    Maharashtra State Electricity TransmissionCompany Ltd.

    Daily system Report

    12/Mar/2014

    for

    State Load Dispatch Center,Airoli

    0 of 7

  • 8/12/2019 1203e

    2/8

    Daily system Report for 12/Mar/2014

    State Load Dispatch Center,Airoli (MSETCL)

    WEDNESDAY

    I GENERATION (MUs) II EXCHANGES (MUs)A) MSGENCO Daily Monthly

    1) Thermal

    3) Gas

    2) Hydro

    Total MSGENCO

    B) 1) JSW JAIGAD

    5) Wind Generation

    4) Other CPP / IPP

    C) 1) TPCL Thermal

    2) TPCL Hydro

    TOTAL TPCL3) REL Thermal

    D) STATE

    1) Thermal

    2) Hydro3) Gas4) Wind

    TOTAL STATE

    (A1+C1+C3)

    (A2+B6+C2)

    (A3)

    (B5)

    E) Central Sector Daily Monthly

    1) Gujrat

    2) Madhya Pradesh

    3) Chattisgarh

    4) Maharashtra Net

    8) Pench (Excess)

    # Total Cent. Sector

    F) Other Exchanges

    1) With TPCL (Excess)

    1) MSEDCL Bilateral

    H) ENERGY CATERED (MUs)

    1) MSEDCL

    2) TPCL

    3) REL

    TOTAL STATE

    DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW)

    MSGENCO Thermal

    MSGENCO Hydro

    MSGENCO Gas

    MSGENCO Total Generation

    Central Sector Receipt

    Exchange with MumbaiMSEDCL DEMAND MET

    MSEDCL DEMAND

    TPCL GENERATION

    R-INFRA GENERATION

    TPCL+R-INFRA DEMAND

    STATE DEMAND MET

    STATE DEMAND

    Frequency (Hz)

    FREQUENCY PARTICULARSMAXIMUM FREQ. MINIMUM FREQ. AVERAGE FREQ. FREQ. BELOW 49.2 Hz

    * Displayed for information, not added in total. # Total Cent. Sector includes MSEDCL and TPCL bilateral power.

    PARTICULARS

    121.706 1410.540

    19.020 122.312

    6.925 78.189

    147.651 1611.04114.255 205.738

    1.669 62.146

    18.133 197.580

    14.914 174.408

    4.369 33.670

    19.283 208.07811.710 136.023

    148.330 1720.971

    23.675 158.332

    6.925 78.189

    1.669 62.146

    246.283 2514.555

    -2.082 -47.319

    20.580 218.934

    10.440 104.350

    72.708 870.184

    -0.286 -2.350

    101.921 1161.834

    -23.756 -257.209

    4.276 126.806

    293.455 3397.067

    35.533 388.946

    19.215 212.339

    348.203 3998.352

    5521

    A. Morning Peak at 11Hrs

    B. Evening Peak at 17Hrs

    C. Night Minimum at 3Hrs

    1252

    282

    7055

    4576

    -119013356

    13478

    1063

    521

    2774

    16130

    16252

    49.95 49.91 50.11

    50.33 Hz at 00.01 Hrs 49.28 Hz at 19.25 Hrs 50.01 0 % of Time(min)

    5133

    1052

    6480

    295

    4947

    -123312955

    13242

    966

    523

    2722

    15677

    15964

    4770

    139

    5185

    276

    3611

    -67810822

    10874

    495

    392

    1565

    12387

    12439

    Shift Engineer Shift Incharge

    G) Bilateral Power *

    Include PX -12.679 -64.886

    2) MUMBAI Bilateral 20.160 220.277

    Include PX 7.382 58.780

    3) MUMBAI Schedule 20.160 220.303

    WIND 40 50 37

    6) PENCH (MS) 0.286 2.350

    5)CPP/IPP 64.617 482.993(B1+B2+B3+B4)

    CPP / IPP 2716 2649 2667

    Load Shedding 122 287 52

    5) Goa

    6) TAPS 1&2 Injection

    7) RGPPL Injection

    -6.895 -71.825

    7.456 89.860

    0.000 0.000

    2) WPCL 4.056 51.502

    3) ADANI 28.173 350.161

    62SOLAR 138 0

    7) SOLAR 1.067 11.924

    6) SOLAR (B7) 1.067 11.924

    (Incl. 765kV Solapur-Raichur) -14.515-0.628

    1 of 7

  • 8/12/2019 1203e

    3/8

    Daily and Progressive Generation,Maximum,Minimum,OLC Details for 12/Mar/2014

    State Load Dispatch Center,Airoli (MSETCL)

    Generating

    unit

    Generation

    Daily

    (Mus)

    OLC

    (MW)Monthly

    (Mus)

    Max

    (MW)

    Min

    (MW)

    Koradi

    0.00 0 0 00.00Unit 5

    3.27 157 119 13539.23Unit 6

    3.64 170 130 15540.84Unit 7

    6.91 80.08Total 290Bhusawal

    3.14 135 125 14028.02Unit 2

    3.12 140 120 14037.40Unit 3

    7.85 500 115 43054.94Unit 4

    7.92 410 285 37697.02Unit 5

    22.04 217.38Total 1086

    Parli

    0.00 0 0 00.00Unit 3

    4.00 183 152 15533.91Unit 4

    0.00 0 0 019.00Unit 5

    4.77 250 180 18054.02Unit 6

    4.74 250 180 18053.29Unit 7

    13.51 160.22Total 515

    Chandrapur

    3.27 145 130 14038.14Unit 1

    3.81 170 145 15035.55Unit 2

    4.13 181 161 18042.05Unit 3

    4.55 205 169 21051.49Unit 4

    9.78 440 354 40085.46Unit 5

    9.06 405 360 400108.26Unit 6

    6.05 275 231 28095.13Unit 7

    40.64 456.09Total 1760

    Paras0.00 0 0 046.32Unit 3

    4.90 231 174 24059.13Unit 4

    4.90 105.45Total 240

    Khaparkheda

    3.92 175 135 18043.25Unit 1

    3.23 155 100 18041.52Unit 2

    4.30 188 171 19547.62Unit 3

    0.00 0 0 09.73Unit 4

    9.71 468 360 500111.97Unit 5

    21.16 254.09Total 1055

    Nasik4.02 175 150 19035.38Unit 3

    4.30 195 171 19051.22Unit 4

    4.22 187 170 19050.64Unit 5

    12.54 137.23Total 570

    Uran

    6.92 316 272 28078.19All Units

    6.92 78.19Total 280

    PENCH (MS)

    0.29 49 02.35Pench (MS)

    0.29 2.35Total

    Koyna

    3.80 565 40 60031.38Stage 1-2

    8.52 838 0 25025.35Stage 4

    3.05 256 0 32012.60Stage 3

    Generating

    unit

    Generation

    Daily

    (Mus)

    OLC

    (MW)Monthly

    (Mus)

    Max

    (MW)

    Min

    (MW)

    15.38 69.33Total 1170

    Hydro

    0.45 19 18 186.27KDPH

    0.00 0 0 00.00VTRNA

    0.40 64 0 604.82TILLARI0.00 0 0 00.01BHTGR/VEER

    0.14 41 0 401.34BHIRA T.R.

    0.34 15 14 103.78RNGR+BHTSA

    0.34 32 0 308.48BHANDARDRA

    0.00 0 0 00.00ELDARY

    0.87 37 36 1110.92SMLHY_PTN

    1.10 125 0 017.36GHATGHAR

    3.64 52.98Total 169

    Wind

    0.07 2.24MalharPeth

    0.15 3.98Vankuswadi

    0.01 0.37ATIT

    0.04 0.59Kale

    0.60 15.76Satara

    0.03 1.19Shirala

    0.01 0.19K Mahankal

    0.09 1.47Supa

    0.50 9.44Vita

    0.06 16.07Dondaicha

    0.01 1.77Sakri

    0.01 1.19Nandurbar

    0.07 4.43Khandke

    0.02 3.47Khaparale1.67 62.15Total

    CPP

    14.26 768 464 691205.74JSW_JAIGAD

    4.06 172 163 17051.50WARDHA

    28.17 1200 1080 1234350.16Adani

    18.13 465197.58Other_CPPs

    64.62 804.98Total 2560

    SOLAR

    1.07 11.92Total

    1.07 11.92Total

    Tata0.00 0 0 00.00Trombay 4

    10.52 502 314 500122.15Trombay 5

    0.00 0 0 00.00Trombay 6

    2.78 123 114 12033.07Trombay 7A

    1.61 70 66 6019.18Trombay 7B

    0.00 0 0 00.00Trombay 8

    4.37 438 0 44733.67TATA Hydro

    19.28 208.08Total 1127

    REL

    11.71 524 392 500136.021&2

    11.71 136.02Total 500

    Cent_Sect

    4819Share

    Total 4819

    121.71 1410.54 5516

    19.02 122.31 1339

    State Total 246.28 2514.56 16141Total

    Hydro

    Thermal

    147.65 1611.04 7135

    MSPGCL

    Thml+Gas 128.63 1488.73 579612.32 56.73 850Koyna 12&4 Total

    2 of 7

  • 8/12/2019 1203e

    4/8

    State Load Dispatch Center,Airoli (MSETCL)

    Hourly Load Data As on 12/Mar/2014

    THM HY GAS

    TOTALCS

    SHARECS

    RECPTMum.S

    CH.

    Mum.NET

    EXCH.

    MSEDCLDEM.MET

    LOADSHEDDI

    NG

    MSEDCLDEM.

    WITH LS

    TPCL + R-INFRA

    DEMAND

    STATEDEMAND

    FREQ.(Hz)

    MSPGCL GEN.TIMESR.NO.

    WINDCPP /IPP

    SOLAR

    1 4645 257 272 5174 3447 4190 50.161797114048411320-910-660 1320191 2775 0

    2 4735 153 272 5160 3526 3930 50.071648111585211106-758-560 1280680 2694 0

    3 4770 139 276 5185 3536 3611 50.111565108745210822-678-515 1243937 2667 0

    4 4784 159 276 5219 3536 4193 50.161522115455211493-633-515 1306755 2659 0

    5 4848 141 276 5265 3536 4276 50.101517117365211684-627-520 1325360 2710 0

    6 5043 176 276 5495 3887 4382 49.991629120937712016-713-534 1372235 2817 0

    7 5162 293 276 5731 4116 4481 49.9318131269114012551-735-524 1450441 2991 2

    8 5207 509 276 5992 4295 4643 50.0119711323628312953-745-692 1520741 2953 22

    9 5271 613 276 6160 4378 4391 49.9422441300123012771-808-748 1524527 2895 57

    10 5148 1059 282 6489 4575 4670 49.8925461331814113177-985-884 1586430 2852 100

    11 5521 1252 282 7055 4691 4576 49.9527741347812213356-1190-1135 1625240 2716 138

    12 5544 1234 282 7060 4798 4392 50.0328141331415113163-1174-1200 1612839 2672 157

    13 5349 1061 282 6692 4588 5002 50.0327951343219913233-1244-1189 1622743 2588 152

    14 5161 1110 283 6554 4431 4568 49.9327061295115412797-1138-1083 1565745 2635 133

    15 5087 1189 291 6567 4764 4887 49.9127321316911113058-1167-1065 1590140 2621 110

    16 5060 1280 295 6635 4762 4666 49.9727081301216412848-1216-1064 1572046 2618 99

    17 5133 1052 295 6480 4390 4947 49.9127221324228712955-1233-985 1596450 2649 62

    18 5018 985 300 6303 3769 3588 49.9926751176733711430-1209-961 14442121 2595 32

    19 4992 501 305 5798 4021 4185 49.8926191172110311618-1188-971 1434098 2682 3

    20 5004 1239 306 6549 4529 3794 49.902685119427611866-1214-981 14627124 2591 0

    21 5094 1543 307 6944 3822 4194 50.112582128076312744-1151-948 15389121 2614 0

    22 5059 1383 309 6751 3386 3744 50.012341121685712111-1100-849 14509164 2545 0

    23 5085 1080 314 6479 3129 3070 50.022221112315711174-1018-744 13452105 2538 0

    24 4986 612 316 5914 3218 3541 50.162123112665711209-922-832 13389136 2540 0

    121.71

    MUs 19.02 6.92 147.65 97.13 101.92 -20.16 -23.76 293.46 3.10 296.56 54.75 351.30 50.01

    NOTE : ALL VALUES IN MWMumbai Sch./Net Exch is shown with reference to MSETCL System. (+) indicates Mum. to MSETCL and (-) indicatesMSETCL to Mum. Mumbai Schedule is calculated for MSETCL periphery (taking 4% loss for import & 4.85% MSETCL loss

    1.67

    # Without Applying Load Diversity Factor

    64.62 1.07

    3 of 7

  • 8/12/2019 1203e

    5/8

    State Load Dispatch Center,Airoli (MSETCL)

    Details of Generating Unit Outages/Trippings for 12/Mar/2014Position as on 6.30 Hrs of 13/Mar/2014

    Name of Generating

    Unit

    Tripped

    Date

    Trippe

    d TimeSync.Date

    Sync.

    TimeReason of OutageCapacity

    Expected

    Date

    PLANNED OUTAGE

    Parli Unit 3 13/02/2013 23.50 Continued. Water Shortage210

    FORCED OUTAGE

    Dabhol 1B 28/05/2013 22.02 Continued. Gas shortage.230

    Dabhol 3A 06/06/2013 08.28 Continued. Gas Shortage230

    Dabhol 2A 06/06/2013 09.10 Continued. Gas Shortage230

    Dabhol 1X 27/06/2013 21.46 Continued. Gas Shortage290

    Dabhol 1A 27/06/2013 21.47 Continued. Gas Shortage230

    Dabhol 2X 15/07/2013 15.09 Continued. Gas Shortage290

    Tata Trombay 6 19/07/2013 23.54 Continued. Economic shut down.500

    Dabhol 2B 08/08/2013 15.03 Continued. Gas Shortage230

    CPP VIPL02/10/2013 00.45 Continued.

    Turbine bearing vibration

    high.300

    Dabhol 3X 29/12/2013 05.47 Continued. Gas Shortage290

    Dabhol 3B 29/12/2013 06.14 Continued. Gas Shortage230

    Uran Unit 8 03/01/2014 14.06 Continued. Gas Shortage108

    Tata Trombay 809/01/2014 22.54 Continued.

    Emergency H/T,Fire at

    turbine track.250

    Uran Unit B0 29/01/2014 17.50 Continued. Gas Shortage.120

    Uran Unit 7 29/01/2014 18.05 Continued. Gas Shortage.108

    CPP WPCL U-1 30/01/2014 12.45 Continued. turbine vibration135

    CPP WPCL U-2 18/02/2014 00.02 Continued. Ash Conveying problem135

    Koradi Unit 5 23/02/2014 04.04 Continued. ID Fan Problem.200

    CPP JSW (J) U2 28/02/2014 17.52 Continued. No Schedule.300

    Khaparkheda Unit 4 03/03/2014 09.32 Continued. B.T.L.210

    Parli Unit 5 06/03/2014 07.06 Continued. Coal Shortage.210

    Paras Unit 3 11/03/2014 12.25 Continued. BTL250

    CPP Adani U-211/03/2014 17.52 13/03/2014 1.54

    on hp bypass drainline

    leakage660

    4 of 7

  • 8/12/2019 1203e

    6/8

    Details of Line outages/Trippings for 12/Mar/2014

    State Load Dispatch Center,Airoli (MSETCL)

    Position as on 6.30 Hrs of 13/Mar/2014

    Name of LineTripped

    Date

    Tripped

    Time

    Synchronise

    d Date

    Synchronise

    d TimeReason of Outage

    InterState

    400KVVoltage Level : PLANNED OUTAGEOutage Type

    A"Bad - A'Bad (PG)- II 07/03/2014 15.11 Continued. Outage.(lilo bypass)220KVVoltage Level : PLANNED OUTAGEOutage Type

    Borivali -Tarapur 07/12/2013 10.15 Continued. MUMBAI STRENGTHENING WORK

    400KVVoltage Level : HAND TRIPPEDOutage Type

    765 KV Akola-II - Tiroda -

    I07/03/2014 14.50 12/03/2014 19.04

    H/T in view of Outage on 400KV Akola-

    A'bad PG & 400KV A'bad-A'bad PG.

    Dhule-Sar'Sarovar - I 11/03/2014 21.27 12/03/2014 6.42 over voltage

    Kolhapur - Mapusa - I 11/03/2014 21.28 12/03/2014 8.01 over voltage

    Kolhapur-Mapusa-II 12/03/2014 17.11 Continued. over voltage

    Dhule-Sar'Sarovar - I 12/03/2014 22.57 Continued. over voltage

    400KVVoltage Level : TRIPPEDOutage Type

    Solapur-Solapur(PGCIL) 26/02/2014 19.39 Continued.Distance Protection.tower collepse loc

    110

    Karad - Solapur (PGCIL) 26/02/2014 19.54 Continued. Distance Protection.

    Kolhapur-Solapur(PGCIL)-

    I10/03/2014 19.38 Continued.

    Dist.Prot,Conductor Snap at 47Kms

    from Solapur PG at Loc.no.128,129

    collapse.2no tower collapse

    Kolhapur-Solapur (PG) II 10/03/2014 19.38 Continued.

    Dist.Prot,Conductor Snap at 47

    Kms.from Solapur PG at Loc no

    128,129 collapse.

    220KVVoltage Level : TRIPPEDOutage Type

    Kalmeshwar - Pandurna 12/03/2014 15.18 12/03/2014 15.30 tripped at pandhurna end only

    IntraState

    400KVVoltage Level : PLANNED OUTAGEOutage Type

    Bus Coupler @ Bhusawal 25/02/2014 10.30 Continued.For Replacement Of OLD MOCB

    Under Jaica-2 Outage.

    Koradi-Khaparkheda-I 12/03/2014 10.41 12/03/2014 16.15 cb timing

    400/220 KV 315 MVA ICT-

    II @ Chandrapur12/03/2014 20.07 12/03/2014 23.01

    emergency outage for attending

    sparking at lv r-ph bushing

    220KVVoltage Level : PLANNED OUTAGEOutage Type

    Ghodbandar - Bhoisor

    (MSETCL)07/12/2013 10.38 Continued. MUMBAI STRENGTENING WORK

    Borivali - Ghodbandar - II 05/02/2014 10.14 Continued.Tower Erection of Loc.8 & M/C

    Stringing.

    Babaleshwar - Chalisgaon 06/03/2014 11.42 Continued.

    Stringing of 220KV Tapline for

    Kopergaon S/S Alongwith Erection of

    MD Tower. (upto 10 th March.)

    220/132KV 200MVA ICT -

    I at Parbhani12/03/2014 11.15 12/03/2014 14.02 Tan delta measurement of ct.

    Theur-Jejuri 12/03/2014 11.28 Continued.removing old structure of main bus

    iso,aux.bus iso & 3 nos of ct structure

    Main Bus - I @

    Vansudwadi12/03/2014 12.35 12/03/2014 15.32 replacement of bus insu.string

    Jejuri-Jejuri I 12/03/2014 8.15 12/03/2014 10.36 hot spot attending work

    Pusad - Nanded 12/03/2014 9.42 12/03/2014 16.45strining work of lilo line for remaining

    work

    400KVVoltage Level : HAND TRIPPEDOutage Type

    New Koyna - Dabhol - I 06/02/2014 00.02 Continued.Over Voltage.(RFC 20.35 Hrs on

    16.02.14)

    5 of 7

  • 8/12/2019 1203e

    7/8

    Details of Line outages/Trippings for 12/Mar/2014

    State Load Dispatch Center,Airoli (MSETCL)

    Position as on 6.30 Hrs of 13/Mar/2014

    Name of LineTripped

    Date

    Tripped

    Time

    Synchronise

    d Date

    Synchronise

    d TimeReason of Outage

    Dabhol-Nagothane - II 28/02/2014 21.35 Continued. Over Voltage.

    Bhusawal- Aurangabad 11/03/2014 18.21 12/03/2014 6.55 over voltage

    Karad-Jaigad I 11/03/2014 21.47 12/03/2014 6.43 over voltageBhusawal- Aurangabad 12/03/2014 17.46 Continued. over voltage

    220KVVoltage Level : HAND TRIPPEDOutage Type

    Aurangabad -

    Babaleshwar09/03/2014 10.21 Continued. To control ICT loading at Waluj.

    400KVVoltage Level : TRIPPEDOutage Type

    Karad-Jaigad I 12/03/2014 17.53 Continued. over voltage

    Karad - Kolhapur - II 13/03/2014 4.00 13/03/2014 6.36 over voltage

    220KVVoltage Level : TRIPPEDOutage Type

    Vita - Lamboti 09/03/2014 17.32 Continued. Dist.Prot.

    220/132 KV 200 MVA ICT- I @ Beed

    11/03/2014 00.56 Continued. Diff.Prot.

    Parly (Ext.) - Beed - II 11/03/2014 00.56 Continued. Dist.Prot.

    Lonikand-Theur - I 12/03/2014 17.23 Continued. distance prot.

    Lonikand -Theur - II 12/03/2014 17.42 Continued. distance prot.

    220/132KV, 200MVA ICT-I

    at Theur12/03/2014 17.42 12/03/2014 18.15 o/c & e/f prot.

    220/132 KV 200 MVA ICT

    - II @ Theur12/03/2014 17.42 12/03/2014 18.20 hv e/f & backup over current

    Theur - Flagship 12/03/2014 19.45 12/03/2014 18.10 tripped

    6 of 7

  • 8/12/2019 1203e

    8/8

    Details of On Line Capacity for 13/Mar/2014

    State Load Dispatch Center,Airoli (MSETCL)

    Generating unit Derated Capacity

    (MW) OLC (MW)

    Koradi

    200 0Unit 5

    210 145Unit 6

    210 175Unit 7

    620 320

    Bhusawal

    210 140Unit 2

    210 140Unit 3

    500 430Unit 4

    500 376Unit 5

    1420 1086

    Parli

    210 0Unit 3

    210 162Unit 4

    210 0Unit 5

    250 190Unit 6

    250 190Unit 71130 542

    Chandrapur

    210 140Unit 1

    210 160Unit 2

    210 180Unit 3

    210 210Unit 4

    500 450Unit 5

    500 420Unit 6

    500 280Unit 7

    2340 1840

    Paras

    250 0Unit 3

    250 230Unit 4

    500 230

    Khaparkheda

    210 180Unit 1

    210 180Unit 2

    210 195Unit 3

    210 0Unit 4

    500 500Unit 5

    1340 1055

    Nasik

    210 190Unit 3210 190Unit 4

    210 190Unit 5

    630 570

    Uran

    852 300All Units

    852 300

    PENCH (MS)

    53Pench (MS)

    53

    Koyna

    600 600Stage 1-2

    1000 250Stage 4

    320 320Stage 3

    1920 1170

    Hydro

    40 18KDPH

    60 0VTRNA

    Generating unit Derated Capacity

    (MW) OLC (MW)

    60 60TILLARI

    21 0BHTGR/VEER

    80 40BHIRA T.R.

    20 16RNGR+BHTSA

    45 30BHANDARDRA23 0ELDARY

    12 0SMLHY_PTN

    250 0GHATGHAR

    611 164

    Wind

    0MalharPeth

    0Vankuswadi

    0ATIT

    0Kale

    0Satara

    0Shirala

    0K Mahankal

    0Supa

    0Vita

    0Dondaicha

    0Sakri

    0Nandurbar

    0Khandke

    0Khaparale

    0

    CPP

    1200 550JSW_JAIGAD

    405 195WARDHA1980 1851Adani

    300 465Other_CPPs

    3885 3061

    SOLAR

    0Total

    0

    Tata

    150 0Trombay 4

    500 500Trombay 5

    500 0Trombay 6

    120 120Trombay 7A

    60 60Trombay 7B250 0Trombay 8

    444 447TATA Hydro

    2024 1127

    REL

    500 5001&2

    500 500

    Cent_Sect

    3455 4716Share

    3455 4716