    Project Number: HXLY0606 Project Title: Quantum Coherence

    Project Manager: Kevin Barnes College Customers / Business Contacts:

    Project Board:

    ID TYPE AUTHOR OWNER

    (i.e. A.Nother)

    DATE IDENTIFIED DESCRIPTION

    1 Project R. Hall R. Hall 12/04/07 Existing Ventilation insufficient for new desi

    AHU Plant required.

    2 Project R. Hall R. Hall 12/04/07 Existing LTHW supply insufficient to me

    requirements, additional heating plant required

    3 Project R. Hall R. Hall 12/04/07

    Insufficient room for process cooling plant within

    4 Project R. Hall R. Hall 12/04/07Insufficient L0 drainage

    5 Project R. Hall R. Hall 12/04/07 Existing services interfering with design expec

    final layout, leading to loss of ceiling heigh

    services.

    6 Project R. Hall R. Hall 12/04/07Works causing interference (dust / dirt) with su

    sensitive areas. Specifically Laboratories 009A

    7 Project R. Hall R. Hall 12/04/07

    Smoke Extract requirements impeding on

    design.

    8 Project R. Hall R. Hall 12/04/07Lack of available electrical supply, new incom

    may be required

    9 Project R. Hall R. Hall 12/04/07

    Lack of available data and telephone capacit

    upgrade existing system

    10 Project R. Hall Project Team 12/04/07

    Insuff icient floor space for electrical di

    equipment

    11 Project R. Hall Project Team 12/04/07 Insufficient wall space for mechanical services

    impede on work space

    12 Project BMJ Arch Project Team 16/04/07

    Existing services to be isolated

    13 Project BMJ Arch Project Team 16/04/07

    Slips, Trips and Fall hazards

    14 Project BMJ Arch Project Team 16/04/07

    Confined space working

    15 Project BMJ Arch Project Team 16/04/07

    Removal of existing floor slab and balustrade

    16 Project BMJ Arch Project Team 16/04/07

    Access issues for plant and materials

    17 Project BMJ Arch Project Team 16/04/07

    Spatial problems with temp works / scaffolding w

    009

    18 Project BMJ Arch Project Team 16/04/07

    Project Risk Log Rev 06 dated 28

    Dr Roy Burns plus appointed academics

  • 8/12/2019 1.20RiskLogexample

    2/2

    TYPE PROBABILITY IMPACT STATUS ACTION

    Business 1 1 Open Contingency

    Project 2 2 Closed Transference

    Stage 3 3 Prevention

    4 4 Reduction

    Acceptance