122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLAN 4+5- /I?

122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 2-201.1 .

SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2

08 /04 /95

.---

DOE-I 320-95 DOE-FN EPAS

WORK PLAN 4+5- /I?

Page 2: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

Department of Energy Fernald Environmental Management Project

P. 0. Box 538705 Cincinnati, Ohio 45253-8705

(51 3) 648-31 55

i 122

&JG 041995 DOE-1320-95

Mr. James A. S a r i c , Remedial P r o j e c t D i r e c t o r U.S. Environmental P r o t e c t i o n Agency Region V - 5HRE-83 77 W . Jackson Blvd. Chicago, IL 60604-3590

Mr. Tom Schne ide r , P r o j e c t Manager Ohio Environmental P r o t e c t i o n Agency 401 East 5 th S t r e e t Dayton, OH 45402-2911

Dear Mr. S a r i c and Mr. Schneider :

SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE U N I T 2

The purpose o f this l e t t e r i s t o submit t h e enc losed D r a f t Remedial Design Work Plan f o r Remedial Act ions a t Operable Unit 2 for your review and comment. Submit ta l o f th is document i s r equ i r ed by August 7 , 1995, which i s w i t h i n s i x t y (60) days of the s i g n i n g of t h e Operable U n i t 2 Record of Decis ion.

This D r a f t Remedial Design Work Plan p r e s e n t s the remedial des ign p rocess f o r Operable U n i t 2. 31, 1995, meet ing between the U.S. Environmental P r o t e c t i o n Agency (U.S. EPA), Ohio Environmental P r o t e c t i o n Agency (OEPA) , Department of Energy, Fernald Area O f f i c e (DOE-FN), and t h e Fernald Environmental R e s t o r a t i o n Management Corpora t ion (FERMCO). A t t h i s meeting, an i n t e g r a t e d approach f o r Fernald s i t e remedial a c t i v i t i e s was d i scussed . Inhe ren t i n th i s approach i s t h e commitment t h a t the placement of waste m a t e r i a l s i n the o n - s i t e d i s p o s a l f a c i l i t y will n o t be de layed .

Th i s d r a f t document i n c o r p o r a t e s d i s c u s s i o n s from the J u l y

A schedule f o r the submi t t a l of des ign packages f o r each phase of remedial des ign i s a l s o proposed i n t h e Work Plan. the proposed des ign c r i t e r i a packages has been p r e s e n t e d i n Sec t ion 3.0. This s e c t i o n has been inc luded t o promote e a r l y d i s c u s s i o n of the d i sposa l f a c i l i t y t e c h n i c a l d e s i g n requi rements between U.S. EPA, OEPA and DOE-FN.

P l e a s e n o t e t h a t a d i s c u s s i o n on

Page 3: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

Page 2

I f you have any quest ions regard ing t h e enc losed document, p lease c o n t a c t Rod Warner a t 513-648-3156.

S i n c e r e l y , r

j a c k R. C r a i g Ferna ld Remedial A c t i o n P r o j e c t Manager

Enclosure: As Sta ted

cc

K. B. G. J. P. M. S. R. F. R.

cc

R. N. M. AR

w/enc:

Chaney, EM-423/GTN Skokan, EM-423/GTN Jablonowski , USEPA-V, HRE-8J Kwasniewski, OEPA-Columbus H a r r i s , OEPA-Dayton P r o f f i t t , OEPA-Dayton McCl e l 1 an, PRC Cohen, GEOTRANS B e l l , ATSDR Owen, ODOH

w/o enc:

Warner, DOE-FN Weatherup, FERMCO Yates, FERMCO Coord inator , FERMCO

000002

Page 4: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122

DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT

OPERABLE UNIT 2 FERNALD ENVIRONMENTAL MANAGEMENT PROJECT

FERNALD, OHIO

AUGUST 1995

US. DEPARTMENT OF ENERGY F’ERNALD AREA OFFICE

Page 5: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 D W

August 7. 1995

TABLE OF CONTENTS

Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i

List of Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii

List of Figures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iv

Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v

1.0 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1

2.0 Description of Selected Remedy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1

2.1 Description of Operable Unit 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1

2.2 Description of Selected Remedy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1

2.2.1 Construction of the On-Site Disposal Facility . . . . . . . . . . . . . . . . . . . . . . . . . 2-3

2.2.2 Excavation of Material and Certification Sampling . . . . . . . . . . . . . . . . . . . . . . 2-3

2.2.3 Transpoitation and Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6

2.2.4 Restoration and Long-Term Monitoring and Maintenance . . . . . . . . . . . . . . . . . 2-6

2.3 Remedial Action Levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . 2-7

3.0 Design Criteria Package . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1

4.0 Permitting/Rejplatory Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1

4.1 Compliance With ARARs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1

4.1.1 Chemical-Specific Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2

4.1.2 Action-Specific Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2

4.1.3 Location-Specific Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3

4.2 Permitting Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . : . . . . . . . . 4 4

5-1 5.0 Tests And Studies In Support Of Design . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.1 Predesign Investigation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1

5.2 Site-Wide Disposal Facility Field Investigation . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.3 Geotechnical Studies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2

5-2

FER\CRU2UU)WRKt'lNT\TOCMu~4. 1995 9:32am i 000004

Page 6: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU024 DRAFT

August 7. 1995

TABLE OF CONTENTS (Continued)

5.4 Liner Compatibility Study . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2

5.5 Engineering Studies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3 .

6.0 -Remedial Design Strategy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1

6.1 Phases of.Remedial Design . . . . . . . . . . . . . . . . . . . . : . . . . . . . . . . . . . . . . . . . 6-1

6.1.1 Phase 1 - Design of Primary Waste Haul Road . . . . . . . . . . . . . . . . . . . . . . . 6-1

6.1.2 Phase 2 - Design of Test Pads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1

6.1.3 Phase 3 - Design of On-Site Disposal Facility . . . . . . . . . . . . . . . . . . . . . . . . 6-3

6.1.4 Phase 4 - Excavation of Waste Units . . . . . . . . . . . : . . . . . . . . . . . . . . . . . 6-3

6.2 Review and Finalization of Design Deliverables . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4

6.3 Commencement of Remedial Action . . . . . . . . . . . . . . . . . i . . . . . . . . . . . . . . . . 6-4

7.0 Program Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1

7.1 Staffing Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1

7.2 Community Relations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5

References

Appendix A Applicable or Relevant and Appropriate Requirements ( A N ) and To Be Considered Criteria (lBCs)

F E R \ C R U Z \ R D W R K P L ' K X ~ A U ~ U S I ~ . 1995 932am ii 080005

Page 7: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122

L I n OF TABLES

FEMP-OUM-4 DRAFT August 7, 1995

Table Title Pane 2-1

2-2

2-3

6-1

Operable Unit 2 Primary Soil Remedial Action Levels . . . . . . . . . . . . . . . . . . . . . . 2-8

Operable Unit 2 Secondary Soil Remedial Action Levels . . . . . . . . . . . . . . . . . . . . 2-10

Envirocare Acceptance Criteria Compared to Maximum Activities Detected . . . . . . . . 2-1 1

Remedial Design Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2

iii

Page 8: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

* 122 FEMP-OU024 DRAFT

August 7, 1995

LIST OF FIGURES

Fimre Title Page

2-1

2-2

2-3

7-1

7-2

7-3

FEMP Site Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . :. . . . . . . . . . 2-2

Typical Detail Composite Cap and Liner . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4

Potentially Acceptable Region for On-Site Disposal Facility . . . . . . . . . . . . . . . . . . . 2-5

Operable Unit 2 Remedial Design Administrative Relationships . . . . . . . . . . . . . . . . 7-2

Operable Unit 2 Remedial Design Project Communications Flow Chart . . . . . . . . . . . . 7-3

Remedial Design Project for Operable Unit 2 Project Organization Chart . . . . . . . . . . 7 4

F E R \ C R U ~ U U ) W R K P L \ ~ M U ~ U S I ~ . 1995 932am iv

Page 9: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 D W August 7, 1995

1 .O INTRODUCTION 1

c

This Remedial Design Work Plan defines the activities required to develop the final construction

plans, drawings', specifications, and procurement documents for the implementation of the Operable

Unit 2 selected remedy. This remedy is described in the Final Record of Decision for Remedial

U.S. Environmental Protection Agency @PA) on June 8, 1995 (DOE 1995).

3

4

5

Actions at Operable Unit 2 of the Fernald Environmental Management Project (FEMP), signed by the 6

7

8

The selected remedy presented in the Final Operable Unit 2 Record of Decision includes excavation

of all material with contaminants of concern (COCs) above the established cleanup levels; material

processing for size reduction and moisture control, if required; on-site disposal in an engineered

disposal facility with a composite cap and liner system; and off-site disposal of a small fraction of the

excavated material that exceeds the waste acceptance criteria for the on-site disposal facility.

9

10

11

12

15

14

In an effort to integrate Fernald site remedial activities, certain components of the Operable Unit 2

selected remedy will be covered by the separate site-wide plans, and thus have not been included in

the scope of this Remedial Design Work Plan. These site-wide plans will include components such

15

16

17

as: soil cleanup certification sampling, final subunit grading and restoration, groundwater and

and stormwater plans for the on-site disposal facility are included in the scope of this Remedial

Design Work Plan. The site-wide integration of certain remedial components will not impact the

schedule for initial placement of waste material in the on-site disposal facility.

18

stormwater monitoring, off-site transportation, and treatment activities. However, the groundwater 19

P

21

P

23

The U.S. Department of Energy (DOE) intends to construct only one disposal facility at the F E W .

On-site disposal of waste material is also the preferred remedial alternative of Operable Unit 5 and the

site disposal facility that will accommodate all FEMP waste proposed for on-site disposal.

This Work Plan is the primary document to be used in defining the implementation of the Operable

Unit 2 remedial design activities and has been prepared in accordance with Section M of the 1991

Amended Consent Agreement between DOE and EPA. The Amended Consent Agreement was

entered into under Sections 120 and 106(a) of the Comprehensive Environmental Response,

Compensation, and Liability Act (CERCLA), as amended. This Work Plan has also been prepared,

24

2.5

leading remedial alternative for Operable Unit 3. Operable Unit 2 is responsible for designing the on- m

27

28

29

20

31

32

33

FER\CRU2WDWKPLMTDO~ECTO1Uuyst 4.1995 8 : 5 h 1-1

Page 10: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU024 DRAFT August 7 , 1995

where feasible, utilizing EPA guidance provided in "Superfund Remedial Design and Remedial Action

Guidance" (EPA 1986) and "Guidance on EPA Oversight of Remedial Designs and Remedial Actions

Performed by Potentially Responsible Parties" @PA 1990).

The Remedial Design Work Plan includes a description of the selected remedy, a discussion of how

technical design requirements will be identified, environmental compliance requirements, and general

design strategy. This Work Plan addresses the design deliverables and schedules associated with

implementation of the Operable Unit 2 remedial design in the following four phases:

Phase 1 is the design of a primary waste haul road from the South Field and Inactive and Active Flyash Pile areas to the on-site disposal facility;

Phase 2 is the design of test pads to verify the permeability of the cap and liner systems;

Phase 3 is the design of an engineered on-site disposal facility; and

Phase 4 is the design of the excavation activities for the waste unit areas.

The specific components of these phases are discussed in greater detail in Section 6.0. The Amended

Consent Agreement requires that this Remedial Design Work Plan provide a schedule for the

implementation of activities required to complete the remedial design. The schedule is also presented

in Section 6.0 of this Work Plan and includes document submittal dates for the four phases discussed

above and submittal dates for the Operable Unit 2 Remedial Action Work Plans.

This Remedial Design Work Plan is comprised of seven sections and one appendix. The sections and

a description of the contents are as follows:

Section 1.0

Section 2.0

Section 3.0

Section 4.0

Introduction

Description of Selected Remedy - This section includes a description of the selected remedy and the major components required to complete implementation.

Design Criteria Package - This' section briefly discusses the Design Criteria Packages to be submitted to EPA independent of this Work Plan.

Regulatory Compliance - This section identifies the substantive requirements of applicable or relevant and appropriate requirements (ARARs) pertaining to on- site activities and explains in concept how the remedial action will comply with ARARs and attain performance standards.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

23

24

n 28

29

30

31

32

33

34

35

36

37

38

39

40

Page 11: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122

Section 5.0

Section 6.0

Section 7.0

Appendix A

FEMP-OU02-4 DRAFT August 7, 1995 \

Tests'and Studies in Support of Design - This section provides a discussion of field studies supporting the remedial design.

Remedial Design Strategy - This section proposes remedial design schedules and plans for completion of design activities.

Program Management - This section discusses the initial assignment of responsibility and authority of all organizations and key personnel involved in the implementation of the selected remedy. This section also discusses the avenues of public participation during the remedial design process.

ARARs and To Be Considered (TBC) Criteria

FER\CRU2UU)WKP~TM)U~IMugust 4.1995 8 : 5 b 1-3

1

2

3

4

5

6

7

8

9

10

11

12

Page 12: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

i' 122 FEMP-OU02-4 DRAFT August 7 , 1995

2.0 DESCRIPTION OF SELECTED REMEDY

2.1

Operable Unit 2, Other Waste Units, consists of five site areas and their associated berms, liners, and

DESCRIPTION OF OPERABLE UNIT 2

soils.

8

8

0

8

0

The Solid Waste Landfill was reportedly used for the disposal of cafeteria waste, rubbish, and other types of waste from the nonprocess areas and on-site construction/demolition activities.

The North and South Lime Sludge Ponds contain waste from the FEMP water treatment plant operations, coal pile storm water runoff, and boiler plant blowdown. The South Lime Sludge Pond is inactive and overgrown with grasses and shrubs, while the North Lime Sludge Pond is currently in use. The FEMP will be connected to a public water supply in Fall 1995 which will eliminate the use of the water treatment operations and therefore the use of the North Lime Sludge Pond.

The Inactive Flyash Pile was used for the disposal of ash from the boiler plant and other nonprocess wastes and building rubble such as concrete, gravel, asphalt, masonry, and steel rebar.

The South Field was reportedly used as a burial site for FEhlP nonprocess wastes such as flyash, on-site construction/demolition rubble, and soils that may have contained low levels of radioactivity.. A slope at the southwest border of the South Field was used as the backstop for the FEMP security firing range for 35 years. Lead ammunition used during target practice is embedded in this slope.

The Active Flyash Pile was the disposal area for flyash and hottom ash from the FEMP boiler plant.

The operational histories of the Lime Sludge Ponds and Active Flyash Pile are well understood, but

the operational histories of the Solid Waste Landfill, Inactive Flyash Pile, and South Field are vague

and not well documented. The location of each of the five Operable Cnit 2 subunits is illustrated on

Figure 2-1.

2.2 DESCRIPTION OF SELECTED REMEDY

The selected remedy presented in the Operable Unit 2 Record of Decision was designed to address the

overall remediation of Operable Unit 2. The following are the major components of the selected

remedy that are described below in more detail:

i

2

3

4

5

6

7

8

9

10

I I

12

13

14

15

16

17

18

19

20

21

21- 23

24

25

24

27

28

29

30

31

32

-- JJ

41

35

36

37

38

39

40

FER\CRUZ\RDWKPLWTL?O\SUII1YL\August 3 . 1995 5:48pm 2- 1

Page 13: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

FEMP-OU02-4 DRAFT

. - August 7, 1995 122

Scale of Kilometers

0 1 Kilometer = 0.62 Mile

Sewage Treatment

.i

LEGEND -Location of Operable Unit 2 Subunits . . . . . . . Covered Pit x-x Fence

----- Railroad Spur ----- Roadway

Figure 2-1: FEMP Site Map GRAPHICS #2617

2-2

QQO822

Page 14: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

i22 FEMP-OU02-4 DRAFT August 7 , 1995

construction of the on-site disposal facility i

excavation of material and certification sampling ?

transportation and disposal of waste materials

restoration d

long-term monitoring and maintenance 5

6

2.2.1

The on-site disposal facility will be constructed with a composite liner of soil and geosynthetics.

Excavated material meeting the on-site disposal facility waste acceptance criteria will be placed on the

liner system. The composite cap of soil and geosynthetics will be constructed above the waste and

tied-in with the liner system. Construction will also include associated site work and installation of

monitoring wells. Figure 2-2 depicts a cross-section of the proposed cap and liner system. The

design of the disposal facility will be finalized during the remedial design based on additional

investigations and the design process. The on-site disposal facility will be located within the limits of

the potentially acceptable region shown on Figure 2-3. A more specific location for the disposal

facility has been proposed in the Draft Predesign Investigation Report, which was submitted to EPA

and OEPA on July 31, 1995.

Construction of the On-Site DisDosal Facility

2.2.2

The material at the Operable Unit 2 subunits will be excavated to the required depth established by

the Remedial Investigation (RI) and Feasibility Study (FS) Reports to remove materials with

concentrations of COCs above the cleanup levels. Excavation will be performed in such a way as to

minimize possible dilution of waste. The concept of keeping public and worker exposure "as low as reasonably achievable" (ALARA) will be documented in the Remedial Action Work Plan and

implemented during construction. Dust control measures will also be utilized to minimize air

emissions during excavation. Debris from the excavated material will be segregated and processed

for size reduction, if required, before disposal.

Excavation of Material and Certification Sampling

Throughout excavation, waste acceptance criteria attainment certification sampling will be conducted

to verify on-site or off-site disposal of the excavated material. Cleanup attainment certification

sampling will be performed in the subunit areas following excavation of material.

7

8

9

IO

11

I?

13

14

15

16

17

IX

19

?o

?I

E

?3

24

3

m

n

23

29

30

31

7 .-

~\CRUZ\RDWKPW\~O\STOZ\August 3. 1995 5:48pm 2-3

Page 15: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

I- -0UO2-4 DRAFT L . 1 sv August 7 , 1995

TOP SLOPE-MIN.3% SIDE SLOPE-TYPICAL 5:l GRASS COVER - FERTILIZE, /- SEED AND MULCH

COMPOSITE CAP CONTAMINATED SOIL/DEBRIS/ FLYASH/L IME MIN. 12' CUSHION LAYER GEOTEXTILE FABRIC

(CONTAMINATED SOIL/ 12' PEA GRAVEL

6' OIA. PERFORATE0 HDPE LEACHATE COLLECTION PIPING GEOTEXTILE FABRIC HOPE FLEXIBLE MEMBRANE LINER

BENTONITE GEOCOMPOSITE

6' DIA. PERFORATED HDPE LEAK DETECTION PIPING GEOTEXTILE FABRIC HOPE FLEXIBLE MEMBRANE LINER

BENTONITE GEOCOMPOSITE 36' COMPACTED C L A Y

PRIMARY LINER 12' PEA GRAVEL

COMPOSITE LINER

Kq TOPSOIL SAND PEA GRAVEL

LEGEND

COBBLES COMPACTED CLAY E3 VEGETATIVE SUPPORT

m y CUSHION LAYER - HDPE FLEXIBLE MEMBRANE LINER

COMPACTED SUBGRADE - BENTON I TE GEOCOMPOSITE

1 1 1 GEOTEXTILE FABRIC 1'.'.'*'.1 . . . . CONTOURING LAYER

FIGURE 2 - 2 TYPICAL DETAIL

GRASS COVER

1 ! COMPOSITE CAP AND LINER , (NOT TO SCALE)

Page 16: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

r P-OUO2-4 D M i 2v August7, 1995

SCALE - - 0 1200 2400 FEET

0 288 576 METER

LEGEND

r -7 POTENTIALY ACCEPTABLE REGION

F E W BOUNDARY . -.I-

FIGURE 2-3

FOR ON-SITE DISPOSAL FACILITY

PO TENT I AL L Y AC C E P T ABL E RE GlON

Page 17: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OU02-4 DR- August 7 , 1995

2.2.3 Transportation and Disposal

A waste acceptance criteria of 346 picoCuries/gram @Ci/g) of uranium-238 or 1,030 parts per million

(ppm) total uranium has been established for the Operable Unit 2 material to be disposed of in the on-

site disposal facility. Operable Unit 2 material with concentrations above the cleanup levels and at or

below the on-site waste acceptance criteria will be transported and disposed in the on-site disposal

facility. It is estimated that out of a total of approximately 315,000 cubic yards, approximately 3,100

cubic yards of material will have concentrations of uranium-238 or total uranium above the disposal

facility waste acceptance criteria. This material will be transported to an approved off-site disposal

facility. An additional 300 cubic yards of lead-containing soil from the South Field Firing Range will

be handled as mixed waste, treated as necessary, and disposed at an approved off-site disposal

facility.

Additional waste acceptance criteria for Operable Units 3 and 5 COCs are in the process of being

established and will be incorporated into the design once they are finalized.

2.2.4

Restoration of the Operable Unit 2 subunits will include grading of the subunits to blend with the

surrounding topography, seeding, fencing, and the installation of monitoring wells. Institutional

controls. such as access restrictions (fencing) of the on-site disposal facility and groundwater

monitoring at the Operable Unit 2 subunits and on-site disposal facility, will be implemented

following restoration. Groundwater monitoring at the disposal facility will be initiated prior to the

placement of wastes to obtain background data. Groundwater monitoring and review of the results

will continue for at least 30 years following closure of the on-site disposal facility. Continued Federal

ownership of the FEMP is also a key component of the selected remedy. Maintenance of the subunit

areas after restoration, and maintenance of the on-site disposal facility will be performed as necessary.

Because this remedy will result in contaminants remaining on site in an engineered disposal facility, a

review will be conducted by EPA no less often than every five years after the initiation of remedial

action in accordance with CERCLA §121(c) to ensure that the remedy continues to provide adequate

protection of human health and the environment. The five year reviews will continue, based on long-

term monitoring results, until EPA determines that the reviews are no longer needed to ensure

protectiveness of human health and the environment. Operation and maintenance plans will include

general contingency provisions.

Restoration and Long-Term Monitoring and Maintenance

i

2

J

5

6

7

8

9

IO

I I

12

13

14

IS

16

17

18

19

Lo

21

n

3

24

3

26

27

21

29

w

31

32

FER\CRU2\RDW"LN\TDO\SECTOZV\ugust 3, 1995 5:48pm 2-6

Page 18: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

i 122 FEMP-OU02-4 DRAFT August 7. 1995

2.3 REMEDIAL ACTION LEVELS

The Operable Unit 2 remedial action levels (referred to as cleanup levels in the Operable Unit 2

Record of Decision) have been divided into primary and secondary levels, which are presented in

Tables 2-1 and 2-2 respectively. Primary remedial action levels refer to those COCs that contribute

over 90 percent of the risk from Operable Unit 2 and over 99 percent of the Operable Unit 2 volumes

to be excavated under the selected remedial action. Secondary remedial action levels refer to those

COCs that pose risks that are close to the

to the overall risk from Operable Unit 2. This delineation has been made in order to optimize the

cleanup certification sampling program which will be outlined in the Remedial Action Work Plan.

Based on existing analytical results from the RI and the volume calculations from the FS, secondary

cleanup levels will most likely be achieved by remediation to the primary levels, however, the

achievement of remediation will be confirmed through cleanup attainment certification sampling.

point of departure and contribute less than 10 percent

Wastes not meeting the on-site disposal facility waste acceptance criteria must meet the waste

acceptance criteria for the selected off-site disposal facility. An off-site disposal facility has not yet

been chosen; however, Envirocare in Clive, Utah was used as a representative facility for purposes of

cost estimates and planning. The waste acceptance criteria for radionuclides at the Envirocare facility

are listed in Table 2-3. As Table 2-3 illustrates, based on samples taken during the RI, it is expected

that all Operable Unit 2 waste with concentrations above the on-site waste acceptance criteria will

meet the off-site waste acceptance criteria. In the unlikely event that any material exceeds the off-site

disposal facility waste acceptance criteria, another acceptable off-site disposal facility with a higher

waste acceptance criteria (e.g., Nevada Test Site) will be evaluated.

.

1

2

4

5

6

7

8

9

10

11

I?

13

14

IS

16

17

18

IO

20

21

32

FER\CRUZ\RDWKPW\TDO\SECTOZ\Augwt 3. 1995 5:48pm 2-7

Page 19: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OUM-4 D M

August 7 , 1995

TABLE 2-1 OPERABLE UNIT 2 PRIMARY SOIL REMEDIAL ACTION LEVELS

\

See footnotes at end of table.

FER\CRU?\RDWRKPLN\TDO\TABZ-l\August 3. I995 6:48pm 2-8

Page 20: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2

Contaminant of Concern (COC)

FEMP-OU02-4 DRAFT August 7, 1995

Remedial Action Basis for Remedial Units Backgrounda kvelb Action Level

TABLE 2-1 (Continued)

Thorium-230g pCi1g

Uranium-234g pCi/g Uranium 235/2368 pCi/g Uranium-2388 pCi/g Uranium-Totalg m g k

1.97 6.97 ARARJ ,

I .04 4.24 I O 6 ILCR 0.15 3.35 IOd ILCR 1.12 3.22 lod ILCR 3.4 24.8 ARARf

Arsenic Uranium-2348 Uranium-235/2368 U rani urn-23 8g Uranium-Totalg

"Biickground value from Operable Unit 2 RI Report, Table 4-1A, surface concentrations. bThe cleanup level is the lowest value of the lod ILCR, 0.2 Hazard Index, or ARAR standard. 'lLCR = incremental lifetime cancer risk. concentration responsible for the incremental risk plus the background concentration. d T ~ s value determined by calculating the uranium-238 concentration in uranium-total.

= applicable or relevant and appropriate requirement 'Based on the proposed MCL for uranium (56 Federal Reeister 33050). gRemedial action level due to off-property resident farmer receptor hThe lead cleanup level applies to the Firing Range only, not the entire South Field area. 'Based on the EPA "Revised Interim Soil Lead Guidance for CERCLA Sites and RCRA Corrective Action Facilities" (OSWER Directive 9355.4- 12). J B d on DOE Order 5400.5, Chapter IV (4)(a)(2).

In the case of radionuclides, the remedial action level is the

m g k 8.2 16.9 IOd ILCR pCi/g 1.04 8.64 IOd ILCR pCilg 0.15 1.15 ILCR

pCi/g 1.12 6.12 ILCR

m g k 3.4 28 ARARf

Source: Table 2-23, .Operable Unit 2 FS Report.

FER\CRU2RDWP\CME\TABLE2-I\August 3 . 1995 6:48pm 2-9

Page 21: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122

Contaminant of Concern (COC)

FEMP-OUO24 D W August 7, 1995

Remedial Action Basis for Remedial Units Backgrounda Level" Action Level

TABLE 2-2

OPERABLE UNIT 2 SECONDARY SOIL REMEDIAL ACTION LEVELS

Aroclor- 1260' Benzo( a)anthracenz

Benzo(a)pyrene BznzobMuoranthenec

mg& 0 25 io" I L C R ~

m g k 0 0.777 ARARf mdkr 0 0.513 ARAR f .

m g k 0 0.455 m e , f

r

Benzo(k)fluoranthene mgkg 0 0.603

Dibenzo(a,h)anthrace' mgflrg 0 0.157 Dieldrin m g h 0 0.00957 Indeno( 1 ,2,3-cd)pyrenec mgkz 0 0.496 Phenanthrene m g h 0 0.19 Technetium-99 DCi/g 0 71

I I O ' 11 ~

SOUTH FIELD (WASTE/SOIL LOCATED OVER > 16 FEET NATURAL SOIL) 11

ACTIVE F'LYASH PILE Neptunium-237 I pci/g I 0 I 4.99 I 10" ILCR

aBackground value from Operable Unit 2 RI Report, Table 4-1A, surface concentrations. "The remedial action level is the lowest value of the 10" ILCR, 0.2 Hazard Index, or ARAR standard. 'Remedial action level due to off-property resident farmer receptor. dILCR = incremental lifetime cancer risk. concentration responsible for the incremental risk plus the background concentration. 'ARAR = applicable or relevant and appropriate requirement fBased on the Ohio Water Quality Standards (OAC 3745-1-07) gBased on DOE Order 5400.5, Chapter IV (4)(a)(2).

In the case of radionuclides, the remedial action level is the

Source: Table 2-23, Operable Unit 2 FS Report.

FEH\CRU2\RDWRKPW\TDO\TAB2-2\August 3, I995 6:5Opm 2-10 880020

Page 22: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7 , 1995

$ 3 0 C

L 0

2-1 1

Page 23: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

FEW-OU02-4 DRAFT August 7, 1995

3.0 DESIGN CRITERIA PACKAGE

DOE will assemble engineering criteria, technical criteria, and scope information into a concise design

criteria package (DCP) for each of the four Preliminary Design Review Packages for the remedial action.

Each DCP will be submitted at the same time as its associated Preliminary Design Review Package.

Each DCP will provide the project description and the project design basis. The description will address

the physical layout, structures, buildings, services, utilities, etc. that constitute the remedial action

project. The design basis will describe how the project design will satisfy compliance with the ARAB,

TBCs, and pertinent DOE Orders identified for the project. Within the design basis, the DCPs will

identify the system functions, technical requirements, and design constraints and limitations.

The objective of the engineering design criteria is to identify and define the applicable general and

discipline-specific design requirements that must be satisfied in performing the engineering design, and

preparing construction drawings and specifications for the final remediation. The DCPs will list pertinent

DOE Orders, ARARS and TBCs, Engineering Design Codes (national, state, and local) and Standards,

and will also identify any exemptions to be requested from specific DOE Orders.

The engineering design criteria will include technical design requirements that, if modified after the

submittal of the On-Site Disposal Facility Preliminary Design Review Package, may impact design and

construction schedules. The significance of some of these technical design requirements is such that early

consensus between DOE and EPA is required. The most important examples include the following

proposed design criteria:

Design Storm - 2,000 year storm event (mean annual hazard probability of 5 ~ 1 0 ~ ) in accordance with Performance Category 2 in DOE Standard 1020-94; .i

Design Seismic Event - maximum horizontal ground surface acceleration of 0.13 gravities in accordance with Performance Category 2 in DOE Standard 1020-94;

Design Life - the facility is to be effective for up to 1,000 years, to the extent reasonably achievable, and in any case, for at least 200 years as required under 40 CFR 192.02(a) with the design life of certain components being determined through a graded approach based on: (1) whether the component can be replaced/repaired via routine maintenance; (2) whether the failure ,of the component would jeopardize long-term protection of human health and the environment; and/or (3) how a reasonably achievable design life would be defined for a specific component.

i

2

3

4

5

6

7

8

9

IO

I I

12

13

14

15

16

17

18

19

20

21

0

23

24

2.5

26

n 28

29

M

31

32

33

34

35

xi 37

F E R \ C R U Z \ R D W K P L N \ T D O \ S ~ ~ ~ U ~ ~ 3. 1995 6:17pm 3-1

Page 24: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT August 7 , 1995

4.0 REGULATORY COMPLIANCE 1

4.1 COMPLIANCE WITH ARARs

CERCLA $121(d)(2) directs that remedial actions must comply with federal and state environmental

laws that are legally applicable or are relevant and appropriate under the circumstances of the release

or potential release. The complete list of Operable Unit 2 ARARs is attached to this document as

Appendix A. Because waste from other operable units may be disposed in the on-site disposal

facility, Appendix A also includes ARARs from Operable Unit 5 that are pertinent to the design of

the disposal facility. These additional ARARs have already been considered in the conceptual design

of the cap and liner system (see Figure 2-2).

ARARs are defined as follows:

ADDlicable requirements are cleanup standards, standards of control, and other substantive environmental protection requirements, criteria, or limitations promulgated under federal or state law that specifically address a hazardous substance, pollutant, contaminant, remedial action, location, or other circumstance at a CERCLA site.

Relevant and aDDroDriate requirements are cleanup standards, standards of control, and other substantive environmental protection requirements, criteria, or limitations promulgated under federal or state law that,. while not "applicable" to a hazardous substance, pollutant, contaminant, remedial action, location, or other circumstance at a CERCLA site, address problems or situations sufficiently similar to those encountered at the CERCLA site that their use is well suited to the particular site.

To Be Considered criteria is a category that includes non-promulgated criteria, advisories, and guidance issued by federal or state government that are not legally binding and d o not have the status of potential ARARs. However, pertinent TBCs will be considered along with the ARARs in determining the necessary level of cleanup or technology requirements.

EPA has identified three categories of A M :

Chemical-specific ARARs are usually health- or risk-based numerical values or methodologies used to determine acceptable concentrations of chemicals that may be found in or discharged to the environment [e.g., maximum contaminant levels (MCLs) that establish safe levels in drinking water].

Action-specific ARARs are usually technology- or activity-based requirements or limitations on actions or conditions involving special substances.

Locution-specific ARARs restrict actions or contaminant concentrations in certain environmentally sensitive areas. Examples of areas regulated under various federal laws

3

4

5

6

7

8

Y

10

I?

13

14

15

16

17

18

19

20

21

22

23

24

P

26

27

28

29

31

32

33

34

35

36

37

38

39

40

41

42

FER\CRU2UU)WKPW\TDO\KWMugust 3. 1995 6:41pm 4- 1

Page 25: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT August 7 , 1995

include floodplains, wetlands, and locations where endangered species or historically significant cultural resources are present.

I

Sources of Operable Unit 2 ARARs are federal and state laws, regulations, and guidance and DOE

Orders that address the site-specific circumstances in Operable Unit 2.

4

5

4

4.1.1 Chemical-SDecific Requirements

All Operable Unit 2 remedial alternatives must meet the chemical-specific ARARs associated with 3

potential releases to air, surface water, groundwater, and penetrating radiation. Air emission and 4

radon protection standards will be met above the on-site disposal facility and each Operable Unit 2 io

subunit. Ohio Water Quality Standards will be met at both Paddys Run and the Great Miami River. :I

.+ L _

Groundwater will be protected to promulgated federal non-zero maximum contaminant level goals

(MCLGs) and MCLs, and any more stringent state standards, for drinking water. The engineering

and institutional controls associated with the selected remedy for Operable Unit 2 were established for

the protection of human health, and will ensure that the groundwater MCLs and non-zero MCLGs

will be met at the boundary of the on-site disposal facility and at each Operable Unit 2 subunit.

Radiation dose standards from DOE Orders 5400.5 and 5820.2A have been established so that no

member of the public receives an' effective dose equivalent greater than 100 millirem (mrem) in a year

from radiation exposure as a consequence of all routine DOE activities or an effective dose equivalent

of 25 mrem per year from concentrations of radioactive material released to the general environment

in surface water, groundwater, soil, plants or animals. These standards will be met through the

removal of all contaminated material above cleanup levels from Operable Unit 2. The material will

either be safely disposed in the on-site disposal facility or, if it does not meet the on-site disposal

facility waste acceptance criteria, it will be sent off-site for disposition at an approved facility.

4.1.2 Action-Suecific Requirements

Because Operable Unit 2 includes both low-level radioactive waste/residual radioactive material and

solid waste, design and construction of the on-site disposal facility will meet the more stringent .

requirements for the disposal of low-level radioactive waste/residual radioactive material. EPA states

in 40 CFR §192.02(a) that the disposal facility must be designed to be effective for up to 1,000 years,

to the extent reasonably.achievable, and in any case, for at least 200 years. DOE Order 5820.2A

30

31

32

33

FER\CRU?-\RDWKPLN\TDO\SEXT04Mugust 3 . 1995 6:41pm 4-2

Page 26: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

-. 122 FEMP-OU01-4 DRAFT August 7 , 1995

requires compliance with performance objectives for low-level radioactive waste disposal sites,

including protection of public health and safety, protection of the public and the environment from

releases of radioactivity, and protection of groundwater resources. DOE Order 5400.5 requires that

the ALARA policy to minimize radiation exposure be adopted during design and construction.

The on-site disposal facility will also meet the less stringent Ohio Environmental Protection Agency

(OEPA) technical requirements for the disposal of solid waste. These requirements include

specifications for the design and construction of a liner and cap system for the on-site disposal

facility.

Material from the South Field Firing Range is assumed to be mixed waste and will be treated as

necessary and disposed at an off-site disposal facility that is approved to accept mixed waste. Firing

Range material that is hazardous waste must comply with the storage, packaging, and transportation

requirements of the Resource, Conservation, and Recovery Act (RCRA), including the manifest

system, while it is being prepared and shipped from the FEMP. Packaging and transportation of the

Firing Range wastes will also be required to meet DOE requirements for the transport of hazardous

materials.

4.1.3 Location-SDecific Reauirements

The protection of endangered species, cultural resources, floodplains, and wetlands in the locations of

remediation is required by federal and state regulations. Endangered and threatened species and

habitat at the FEMP will be protected under the Operable Unit 2 selected remedy. Surveys for

cultural resources have been performed in the area of the on-site disposal facility and all finds of

archaeological significance will be preserved through avoidance of the area where possible or

controlled removal of the resource. Additional cultural resource surveys will be implemented as the

location of the on-site disposal facility is finalized and as areas for disturbance (e.g., roads, staging

areas, etc.) are identified during remedial design. Part of the Inactive Flyash Pile and South Field are

located in a 100- and 500-year tloodplain area, but the remedial action will not adversely impact this

floodplain. A small area of wetlands is located north of the Solid Waste Landfill. During

remediation, contaminated sediments may be removed from the area, thus impacting the wetland.

Wetlands in other areas of the site may also be impacted by construction and operation of the on-site

disposal facility. This remedial action will be performed in accordance with the wetlands protection

requirements of the Clean Water Act (Section 404 and applicable regulations). A DOE National

'

1

2

4

5

b

7

8

9

10

11

I?

13

14

15

16

17

18

19

3

21

2

Y

24

25

26

17

28

1-9

30

31

32

33

FER\CRUZ\RDWKPLN\TDO\SECT04\August 3, 1995 6:41prn 4-3 000025

Page 27: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

i 122 FEMP-OUO1-4 DRAFT August 7, 1995

Environmental Policy Act (NEPA) assessment [ 10 CFR $10221 was prepared to evaluate and

minimize potential impacts to floodplains and wetlands.

Because the on-site disposal facility will contain solid waste in addition to low-level radioactive

waste/residual radioactive material, the siting criteria from the Ohio Solid Waste Disposal Regulations

are pertinent ARARs. Ohio Administrative Code (OAC) 3745-27-07 establishes restrictions and

prohibitions on where a solid waste disposal facility may be constructed, including prohibiting

placement over a sole-source aquifer or over an unconsolidated aquifer capable of sustaining a yield

of 100 gallons per minute for a 24-hour period (i.e., high yield.) The Great Miami Aquifer, which

underlies the entire FEMP, is both a sole-source aquifer and a high-yield aquifer. Because of this,

Operable Unit 2 has received a CERCLA ARAR waiver from EPA in accordance with CERCLA

$121(d)(4)@) to allow the on-site disposal facility to be constructed at the FEMP. The facility will

be located in the area that exhibits the most suitable hydrogeologic conditions on site. This is

currently defined as an area where, at a minimum, 12 feet or more of gray clay would exist between

the bottom of the disposal facility and the aquifer. As discussed in Section 2.2.1, the most suitable

location for the on-site disposal facility has been proposed in the Draft Predesign Investigation

Report. This report also verified that the most suitable location would ensure protection of human

health and the environment.

4.2 PERMITTING REQUIREMENTS

The selected remedy for Operable Unit 2 is exempt from administrative permitting requirements

pursuant to CERCLA Section 121(e)(l), 40 CFR $ 300.400(e) and Paragraph XII1.A of the Amended

Consent Agreement. CERCLA Section 121(e)(l) specifically states that no Federal, State, or local

permit shall be required for the portion of any removal or remedial action conducted entirely on site,

where such remedial action is selected and carried out in compliance with Section 12 1, The only

exception for Operable Unit 2 is that National Pollutant Discharge Elimination System (NPDES)

discharges to the Great Miami River will be off-site releases. In this case, the remedial action must

comply with both the substantive and the administrative requirements of the NPDES permit.

Paragraph XII1.B of the Amended Consent Agreement requires DOE to supply specitic information

regarding ,any permits that would have been required for the action in the absence of the CERCLA

permitting exemption. Pursuant to Paragraph XIII.B of the Amended Consent Agreement, the

following information is required:

~\CRUZ\RDW~LPW\TDO\SE(~T~~\AU~~~~ 3 . 1995 6:41pm 4-4

Page 28: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OUO2-4 DRAFT August 7. 1995

Identification of each permit that would have been required in absence of the CERCLA 12 1 (e) permitting exemption;

Identification of the standards, requirements, criteria, or limitations that would have had to have been met to obtain the permits; and

Explanation of how the remedial action will meet the substantive requirements, criteria, or limitations identified above.

This information will be provided in the Pre-Final Design Review Package.

FER\CKU2\RDWKPW\TDO\SECTO4\Auguat 3. 1995 641pm 4-5

i

1

5

b

1

12 0

. IO

Page 29: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 EEMF'-OUO24 DRAFT August 7, 1995

5.0 TESTS AND STUDIES IN SUPPORT OF DESIGN i

Various tests and studies have been deemed necessary to support the remedial design of the Operable

Unit 2 remediation efforts and the on-site disposal facility. These tests/studies are in various stages of

completion. The results of these additional investigations will be factored into the.design, and will be

'summarized in the detailed design packages. The testdstudies that have been, or will be, completed

in support of design include the following and are discussed below:

Predesign Investigation;

Site-Wide Disposal Facility Field Investigation;

Geotechnical Studies;

Liner Compatibility Study; and

Engineering Studies.

5 .1 PREDESIGN INVESTIGATION

The purpose of the Predesign Investigation was to define the most suitable location for the on-site

disposal facility within an identified best area at the F E W . This most suitable area is located on the

east side of the FEMP and was chosen because it has the greatest thickness of gray clay and

interbedded coarse granular materials which provide a protective layer over the Great Miami Aquifer

(see Figure 2-3).

The Predesign Investigation fieldwork was performed in a phased approach. The first phase included

preliminary cone penetrometer testing (CPT) and water level measurements of existing wells. This

information was used to obtain a preliminary understanding of the existing soil conditions and to

optimize the sampling locations for the second phase. This included the installation and sampling of

wells, borings, and lysimeters. Data obtained and analyzed in the Predesign Investigation was used to

confirm the thickness of the gray clay, identify interbedded course granular materials, verify the

protectiveness of human health and the environment, and obtain preliminary geotechnical information

for the design of the disposal facility.

3

4

5

6

7

8

9

10

11

12

13

14

IS

16

17

18

19

m

21

22

23

24

26

n

28

29

M

31

32

33

34

F E R \ C R U Z \ R D W R K P L N \ 7 D O \ S ~ ~ u ~ . 1995 6:29pm 5- 1 080028

Page 30: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT August 7, 1995

5 .2 SITE-WIDE DISPOSAL FACILITY FIELD INVESTIGATION

The objective of the Site-Wide Disposal Facility Field Investigation is to obtain engineering and

geotechnical data necessary for the detailed engineering design of the on-site disposal facility. This

investigation will consist of soil borings, shallow soil sampling, CPTs, and slug testing. Soil borings

will be completed within and adjacent to the proposed location for the disposal facility to facilitate

additional engineering/geotechnical soil tests and gather additional soil profile information. Shallow

soil sampling will be conducted to facilitate additional soil tests on both the topsoil and underlying

till. CPTs will be performed within and adjacent to the proposed location for the disposal facility to

provide continuous stratigraphy information and strength data for engineering evaluation and analysis.

The data obtained through this investigation will support engineering analyses for the disposal facility

design including settlement, earthquake stability, structural support, liquefaction potential, slope

stability, and other design requirements. Additional hydrogeologic data, including slug testing, will

also be obtained to determine if engineering controls will be required to minimize potential lateral

flow pathways.

5 .3 GEOTECHNICAL STUDIES

A Borrow Area Geotechnical Investigation will be conducted to identify local borrow sources and the

properties of the material from these sources. If an on-site borrow source can be located, the material

may be used in the construction of the cap and liner of the on-site disposal facility. This information

will also be utilized in conjunction with the Site-Wide Disposal Facility Field Investigation to support

the design of the on-site disposal facility cap and liner system.

I

An investigation of the waste units will also be conducted to characterize and define geotechnical

properties of the Operable Unit 2 waste materials to assist in the evaluation of long-term settlement in

the disposal facility and for possible use in the construction of the disposal facility. If the

geotechnical properties of the waste material are suitable, it may be used as berm material and as a

cushioning layer at the top of the liner system.,

5.4 LINER COMPATIBILITY STUDY

A liner compatibility study will be performed on liner materials to detennine the most suitable liner

materials for use in the construction of the on-site disposal facility. This study will evaluate the

physical properties of the materials and evaluate compatibility with leachates and other layers in the

proposed cap and liner systems.

i

2

3

4

5

6

1

a

9

10

11

12

13

14

IS

16

17

18

19

20

21

22

23

24

25

26

n

28

29

30

31

32

33

FER\CRU2\RDWRKPLN\TDO\SUTmS\Augun3,lS95 6:29pm 5-2

Page 31: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

.). 122 FEMP-OU024 DRAFT August 7 , 1995

5.5 ENGINEERING STUDIES

Engineering studies will be performed on two potential technologies to evaluate their effectiveness and

applicability to the Operable Unit 2 remediation. These studies will be performed on a geochemical

barrier technology and on a volume reduction technology known as brickmaking. These studies will

be completed in a phased approach to determine the effectiveness of the two technologies and the

need to continue studying the two technologies. Further studies would be conducted only if it is

determined in the engineering studies that the technologies are cost effectiveand reduce contaminant

toxicity, mobility, or volume.

FER\CRU2\RDWRKPLN\TDO\SECTDS\August3, I995 6:29pm 5-3

Page 32: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

12.2 FEMP-OU02-4 DRAFT August 7, 1995

6.0 REMEDIAL DESIGN STRATEGY

Section 6.0 discusses the phases of remedial design and associated project documentation and

deliverable schedules and the process and schedule for review and finalization of the identified

deliverables.

6.1 PHASES OF REMEDIAL DESIGN

The basis for Operable Unit 2 remediation includes all of the elements of the selected remedy as

presented in Section 2.2. The design approach to these elements will be reflected in the design

deliverables which are included in one of the four phases of design. Phase 1 is the design of a

primary waste haul road from the South Field and Inactive and Active Flyash Pile areas to the on-site

disposal facility. Phase 2 is the design of test pads to verify the permeability of the cap and liner

systems. Phase 3 is the design of the on-site disposal facility. Phase 4 is the design of the excavation

for the waste unit areas.

6.1.1

A primary waste haul road from the waste unit areas to the on-site disposal facility will be constructed

during remedial action. This activity will also entail relocating the FEMP North Access Road. The

design of this activity will be based on the results of a study to coordinate remedial traffic activities.

Phase 1 - Design of Primarv Waste Haul Road

Documentation and Schedule

The Primary Waste Haul Road Preliminary, Pre-Final, and Final Design Review Packages will be

submitted for EPA review and approval (and OEPA review). A remedial action work plan will be

submitted to EPA and OEPA with the Primary Waste Haul Road Pre-Final Design Review Package.

The schedule associated with this documentation is included in Table 6-1.

6.1.2

Ohio Solid Waste Disposal Regulations specify the maximum permeability for certain layers of the

cap and liner system [OAC 3745-2748(C)]. Test pads will be designed based on the results of the

Predesign Investigation, Site-Wide Disposal Facility Field Investigation, and the Borrow Area

Geotechnical Investigation to verify that the permeabilities of the recompacted soil liner and the

Phase 2 - Design of Test Pads

recompacted soil barrier layer in the cap system will meet the Ohio requirements.

5

IO

11

12

13

14

15

16

17

18

FER\CRU2\RDWRI(PW\TDO\SECTOb\August3. 1995 6:39pm 6- I

Page 33: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2

DELIVERABLE SCHEDULED

DATE

REMEDIAL DESIGN WORK PLAN Submit Draft Remedial Design Work Plan to EPA I 08/07/95

REMEDIAL DESIGN

Submit Primary Waste Haul Road Preliminary Design Review Package to EPA Submit Primary Waste Haul Road Pre-Final Design Review Package to EPA Issue Primary Waste Haul Road Final Design Review PackageICFCl to EPA

0 1/29/96 05/03/96 0612 1 196

Submit Draft Test Pad Work Plan to EPA Submit Final Test Pad Work Plan to EPA

Submit Draft Disposal Facility Remedial Action Work Plan to EPA Submit Draft Primary Waste Haul Road Remedial Action Work Plan to EPA Submit Final Disposal Facility Remedial Action Work Plan to EPA Submit Final Primary Waste Haul Road Remedial Action Work Plan to EPA Submit Draft Waste Unit Remedial Action Work Plan to EPA Submit Final Waste Unit Remedial Action Work Plan to EPA

0 11 15/96 03/07/96

04/12/96 05/03/96 06/28/96 0612 1 196 10122196 03/20/97

Submit Disposal Facility Preliminary Design Review Package to EPA Submit Disposal Facility Pre-Final Design Review Package to EPA Issue Disposal Facility Final Design Review PackageICFC to EPA

1 CFC = certified for construction

12/22/95 06/28/96 10/14/96

Submit Waste Unit Preliminary Design Review Package to EPA Submit Waste Unit Pre-Final Design Review Package to EPA Issue Waste Unit Final Design Review PackageICFC to EPA

05/28/96 10122196 03/20/97

Page 34: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OU02-4 DRAFT August 7 , 1995

Documentation and Schedule

Due to the single focus of this phase, the design, specifications, and drawings will be included in a

single work plan. The Draft and Final Test Pad Work Plan will be submitted to EPA for review and

approval (and OEPA for review). The schedule associated with this documentation is included in

Table 6-1.

6.1.3

The on-site disposal facility will be designed to accommodate 2.5 million cubic yards of remediation

waste’from the FEMP. The facility will include a multi-layer geocomposite cap and liner system with

leak detection and leachate collection layers. For Operable Unit 2 remediation waste, a maximum on-

site disposal facility waste acceptance criteria of 346 pCi/g uranium-238 or 1,030 ppm total uranium

has been established to protect the Great Miami Aquifer, which underlies the FEMP. Similar waste

acceptance criteria for other COCs are in the process of being established for remediation waste in

Operable Units 3 and 5. Upon finalization, these additional waste acceptance criteria will be

incorporated into the design. The cap and liner design, stormwater control, leachate management,

waste acceptance criteria screening, and groundwater monitoring plan will be included in the on-site

disposal facility remedial design package.

Phase 3 - Desim of On-Site Disuosal Facility

Documentation and Schedule

The on-site disposal facility Preliminary, Intermediate, Pre-Final, and Final Design Review Packages

will be submitted to EPA for review and approval (and OEPA review). The schedule associated with

this documentation is included in Table 6-1. The Intermediate Design Review Package is not an

Amended Consent Agreement submittal and therefore is not included in Table 6-1.

6.1.4

The excavation activities for the waste units will be designed during this phase. The material with

concentrations of COCs above the cleanup levels will be excavated from each of the five Operable

Unit 2 waste units. The excavated material will be screened in the field and samples will be

analyzed, as necessary, to determine the uranium concentration. This waste acceptance criteria

attainment certification is to verify on-site or off-site disposal of the excavated material. If the

material is at or below the on-site disposal facility waste acceptance criteria of 346 pCi/g of uranium-

238 or 1,030 ppm total uranium, it will be transported for disposal in the on-site disposal facility. If

the uranium concentration is above the on-site disposal facility waste acceptance criteria, the material

Phase 4 - Excavation of Waste Units

i

2

5

6

7

8

9

10

11

12

I>

14

15

16

FER\CRUZ\RDWRKPW\TDO\SECTO~\A~~~J~~. 1995 6:39pm 6-3

000033

Page 35: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT August 7 , 1995

will be packaged and shipped to an approved off-site disposal facility. .Material from the South Field

Firing Range that contains lead is being considered a mixed waste. This waste will be treated and

disposed at an approved oft-site disposal facility. The specific treatment method for the lead-

containing Firing Range material will be defined in the remedial design package.

Documentation and Schedule

The Waste Units Preliminary, Pre-Final, and Final Design Review Packages will be submitted for

EPA review and approval (and OEPA review). The schedule associated with this documentation is

included in Table 6-1.

6.2

DOE will formally address all EPA and OEPA comments on the Preliminary Design Review

Packages through submittal of a comment response document within 30 days of receipt of the

agencies' comments. DOE does not plan to submit revised Preliminary, Intermediate, or Pre-Final

Design Review Packages, but rather will incorporate revisions to address comments into subsequent

submittals.

REVIEW AND FINALIZATION OF DESIGN DELIVERABLES

6.3 COMMENCEMENT OF REMEDIAL ACTION

The design approach presented in this Remedial Design Work Plan, as reflected in the design

deliverables and presented in the schedule, provides the mechanism for the Operable Unit 2

remediation to meet the requirement of Section 120(e)(2) for commencing substantial continuous

physical on-site remedial action not later than' 15 months after the signing of the Operable Unit 2

Record of Decision (Le., by September 8, 1996). The schedule presented in Table 6-1 is based upon

a 60 day review period for the Preliminary and Pre-Final Design Review Packages, and a 30 day

review period for the Intermediate Design Review Package and certification for construction.

/

The Operable Unit 2 activity which fulfills the commitment to implement the remedy within 15

months is the issuance of the contract for the construction of the primary waste haul road from the

waste unit areas to the location of the on-site disposal facility. This activity will be closely followed

by construction of the primary waste haul road add construction of the test pads. Prior to completion

of road construction, the construction of the disposal facility will begin.

F E R \ C R U 2 \ R D W R K P L N \ T D O \ S E ~ 6 ~ u ~ t 3 . 1995 6:39pm 6-4

Page 36: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

ii 1 2 2 FEMP-OU02-4 DRAFT August 7, 1995

Winter construction shut downs are anticipated once construction of the disposal facility and

excavation of the waste units begins. This is necessary because optimum weather conditions are

needed to construct the liner and cap systems of the on-site disposal facility and to place waste within

the facility. These periodic shut downs do not constitute a lapse in the "substantial continuous

physical on-site remedial action" that is required by CERCLA [Section 120(e)(2)]; they are a normal

part of constructing and operating a disposal facility in this climate.

FER\CRUZ\RDWRKPW\TDO\SECTO~~A~~~~~~. 1995 6:39pm 6-5

Page 37: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

ii 122 FEMP-OU02-4 DRAFT August 7, 1995

7.0 PROGRAM MANAGEMENT

This section identifies key management and technical personnel, defines specific project roles and

responsibilities for managing and preparing the design for the selected remedy for Operable Unit 2, and

discusses requirements for informing and involving the public.

7.1 STAFFING REQUIREMENTS

The Amended Consent Agreement places ultimate project management responsibility with the DOE and

the EPA. In addition, the OEPA has been granted regulatory authority over certain RCRA activities.

Each agency has engaged contractors to perform identified scopes of work related to their prime areas

of responsibility for site remediation. For the development of remedial design, Figure 7-1 identifies the

relationship among the regulators , DOE administrative and program management organizations, the

public, and the Fernald Environmental Restoration Management Corporation (FERMCO) and its

subcontractors. Figure 7-2 depicts the project communications which are in place for this project. Figure

7-3 depicts the project organizational chart.

The DOE Operable Unit 2 Team Leader will provide the overall programmatic direction for the Operable

Unit 2 remedial activities. The FERMCO CERCLA/RCRA Unit 2 Project Director, will provide for the

overall project management and technical guidance to the FERMCO team and the architect/engineer (A/E)

design firm. One of the Project Director's roles is to ensure adherence of the NE with the DCP and site-

wide quality standards. The FERMCO organization consists of project organizations, support divisions,

and service departments. The support divisions will provide a multidisciplinary team of full-time/part-

time personnel to the project on a matrix basis. This may range from a simple point of contact (such as

the procurement, safety, and quality control representatives) to a full department (such as Environmental,

Engineering, or Construction).

Within the Operable Unit 2 organization, the Project Director is directly responsible for all remedial

design activities. Public participation in the remedial design process will be coordinated through the

Operable Unit 2 Project Director, DOE, and the Operable Unit 2 Public Affairs Specialists.

FER\CRU2\RDWKF'LN\TDO\SECTW\August 3. 1995 6:32pm 7- 1 000836

1

2

3

4

5

6

7

8

9

IO

I I

12

13

14

15

16

17

18

19

20

21

zz

23

24

25

zb

27

28

29

30

31

32

Page 38: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT August 7 , 1995

I

I

t I I 1 2 a

0 I Z I

a w

.- C .-

a

I 1 . 5 ?A-

- E E

- 5

n

0

al

W 0

u I

I I I I

- t C

i! Q C (I C

r

4

7-2

Page 39: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 D R A R August 7, 1995

L a

T

-r m C 0 0, a U

.-

a

vj 5

a W

u .- L

+ 0 - a a --

v)

a

2 E (I)

a LL

W I

0 n

I! E m a LL

W I

0 n

1-3

Page 40: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

L

FEMP-OU0244- D M August 7, I=

I

v) Q) c .-

C 0 .- Y

122

I

Page 41: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

12.2 FEW-OUO24 DRAM August 7, 1995

7.2 COMMUNITY RELATIONS

As a Superfund site, the FEMP must comply with certain requirements for informing and involving the

public. The Community Relations Plan (CRP) for the U.S. Department of Energy Fernald Environmental

Management Project, Revision 4, provides details about how management will involve the public in

decisions related to the site during the remedial design, remedial action, and monitoring and maintenance

phases. The CRP is designed to comply with the public participation requirements in CERCLA; it also

reflects EPA guidance in Community Relations in Supe@nd: A Handbook (January 1992). The CRP

sets forth activities under the Amended Consent Agreement between DOE and EPA. The CRP also

complies with the requirements of all applicable laws and regulations, including the NEPA and the

Federal Facilities Compliance Act.

The CRP was revised in September/October 1994. OEPA approved the revised CRP in December 1994

and EPA approved the revised CRP in January 1995. Throughout the duration of remedial activities, the

C W may be revised to reflect changing community concerns, as well as changes in the law, regulations,

or regulatory agreements.

Throughout the Operable Unit 2 remedial design, the public will be informed of the status of remedial

design activity schedules, as well as any new findings or significant developments. Upon submittal of

the draft and final Remedial Design Work Plan and Remedial Action Work Plan to EPA, key

stakeholders, such as community leaders and members of the Fernald Citizens Task Force and Fernald

Residents for Environment, Safety, and Health (F.R.E.S.H.), Inc., will be informally notified of the

documents’ availability at the Public Environmental Information Center.

As identified in the CRP, following completion of the final engineering design for the first construction

package under remedial design, a fact sheet describing general engineering design for all components will

be distributed to the general public. A public briefing will also be held to discuss the Operable Unit 2

actions to be undertaken. At a minimum, these opportunities will reflect regulatory requirements, as well

as DOE’S commitments for public involvement at the F E W . The required public involvement activities

during remedial design and remedial action are as follows:

Upon completion of the final engineering design, prepare a fact sheet describing the remedial design [National Contingency Plan (NCP) 3OO.4351.

i

7

3

4

5

6

7

8

9

IO

!I

12

13

14

15

16

17

18

19

3

?I

2 ’

23

24

3

2b

-?

28

29

30

31

32

33

FER\CRUZ\RDWKPLN\TDO\SEC~~\AU~~P 3. 1995 6:32pm 7-5

Page 42: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

i 122 FEW-OUO2-4 DRAFT August 7 , 1995

Provide a public briefing upon completion of the final engineering design and prior to the beginning of the remedial action [NCP 30.4351.

When practicable, Operable Unit 2 management will offer public involvement opportunities -- surpassing

regulatory requirements -- throughout the remedial design, remedial action, and monitoring and

maintenance phases. The following are examples of some supplemental public involvement activities

which may be conducted during the Operable Unit 2 remedial design:

community workshops;

media relations;

public information and notification;

written materials & videos;

presentations to interested groups; and

environmental education programs.

i

FER\CRU2\RDWWLN\TDO\SWTm7\Augw 3, 1995 6:32pm 7-6

i

2

3

4

5

6

7

8

9

IO

I I

12

13

14

15

16

17

ia

19

Page 43: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August I, 1995

REFERENCES

Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, 42 U.S.C. $9601 et seq.

Consent Agreement as Amended Under CERCLA Sections 120 and 106(a), 1991, U.S. Environmental Protection Agency and U.S. Department of Energy, Administrative Docket No. V-W- 9 0 x 4 5 7 .

National Oil and Hazardous Substances Pollution Contingency Plan (NCP), 40 CFR Part 300.

U.S. Department of Energy, 1995, "Final Record of Decision for Remedial Actions at Operable Unit 2," U.S. DOE, Fernald Field Office, Fernald, OH.

U.S. Department of Energy, 1995, "Final Remedial Investigation Report for Operable Unit 2, FEMP, Fernald, Ohio, Remedial Investigation and Feasibility Study," U.S. DOE, Fernald Office, Fernald, OH.

U.S. Department of Energy, 1995, "Final Feasibility Study Report for Operable Unit 2, F E W , Fernald, Ohio, Remedial Investigation and Feasibility Study," U.S. DOE, Fernald Office, Fernald, OH.

U.S. Department of Energy, 1994, "DOE Standard, Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities," (DOE-STD-1020-94) U .S. DOE, Washington, D.C.

U.S. Department of Energy, 1995, "Community Relations Plan for the U.S. Department of Energy Fernald Environmental Management Project," U.S. DOE, Fernald Field Office, Fernald OH.

U.S. Environmental Protection Agency, 1986, "Superfund Remedial Design and Remedial Action Guidance," (OSWER Directive 9355WA), U.S. EPA, Washington, D.C.

U.S. Environmental Protection Agency, 1990, "Guidance on EPA Oversight of Remedial Designs and Remedial Actions Performed by Potentially Responsible Parties," (EPA/540/G-90/001), U.S. EPA, Washington, D.C.

U.S. Environmental Protection Agency, 1992, "Community Relations in Superfund: A Handbook," U.S. EPA, Washington, D.C.

F E R \ C R U ~ U U I W I ( P L N \ T W W R A ~ ~ ~ ~ ~ 4.1995 916.m R- 1 080842

Page 44: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122

APPENDIX A

APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS (ARARs) AND TO BE CONSIDERED

CRITERIA (TBCs)

Page 45: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OUO2-4 DRAFT

August 7, 1995

LIST OF TABLES

Table Title Pae A- 1

A-2

A-3

A 4

A-5

Chemical-Specific Requirements . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . A- I

Solid Waste Action-Specific Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-13

Radiological Action-Specific Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-4 1

Other Action-Specific Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-55

Location-Specific Requirements . . . . . . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . A-63

FERiCRll2\RDWKPLN\CME\APPENA\TOC. 11Mugust 4. 1995.9:06yn 1

Page 46: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

. ' - 0 . . c . . a

. . c 0

' ' - 0 . . E . . . . . . . . . .

. . . . . . . . . .

. . . . .

i

P

122 FEMP-6U02-4 D M

August 7, 1995

A- 1

Page 47: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

U

+ m

1 2 2 FEMP-OUW-4 DRAFT

August 7, 1995

F

A-2

Page 48: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OU02-4 DRAFT

August 7, 1995

e, a

2 3 Q

C M

-0

Q L

>

.- 8 E

a

H

.I

.- 5

5 rti e,

-0 C Q C

5

2 R 6 U -0

A-3

0 I

-2 0 .I d

a 4

w a I - - 0 0

- 0 0

1 - 0 0 z ? 9 9

Page 49: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

12 2- FEMP-OU02-4 DRAFT

August 7 , 1995

u c m

u e

0 5 c 0

L

0

L 0

f

0 - -2

a

0 a P

.- e

C C U

A-4

Page 50: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122

C c

~

e, 5 CI 0

z 0 e C 2 c z

e

s U U

P F

E <

C i

t f E ;

FEMP-OU02-4 DRAFT August 7, 1995

A-5

Page 51: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

0 f L C

u I- m

L .- a L 0 c C .- - a - 6 c C

0 .-

e, 5 L 0

1.. 2.2 FEMP-OU02-4 DRAFT

August 7 , 1995

u I- m

'3 r d - L 0

A-6

Page 52: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

i C

u f L C

u 5 L 0

122 FEMP-OU02-4 DRAFT

August 7 , 1995

V f - 0

x

A-7

Page 53: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMPiOG02-4 DRAFT

August 7, 1995

C .- 0 M

f a

e, U X 0 .-

s E z u

e, C

5

n

3 X C L

a v)

Page 54: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OUW4 DRAFT

August 7 . 1995

U

+ m

I e, > s C 0 .- In In .- E w

In In Q

0 U n w

L d A C 0 . d - 0

<

- > E E E U

=I .-

c -

L 0

J A-9

Page 55: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7. 1995

0

x a a

r - m

0,

f

m

m - d

N PI

? 0 -0

0 u D m 0

a

E r - .- - 4 2 % .; c;'

kt? .- c > o 0-0

A-10

Page 56: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7, 1995

U m c

0 h

-5 m L

0

U m c

* 0 a v)

- - 0 X

P - d

L 0

A-1 1

Page 57: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

P 2 2-

U

c m U m c

FEMP-OU02-4 D M August 7 , 1995

A-'1 2 (400056

Page 58: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

A-13

122 FEMP-OU02-4 DRAFT

August 7, 1995

Page 59: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

I FEMP-OU02-4 122 DFUFT

August 7 , 199.5

C 0 .- e

A-14

Page 60: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122

C 0

C r=

.- .- .a

B

u I- m

-0 C m 3 . ^ .a v) .-

C

Q

m

.- .a

2 .a

v1 .- 0 .a

2 .

C 0

C

.- .a .-

B

FEMP-OUO2-4 DRAFT August 7, 1995

5 N LT.

*

A-15

Page 61: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

c

FEMP-OUO2-4 DRAFT August 7 , 1995

.I:

5 E ct

C 0 rl C

.- .a

.- € B e, .a

.d

C

E $ e .-

a:

C 0 .- .a

P

C 0 .- .- 3 u

0

C

.a

L

A-16

Page 62: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

D C

.- 2 rJ -0 C

0 D x

0

Y

Y .- w .- c 5

5 3

C .- .- 5

a 0 e

- -

A-17

,

122 FEMP-OU02-4 DRAFT

August 7, 1995

K C e Y C 0 C

0

.- - .- .-

Page 63: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU01-4 DRAFT

August 7. 1995

0 I: m 0

c

- .- d 4

m 4 C

-

A-18

Page 64: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7 , 1995

.. 5 '5 3 - .-

c 0

B d

0 2

s e VI C

$ E .- a Q 0

0 c

d

3 L 0

a C 0

0 0

c)

d

d

e a d .- E a a -0

0

4

4

n 5

A-19

Page 65: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

August 7, 1995

A-20

Page 66: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

4 cd

C 0

C

.- d

.- € B -

d C

E

2 2 .- a U

C 0 .- a

9

C 0 .- .- 4 V

122 FEMP-OUO2-4 D M

August 7 , 1995

L e, .- a e, C

D E E 2 A 3 h

e, -

-

G n. a I,

- 3 0 C - e, x 0 e x

- - .- 2 -0 -c M e .- - .- E x X a

.- v1

. I

A-2 1

Page 67: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OUW-4 DRAFT

August 7, 1995

C 0 .- e

E E -0

M .-

C 0 0 " - - 8 E & x c M

- .- .- d

2 C

A-22

Page 68: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

3

FEMP-OUO2-4 DRAFT August 7, 1995

. ^ L 0 x

0

C

-0 0

C

- 2 E

5

3

.-

.- U

2 E .- 0 D

U

.d

C 0

.^ .d &

E B d C

> 2 n 0

U d

- m 2 v) d

.- C 0 0 m -c

'?

A-23

Page 69: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

FEMP- UO--4 DRAFT

e,

x D 13

=I 0-

f

e e

U- e

.-

v1

0

c 4 .-

E

2 0 1 & v1

v1 e 2

C Y

=I &

0

.A w .

x i 0 .L

fl

August 7, 1995

A-24

Page 70: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7, 1995

A-25

Page 71: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7, 1995

-0 C m

I 4

e n n

5 U

,

m c m M C

f x

C

U -0 C CJ

S o C

.- In

d

In .-

d

e

8 2 3 In . ^ - .- 22 * E

A-26

Page 72: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7, 1995

A-27

Page 73: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7 , 1995

-0 2 a 5

.- U e,

e, .- 2 -c m 0 c)

A-2 8

i

Page 74: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

FEMP-OU03-4 DRAFT August 7 , 1995

n Y,

$ a!

C 0 0 .- d

.- E B d

d C

E e s .- a cu:

C r' .- d

9

E 0

rj

.- d

d .- u

A-29

Page 75: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OU02-4 DRAFT

August 7 , 1995

A-30

Page 76: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

Jl

5

!Y

C 0 n C

.- d

.- E B e, d

d C

E

2 2 .- 3 CT

C 0 .- d

Y

c C .- .- 3 u

e, 3 0

- .- e

n 4

i- ,122 FEMP-OU01-4 DRAFT

August 7 . 1995

n

A-3 1

Page 77: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEhlP-OCiO2-4 DRAFT

August 7 , 1995

0 - -2 0 0. .- A

4

A-32

Page 78: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7 , 1995

0

s 0 .- - n 2

e,

n 0

CL

2 .4 - 4

A-33

Page 79: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7, 1995

f

A-34

Page 80: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122

n 5 5 E

C C

C

.- d

.- E L e, d

&

d C

5 L .d a 5

2

C C .- d

9

C 0 n .- d

d .- V

FEMP-OU02-4 DRAFT August 7, 1995

L n s C

M

- E

.. 2 %

A-35

Page 81: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OUO2-4 DRAFT

August 7, 1995

A-36

Page 82: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 /

FEMP-OU02-4 DRAFT .

August 7 , 1995

A-37

000082

Page 83: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 D M

August 7. 1995

C d

c 0

e, 5

s 3

d U C 4

L 0 L

0 C 0 0

U

.- d

u

. - e, 0 C 4

K e, C d

.- E

c 0

Y 4

e, - 5

U F 111

Y 5 5

E

E

.I

.d C

U 4

L 0 C u .-

E 5 .- 3

U K r:

U 2 C 0

C

.- d

.2

C 4 .- d

.- E

d

0 d

2 n 0 0 5

A-3 8

Page 84: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

c

12.2 FEMP-OUO2-4 DRAFT

August 7. 1995

A-39

Page 85: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

w 0 4 a

A-40

122 FEMP-OU02-4 D M

August 7 , 1995

008084

Page 86: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

FEMP-OU02-4 DRAFT August 7 , 1995

i

E t C

C 0

C

.- .- d

B

. - n d 0 ¶ 3 E a x 0 Q C 0 Q

e, e $ -2 .- n i C

c 0

i:

n

.- - - d c e,

C

8 e

... C 0 .- e .- '0 e - E c %I

n

.. - 4 X e, e

Q m C 0 .- .- .a a

E .- .a r

2 e, 0 .n L ¶ VI

e

-

J c - e .

0

A-4 1

Page 87: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

U

2

122 FEMP-OU02-4 DRAFT

August 7. 1995

u c m

.,. 0

D s n e,

.- - 5

5

c 0 v)

-0

! 0 d

2 0 U

f

2 E .- X

0

. - c 0

n J

._ 0

n .- d

E - d

d v)

B e c c 0 Y

.o L - m v) 0 -0 0

.. v1

/ &

J

n

e,

n n

M 0 0 s 0

0

.- E d - - .- - 4

5 L c: c 1

L

8

8 d v)

A-42

Page 88: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7 , 1995

u c m u

c m

C d

u c m

A-43

Page 89: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU01-4 DRAFT

August 7, 1995

E

A-44

Page 90: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OUE-4 DRAFT

August 7 , 1995

A-45

V c. m

4 E

E

5

2 v1 e, , 111

V F m

000083

Page 91: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7, 1995

u m l-

A-46

Page 92: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OUO2-4 DRAFT

August 7 , 1995

u m c

u m c

Page 93: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

12% FEMP-OU 2-4 DRAFT

August 7, 1995

n 5 E B

C 0 a .- d

.- E B d

d

C z 2 2 .- =I 0

r 0 .- , 2

C 0 a .- , d

i3

U

E!

B P

Jc 'c!

'A m %

A-48

Page 94: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

2 3 in

z 0 -0

C M vi 0 -0 e, 9

m

- .-

- 5 E E e M

0. 0 = 0 c

. - VI

2

2

E

e, - d C 0 3

- n C 0 .- .-a

L

a. 0

. -

.A 0

0 C 0 -0

E a - .- 2 0 c 0 .- 4

E! E 30 .-

122 FEMP-OU02-4 DRAFT

August 7, 1995

A-49

Page 95: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OU02-4 DRAFT

August 7, 1995

M C J C s

.-

0 &- E o

2 * c

A-SO 080094

Page 96: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

i

August 7, 1995

A-5 1

Page 97: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

12.2 FEhlP-OUE-4 DRAFT

August 7, 1995

A-52

Page 98: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

U

f- m

3 f c 0

U

c m

u r

0

L 0

f

4-53

e 0

3 5 c 0

122' FEMP-OU02-4 DRAFT

August 7, 1995

U m i-

u c - - 2

7

s M 4

Page 99: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

w 0 4 a

A-54

1 2 2 FEhlP-OUO24 D W

August 7, 1995

(800098

Page 100: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

i 122 FEMP-OU01-4 D R A I T

August 7 . 1995

L 0

x

x C

d .- - 6

Page 101: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OU02-4 DRAFT

August 7; 1995

P

A-56

Page 102: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

0 0 0 0 0 0 0 0 0 0 0 0 - P I -t \o m o

C C

1 2 2 FEMP-OU02-4 DRAFT

August 7. 1995

T

A-51

Page 103: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7. 1995

A-58

Page 104: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

i 122 FEMP-OU02-4 DRAFT

August 7, 1995

A-59

Page 105: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122

3 a e e 0

.- Y

Y

s 8 P

c z

z

3 A 4

cz w E- d

P I

s

L 0

FEMP-OU02-4 DRAFT August 7 , 1995

A 4 0

Page 106: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

C 0

.i 122 FEMP-OU02-4 DRAFT

August 7 , 1995

f

A-6 1

Page 107: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7, 1995

Page 108: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OU02-4 DRAFT

August 7 , 1995

A 4 3

Page 109: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

5 E 2 a

&

L n

e, 0 v)

e)

D m

P

- P - 4

a 3 v1 U

C

1)

d .- 3

f L 0

122 FEMP-OU03-4 DRAFT

August 7. 1995

A-64

Page 110: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1. 2 2 FEMP-OU02-4 DRAFT

August 7, 1995

e,

0 3 m e, e, v)

, - Y

e, v)

Y - -2 .- I P I Q

n

? E u

Page 111: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OU02-4 DRAFT

August 7 . 1995

L

A -66

Page 112: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

August 7 , 1995

z, % E m

2

C 0

m C

.- d

.- E B e, '

' t: z 2 B .- a

oi

C 0 m .- '

3

C 0 .- .- 3 u

0 C

V

e, Y

'13 C m 9. c

d

.- d

9

.- e U m 0 - s e .- 0 X e, - - - 2 n

m

W 0

n 0

U 0 0 c L 0

-

3 .- I.

U C a 'i! - 2 m N

0

Y

f 3

5

2

Page 113: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

e, AI m _.- - n 4

122 FEMP-OU01-4 DRAFT

August 7, 1995

A-68

Page 114: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

C

p. U 0

.- - m h

L

G B a

Y e a 0 cn Y 0

Ln

- e

8

122 FEMP-Oti023 DRAFT

August 7, 1995

A-69

Page 115: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1 2 2 FEMP-OU02-4 DRAFT

August 7, 1995

L c o

h

3

-0 - c

58

x 2

A-70

h

4

Page 116: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

122 FEMP-OU02-4 DRAFT

August 7 . 1995

x 4

A-1 1

x 4

x 4

Page 117: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

1.2 2 FEMP-OU02-4 DRAFT

August 7. 1995

Page 118: 122 2-201...122 2-201.1 . SUBMISSION OF THE DRAFT REMEDIAL DESIGN WORK PLAN FOR REMEDIAL ACTIONS AT OPERABLE UNIT 2 08/04/95 .--- DOE-I 320-95 DOE-FN EPAS WORK PLANDepartment of Energy

x 4

A-73

122’ FEMP-OU02-4 DRAFT

August 7, ,1995

E

c ‘ N

3