Additional agenda for 12th Meeting of SR constituents regarding Connectivity/LTA applications

Page-1 of 6

Additional agenda Note for 12th Meeting of Southern Region contituents

regarding Connectivity/Long-term Access Applications of IPPs in SR

1.0 ADDITIONAL AGENDA FOR THE MEETING

1.1 To consider grant of Long-term Access for 3 nos. of additional applications who had

applied for grant of LTA as per CERC Regulations, 2009 and their application for

connectivity mentioned in the earlier circulated main agenda at sl. no. 7, 10 & 12 in

Table-1.1 is also proposed for consideration in the present meeting. The details of

LTA application is given below.

Table – 1.1

Quantum allocated in the

region

Sl.

No.

Applicant Installed

Capacity

(MW)

LTA

applied

for (MW)

Time

Frame

SR WR NR

1. NLC TS-I (Replacement) 1000 400 Apr, 2015 400 0 0

2. NTPC Limited - Kudgi 2400 2392.49 May, 2015 2392.49 0 0

3. PPN Power Generating

Company Pvt. Ltd.

1080 360 Sept, 2013 360 0 0

Total 4480 3152.49 3152.49 0 0

1.2 To consider revision of transmission system associated with ISGS projects in

Nagapattinam / Cuddalore area, Tamil Nadu.

A. LONG-TERM ACCESS APPLICATIONS

2.0 TRANSMISSION SYSTEM FOR NEYVELI LIGMITE CORPORATION LTD.

GENERATION PROJECT

Project Details

Quantum allocated in the

region

Sl.

No.

Applicant Installed

Capacity

(MW)

LTA

applied

for (MW)

Time

Frame

SR WR NR

1. Neyveli Lignite Corporation

Ltd. TS-I (Replacement)

1000 400 Apr, 2015 400 0 0

As discussed in the main agenda, Connectivity transmission system has been

finalized in the 11th meeting of SR constituents regarding Connectivity/LTA

applications. The NLC vide their letter dated 23.03.2011 had indicated that MoP has

allocated 600 MW from the proposed NNTPS entirely for Tamil Nadu and has

allocated the balance 400 MW only amongst the Southern Region beneficiaries

(including Tamil Nadu) as per the Gadgil formula, considering NNTPS as a

Additional agenda for 12th Meeting of SR constituents regarding Connectivity/LTA applications

Page-2 of 6

replacement project of the existing 600 MW NLC-TPS-I whose sole beneficiary is

TNEB.

Presently Neyveli TPS-I generation is stepped at 220 kV level and power from this

plant is evacuated through 220 kV lines. As indicated by NLC, the new plant is being

stepped up at 400 kV level. Looking into all these provision has been kept for 2x315

MVA, 400/220 kV transformer alongwith associated 400 kV and 220 kV bays as part

of Connectivity transmission system for utilization of existing 220kV transmission

network for transfer of 600MW to TNEB.

However for the additional 400 MW for which LTA have applied is to be transferred

to Southern region beneficiaries through displacement by interconnecting the

generation project to Sholinganallur 400kV Substation through 400kV D/c

transmission line. Sholinganallur substation is proposed under wind generation

projects of Tamil Nadu to be implemented by TNEB. In the event of TNEB not

started the implementation of Sholinganallur substation then, the same is proposed

under this project as GIS substation. The load flow study results are placed at

Exhibit-I.

Proposal : In view of above it is proposed to grant LTA to following applicant as per

details given below subject to following strengthening of grid.

Quantum allocated

in the region

Sl.

No.

Applicant Installed

Capacity

(MW)

LTA

applied

for (MW)

Time

Frame

SR WR NR

1. Neyveli Lignite Corporation

Ltd. TS-I (Replacement)

1000 400 Apr, 2015 400 0 0

A. Transmission System proposed for Connectivity:

(i) LILO of existing Neyveli TS-II – Neyveli TS-I expansion 400 kV S/c at generation

switchyard

(ii) Provision of 2x315 MVA, 400/220 kV transformer at generation switchyard

(iii) 1x80 MVAR Bus Reactor at generation switchyard

B. Transmission System Strengthening:

(i) Neyveli (replacement) – Sholinganallur 400kV D/c line

(ii) Establishment of new GIS 400/220 kV, 2x500 MVA substation at Sholinganallur.

Additional agenda for 12th Meeting of SR constituents regarding Connectivity/LTA applications

Page-3 of 6

3.0 TRANSMISSION SYSTEM FOR NTPC LTD. GENERATION PROJECT IN KUDGI-I

(3x800 MW) OF NTPC LTD.

Project Details

Quantum allocated in the

region

Sl.

No.

Applicant Installed

Capacity

(MW)

LTA

applied

for (MW)

Time

Frame

SR WR NR

1. NTPC Limited - Kudgi 2400 2392.49 May, 2015 2392.49 0 0

The Connectivity transmission system has been proposed in the main agenda for the

proposed generation project of NTPC Ltd. at Kudgi in Karnataka. The NTPC have

applied for LTA for the proposed generation project with the beneficiaries as

Southern region constituents.

A. Transmission System proposed for Connectivity:

(i) Generation switchyard – Narendra (New) 400 kV D/c (Quad) line

(ii) Provision of Bus reactor of 2x125 MVAR at generation switchyard.

(iii) Provision of 2x500 MVA, 400/220 kV transformers at generation switchyard or

Generation switchyard – Basawana Bagewadi 400 kV D/c (Quad) line in the

event of KPTCL commission this substation under the associated transmission

system of Yeramarus & Edlapur generation.

B. Transmission System Strengthening:

(i) Narendra (New) – Madhugiri 765 kV D/c line (earlier proposed under Common

Transmission System for ISGS projects of Cuddalore/Nagapattinam area)

(ii) Madhugiri – Bangalore 400 kV D/c (quad) line.

The load flow studies with the above strengthening and the results are placed at

Exhibit – II. From the study results it may be observed that line loadings in the ISTS

system in Karnataka are well within the limits. Further the studies have been

repeated for Karnataka’s proposed generation at Yeramarus and Edlapur alongwith

its associated transmission system (study results enclosed at Exhibit-III) wherein the

proposed system of Kudgi dovetails well with the proposed system.

Proposal : In view of above it is proposed to grant LTA to following applicant as per

details given below subject to above proposed strengthening of grid.

Additional agenda for 12th Meeting of SR constituents regarding Connectivity/LTA applications

Page-4 of 6

4.0 TRANSMISSION SYSTEM FOR PPN POWER GENERATION PROJECT (360

MW) IN NAGAPATTINAM AREA.

In addition to the other IPP generation developers in the Nagapattinam/Cuddalore

area PPN Power Generating Company Pvt. Ltd. has also applied LTA under CERC

Regulations 2009, the details of LTA application mentioned in Table-1.1 of the main

agenda. The Connectivity for the same generation project is proposed in the main

agenda.

Proposal: The PPN Power Generating Company shall have to share transmission

charges for the “Common Transmission System Associated with ISGS Projects in

Nagapattinam/Cuddalore area of Tamil Nadu” and proposed “Additional transmission

system required for LTA to Nagapattinam / Cuddalore area of Tamil Nadu” in the

main agenda in proportion the capacity of the generation project. As the margins are

available in the proposed system and there are uncertainties in the materialization of

all the generation projects in the vicinity, therefore, it is proposed to grant LTA to

following applicant alongwith other LTA applicants in Nagapattinam / Cuddalore area

as per details given below:

Quantum allocated

in the region

Sl.

No.

Applicant Installed

Capacity

(MW)

LTOA

applied

for (MW)

Location Time

Frame

SR WR NR

1. PPN Power

Generating Company

Pvt. Ltd.

1080 360 Nagapattinam,

Tamil Nadu

Sept,

2013

360 0 0

Transmission system associated with PPN Power:

A. Transmission System proposed for Connectivity:

(i) Generation switchyard – Nagapattinam Pooling station 400 kV D/c (Quad

or Twin HTLS) line

(ii) Provision of Bus reactor of 1x80 MVAR at generation switchyard.

B. Transmission System Strengthening:

Common Transmission System associated with ISGS projects in

Nagapattinam/Cuddalore Area of Tamil Nadu and additional transmission system

identified in Nagapattinam/Cuddalore area of Tamil Nadu.

Additional agenda for 12th Meeting of SR constituents regarding Connectivity/LTA applications

Page-5 of 6

B. REVISION OF TRANSMISSION SYSTEM FOR GENERATION PROJECTS IN

NAGAPATTINAM/CUDDALORE AREA.

The Common Transmission System associated with ISGS projects in

Nagapattinam/Cuddalore Area of Tamil Nadu was earlier approved in the 11th

meeting of LTA which inter-alia comprised of establishment of 765/400 kV Pooling

Station at Nagapattinam/Cuddalore and 765 kV D/c lines from pooling station to

Salem and Salem – Madhugiri 765 kV S/c line. Further, the system is to be initially

charged at 400 kV and upgraded to 765 kV based on the actual materilisation of

generation projects.

It has been seen that in this area there are two clusters of generation viz.

Nagapattinam and Cuddalore. Both the areas have a potential of the order 4000-

5000 MW each and they are about 50-60 kms apart. Establishment of pooling station

at one location only shall call for construction of dedicated lines from each of the

project to the pooling station which shall be about 7-8 in nos. This arrangement shall

be sub-optimal as construction of so many no. of dedicated lines shall be difficult

from RoW consideration as well as their utilization. Accordingly, it has been found

prudent to establish two nos. of sub-pooling stations at Nagapattinam and Cuddalore

each so that the length of the dedicated lines gets lowered.

Accordingly the earlier approved system is modified to the extent that one more sub-

pooling station is established near Cuddalore. The system shall thus be developed

as below:

Phase-I (initially charged at 400 kV)

� Establishment of 765/400 kV GIS pooling station at Nagapattinam wherein power

from generation projects in Nagapattinam Area Viz. PEL Power, NSL Power,

Chettinad Power, Empee Power, PPN Power etc. shall be pooled.

� Nagapttinam Pooling Station – Salem 765 kV D/c line (line to be routed through

proposed Cuddalore Pooling Station)

� Salem – Madhugiri 765 kV S/c line – 2

� LILO of Neyveli – Trichy 400kV S/c line at Nagapattinam Pooling Station for

interim arrangement which later shall be bypassed

� LILO of IL & FS – Cuddalore Pooling station dedicated line on one circuit

Nagapattinam Pooling Station – Salem 765 kV D/c line

Phase-II (initially charged at 400 kV)

� Establishment of 765/400 kV GIS pooling station at Cuddalore to be taken up

when the capacity in this area becomes more then 2500 MW and upto 4000 MW.

Additional agenda for 12th Meeting of SR constituents regarding Connectivity/LTA applications

Page-6 of 6

� Cuddalore Pooling Station to Thiruvalem 765 kV D/c line

Phase-III (charged at rated voltage)

� Charging of Nagapattinam, Cuddalore, Salem and Madhugiri at its rated voltage

of 765 kV with 2x1500 MVA transformers each.

A load flow study has been carried out considering all the LTA applications (full

generation available at Tuticorin, Nagapattinam, Cuddalore, Krishnaptnam &

Vemagiri) thereby making the SR surplus. The results are placed at Exhibit-IV. From

the results it may be observed that the loading on all the lines are well within their

limits.

Members may discuss the above proposals and decide.