ 0
6
3283-01-01419 - ATLANTA HARRISON
MPO PROJ NUM:REHABILITATE PAVEMENT ON EXISTING 2 LANE RURAL HIGHWAY PROJECT
DESCR:
FM 2625FM 31LIMITS FROMFM 9LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 2,980,702
$ 2,980,702 $ 2,980,702
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 219,976IND COSTS: $ 1,490CONTING:
$ 2,980,702CONST COST:
$ 146,054CONST ENG:
$ 0ROW PURCHASE: $ 146,054PRELIM ENG:
$ 3,629,005TOTAL PRJ COST:
C
REHABILITATE PAVEMENT ON EXISTING 2 LANE RURAL HIGHWAY PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 2,980,702
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 2,384,562 $ 2,384,562
$ 596,140 $ 596,140
$ 0 $ 0
$ 0 $ 0
1
0520-02-05419 - ATLANTA UPSHUR
MPO PROJ NUM:RESURFACE EXISTING HIGHWAY WITH ASPHALTIC CONCRETE PROJECT
DESCR:
SH 1551.0 MILE SOUTH OF FM 1002LIMITS FROMUS 80LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 490,151
$ 490,151 $ 490,151
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 36,173IND COSTS: $ 8,578CONTING:
$ 490,151CONST COST:
$ 17,057CONST ENG:
$ 0ROW PURCHASE: $ 24,017PRELIM ENG:
$ 591,367TOTAL PRJ COST:
C
RESURFACE EXISTING HIGHWAY WITH ASPHALTIC CONCRETE PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 490,151
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 392,121 $ 392,121
$ 98,030 $ 98,030
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 18 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0495-10-08319 - ATLANTA HARRISON
MPO PROJ NUM:RESURFACE EXISTING EXISTING INTERSTATE FACILITY PROJECT
DESCR:
IH 200.5 MI W OF US 80LIMITS FROMLOUISIANA STATE LINE,WB LANES ONLYLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,040,000
$ 1,040,000 $ 1,040,000
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 76,752IND COSTS: $ 18,200CONTING:
$ 1,040,000CONST COST:
$ 36,192CONST ENG:
$ 0ROW PURCHASE: $ 50,960PRELIM ENG:
$ 1,222,104TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,040,000
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 936,000 $ 936,000
$ 104,000 $ 104,000
$ 0 $ 0
$ 0 $ 0
1
0632-04-03119 - ATLANTA HARRISON
MPO PROJ NUM:REHABILITATE PAVEMENT ON EXISTING 2 LANE RURAL HIGHWAY PROJECT
DESCR:
FM 451AT ELYSIAN FIELDS ELEMENTARY SCHOOLLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 147,867
$ 147,867 $ 147,867
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 10,913IND COSTS: $ 74CONTING:
$ 147,867CONST COST:
$ 103,507CONST ENG:
$ 0ROW PURCHASE: $ 7,245PRELIM ENG:
$ 276,289TOTAL PRJ COST:
C
REHABILITATE PAVEMENT ON EXISTING 2 LANE RURAL HIGHWAY PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 147,867
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 118,294 $ 118,294
$ 29,573 $ 29,573
$ 0 $ 0
$ 0 $ 0
1
0640-01-04419 - ATLANTA HARRISON
MPO PROJ NUM:REHABILITATE PAVEMENT ON EXISTING 2 LANE RURAL HIGHWAY PROJECT
DESCR:
FM 311.3 MI N OF PANOLA C/LLIMITS FROMPANOLA C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 488,301
$ 488,301 $ 488,301
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 36,037IND COSTS: $ 244CONTING:
$ 488,301CONST COST:
$ 341,811CONST ENG:
$ 0ROW PURCHASE: $ 23,927PRELIM ENG:
$ 912,391TOTAL PRJ COST:
C
REHABILITATE PAVEMENT ON EXISTING 2 LANE RURAL HIGHWAY PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 488,301
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 390,641 $ 390,641
$ 97,660 $ 97,660
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 19 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0919-22-01919 - ATLANTA MARION
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES_ON KELLYVILLE ROAD AT BLACK CYPRESS CREEKPROJECT
DESCR:
CRON KELLYVILLE ROAD CRLIMITS FROMCC ROADLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 572,000
$ 572,000 $ 572,000
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 42,214IND COSTS: $ 0CONTING:
$ 572,000CONST COST:
$ 42,614CONST ENG:
$ 0ROW PURCHASE: $ 28,028PRELIM ENG:
$ 698,526TOTAL PRJ COST:
C
REPLACE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 572,000
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 457,600 $ 114,400 $ 0 $ 0 $ 457,600 $ 114,400 $ 0 $ 0
6
0610-06-07819 - ATLANTA BOWIE
MPO PROJ NUM:REPAIR PAVEMENT & RESURFACE EXISTING INTERSTATE FACILITY PROJECT
DESCR:
IH 30SH 98LIMITS FROMSP 86LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 412,498
$ 412,498 $ 412,498
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 30,442IND COSTS: $ 206CONTING:
$ 412,498CONST COST:
$ 20,212CONST ENG:
$ 0ROW PURCHASE: $ 20,212PRELIM ENG:
$ 502,216TOTAL PRJ COST:
C
RESURFACE EXISTIN INTERSTATE FACILITY PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 412,498
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 371,248 $ 371,248
$ 41,250 $ 41,250
$ 0 $ 0
$ 0 $ 0
1
0919-00-06819 - ATLANTA CASS
MPO PROJ NUM:PAVEMENT MARKINGS PROJECT
DESCR:
VAAT VARIOUS LOCATIONSLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,071,200
$ 1,071,200 $ 1,071,200
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 79,055IND COSTS: $ 13,818CONTING:
$ 1,071,200CONST COST:
$ 68,343CONST ENG:
$ 0ROW PURCHASE: $ 52,489PRELIM ENG:
$ 1,346,820TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,071,200
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 856,960 $ 856,960
$ 214,240 $ 214,240
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 20 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0248-01-07019 - ATLANTA TITUS
MPO PROJ NUM:RESTORE SECTION & RESURFACE EXISTING 4-LANE HIGHWAY PROJECT
DESCR:
US 271CAMP C/LLIMITS FROM0.3 MI. SOUTH OF FM 3417LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 950,940
$ 950,940 $ 950,940
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 70,179IND COSTS: $ 475CONTING:
$ 950,940CONST COST:
$ 46,596CONST ENG:
$ 0ROW PURCHASE: $ 46,596PRELIM ENG:
$ 1,157,769TOTAL PRJ COST:
C
RESURFACE EXISTING 4-LANE HIGHWAY WITH ASPHALTIC CONCRETE
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 950,940
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 760,752 $ 760,752
$ 190,188 $ 190,188
$ 0 $ 0
$ 0 $ 0
1
0083-07-04019 - ATLANTA CAMP
MPO PROJ NUM:CONSTRUCT LEFT TURN LANE PROJECT
DESCR:
SH 11AT FM 21 INTERSECTIONLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 230,048
$ 230,048 $ 230,048
3-URBAN CRDR:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 16,978IND COSTS: $ 2,968CONTING:
$ 230,048CONST COST:
$ 14,677CONST ENG:
$ 0ROW PURCHASE: $ 11,272PRELIM ENG:
$ 289,239TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 230,048
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 0 $ 230,048 $ 0 $ 0 $ 0 $ 230,048 $ 0 $ 0
3
0063-11-05519 - ATLANTA PANOLA
MPO PROJ NUM:CONSTRUCT CONTINUOUS LEFT TURN LANE PROJECT
DESCR:
SH 149BALLPARK ROADLIMITS FROMFM 10LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,200,394
$ 1,200,394 $ 1,200,394
3-URBAN CRDR:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 88,589IND COSTS: $ 600CONTING:
$ 1,200,394CONST COST:
$ 58,819CONST ENG:
$ 0ROW PURCHASE: $ 58,819PRELIM ENG:
$ 1,407,222TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,200,394
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 0 $ 1,200,394 $ 0 $ 0 $ 0 $ 1,200,394 $ 0 $ 0
3
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 21 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
0083-09-03019 - ATLANTA TITUS
MPO PROJ NUM:CONSTRUCT LEFT TURN LANE PROJECT
DESCR:
SH 11AT FM 1735 INTERSECTIONLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 230,048
$ 230,048 $ 230,048
3-URBAN CRDR:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 16,978IND COSTS: $ 2,968CONTING:
$ 230,048CONST COST:
$ 14,677CONST ENG:
$ 0ROW PURCHASE: $ 11,272PRELIM ENG:
$ 275,943TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 230,048
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 0 $ 230,048 $ 0 $ 0 $ 0 $ 230,048 $ 0 $ 0
3
0402-02-02419 - ATLANTA UPSHUR
MPO PROJ NUM:WIDEN EXISTING ROADWAY PROJECT
DESCR:
SH 1540.7 MI WEST OF US 259LIMITS FROMUS 259LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 780,000
$ 780,000 $ 780,000
3-URBAN CRDR:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 57,564IND COSTS: $ 390CONTING:
$ 780,000CONST COST:
$ 38,220CONST ENG:
$ 40,723ROW PURCHASE: $ 38,220PRELIM ENG:
$ 955,117TOTAL PRJ COST:
C
WIDEN EXISTING ROADWAY PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 780,000
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 0 $ 780,000 $ 0 $ 0 $ 0 $ 780,000 $ 0 $ 0
3
0248-05-05319 - ATLANTA UPSHUR
MPO PROJ NUM:INSTALL LEFT TURN LANES PROJECT
DESCR:
US 271AT INT. OF FM 726LIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,924,001
$ 1,524,001 $ 400,000 $ 1,924,001
3-URBAN CRDR:8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 141,991IND COSTS: $ 0CONTING:
$ 1,924,001CONST COST:
$ 86,003CONST ENG:
$ 156,159ROW PURCHASE: $ 94,276PRELIM ENG:
$ 2,462,266TOTAL PRJ COST:
C
INSTALL LEFT TURN LANES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,924,001
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 360,000 $ 1,564,001 $ 0 $ 0
$ 0 $ 1,524,001 $ 0 $ 0 $ 360,000 $ 40,000 $ 0 $ 0
3,8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 22 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2013
1384-01-02119 - ATLANTA TITUS
MPO PROJ NUM:IMPROVE ALIGNMENT AND ADD TURN LANES AT HART'S BLUFF SCHOOL PROJECT
DESCR:
FM 14021.4 MI N OF IH 30LIMITS FROM2.1 MI N OF IH 30LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 871,770
$ 871,770 $ 871,770
3-URBAN CRDR:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 64,337IND COSTS: $ 10,897CONTING:
$ 871,770CONST COST:
$ 42,717CONST ENG:
$ 0ROW PURCHASE: $ 42,717PRELIM ENG:
$ 1,032,437TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 871,770
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 0 $ 871,770 $ 0 $ 0 $ 0 $ 871,770 $ 0 $ 0
3
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 23 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2014
0402-04-03019 - ATLANTA HARRISON
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
SH 154AT LAWRENCE CREEKLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 839,322
$ 839,322 $ 839,322
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 61,942IND COSTS: $ 0CONTING:
$ 839,322CONST COST:
$ 62,529CONST ENG:
$ 59,225ROW PURCHASE: $ 41,127PRELIM ENG:
$ 1,064,145TOTAL PRJ COST:
C
REPLACE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 839,322
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 671,458 $ 167,864 $ 0 $ 0 $ 671,458 $ 167,864 $ 0 $ 0
6
0495-08-09619 - ATLANTA HARRISON
MPO PROJ NUM:INSTALL & UPGRADE ROADWAY LIGHTING & HIGH MAST LIGHTING PROJECT
DESCR:
IH 20GREGG COUNTY LINELIMITS FROM0.5 MI. W. OF SH 43LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 79,317
$ 79,317 $ 79,317
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 5,854IND COSTS: $ 1,642CONTING:
$ 79,317CONST COST:
$ 12,389CONST ENG:
$ 0ROW PURCHASE: $ 3,887PRELIM ENG:
$ 108,426TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 79,317
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 63,454 $ 63,454
$ 15,863 $ 15,863
$ 0 $ 0
$ 0 $ 0
1
0495-09-04919 - ATLANTA HARRISON
MPO PROJ NUM:RESURFACE EXISTING INTERSTATE FACILITY PROJECT
DESCR:
IH 200.5 MI. W. OF SH 43LIMITS FROMEAST END OF EIGHT MILE CREEK_BRIDGELIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 6,486,354
$ 6,486,354 $ 6,486,354
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 478,693IND COSTS: $ 3,243CONTING:
$ 6,486,354CONST COST:
$ 317,831CONST ENG:
$ 0ROW PURCHASE: $ 317,831PRELIM ENG:
$ 7,897,136TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 6,486,354
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 5,837,719 $ 5,837,719
$ 648,635 $ 648,635
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 24 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2014
0495-09-05019 - ATLANTA HARRISON
MPO PROJ NUM:INSTALL & UPGRADE ROADWAY LIGHTING & HIGH MAST LIGHTING PROJECT
DESCR:
IH 200.5 MI. W. OF SH 43LIMITS FROMEAST END OF EIGHT MILE CREEK_BRIDGELIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 79,317
$ 79,317 $ 79,317
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 5,854IND COSTS: $ 1,642CONTING:
$ 79,317CONST COST:
$ 12,389CONST ENG:
$ 0ROW PURCHASE: $ 3,887PRELIM ENG:
$ 108,426TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 79,317
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 63,454 $ 63,454
$ 15,863 $ 15,863
$ 0 $ 0
$ 0 $ 0
1
0495-10-08419 - ATLANTA HARRISON
MPO PROJ NUM:INSTALL & UPGRADE ROADWAY LIGHTING & HIGH MAST LIGHTING PROJECT
DESCR:
IH 20EAST END OF EIGHT MILE CREEK_BRIDGELIMITS FROMLOUISIANA STATE LINELIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 79,318
$ 79,318 $ 79,318
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 5,854IND COSTS: $ 1,642CONTING:
$ 79,318CONST COST:
$ 12,389CONST ENG:
$ 0ROW PURCHASE: $ 3,887PRELIM ENG:
$ 108,428TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 79,318
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 63,454 $ 63,454
$ 15,864 $ 15,864
$ 0 $ 0
$ 0 $ 0
1
0919-20-03019 - ATLANTA MORRIS
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
CRON COUNTY ROAD 4114LIMITS FROMAT BRUTONS CREEKLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 313,664
$ 313,664 $ 313,664
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 23,148IND COSTS: $ 0CONTING:
$ 313,664CONST COST:
$ 23,368CONST ENG:
$ 0ROW PURCHASE: $ 15,370PRELIM ENG:
$ 383,046TOTAL PRJ COST:
C
REPLACE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 313,664
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 250,931 $ 62,733 $ 0 $ 0 $ 250,931 $ 62,733 $ 0 $ 0
6
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 25 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2014
0919-00-06919 - ATLANTA CASS
MPO PROJ NUM:2014 DISTRICT SEAL COAT PROJECT
DESCR:
VAVARIOUS LOCATIONSLIMITS FROMVARIOUS LOCATIONSLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 8,355,952
$ 8,355,952 $ 8,355,952
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 616,669IND COSTS: $ 46,793CONTING:
$ 8,355,952CONST COST:
$ 212,241CONST ENG:
$ 0ROW PURCHASE: $ 409,442PRELIM ENG:
$ 9,784,819TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 8,355,952
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 6,684,762 $ 6,684,762
$ 1,671,190 $ 1,671,190
$ 0 $ 0
$ 0 $ 0
1
0085-04-03319 - ATLANTA BOWIE
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
US 259AT RED RIVERLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 8,179,306
$ 8,179,306 $ 8,179,306
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 603,633IND COSTS: $ 0CONTING:
$ 8,179,306CONST COST:
$ 609,358CONST ENG:
$ 33,100ROW PURCHASE: $ 400,786PRELIM ENG:
$ 10,021,668TOTAL PRJ COST:
C
REHABILITATE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 8,179,306
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 6,543,445 $ 1,635,861 $ 0 $ 0 $ 6,543,445 $ 1,635,861 $ 0 $ 0
6
0085-04-03719 - ATLANTA BOWIE
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
US 259ON TEXAS SIDE OF RED RIVER BRIDGELIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
TXDOT
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,343,938
$ 1,343,938 $ 1,343,938
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 99,183IND COSTS: $ 0CONTING:
$ 1,343,938CONST COST:
$ 100,123CONST ENG:
$ 0ROW PURCHASE: $ 65,853PRELIM ENG:
$ 1,641,217TOTAL PRJ COST:
C
REPLACE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,343,938
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,075,150 $ 268,788 $ 0 $ 0 $ 1,075,150 $ 268,788 $ 0 $ 0
6
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 26 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2014
0085-04-03819 - ATLANTA BOWIE
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
US 259ON OKLAHOMA SIDE OF RED RIVER BRIDGLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
TXDOT
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,337,680
$ 1,337,680 $ 1,337,680
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 98,721IND COSTS: $ 0CONTING:
$ 1,337,680CONST COST:
$ 99,657CONST ENG:
$ 0ROW PURCHASE: $ 65,546PRELIM ENG:
$ 1,633,574TOTAL PRJ COST:
C
REPLACE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,337,680
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,070,144 $ 267,536 $ 0 $ 0 $ 1,070,144 $ 267,536 $ 0 $ 0
6
0610-05-04819 - ATLANTA BOWIE
MPO PROJ NUM:REPAIR PAVEMENT & RESURFACE EXISTING INTERSTATE FACILITY PROJECT
DESCR:
IH 30WEST END OF SUPHUR RIVER BRIDGELIMITS FROMSH 98LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 3,020,932
$ 3,020,932 $ 3,020,932
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 222,945IND COSTS: $ 1,510CONTING:
$ 3,020,932CONST COST:
$ 148,026CONST ENG:
$ 0ROW PURCHASE: $ 148,026PRELIM ENG:
$ 3,677,985TOTAL PRJ COST:
C
RESURFACE EXISTING INTERSTATE FACILITY PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 3,020,932
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 2,718,839 $ 2,718,839
$ 302,093 $ 302,093
$ 0 $ 0
$ 0 $ 0
1
0919-00-07019 - ATLANTA CASS
MPO PROJ NUM:2014 DISTRICT SEAL COAT PAVEMENT MARKINGS PROJECT
DESCR:
VAAT VARIOUS LOCATIONSLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,114,048
$ 1,114,048 $ 1,114,048
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 82,217IND COSTS: $ 14,371CONTING:
$ 1,114,048CONST COST:
$ 71,076CONST ENG:
$ 0ROW PURCHASE: $ 54,588PRELIM ENG:
$ 1,400,693TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,114,048
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 891,238 $ 891,238
$ 222,810 $ 222,810
$ 0 $ 0
$ 0 $ 0
1
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 27 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2014
0632-03-04019 - ATLANTA HARRISON
MPO PROJ NUM:REHABILITATE BRIDGE AND APPROACHES PROJECT
DESCR:
FM 134AT BULLARD CREEKLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 876,096
$ 876,096 $ 876,096
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 64,656IND COSTS: $ 40,125CONTING:
$ 876,096CONST COST:
$ 66,320CONST ENG:
$ 0ROW PURCHASE: $ 42,929PRELIM ENG:
$ 1,110,627TOTAL PRJ COST:
C
REHABILITATE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 876,096
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 700,877 $ 175,219 $ 0 $ 0 $ 700,877 $ 175,219 $ 0 $ 0
6
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 28 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0046-04-05919 - ATLANTA BOWIE
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 82FM 1840LIMITS FROMIH 30LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 614,531
$ 614,531 $ 614,531
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 45,352IND COSTS: $ 0CONTING:
$ 614,531CONST COST:
$ 27,470CONST ENG:
$ 0ROW PURCHASE: $ 30,112PRELIM ENG:
$ 736,577TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 614,531
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 553,078 $ 61,453 $ 0 $ 0 $ 553,078 $ 61,453 $ 0 $ 0
8
0062-02-02519 - ATLANTA CASS
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
SH 80.1 MI. S.OF BOWIE C/LLIMITS FROMSH 77LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 356,014
$ 356,014 $ 356,014
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 26,274IND COSTS: $ 0CONTING:
$ 356,014CONST COST:
$ 15,914CONST ENG:
$ 0ROW PURCHASE: $ 17,445PRELIM ENG:
$ 426,718TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 356,014
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 320,413 $ 35,601 $ 0 $ 0 $ 320,413 $ 35,601 $ 0 $ 0
8
0218-04-11219 - ATLANTA CASS
MPO PROJ NUM:INSTALL SAFETY LIGHTING PROJECT
DESCR:
US 59SH 77LIMITS FROMFM 1841LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 29,574
$ 29,574 $ 29,574
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 2,183IND COSTS: $ 0CONTING:
$ 29,574CONST COST:
$ 1,322CONST ENG:
$ 0ROW PURCHASE: $ 1,449PRELIM ENG:
$ 35,447TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 29,574
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 26,617 $ 2,957 $ 0 $ 0 $ 26,617 $ 2,957 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 29 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0218-04-11319 - ATLANTA CASS
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 59SH 77LIMITS FROMFM 1841LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,049,387
$ 1,049,387 $ 1,049,387
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 77,445IND COSTS: $ 0CONTING:
$ 1,049,387CONST COST:
$ 46,908CONST ENG:
$ 0ROW PURCHASE: $ 51,420PRELIM ENG:
$ 1,257,795TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,049,387
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 944,448 $ 104,939 $ 0 $ 0 $ 944,448 $ 104,939 $ 0 $ 0
8
0945-05-02019 - ATLANTA CASS
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
FM 31292.1 MI. N. OF CR 3784LIMITS FROMFM 251LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 526,727
$ 526,727 $ 526,727
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 38,872IND COSTS: $ 0CONTING:
$ 526,727CONST COST:
$ 23,545CONST ENG:
$ 0ROW PURCHASE: $ 25,810PRELIM ENG:
$ 631,334TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 526,727
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 474,054 $ 52,673 $ 0 $ 0 $ 474,054 $ 52,673 $ 0 $ 0
8
1572-03-00819 - ATLANTA CASS
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
FM 2328US 59LIMITS FROMSH 43LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 272,820
$ 272,820 $ 272,820
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 20,134IND COSTS: $ 0CONTING:
$ 272,820CONST COST:
$ 12,195CONST ENG:
$ 0ROW PURCHASE: $ 13,368PRELIM ENG:
$ 327,002TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 272,820
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 245,538 $ 27,282 $ 0 $ 0 $ 245,538 $ 27,282 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 30 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0062-07-08419 - ATLANTA HARRISON
MPO PROJ NUM:INSTALL SAFETY LIGHTING PROJECT
DESCR:
US 59MARION C/LLIMITS FROMUS 80LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 29,574
$ 29,574 $ 29,574
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 2,183IND COSTS: $ 0CONTING:
$ 29,574CONST COST:
$ 1,322CONST ENG:
$ 0ROW PURCHASE: $ 1,449PRELIM ENG:
$ 35,447TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 29,574
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 26,617 $ 2,957 $ 0 $ 0 $ 26,617 $ 2,957 $ 0 $ 0
8
0062-07-08519 - ATLANTA HARRISON
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 59MARION C/LLIMITS FROMUS 80LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 980,988
$ 980,988 $ 980,988
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 72,397IND COSTS: $ 0CONTING:
$ 980,988CONST COST:
$ 43,850CONST ENG:
$ 0ROW PURCHASE: $ 48,068PRELIM ENG:
$ 1,175,813TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 980,988
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 882,889 $ 98,099 $ 0 $ 0 $ 882,889 $ 98,099 $ 0 $ 0
8
0063-01-08619 - ATLANTA HARRISON
MPO PROJ NUM:IMPROVE TRAFFIC SIGNAL PROJECT
DESCR:
US 59AT BELL STREETLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 62,486
$ 62,486 $ 62,486
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 4,611IND COSTS: $ 0CONTING:
$ 62,486CONST COST:
$ 2,793CONST ENG:
$ 0ROW PURCHASE: $ 3,062PRELIM ENG:
$ 74,896TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 62,486
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 56,237 $ 6,249 $ 0 $ 0 $ 56,237 $ 6,249 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 31 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0096-09-07419 - ATLANTA HARRISON
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 80INDIAN SPRINGS ROADLIMITS FROMWEBB ROGERS ROADLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 554,530
$ 554,530 $ 554,530
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 40,924IND COSTS: $ 0CONTING:
$ 554,530CONST COST:
$ 24,787CONST ENG:
$ 0ROW PURCHASE: $ 27,172PRELIM ENG:
$ 664,659TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 554,530
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 499,077 $ 55,453 $ 0 $ 0 $ 499,077 $ 55,453 $ 0 $ 0
8
0640-01-04619 - ATLANTA HARRISON
MPO PROJ NUM:INSTALL SAFETY LIGHTING PROJECT
DESCR:
FM 31INDIAN SPRINGS ROADLIMITS FROMPANOLA C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 29,574
$ 29,574 $ 29,574
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 2,183IND COSTS: $ 0CONTING:
$ 29,574CONST COST:
$ 1,322CONST ENG:
$ 0ROW PURCHASE: $ 1,449PRELIM ENG:
$ 35,447TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 29,574
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 26,617 $ 2,957 $ 0 $ 0 $ 26,617 $ 2,957 $ 0 $ 0
8
0640-01-04719 - ATLANTA HARRISON
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
FM 31INDIAN SPRINGS ROADLIMITS FROMPANOLA C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,204,491
$ 1,204,491 $ 1,204,491
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 88,891IND COSTS: $ 0CONTING:
$ 1,204,491CONST COST:
$ 53,841CONST ENG:
$ 0ROW PURCHASE: $ 59,020PRELIM ENG:
$ 1,443,703TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,204,491
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,084,042 $ 120,449 $ 0 $ 0 $ 1,084,042 $ 120,449 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 32 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
1920-01-02019 - ATLANTA HARRISON
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
FM 1998LP 390LIMITS FROMFM 2199LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 269,160
$ 269,160 $ 269,160
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 19,864IND COSTS: $ 0CONTING:
$ 269,160CONST COST:
$ 12,031CONST ENG:
$ 0ROW PURCHASE: $ 13,189PRELIM ENG:
$ 322,615TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 269,160
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 242,244 $ 26,916 $ 0 $ 0 $ 242,244 $ 26,916 $ 0 $ 0
8
0610-04-03119 - ATLANTA MORRIS
MPO PROJ NUM:RESTORE SECTION & RESURFACE EXISTING INTERSTATE FACILITY PROJECT
DESCR:
IH 30TITUS COUNTY LINELIMITS FROMWEST END OF SULPHUR RIVER BRIDGELIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 11,307,515
$ 11,307,515 $ 11,307,515
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 834,495IND COSTS: $ 5,654CONTING:
$ 11,307,515CONST COST:
$ 554,068CONST ENG:
$ 0ROW PURCHASE: $ 554,068PRELIM ENG:
$ 13,766,900TOTAL PRJ COST:
C
RESURFACE EXISTING INTERSTATE WITH ASPHALTIC CONCRETE PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 11,307,515
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 10,176,764 $ 10,176,764
$ 1,130,752 $ 1,130,752
$ 0 $ 0
$ 0 $ 0
1
0063-04-05719 - ATLANTA PANOLA
MPO PROJ NUM:UPGRADE TRAFFIC SIGNAL @ SAFETY LIGHTING PROJECT
DESCR:
US 59AT FM 699 INTERSECTIONLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 149,719
$ 149,719 $ 149,719
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 11,049IND COSTS: $ 0CONTING:
$ 149,719CONST COST:
$ 6,692CONST ENG:
$ 0ROW PURCHASE: $ 7,336PRELIM ENG:
$ 179,454TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 149,719
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 134,747 $ 14,972 $ 0 $ 0 $ 134,747 $ 14,972 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 33 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0246-02-04719 - ATLANTA PANOLA
MPO PROJ NUM:INSTALL SAFETY LIGHTING PROJECT
DESCR:
US 79SH 149LIMITS FROMFM 124LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 44,671
$ 44,671 $ 44,671
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 3,297IND COSTS: $ 0CONTING:
$ 44,671CONST COST:
$ 1,997CONST ENG:
$ 0ROW PURCHASE: $ 2,189PRELIM ENG:
$ 53,542TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 44,671
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 40,204 $ 4,467 $ 0 $ 0 $ 40,204 $ 4,467 $ 0 $ 0
8
0247-03-02819 - ATLANTA PANOLA
MPO PROJ NUM:INSTALL SAFETY LIGHTING PROJECT
DESCR:
US 79LOUISIANA STATE LINELIMITS FROMFM 31LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 29,574
$ 29,574 $ 29,574
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 2,183IND COSTS: $ 0CONTING:
$ 29,574CONST COST:
$ 1,322CONST ENG:
$ 0ROW PURCHASE: $ 1,449PRELIM ENG:
$ 35,447TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 29,574
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 26,617 $ 2,957 $ 0 $ 0 $ 26,617 $ 2,957 $ 0 $ 0
8
0394-03-03819 - ATLANTA PANOLA
MPO PROJ NUM:INSTALL SAFETY LIGHTING PROJECT
DESCR:
FM 699US 59LIMITS FROMSHELBY C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 15,097
$ 15,097 $ 15,097
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 1,114IND COSTS: $ 0CONTING:
$ 15,097CONST COST:
$ 675CONST ENG:
$ 0ROW PURCHASE: $ 740PRELIM ENG:
$ 18,095TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 15,097
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 13,587 $ 1,510 $ 0 $ 0 $ 13,587 $ 1,510 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 34 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0640-02-02719 - ATLANTA PANOLA
MPO PROJ NUM:INSTALL SAFETY LIGHTING PROJECT
DESCR:
FM 31HARRISON C/LLIMITS FROMFM 123LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 15,097
$ 15,097 $ 15,097
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 1,114IND COSTS: $ 0CONTING:
$ 15,097CONST COST:
$ 675CONST ENG:
$ 0ROW PURCHASE: $ 740PRELIM ENG:
$ 18,095TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 15,097
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 13,587 $ 1,510 $ 0 $ 0 $ 13,587 $ 1,510 $ 0 $ 0
8
0402-02-03219 - ATLANTA UPSHUR
MPO PROJ NUM:INSTALL SAFETY LIGHTING PROJECT
DESCR:
SH 154FM 726(N)LIMITS FROMUS 259LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 73,625
$ 73,625 $ 73,625
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 5,433IND COSTS: $ 0CONTING:
$ 73,625CONST COST:
$ 3,291CONST ENG:
$ 0ROW PURCHASE: $ 3,608PRELIM ENG:
$ 88,246TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 73,625
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 66,263 $ 7,363 $ 0 $ 0 $ 66,263 $ 7,363 $ 0 $ 0
8
0520-05-04119 - ATLANTA UPSHUR
MPO PROJ NUM:INSTALL SAFETY LIGHTING PROJECT
DESCR:
SH 1550.2 MI. W. OF MARION C/LLIMITS FROMOLD COFFEYVILLE ROADLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 73,625
$ 73,625 $ 73,625
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 5,433IND COSTS: $ 0CONTING:
$ 73,625CONST COST:
$ 3,291CONST ENG:
$ 0ROW PURCHASE: $ 3,608PRELIM ENG:
$ 88,246TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 73,625
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 66,263 $ 7,363 $ 0 $ 0 $ 66,263 $ 7,363 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 35 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0083-07-04119 - ATLANTA CAMP
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
SH 11WOOD C/LLIMITS FROMFM 21LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 405,992
$ 405,992 $ 405,992
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 29,962IND COSTS: $ 0CONTING:
$ 405,992CONST COST:
$ 18,148CONST ENG:
$ 0ROW PURCHASE: $ 19,894PRELIM ENG:
$ 486,621TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 405,992
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 365,393 $ 40,599 $ 0 $ 0 $ 365,393 $ 40,599 $ 0 $ 0
8
0919-00-07119 - ATLANTA CASS
MPO PROJ NUM:2015 DISTRICT SEAL COAT PROJECT
DESCR:
VAVARIOUS LOCATIONSLIMITS FROMVARIOUS LOCATIONSLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 9,470,001
$ 9,470,001 $ 9,470,001
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 698,886IND COSTS: $ 53,032CONTING:
$ 9,470,001CONST COST:
$ 240,538CONST ENG:
$ 0ROW PURCHASE: $ 464,030PRELIM ENG:
$ 11,089,371TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 9,470,001
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 7,576,001 $ 7,576,001
$ 1,894,000 $ 1,894,000
$ 0 $ 0
$ 0 $ 0
1
1101-01-01419 - ATLANTA MARION
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
FM 805SH 49LIMITS FROMSH 43LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 318,366
$ 318,366 $ 318,366
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 23,495IND COSTS: $ 0CONTING:
$ 318,366CONST COST:
$ 14,231CONST ENG:
$ 0ROW PURCHASE: $ 15,600PRELIM ENG:
$ 381,593TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 318,366
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 286,529 $ 31,837 $ 0 $ 0 $ 286,529 $ 31,837 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 36 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
1895-03-02119 - ATLANTA MARION
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
FM 726FM 1968LIMITS FROMFM 3001LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 314,694
$ 314,694 $ 314,694
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 23,224IND COSTS: $ 0CONTING:
$ 314,694CONST COST:
$ 14,067CONST ENG:
$ 0ROW PURCHASE: $ 15,420PRELIM ENG:
$ 377,192TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 314,694
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 283,225 $ 31,469 $ 0 $ 0 $ 283,225 $ 31,469 $ 0 $ 0
8
0063-03-05919 - ATLANTA PANOLA
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 59FM 2792LIMITS FROMLP 436LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 499,670
$ 499,670 $ 499,670
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 36,876IND COSTS: $ 0CONTING:
$ 499,670CONST COST:
$ 22,335CONST ENG:
$ 0ROW PURCHASE: $ 24,484PRELIM ENG:
$ 598,905TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 499,670
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 449,703 $ 49,967 $ 0 $ 0 $ 449,703 $ 49,967 $ 0 $ 0
8
0063-05-03519 - ATLANTA PANOLA
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 590.4 MI. N. OF CR 420LIMITS FROMSHELBY C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 626,333
$ 626,333 $ 626,333
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 46,223IND COSTS: $ 0CONTING:
$ 626,333CONST COST:
$ 27,997CONST ENG:
$ 0ROW PURCHASE: $ 30,690PRELIM ENG:
$ 750,723TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 626,333
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 563,700 $ 62,633 $ 0 $ 0 $ 563,700 $ 62,633 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 37 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0246-02-04819 - ATLANTA PANOLA
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 79SH 149LIMITS FROMFM 124LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 811,261
$ 811,261 $ 811,261
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 59,871IND COSTS: $ 0CONTING:
$ 811,261CONST COST:
$ 36,263CONST ENG:
$ 0ROW PURCHASE: $ 39,752PRELIM ENG:
$ 972,377TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 811,261
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 730,135 $ 81,126 $ 0 $ 0 $ 730,135 $ 81,126 $ 0 $ 0
8
0247-03-02919 - ATLANTA PANOLA
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 79LOUISIANA STATE LINELIMITS FROMFM 31LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 752,152
$ 752,152 $ 752,152
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 55,509IND COSTS: $ 0CONTING:
$ 752,152CONST COST:
$ 33,621CONST ENG:
$ 0ROW PURCHASE: $ 36,855PRELIM ENG:
$ 901,529TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 752,152
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 676,937 $ 75,215 $ 0 $ 0 $ 676,937 $ 75,215 $ 0 $ 0
8
0393-03-03319 - ATLANTA PANOLA
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
SH 149RUSK C/LLIMITS FROMFM 959LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 549,408
$ 549,408 $ 549,408
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 40,546IND COSTS: $ 0CONTING:
$ 549,408CONST COST:
$ 24,559CONST ENG:
$ 0ROW PURCHASE: $ 26,921PRELIM ENG:
$ 658,521TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 549,408
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 494,467 $ 54,941 $ 0 $ 0 $ 494,467 $ 54,941 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 38 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0394-01-06219 - ATLANTA PANOLA
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
SH 149FM 959LIMITS FROMUS 79LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 383,872
$ 383,872 $ 383,872
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 28,330IND COSTS: $ 0CONTING:
$ 383,872CONST COST:
$ 17,159CONST ENG:
$ 0ROW PURCHASE: $ 18,810PRELIM ENG:
$ 460,109TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 383,872
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 345,485 $ 38,387 $ 0 $ 0 $ 345,485 $ 38,387 $ 0 $ 0
8
1222-01-03019 - ATLANTA PANOLA
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
FM 10COTTON STREETLIMITS FROMFM 2260LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 717,430
$ 717,430 $ 717,430
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 52,946IND COSTS: $ 0CONTING:
$ 717,430CONST COST:
$ 32,069CONST ENG:
$ 0ROW PURCHASE: $ 35,154PRELIM ENG:
$ 859,912TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 717,430
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 645,687 $ 71,743 $ 0 $ 0 $ 645,687 $ 71,743 $ 0 $ 0
8
1894-01-02219 - ATLANTA PANOLA
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
FM 1971SH 315LIMITS FROMCR 190LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 380,435
$ 380,435 $ 380,435
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 28,076IND COSTS: $ 0CONTING:
$ 380,435CONST COST:
$ 17,005CONST ENG:
$ 0ROW PURCHASE: $ 18,641PRELIM ENG:
$ 455,989TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 380,435
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 342,392 $ 38,044 $ 0 $ 0 $ 342,392 $ 38,044 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 39 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0221-09-02719 - ATLANTA TITUS
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
BU 271EUS 271LIMITS FROMSH 49LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 321,378
$ 321,378 $ 321,378
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 23,718IND COSTS: $ 0CONTING:
$ 321,378CONST COST:
$ 14,366CONST ENG:
$ 0ROW PURCHASE: $ 15,748PRELIM ENG:
$ 385,204TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 321,378
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 289,240 $ 32,138 $ 0 $ 0 $ 289,240 $ 32,138 $ 0 $ 0
8
0248-05-06119 - ATLANTA UPSHUR
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 271SH 154LIMITS FROMGREGG C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,084,008
$ 1,084,008 $ 1,084,008
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 80,000IND COSTS: $ 0CONTING:
$ 1,084,008CONST COST:
$ 48,455CONST ENG:
$ 0ROW PURCHASE: $ 53,116PRELIM ENG:
$ 1,299,292TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,084,008
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 975,607 $ 108,401 $ 0 $ 0 $ 975,607 $ 108,401 $ 0 $ 0
8
0401-04-03419 - ATLANTA UPSHUR
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
SH 154FM 1002LIMITS FROMFM 852LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 858,548
$ 858,548 $ 858,548
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 63,361IND COSTS: $ 0CONTING:
$ 858,548CONST COST:
$ 38,377CONST ENG:
$ 0ROW PURCHASE: $ 42,069PRELIM ENG:
$ 1,029,056TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 858,548
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 772,693 $ 85,855 $ 0 $ 0 $ 772,693 $ 85,855 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 40 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0402-02-03119 - ATLANTA UPSHUR
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
SH 154FM 726(N)LIMITS FROMUS 259LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 120,961
$ 120,961 $ 120,961
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 8,927IND COSTS: $ 0CONTING:
$ 120,961CONST COST:
$ 5,407CONST ENG:
$ 0ROW PURCHASE: $ 5,927PRELIM ENG:
$ 144,984TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 120,961
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 108,865 $ 12,096 $ 0 $ 0 $ 108,865 $ 12,096 $ 0 $ 0
8
0218-03-08319 - ATLANTA CASS
MPO PROJ NUM:OVERLAY EXISTING 4-LANE HIGHWAY WITH CONCRETE PAVEMENT (NORTHBOUND LANES ONLY)
PROJECT DESCR:
US 590.1 MI N OF FM 3129LIMITS FROMBOWIE C/L (NORTHBOUND LANES ONLY)LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 4,294,820
$ 4,294,820 $ 4,294,820
1-PRVNT TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 316,958IND COSTS: $ 2,147CONTING:
$ 4,294,820CONST COST:
$ 210,446CONST ENG:
$ 0ROW PURCHASE: $ 210,446PRELIM ENG:
$ 5,228,943TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 4,294,820
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL $ 3,435,856 $ 3,435,856
$ 858,964 $ 858,964
$ 0 $ 0
$ 0 $ 0
1
0063-01-08519 - ATLANTA HARRISON
MPO PROJ NUM:IMPROVE TRAFFIC SIGNAL AND REALIGN/CONFIGURE LEFT TURN LANES PROJECT
DESCR:
US 59AT INTERSECTION OF SH 43LIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 248,707
$ 248,707 $ 248,707
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 18,355IND COSTS: $ 0CONTING:
$ 248,707CONST COST:
$ 11,117CONST ENG:
$ 0ROW PURCHASE: $ 12,187PRELIM ENG:
$ 298,101TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 248,707
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 223,836 $ 24,871 $ 0 $ 0 $ 223,836 $ 24,871 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 41 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0919-22-03119 - ATLANTA MARION
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
CRON CR 3306 AT HUNTS CREEKLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 337,459
$ 337,459 $ 337,459
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 24,904IND COSTS: $ 0CONTING:
$ 337,459CONST COST:
$ 25,141CONST ENG:
$ 0ROW PURCHASE: $ 16,536PRELIM ENG:
$ 404,040TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 337,459
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 269,967 $ 67,492 $ 0 $ 0 $ 269,967 $ 67,492 $ 0 $ 0
6
0520-04-02619 - ATLANTA MARION
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
SH 155AT BIG CYPRESS CK (LAKE O'THE PINESLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 18,538,884
$ 18,538,884 $ 18,538,884
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 1,368,170IND COSTS: $ 0CONTING:
$ 18,538,884CONST COST:
$ 1,381,147CONST ENG:
$ 207,750ROW PURCHASE: $ 908,405PRELIM ENG:
$ 22,847,435TOTAL PRJ COST:
C
REPLACE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 18,538,884
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 14,831,107 $ 3,707,777 $ 0 $ 0 $ 14,831,107 $ 3,707,777 $ 0 $ 0
6
0062-01-03519 - ATLANTA BOWIE
MPO PROJ NUM:REPLACE BRIDGES AND APPROACHES PROJECT
DESCR:
SH 8AT SULPHUR RIVER & SULPHUR RIV RELLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 29,246,464
$ 29,246,464 $ 29,246,464
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 2,158,389IND COSTS: $ 0CONTING:
$ 29,246,464CONST COST:
$ 2,178,862CONST ENG:
$ 0ROW PURCHASE: $ 1,433,077PRELIM ENG:
$ 35,715,782TOTAL PRJ COST:
C
APPENDIX D PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 29,246,464
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 23,397,171 $ 5,849,293 $ 0 $ 0 $ 23,397,171 $ 5,849,293 $ 0 $ 0
6
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 42 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2015
0062-02-02419 - ATLANTA CASS
MPO PROJ NUM:CASS COUNTY APPROACH TO SULPHUR RIVER BRIDGE PROJECT
DESCR:
SH 8AT SULPHUR RIVER & SULPHUR RIV RELLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 2,812,160
$ 2,812,160 $ 2,812,160
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 207,537IND COSTS: $ 0CONTING:
$ 2,812,160CONST COST:
$ 209,506CONST ENG:
$ 0ROW PURCHASE: $ 137,796PRELIM ENG:
$ 3,434,210TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 2,812,160
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 2,249,728 $ 562,432 $ 0 $ 0 $ 2,249,728 $ 562,432 $ 0 $ 0
6
0221-05-06419 - ATLANTA TITUS
MPO PROJ NUM:REPLACE BRIDGES AND APPROACHES PROJECT
DESCR:
US 271AT RIPLEY CREEK AND RELIEFLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 4,611,942
$ 4,611,942 $ 4,611,942
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 340,361IND COSTS: $ 0CONTING:
$ 4,611,942CONST COST:
$ 343,590CONST ENG:
$ 0ROW PURCHASE: $ 225,985PRELIM ENG:
$ 5,632,104TOTAL PRJ COST:
C
APPENDIX D PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 4,611,942
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 3,689,554 $ 922,388 $ 0 $ 0 $ 3,689,554 $ 922,388 $ 0 $ 0
6
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 43 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2016
0010-12-06719 - ATLANTA BOWIE
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 67FM 2149LIMITS FROMSH 8 (NORTH)LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 467,225
$ 467,225 $ 467,225
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 34,481IND COSTS: $ 0CONTING:
$ 467,225CONST COST:
$ 20,885CONST ENG:
$ 0ROW PURCHASE: $ 22,894PRELIM ENG:
$ 560,016TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 467,225
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 420,503 $ 46,723 $ 0 $ 0 $ 420,503 $ 46,723 $ 0 $ 0
8
0096-08-05219 - ATLANTA HARRISON
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 80FM 450LIMITS FROMSH 154 (LP 390)LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 973,683
$ 973,683 $ 973,683
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 71,858IND COSTS: $ 0CONTING:
$ 973,683CONST COST:
$ 43,524CONST ENG:
$ 0ROW PURCHASE: $ 47,710PRELIM ENG:
$ 1,167,057TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 973,683
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 876,315 $ 97,368 $ 0 $ 0 $ 876,315 $ 97,368 $ 0 $ 0
8
0138-13-01619 - ATLANTA HARRISON
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
FM 2208MARION C/LLIMITS FROMFM 450LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 541,303
$ 541,303 $ 541,303
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 39,948IND COSTS: $ 0CONTING:
$ 541,303CONST COST:
$ 24,196CONST ENG:
$ 0ROW PURCHASE: $ 26,524PRELIM ENG:
$ 648,805TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 541,303
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 487,173 $ 54,130 $ 0 $ 0 $ 487,173 $ 54,130 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 44 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2016
0208-02-03819 - ATLANTA HARRISON
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
SH 43FM 2682LIMITS FROMMARSHALL LEIGH ROADLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 632,639
$ 632,639 $ 632,639
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 46,689IND COSTS: $ 0CONTING:
$ 632,639CONST COST:
$ 28,279CONST ENG:
$ 0ROW PURCHASE: $ 30,999PRELIM ENG:
$ 758,281TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 632,639
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 569,375 $ 63,264 $ 0 $ 0 $ 569,375 $ 63,264 $ 0 $ 0
8
0495-10-08919 - ATLANTA HARRISON
MPO PROJ NUM:INSTALL SAFETY LIGHTING PROJECT
DESCR:
IH 20FM 31LIMITS FROMLOUISIANA STATE LINELIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,184,801
$ 1,184,801 $ 1,184,801
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 87,438IND COSTS: $ 0CONTING:
$ 1,184,801CONST COST:
$ 52,961CONST ENG:
$ 0ROW PURCHASE: $ 58,055PRELIM ENG:
$ 1,420,102TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,184,801
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,066,321 $ 118,480 $ 0 $ 0 $ 1,066,321 $ 118,480 $ 0 $ 0
8
0919-03-05019 - ATLANTA HARRISON
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
CRON CR 1114 AT DRAWLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 438,112
$ 438,112 $ 438,112
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 32,333IND COSTS: $ 0CONTING:
$ 438,112CONST COST:
$ 32,639CONST ENG:
$ 0ROW PURCHASE: $ 21,467PRELIM ENG:
$ 535,022TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 438,112
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 350,490 $ 87,622 $ 0 $ 0 $ 350,490 $ 87,622 $ 0 $ 0
6
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 45 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2016
0919-03-05119 - ATLANTA HARRISON
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
CRON CR 2607 AT HARRISON BAYOU BRANCHLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 497,190
$ 497,190 $ 497,190
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 36,693IND COSTS: $ 0CONTING:
$ 497,190CONST COST:
$ 37,041CONST ENG:
$ 0ROW PURCHASE: $ 24,362PRELIM ENG:
$ 607,168TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 497,190
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 397,752 $ 99,438 $ 0 $ 0 $ 397,752 $ 99,438 $ 0 $ 0
6
1575-04-01419 - ATLANTA HARRISON
MPO PROJ NUM:INSTALL FLASHING BEACON & SAFETY LIGHTING PROJECT
DESCR:
SL 390AT FM 1997(N) (NORWOOD ST)LIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 259,299
$ 259,299 $ 259,299
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 19,136IND COSTS: $ 0CONTING:
$ 259,299CONST COST:
$ 11,591CONST ENG:
$ 0ROW PURCHASE: $ 12,706PRELIM ENG:
$ 310,796TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 259,299
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 233,369 $ 25,930 $ 0 $ 0 $ 233,369 $ 25,930 $ 0 $ 0
8
3283-01-01519 - ATLANTA HARRISON
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
FM 2625FM 31LIMITS FROMFM 9LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 674,868
$ 674,868 $ 674,868
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 49,805IND COSTS: $ 0CONTING:
$ 674,868CONST COST:
$ 30,167CONST ENG:
$ 0ROW PURCHASE: $ 33,069PRELIM ENG:
$ 808,896TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 674,868
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 607,381 $ 67,487 $ 0 $ 0 $ 607,381 $ 67,487 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 46 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2016
0010-08-05319 - ATLANTA MORRIS
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 67FM 161LIMITS FROMTITUS C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 732,180
$ 732,180 $ 732,180
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 54,035IND COSTS: $ 0CONTING:
$ 732,180CONST COST:
$ 32,728CONST ENG:
$ 0ROW PURCHASE: $ 35,877PRELIM ENG:
$ 877,591TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 732,180
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 658,962 $ 73,218 $ 0 $ 0 $ 658,962 $ 73,218 $ 0 $ 0
8
0085-01-04319 - ATLANTA MORRIS
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 259IH 30LIMITS FROMUS 67LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 689,148
$ 689,148 $ 689,148
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 50,859IND COSTS: $ 0CONTING:
$ 689,148CONST COST:
$ 30,805CONST ENG:
$ 0ROW PURCHASE: $ 33,768PRELIM ENG:
$ 826,013TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 689,148
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 620,233 $ 68,915 $ 0 $ 0 $ 620,233 $ 68,915 $ 0 $ 0
8
0222-02-05319 - ATLANTA MORRIS
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
SH 49TITUS C/LLIMITS FROMUS 259LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 518,254
$ 518,254 $ 518,254
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 38,247IND COSTS: $ 0CONTING:
$ 518,254CONST COST:
$ 23,166CONST ENG:
$ 0ROW PURCHASE: $ 25,394PRELIM ENG:
$ 621,179TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 518,254
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 466,429 $ 51,825 $ 0 $ 0 $ 466,429 $ 51,825 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 47 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2016
0063-04-05619 - ATLANTA PANOLA
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 59US 79LIMITS FROM0.4 MI. N. OF CR 420LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,898,188
$ 1,898,188 $ 1,898,188
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 140,086IND COSTS: $ 0CONTING:
$ 1,898,188CONST COST:
$ 84,849CONST ENG:
$ 0ROW PURCHASE: $ 93,011PRELIM ENG:
$ 2,275,168TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,898,188
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,708,369 $ 189,819 $ 0 $ 0 $ 1,708,369 $ 189,819 $ 0 $ 0
8
0247-01-05019 - ATLANTA PANOLA
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 79SABINE RIVERLIMITS FROMUS 59/US 79LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 635,579
$ 635,579 $ 635,579
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 46,906IND COSTS: $ 0CONTING:
$ 635,579CONST COST:
$ 28,410CONST ENG:
$ 0ROW PURCHASE: $ 31,143PRELIM ENG:
$ 761,805TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 635,579
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 572,021 $ 63,558 $ 0 $ 0 $ 572,021 $ 63,558 $ 0 $ 0
8
0394-03-03919 - ATLANTA PANOLA
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
FM 699US 59LIMITS FROMSHELBY C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,035,516
$ 1,035,516 $ 1,035,516
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 76,421IND COSTS: $ 0CONTING:
$ 1,035,516CONST COST:
$ 46,288CONST ENG:
$ 0ROW PURCHASE: $ 50,740PRELIM ENG:
$ 1,241,170TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,035,516
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 931,964 $ 103,552 $ 0 $ 0 $ 931,964 $ 103,552 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 48 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2016
0640-02-02819 - ATLANTA PANOLA
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
FM 31HARRISON C/LLIMITS FROMFM 123LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 739,080
$ 739,080 $ 739,080
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 54,544IND COSTS: $ 0CONTING:
$ 739,080CONST COST:
$ 33,037CONST ENG:
$ 0ROW PURCHASE: $ 36,215PRELIM ENG:
$ 885,861TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 739,080
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 665,172 $ 73,908 $ 0 $ 0 $ 665,172 $ 73,908 $ 0 $ 0
8
0731-01-04919 - ATLANTA PANOLA
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
FM 31FM 123LIMITS FROMFM 2517LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 606,741
$ 606,741 $ 606,741
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 44,777IND COSTS: $ 0CONTING:
$ 606,741CONST COST:
$ 27,121CONST ENG:
$ 0ROW PURCHASE: $ 29,730PRELIM ENG:
$ 727,240TOTAL PRJ COST:
C
. PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 606,741
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 546,067 $ 60,674 $ 0 $ 0 $ 546,067 $ 60,674 $ 0 $ 0
8
0221-05-08219 - ATLANTA TITUS
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 271FRANKLIN C/LLIMITS FROMUS 67LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,320,272
$ 1,320,272 $ 1,320,272
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 97,436IND COSTS: $ 0CONTING:
$ 1,320,272CONST COST:
$ 59,016CONST ENG:
$ 0ROW PURCHASE: $ 64,693PRELIM ENG:
$ 1,582,479TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,320,272
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,188,245 $ 132,027 $ 0 $ 0 $ 1,188,245 $ 132,027 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 49 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2016
0392-02-08619 - ATLANTA UPSHUR
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
US 259FM 557LIMITS FROMGREGG C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,476,010
$ 1,476,010 $ 1,476,010
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 108,930IND COSTS: $ 0CONTING:
$ 1,476,010CONST COST:
$ 65,978CONST ENG:
$ 0ROW PURCHASE: $ 72,324PRELIM ENG:
$ 1,769,145TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,476,010
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,328,409 $ 147,601 $ 0 $ 0 $ 1,328,409 $ 147,601 $ 0 $ 0
8
0520-02-05719 - ATLANTA UPSHUR
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
SH 155US 271LIMITS FROMFM 1002LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 644,440
$ 644,440 $ 644,440
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 47,560IND COSTS: $ 0CONTING:
$ 644,440CONST COST:
$ 28,806CONST ENG:
$ 0ROW PURCHASE: $ 31,578PRELIM ENG:
$ 772,425TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 644,440
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 579,996 $ 64,444 $ 0 $ 0 $ 579,996 $ 64,444 $ 0 $ 0
8
0520-05-04219 - ATLANTA UPSHUR
MPO PROJ NUM:TEXTURIZE SHOULDERS & CL TEXTURING PROJECT
DESCR:
SH 1550.2 MI. W. OF MARION C/LLIMITS FROMOLD COFFEYVILLE ROADLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,266,086
$ 1,266,086 $ 1,266,086
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 93,437IND COSTS: $ 0CONTING:
$ 1,266,086CONST COST:
$ 56,594CONST ENG:
$ 0ROW PURCHASE: $ 62,038PRELIM ENG:
$ 1,517,530TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,266,086
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,139,477 $ 126,609 $ 0 $ 0 $ 1,139,477 $ 126,609 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 50 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2016
0964-02-02719 - ATLANTA UPSHUR
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
FM 2088FM 556(N)LIMITS FROMFM 2454LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 535,821
$ 535,821 $ 535,821
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 39,544IND COSTS: $ 0CONTING:
$ 535,821CONST COST:
$ 23,951CONST ENG:
$ 0ROW PURCHASE: $ 26,255PRELIM ENG:
$ 642,235TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 535,821
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 482,239 $ 53,582 $ 0 $ 0 $ 482,239 $ 53,582 $ 0 $ 0
8
0633-05-01819 - ATLANTA CAMP
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
FM 1519FM 3042LIMITS FROMFM 556LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 556,721
$ 556,721 $ 556,721
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 41,086IND COSTS: $ 0CONTING:
$ 556,721CONST COST:
$ 24,885CONST ENG:
$ 0ROW PURCHASE: $ 27,279PRELIM ENG:
$ 667,286TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 556,721
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 501,049 $ 55,672 $ 0 $ 0 $ 501,049 $ 55,672 $ 0 $ 0
8
1019-02-03119 - ATLANTA CAMP
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
FM 557US 271LIMITS FROMUPSHUR C/LLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,207,250
$ 1,207,250 $ 1,207,250
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 89,095IND COSTS: $ 0CONTING:
$ 1,207,250CONST COST:
$ 53,964CONST ENG:
$ 0ROW PURCHASE: $ 59,155PRELIM ENG:
$ 1,447,010TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,207,250
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,086,525 $ 120,725 $ 0 $ 0 $ 1,086,525 $ 120,725 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 51 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2016
0546-08-01219 - ATLANTA CASS
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
FM 1399FM 250LIMITS FROMSH 8LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,208,909
$ 1,208,909 $ 1,208,909
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 89,217IND COSTS: $ 0CONTING:
$ 1,208,909CONST COST:
$ 54,038CONST ENG:
$ 0ROW PURCHASE: $ 59,237PRELIM ENG:
$ 1,448,998TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,208,909
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,088,018 $ 120,891 $ 0 $ 0 $ 1,088,018 $ 120,891 $ 0 $ 0
8
0546-09-03819 - ATLANTA CASS
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
FM 125US 59LIMITS FROMFM 251LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,514,065
$ 1,514,065 $ 1,514,065
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 111,738IND COSTS: $ 0CONTING:
$ 1,514,065CONST COST:
$ 67,679CONST ENG:
$ 0ROW PURCHASE: $ 74,189PRELIM ENG:
$ 1,814,759TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,514,065
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,362,659 $ 151,407 $ 0 $ 0 $ 1,362,659 $ 151,407 $ 0 $ 0
8
2773-02-01219 - ATLANTA CASS
MPO PROJ NUM:INSTALL LED FLASHING CHEVRONS, TEXTURIZE SHOULDERS & CENTERLINE TEXTURINGPROJECT
DESCR:
FM 2791FM 96LIMITS FROMUS 59LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 538,594
$ 538,594 $ 538,594
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 39,748IND COSTS: $ 0CONTING:
$ 538,594CONST COST:
$ 24,075CONST ENG:
$ 0ROW PURCHASE: $ 26,391PRELIM ENG:
$ 645,559TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 538,594
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 484,735 $ 53,859 $ 0 $ 0 $ 484,735 $ 53,859 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 52 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2016
0546-08-01119 - ATLANTA CASS
MPO PROJ NUM:SAFETY TREAT FIXED OBJECTS PROJECT
DESCR:
FM 1399FM 250LIMITS FROMSH 8LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,126,690
$ 1,126,690 $ 1,126,690
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 83,150IND COSTS: $ 0CONTING:
$ 1,126,690CONST COST:
$ 50,363CONST ENG:
$ 0ROW PURCHASE: $ 55,208PRELIM ENG:
$ 1,350,451TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,126,690
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,014,021 $ 112,669 $ 0 $ 0 $ 1,014,021 $ 112,669 $ 0 $ 0
8
1572-03-00719 - ATLANTA CASS
MPO PROJ NUM:SAFE TREAT FIXED OBJECTS & WIDEN LN PROJECT
DESCR:
FM 2328US 59LIMITS FROMSH 43LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 762,601
$ 762,601 $ 762,601
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 56,280IND COSTS: $ 0CONTING:
$ 762,601CONST COST:
$ 34,088CONST ENG:
$ 0ROW PURCHASE: $ 37,367PRELIM ENG:
$ 914,054TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 762,601
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 686,341 $ 76,260 $ 0 $ 0 $ 686,341 $ 76,260 $ 0 $ 0
8
1101-01-01319 - ATLANTA MARION
MPO PROJ NUM:SAFE TREAT FIXED OBJECTS & WIDEN LN PROJECT
DESCR:
FM 805CR 3410LIMITS FROM1.3 MI. E. OF SH 43LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 874,469
$ 874,469 $ 874,469
8-SAFETY:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 64,536IND COSTS: $ 0CONTING:
$ 874,469CONST COST:
$ 39,089CONST ENG:
$ 0ROW PURCHASE: $ 42,849PRELIM ENG:
$ 1,048,138TOTAL PRJ COST:
C
PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 874,469
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 787,022 $ 87,447 $ 0 $ 0 $ 787,022 $ 87,447 $ 0 $ 0
8
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAMTIP FY 2013-2016
WEDNESDAY, MARCH 21, 201212:29:38 PM
PAGE: 53 OF 53
GROUPED PROJECTS
TXDOT ATLANTA DISTRICT
FY 2016
1895-03-01919 - ATLANTA MARION
MPO PROJ NUM:REPLACE BRIDGE AND APPROACHES PROJECT
DESCR:
FM 726AT BRUSHY CREEKLIMITS FROM.LIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 1,266,956
$ 1,266,956 $ 1,266,956
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 93,501IND COSTS: $ 58,027CONTING:
$ 1,266,956CONST COST:
$ 95,909CONST ENG:
$ 0ROW PURCHASE: $ 62,081PRELIM ENG:
$ 1,606,120TOTAL PRJ COST:
C
REHABILITATE BRIDGE AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 1,266,956
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 1,013,565 $ 253,391 $ 0 $ 0 $ 1,013,565 $ 253,391 $ 0 $ 0
6
0221-05-06519 - ATLANTA TITUS
MPO PROJ NUM:REPLACE BRIDGES AND APPROACHES PROJECT
DESCR:
US 271AT DICKSON CREEK, BIG SLOUGH, WHITELIMITS FROMCREEK, AND WHITE OAK CREEK RELIEFLIMITS TO:
07/2012REVISION DATE:
AUTHORIZED FUNDING BY CATEGORY/SHARE
$ 10,109,328
$ 10,109,328 $ 10,109,328
6-STRUCT RHB:TOTAL:
REMARKS P7:
$ 0BND FINANCING: $ 746,068IND COSTS: $ 0CONTING:
$ 10,109,328CONST COST:
$ 753,145CONST ENG:
$ 0ROW PURCHASE: $ 495,357PRELIM ENG:
$ 12,345,511TOTAL PRJ COST:
C
REPLACE BRIDGES AND APPROACHES PROJECT HISTORY:
*
DISTRICT COUNTY CSJ HWY PHASE CITY
FUNDING CAT(S):
PROJECT SPONSOR YOE COST
$ 10,109,328
TOTAL PROJECT COST INFORMATION
COST OF APPROVED PHASES:
FEDERAL STATE LOCAL LC TOTAL
$ 8,087,462 $ 2,021,866 $ 0 $ 0 $ 8,087,462 $ 2,021,866 $ 0 $ 0
6
PHASE: C = CONSTRUCTION, E = ENGINEERING, R = ROW, T = TRANSFER
* FUNDING NOT FIXED