1 2 3 4Dec 2006
1 2 3 4Jan 2007
1 2 3 4Feb 2007
Delivery of500 MPPCs
MPPC numberingMass check MPPC soldering
WLSFmegastrip
source scan
ACFA
ShippingFeb-14
Beam Test@ DESYFeb 26
~ Mar 30
Test assemblyInstall LED/Temp.
monitor systemPrepare shipping
Ship MPPCsto KNU
MPPCmass check.
MPPC soldering
Direct-readoutmegastrip
source scanInstall LED
Delivery of500 MPPCs
Megastripassembly
Fabrication ofmegastrip layer components
Prepare MPPCmass check system
KEK
Megastripbench test
Fabrication ofFrame / light shielding structureFinalize module design
MPPC study (response curve)
Contact DESY(DC gas, safety issue, etc)
Schedule toward the SC-ECAL Beam Test @ DESY
Establish LED / Temperature monitoring system
Analysis code / Event display
Prepare Trigger / Veto counters
• Measure MPPC response curve, check variation• ECAL module construction
– Make mega-strip layer assembly• ECAL frame and light shield construction• MPPC mass measurement• Mega-strip source scan• Establish / install LED monitoring system• Establish / install temperature monitoring system• Shipping• Settle MPPC operation voltages, prepare table for voltage adjustment• Trigger counters / Veto counter (need positive-polarity signal)• Make measurement plan / schedule• Contact DESY (stage, drift chamber )
Jobs toward the SC-ECAL Beam Test @ DESY
• DAQ ace• Data analysis software / ntuplization• Drift chamber operation and analysis• MIP calibration analysis• Gain calculation (MPPC and electronics inter-calibration)• Online data monitoring (check pedestal, dead channel, etc)• Quick result of energy spectra / resolution• Temperature / LED monitoring data, correction• Event display• MPPC dose test
Jobs during the Beam Test