Upload
tuku-singh
View
217
Download
0
Embed Size (px)
Citation preview
8/12/2019 1203e
1/8
Maharashtra State Electricity TransmissionCompany Ltd.
Daily system Report
12/Mar/2014
for
State Load Dispatch Center,Airoli
0 of 7
8/12/2019 1203e
2/8
Daily system Report for 12/Mar/2014
State Load Dispatch Center,Airoli (MSETCL)
WEDNESDAY
I GENERATION (MUs) II EXCHANGES (MUs)A) MSGENCO Daily Monthly
1) Thermal
3) Gas
2) Hydro
Total MSGENCO
B) 1) JSW JAIGAD
5) Wind Generation
4) Other CPP / IPP
C) 1) TPCL Thermal
2) TPCL Hydro
TOTAL TPCL3) REL Thermal
D) STATE
1) Thermal
2) Hydro3) Gas4) Wind
TOTAL STATE
(A1+C1+C3)
(A2+B6+C2)
(A3)
(B5)
E) Central Sector Daily Monthly
1) Gujrat
2) Madhya Pradesh
3) Chattisgarh
4) Maharashtra Net
8) Pench (Excess)
# Total Cent. Sector
F) Other Exchanges
1) With TPCL (Excess)
1) MSEDCL Bilateral
H) ENERGY CATERED (MUs)
1) MSEDCL
2) TPCL
3) REL
TOTAL STATE
DETAILS OF MAHARASHTRA STATE PEAK DEMAND(MW)
MSGENCO Thermal
MSGENCO Hydro
MSGENCO Gas
MSGENCO Total Generation
Central Sector Receipt
Exchange with MumbaiMSEDCL DEMAND MET
MSEDCL DEMAND
TPCL GENERATION
R-INFRA GENERATION
TPCL+R-INFRA DEMAND
STATE DEMAND MET
STATE DEMAND
Frequency (Hz)
FREQUENCY PARTICULARSMAXIMUM FREQ. MINIMUM FREQ. AVERAGE FREQ. FREQ. BELOW 49.2 Hz
* Displayed for information, not added in total. # Total Cent. Sector includes MSEDCL and TPCL bilateral power.
PARTICULARS
121.706 1410.540
19.020 122.312
6.925 78.189
147.651 1611.04114.255 205.738
1.669 62.146
18.133 197.580
14.914 174.408
4.369 33.670
19.283 208.07811.710 136.023
148.330 1720.971
23.675 158.332
6.925 78.189
1.669 62.146
246.283 2514.555
-2.082 -47.319
20.580 218.934
10.440 104.350
72.708 870.184
-0.286 -2.350
101.921 1161.834
-23.756 -257.209
4.276 126.806
293.455 3397.067
35.533 388.946
19.215 212.339
348.203 3998.352
5521
A. Morning Peak at 11Hrs
B. Evening Peak at 17Hrs
C. Night Minimum at 3Hrs
1252
282
7055
4576
-119013356
13478
1063
521
2774
16130
16252
49.95 49.91 50.11
50.33 Hz at 00.01 Hrs 49.28 Hz at 19.25 Hrs 50.01 0 % of Time(min)
5133
1052
6480
295
4947
-123312955
13242
966
523
2722
15677
15964
4770
139
5185
276
3611
-67810822
10874
495
392
1565
12387
12439
Shift Engineer Shift Incharge
G) Bilateral Power *
Include PX -12.679 -64.886
2) MUMBAI Bilateral 20.160 220.277
Include PX 7.382 58.780
3) MUMBAI Schedule 20.160 220.303
WIND 40 50 37
6) PENCH (MS) 0.286 2.350
5)CPP/IPP 64.617 482.993(B1+B2+B3+B4)
CPP / IPP 2716 2649 2667
Load Shedding 122 287 52
5) Goa
6) TAPS 1&2 Injection
7) RGPPL Injection
-6.895 -71.825
7.456 89.860
0.000 0.000
2) WPCL 4.056 51.502
3) ADANI 28.173 350.161
62SOLAR 138 0
7) SOLAR 1.067 11.924
6) SOLAR (B7) 1.067 11.924
(Incl. 765kV Solapur-Raichur) -14.515-0.628
1 of 7
8/12/2019 1203e
3/8
Daily and Progressive Generation,Maximum,Minimum,OLC Details for 12/Mar/2014
State Load Dispatch Center,Airoli (MSETCL)
Generating
unit
Generation
Daily
(Mus)
OLC
(MW)Monthly
(Mus)
Max
(MW)
Min
(MW)
Koradi
0.00 0 0 00.00Unit 5
3.27 157 119 13539.23Unit 6
3.64 170 130 15540.84Unit 7
6.91 80.08Total 290Bhusawal
3.14 135 125 14028.02Unit 2
3.12 140 120 14037.40Unit 3
7.85 500 115 43054.94Unit 4
7.92 410 285 37697.02Unit 5
22.04 217.38Total 1086
Parli
0.00 0 0 00.00Unit 3
4.00 183 152 15533.91Unit 4
0.00 0 0 019.00Unit 5
4.77 250 180 18054.02Unit 6
4.74 250 180 18053.29Unit 7
13.51 160.22Total 515
Chandrapur
3.27 145 130 14038.14Unit 1
3.81 170 145 15035.55Unit 2
4.13 181 161 18042.05Unit 3
4.55 205 169 21051.49Unit 4
9.78 440 354 40085.46Unit 5
9.06 405 360 400108.26Unit 6
6.05 275 231 28095.13Unit 7
40.64 456.09Total 1760
Paras0.00 0 0 046.32Unit 3
4.90 231 174 24059.13Unit 4
4.90 105.45Total 240
Khaparkheda
3.92 175 135 18043.25Unit 1
3.23 155 100 18041.52Unit 2
4.30 188 171 19547.62Unit 3
0.00 0 0 09.73Unit 4
9.71 468 360 500111.97Unit 5
21.16 254.09Total 1055
Nasik4.02 175 150 19035.38Unit 3
4.30 195 171 19051.22Unit 4
4.22 187 170 19050.64Unit 5
12.54 137.23Total 570
Uran
6.92 316 272 28078.19All Units
6.92 78.19Total 280
PENCH (MS)
0.29 49 02.35Pench (MS)
0.29 2.35Total
Koyna
3.80 565 40 60031.38Stage 1-2
8.52 838 0 25025.35Stage 4
3.05 256 0 32012.60Stage 3
Generating
unit
Generation
Daily
(Mus)
OLC
(MW)Monthly
(Mus)
Max
(MW)
Min
(MW)
15.38 69.33Total 1170
Hydro
0.45 19 18 186.27KDPH
0.00 0 0 00.00VTRNA
0.40 64 0 604.82TILLARI0.00 0 0 00.01BHTGR/VEER
0.14 41 0 401.34BHIRA T.R.
0.34 15 14 103.78RNGR+BHTSA
0.34 32 0 308.48BHANDARDRA
0.00 0 0 00.00ELDARY
0.87 37 36 1110.92SMLHY_PTN
1.10 125 0 017.36GHATGHAR
3.64 52.98Total 169
Wind
0.07 2.24MalharPeth
0.15 3.98Vankuswadi
0.01 0.37ATIT
0.04 0.59Kale
0.60 15.76Satara
0.03 1.19Shirala
0.01 0.19K Mahankal
0.09 1.47Supa
0.50 9.44Vita
0.06 16.07Dondaicha
0.01 1.77Sakri
0.01 1.19Nandurbar
0.07 4.43Khandke
0.02 3.47Khaparale1.67 62.15Total
CPP
14.26 768 464 691205.74JSW_JAIGAD
4.06 172 163 17051.50WARDHA
28.17 1200 1080 1234350.16Adani
18.13 465197.58Other_CPPs
64.62 804.98Total 2560
SOLAR
1.07 11.92Total
1.07 11.92Total
Tata0.00 0 0 00.00Trombay 4
10.52 502 314 500122.15Trombay 5
0.00 0 0 00.00Trombay 6
2.78 123 114 12033.07Trombay 7A
1.61 70 66 6019.18Trombay 7B
0.00 0 0 00.00Trombay 8
4.37 438 0 44733.67TATA Hydro
19.28 208.08Total 1127
REL
11.71 524 392 500136.021&2
11.71 136.02Total 500
Cent_Sect
4819Share
Total 4819
121.71 1410.54 5516
19.02 122.31 1339
State Total 246.28 2514.56 16141Total
Hydro
Thermal
147.65 1611.04 7135
MSPGCL
Thml+Gas 128.63 1488.73 579612.32 56.73 850Koyna 12&4 Total
2 of 7
8/12/2019 1203e
4/8
State Load Dispatch Center,Airoli (MSETCL)
Hourly Load Data As on 12/Mar/2014
THM HY GAS
TOTALCS
SHARECS
RECPTMum.S
CH.
Mum.NET
EXCH.
MSEDCLDEM.MET
LOADSHEDDI
NG
MSEDCLDEM.
WITH LS
TPCL + R-INFRA
DEMAND
STATEDEMAND
FREQ.(Hz)
MSPGCL GEN.TIMESR.NO.
WINDCPP /IPP
SOLAR
1 4645 257 272 5174 3447 4190 50.161797114048411320-910-660 1320191 2775 0
2 4735 153 272 5160 3526 3930 50.071648111585211106-758-560 1280680 2694 0
3 4770 139 276 5185 3536 3611 50.111565108745210822-678-515 1243937 2667 0
4 4784 159 276 5219 3536 4193 50.161522115455211493-633-515 1306755 2659 0
5 4848 141 276 5265 3536 4276 50.101517117365211684-627-520 1325360 2710 0
6 5043 176 276 5495 3887 4382 49.991629120937712016-713-534 1372235 2817 0
7 5162 293 276 5731 4116 4481 49.9318131269114012551-735-524 1450441 2991 2
8 5207 509 276 5992 4295 4643 50.0119711323628312953-745-692 1520741 2953 22
9 5271 613 276 6160 4378 4391 49.9422441300123012771-808-748 1524527 2895 57
10 5148 1059 282 6489 4575 4670 49.8925461331814113177-985-884 1586430 2852 100
11 5521 1252 282 7055 4691 4576 49.9527741347812213356-1190-1135 1625240 2716 138
12 5544 1234 282 7060 4798 4392 50.0328141331415113163-1174-1200 1612839 2672 157
13 5349 1061 282 6692 4588 5002 50.0327951343219913233-1244-1189 1622743 2588 152
14 5161 1110 283 6554 4431 4568 49.9327061295115412797-1138-1083 1565745 2635 133
15 5087 1189 291 6567 4764 4887 49.9127321316911113058-1167-1065 1590140 2621 110
16 5060 1280 295 6635 4762 4666 49.9727081301216412848-1216-1064 1572046 2618 99
17 5133 1052 295 6480 4390 4947 49.9127221324228712955-1233-985 1596450 2649 62
18 5018 985 300 6303 3769 3588 49.9926751176733711430-1209-961 14442121 2595 32
19 4992 501 305 5798 4021 4185 49.8926191172110311618-1188-971 1434098 2682 3
20 5004 1239 306 6549 4529 3794 49.902685119427611866-1214-981 14627124 2591 0
21 5094 1543 307 6944 3822 4194 50.112582128076312744-1151-948 15389121 2614 0
22 5059 1383 309 6751 3386 3744 50.012341121685712111-1100-849 14509164 2545 0
23 5085 1080 314 6479 3129 3070 50.022221112315711174-1018-744 13452105 2538 0
24 4986 612 316 5914 3218 3541 50.162123112665711209-922-832 13389136 2540 0
121.71
MUs 19.02 6.92 147.65 97.13 101.92 -20.16 -23.76 293.46 3.10 296.56 54.75 351.30 50.01
NOTE : ALL VALUES IN MWMumbai Sch./Net Exch is shown with reference to MSETCL System. (+) indicates Mum. to MSETCL and (-) indicatesMSETCL to Mum. Mumbai Schedule is calculated for MSETCL periphery (taking 4% loss for import & 4.85% MSETCL loss
1.67
# Without Applying Load Diversity Factor
64.62 1.07
3 of 7
8/12/2019 1203e
5/8
State Load Dispatch Center,Airoli (MSETCL)
Details of Generating Unit Outages/Trippings for 12/Mar/2014Position as on 6.30 Hrs of 13/Mar/2014
Name of Generating
Unit
Tripped
Date
Trippe
d TimeSync.Date
Sync.
TimeReason of OutageCapacity
Expected
Date
PLANNED OUTAGE
Parli Unit 3 13/02/2013 23.50 Continued. Water Shortage210
FORCED OUTAGE
Dabhol 1B 28/05/2013 22.02 Continued. Gas shortage.230
Dabhol 3A 06/06/2013 08.28 Continued. Gas Shortage230
Dabhol 2A 06/06/2013 09.10 Continued. Gas Shortage230
Dabhol 1X 27/06/2013 21.46 Continued. Gas Shortage290
Dabhol 1A 27/06/2013 21.47 Continued. Gas Shortage230
Dabhol 2X 15/07/2013 15.09 Continued. Gas Shortage290
Tata Trombay 6 19/07/2013 23.54 Continued. Economic shut down.500
Dabhol 2B 08/08/2013 15.03 Continued. Gas Shortage230
CPP VIPL02/10/2013 00.45 Continued.
Turbine bearing vibration
high.300
Dabhol 3X 29/12/2013 05.47 Continued. Gas Shortage290
Dabhol 3B 29/12/2013 06.14 Continued. Gas Shortage230
Uran Unit 8 03/01/2014 14.06 Continued. Gas Shortage108
Tata Trombay 809/01/2014 22.54 Continued.
Emergency H/T,Fire at
turbine track.250
Uran Unit B0 29/01/2014 17.50 Continued. Gas Shortage.120
Uran Unit 7 29/01/2014 18.05 Continued. Gas Shortage.108
CPP WPCL U-1 30/01/2014 12.45 Continued. turbine vibration135
CPP WPCL U-2 18/02/2014 00.02 Continued. Ash Conveying problem135
Koradi Unit 5 23/02/2014 04.04 Continued. ID Fan Problem.200
CPP JSW (J) U2 28/02/2014 17.52 Continued. No Schedule.300
Khaparkheda Unit 4 03/03/2014 09.32 Continued. B.T.L.210
Parli Unit 5 06/03/2014 07.06 Continued. Coal Shortage.210
Paras Unit 3 11/03/2014 12.25 Continued. BTL250
CPP Adani U-211/03/2014 17.52 13/03/2014 1.54
on hp bypass drainline
leakage660
4 of 7
8/12/2019 1203e
6/8
Details of Line outages/Trippings for 12/Mar/2014
State Load Dispatch Center,Airoli (MSETCL)
Position as on 6.30 Hrs of 13/Mar/2014
Name of LineTripped
Date
Tripped
Time
Synchronise
d Date
Synchronise
d TimeReason of Outage
InterState
400KVVoltage Level : PLANNED OUTAGEOutage Type
A"Bad - A'Bad (PG)- II 07/03/2014 15.11 Continued. Outage.(lilo bypass)220KVVoltage Level : PLANNED OUTAGEOutage Type
Borivali -Tarapur 07/12/2013 10.15 Continued. MUMBAI STRENGTHENING WORK
400KVVoltage Level : HAND TRIPPEDOutage Type
765 KV Akola-II - Tiroda -
I07/03/2014 14.50 12/03/2014 19.04
H/T in view of Outage on 400KV Akola-
A'bad PG & 400KV A'bad-A'bad PG.
Dhule-Sar'Sarovar - I 11/03/2014 21.27 12/03/2014 6.42 over voltage
Kolhapur - Mapusa - I 11/03/2014 21.28 12/03/2014 8.01 over voltage
Kolhapur-Mapusa-II 12/03/2014 17.11 Continued. over voltage
Dhule-Sar'Sarovar - I 12/03/2014 22.57 Continued. over voltage
400KVVoltage Level : TRIPPEDOutage Type
Solapur-Solapur(PGCIL) 26/02/2014 19.39 Continued.Distance Protection.tower collepse loc
110
Karad - Solapur (PGCIL) 26/02/2014 19.54 Continued. Distance Protection.
Kolhapur-Solapur(PGCIL)-
I10/03/2014 19.38 Continued.
Dist.Prot,Conductor Snap at 47Kms
from Solapur PG at Loc.no.128,129
collapse.2no tower collapse
Kolhapur-Solapur (PG) II 10/03/2014 19.38 Continued.
Dist.Prot,Conductor Snap at 47
Kms.from Solapur PG at Loc no
128,129 collapse.
220KVVoltage Level : TRIPPEDOutage Type
Kalmeshwar - Pandurna 12/03/2014 15.18 12/03/2014 15.30 tripped at pandhurna end only
IntraState
400KVVoltage Level : PLANNED OUTAGEOutage Type
Bus Coupler @ Bhusawal 25/02/2014 10.30 Continued.For Replacement Of OLD MOCB
Under Jaica-2 Outage.
Koradi-Khaparkheda-I 12/03/2014 10.41 12/03/2014 16.15 cb timing
400/220 KV 315 MVA ICT-
II @ Chandrapur12/03/2014 20.07 12/03/2014 23.01
emergency outage for attending
sparking at lv r-ph bushing
220KVVoltage Level : PLANNED OUTAGEOutage Type
Ghodbandar - Bhoisor
(MSETCL)07/12/2013 10.38 Continued. MUMBAI STRENGTENING WORK
Borivali - Ghodbandar - II 05/02/2014 10.14 Continued.Tower Erection of Loc.8 & M/C
Stringing.
Babaleshwar - Chalisgaon 06/03/2014 11.42 Continued.
Stringing of 220KV Tapline for
Kopergaon S/S Alongwith Erection of
MD Tower. (upto 10 th March.)
220/132KV 200MVA ICT -
I at Parbhani12/03/2014 11.15 12/03/2014 14.02 Tan delta measurement of ct.
Theur-Jejuri 12/03/2014 11.28 Continued.removing old structure of main bus
iso,aux.bus iso & 3 nos of ct structure
Main Bus - I @
Vansudwadi12/03/2014 12.35 12/03/2014 15.32 replacement of bus insu.string
Jejuri-Jejuri I 12/03/2014 8.15 12/03/2014 10.36 hot spot attending work
Pusad - Nanded 12/03/2014 9.42 12/03/2014 16.45strining work of lilo line for remaining
work
400KVVoltage Level : HAND TRIPPEDOutage Type
New Koyna - Dabhol - I 06/02/2014 00.02 Continued.Over Voltage.(RFC 20.35 Hrs on
16.02.14)
5 of 7
8/12/2019 1203e
7/8
Details of Line outages/Trippings for 12/Mar/2014
State Load Dispatch Center,Airoli (MSETCL)
Position as on 6.30 Hrs of 13/Mar/2014
Name of LineTripped
Date
Tripped
Time
Synchronise
d Date
Synchronise
d TimeReason of Outage
Dabhol-Nagothane - II 28/02/2014 21.35 Continued. Over Voltage.
Bhusawal- Aurangabad 11/03/2014 18.21 12/03/2014 6.55 over voltage
Karad-Jaigad I 11/03/2014 21.47 12/03/2014 6.43 over voltageBhusawal- Aurangabad 12/03/2014 17.46 Continued. over voltage
220KVVoltage Level : HAND TRIPPEDOutage Type
Aurangabad -
Babaleshwar09/03/2014 10.21 Continued. To control ICT loading at Waluj.
400KVVoltage Level : TRIPPEDOutage Type
Karad-Jaigad I 12/03/2014 17.53 Continued. over voltage
Karad - Kolhapur - II 13/03/2014 4.00 13/03/2014 6.36 over voltage
220KVVoltage Level : TRIPPEDOutage Type
Vita - Lamboti 09/03/2014 17.32 Continued. Dist.Prot.
220/132 KV 200 MVA ICT- I @ Beed
11/03/2014 00.56 Continued. Diff.Prot.
Parly (Ext.) - Beed - II 11/03/2014 00.56 Continued. Dist.Prot.
Lonikand-Theur - I 12/03/2014 17.23 Continued. distance prot.
Lonikand -Theur - II 12/03/2014 17.42 Continued. distance prot.
220/132KV, 200MVA ICT-I
at Theur12/03/2014 17.42 12/03/2014 18.15 o/c & e/f prot.
220/132 KV 200 MVA ICT
- II @ Theur12/03/2014 17.42 12/03/2014 18.20 hv e/f & backup over current
Theur - Flagship 12/03/2014 19.45 12/03/2014 18.10 tripped
6 of 7
8/12/2019 1203e
8/8
Details of On Line Capacity for 13/Mar/2014
State Load Dispatch Center,Airoli (MSETCL)
Generating unit Derated Capacity
(MW) OLC (MW)
Koradi
200 0Unit 5
210 145Unit 6
210 175Unit 7
620 320
Bhusawal
210 140Unit 2
210 140Unit 3
500 430Unit 4
500 376Unit 5
1420 1086
Parli
210 0Unit 3
210 162Unit 4
210 0Unit 5
250 190Unit 6
250 190Unit 71130 542
Chandrapur
210 140Unit 1
210 160Unit 2
210 180Unit 3
210 210Unit 4
500 450Unit 5
500 420Unit 6
500 280Unit 7
2340 1840
Paras
250 0Unit 3
250 230Unit 4
500 230
Khaparkheda
210 180Unit 1
210 180Unit 2
210 195Unit 3
210 0Unit 4
500 500Unit 5
1340 1055
Nasik
210 190Unit 3210 190Unit 4
210 190Unit 5
630 570
Uran
852 300All Units
852 300
PENCH (MS)
53Pench (MS)
53
Koyna
600 600Stage 1-2
1000 250Stage 4
320 320Stage 3
1920 1170
Hydro
40 18KDPH
60 0VTRNA
Generating unit Derated Capacity
(MW) OLC (MW)
60 60TILLARI
21 0BHTGR/VEER
80 40BHIRA T.R.
20 16RNGR+BHTSA
45 30BHANDARDRA23 0ELDARY
12 0SMLHY_PTN
250 0GHATGHAR
611 164
Wind
0MalharPeth
0Vankuswadi
0ATIT
0Kale
0Satara
0Shirala
0K Mahankal
0Supa
0Vita
0Dondaicha
0Sakri
0Nandurbar
0Khandke
0Khaparale
0
CPP
1200 550JSW_JAIGAD
405 195WARDHA1980 1851Adani
300 465Other_CPPs
3885 3061
SOLAR
0Total
0
Tata
150 0Trombay 4
500 500Trombay 5
500 0Trombay 6
120 120Trombay 7A
60 60Trombay 7B250 0Trombay 8
444 447TATA Hydro
2024 1127
REL
500 5001&2
500 500
Cent_Sect
3455 4716Share
3455 4716