    Improving Chester CountysFive Train Stations

    October 17, 2014

    Jennie Granger, AICPBureau of Aviation, Director

    Pennsylvania Department of Transportation

    http://www.tmacc.org/http://www.tmacc.org/
  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    2/28

    The Keystone Corridor

    104 Mile Corridor

    12 Stations

    1.46 M Passengers in FY13

    14 daily weekday and 8weekend round trips

    On time performance > 90%

    Top 10 fastest growingcorridors

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    3/28

    PennDOT Goals

    Improve the passenger experience to:

    Increase Ridership

    Decrease travel time

    Create modern, attractive,and safe stations

    Build a strong transit culture

    Return to a state of good repair

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    4/28

    Amtrak Owns and operates corridor

    SEPTA Operates on portion

    Norfolk Southern Operates on portion

    PennDOT

    Responsible for operations & maintenance

    PassengerRail Investment and Improvement Act of 2008(PRIIA)

    Receives grants for capital improvements

    Stakeholder Roles

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    5/28

    FTA Commuter Rail Formula Funding

    Stations

    Amenities

    FRA High Speed Intercity Passenger RailProgram (HSIPR)

    All Funding Requires State Match Act 89helped solidify continued success

    Project Funding

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    6/28

    Current Infrastructure Projects

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    7/28

    $20 million to close 3 remaining public at-grade

    crossings

    Projects are expected to be completed by the end of2015

    Will increase safety andfacilitate higher speeds

    Grade Crossings Eliminations

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    8/28

    $40 million to design and reconstruct State Interlocking

    in Harrisburg

    $7 million to perform preliminary engineering forinterlockings throughout the corridor

    $1.5 million to perform

    preliminary engineering forAutomatic Block Signaling

    Interlockings and ABS

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    9/28

    PennDOT led Station Projects

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    10/28

    Planning completed in 2012

    PennDOT will conduct further analysis as projectprogresses

    No funding availableat this time

    Parkesburg Station

    Current Station

    Ridership

    FY 2011 48,951FY 2012 51,296

    FY 2013 55,290

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    11/28

    Property acquisition is nearly complete

    Preliminary Engineering completeawaiting comments for Amtrak

    $26.5 million project

    Coatesville Station

    Proposed New Station Area

    Ridership

    FY 2011 14,981

    FY 2012 16,493

    FY 2013 16,626

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    12/28

    Conceptual design andenvironmental screeningcompleted in Mid 2014

    Downingtown Station

    Ridership

    FY 2011 64,535

    FY 2012 65,345

    FY 2013 68,918

    2013 SEPTA wkdy 856

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    13/28

    Downingtown Station

    Photo Of Existing Station

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    14/28

    Downingtown Station

    Photo Of Proposed New Station Location

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    15/28

    Downingtown Station

    Rendering of Proposed New Station Concept

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    16/28

    SEPTA Led Station Projects

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    17/28

    SEPTA designing station building and high-level

    platforms

    Construction tobegin early 2015

    Long term Parking

    Exton Station

    Ridership

    FY 2011 101,823

    FY 2012 109,980FY 2013 113,499

    2013 SEPTA wkdy 1,420

    Exton Station facing eastbound

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    18/28

    Phase I Accessibility Project Complete by 12/2018

    Future Phases - Phase II Bridge

    Parking/Retail Opportunities

    Paoli Station

    Ridership

    FY 2011 161,791

    FY 2012 167,561FY 2013 175,299

    2013 SEPTA wkdy 2,570

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    19/28

    Phase I - Proposed Accessibility ImprovementsCONCEPTUAL

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    20/28

    Existing Aerial View

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    21/28

    Proposed Aerial View of Accessibility ImprovementsCONCEPTUAL

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    22/28

    Existing View looking Southeast

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    23/28

    Proposed View looking SoutheastCONCEPTUAL

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    24/28

    Existing View looking Northeast

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    25/28

    Proposed View looking NortheastCONCEPTUAL

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    26/28

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    27/28

    WWW.PLANTHEKEYSTONE.COM

  • 8/10/2019 12.18.2014 Plan the Keystone.pdf

    28/28

    Overview of Accessibility ImprovementsCONCEPTUAL