    Indian StandardMETHOD OFMEASUREMENT OF BUILDING AND

    CIVIL ENGINEERING WORKS

    ISr 12. (Part 23) _f Reaffirmed 1997 )

    PART 23 PILING( Fourth Revision)Seco nd R ep rint D EC EMB ER 199 6

    UDC 69.003.12:624.155

    @ C O P Y r i l l r . 1 1989BUREAU OF INDIAN STANDARD SM ANAK BHA VAN, 9BAHADUR SHAH ZAFAR M ARGNEW DELHI 11 0002

    G..3 M arcA 1989

  • 5/14/2018 1200 -Part 23 - Measurement of Bldgs & Civil Engg W

    2/7

    IS 11200(Part 23) - 1_Indian StandardMETHOD OFMEASUREMENT OF BUILDING ANDCIVIL ENGINEERING WORKS

    PART 23 PILING( Fourth Revision)

    o . FOR EW0 R 00.1 This Indian Standard (Part 23) (FourthRevision) was adopted by the Bureau of IndianStandards on 16 November 1988, after thedraft finalized by the Method of Measurementof Works of Civil Engineering (Excluding RiverValley Projects ) Sectional Committee hadbeen approved by the Civil Engineering DivisionCouncil.0.2 Measurement occupies a very importantplace in the planning and execution of any civilengineering work from the time of first estimatesto the final completion and settlement of pay-ments of project. Methods followed for measurement are not uniform and considerable differ-ences exist between practices followed bydifferent construction agencies and also betweenvarious Central and State Government Depart-ments. While it is recognized that each systemof measurement has to be specifically related toadministrative and financial organizationswithin a department responsible for the work, aunification of the various systems at technicallevel has been accepted as very desirablespecially as it permits a wider range of operationfor civil engineering contractors and eliminatesambiguities and misunderstandings arising outof inadequate understanding of the varioussystems followed.0.3 Since different trades are not related to

    one another, the Sectional Committee duringits second revision decided that each trade asgiven in IS: 12001964 shall be issued separa-tely as a different part as it would be helpfulto users in using the specific standard. ThISpart covers the method of measurement ofpiling work applicable to buildings as well asto civil engineering works was published sepa-rately in the year 1971 and further revised in1977. In view of the large number of commentsreceived on this part, the Sectional Committeedecided to issue a fourth revision incorporatingthe changes to keep the latest method as bein~followed by most of the organizat.ions. Theprincipal modifications are in respect of rein-forced cement concrete sheet, timber sheet, andbored piles.0.4 For the purpose of deciding whether aparticular requirement.' of this standard iscomplied with" the final value, observed orcalculated, expressing the result of a measure-ment, shall be rounded off in accordance withIS : 2-1960. The number of significant placesretained in the rounded off value should be thesame as that of the specified value in thisstandard.-Method of measurement of building and civilengineering works fi rs t T 'f li J; on J.tRules far rounding off' numerical values (nuiud).

    1. SCOPE1.1 This standard (Part 23) Covers the methodof measurement of piling.2. GENERAL RULES2.1 Clubbing of Items - Items may be dubb-ed together and that the break-up of thedubbed items is agreed to be on the hasis ofci'tailed description of the items stated in thisstandard.2.2 Booking of Dhnebsion. - T n bookingdimensions, the order shall be consistent and

    generally in the sequence of length, width andheight or depth of thickness.2.3 Descriptio_ of Item. - The descriptionof each item shall unless otherwise stated. beheld to include 'where necessary. conveyanceand delivery, handling, unloading, storing,fabrication, hoisting, all labour for finishing' torequired shape and size. setting, fitting andfixing in position, straight cut ting and waste,ret urn of packings, etc.2.4.Mea.areme_t. - All work shall bemeasured net in decimal system as fixed in its

    1

  • 5/14/2018 1200 -Part 23 - Measurement of Bldgs & Civil Engg W

    3/7

    18 I1200 ( Part 23 ) 1988place as given below:

    a) Linear dimensions shall be measured tothe nearest 0'01 m,b) Areas ahall be worked out to the nearest

    0'01 m', andc) Cubic contents shall be worked to thenearest 0'01 m'.2 .5 Work to be Mea red Separately - Thesituations, such as, in/under water, liquid mud,marshy land, tidal condition, etc, in which workis to be executed shall be stated.2.5.1 The level of high and low water tideswhere occurring, shan be stated.

    2.6 Bill rQ.aaatitiea - The billa of quan-tities shan fully describe the materials andworkmanship, and accurately represent thework to be executed.2.7 A general description of the nature of siteIhall be stated.2.8. The available information as to the stratathrough which the piles are to be driven shallbe stated or reference showing records of boresbe given.2.9 If piles are to be provided from any levelother than the ground level, it shall be stated.If the piling frame is to be lowered or raised,the exact height and nature of working shallbe described, separate items shall be providedfor driving raker/in groups/isolated/lengthened/trial piles.2.10 Items shall include any extra excavationfilling and/or ramming required at the time ofconstruction for the movement of piling framefor executing piling work.2.11 Bringing plant to the site and erecting itand dismantling and taking it back, shall bemeasured separately as lump sum items.

    No'l. - Shiftins of plant at site of work shall beincluded in the item of piles.2.12 Ifload testing is to be done, the provisionfor such test shall be specified and measuredseparately.3. METHOD OF MEASUBEMENT OFPRECAST REINFORCED CONCRETEPJl.ES3.1 The precast reinforced concrete piles shallbe described accordmg to the grade of concrete,section and length, the extra strength of theheads being stated. Any requisite mould shallbe included in the description as also thenecessary strapping, bohs and lifting holes.

    3. 2 The cement concrete in piles shall bemeasured in cubic metres, arrived at by multi-plying the cross-sectional area of the pile by thelength of the pile as cast from the head of thepile to the tip of shoes.3.3 No deduction shall be made for chamfers,tapered points or the volume of reinforcementor holes for lifting piles.3.f The formwork, links and sleeves shall beincluded in the description of the item.3.5 The reinforcement shall be measured sepa-rately [ s e e IS: 1200 (Part 8)-1975. J .3.6 The shoos for each size shall be enumeratedseparately, stating the approximate weight.3.7 Driving piles to a given level and red rivingof lengthened piles shall be measured in runningmetres, separate measurements being made forpiles of 5 m length and less and subsequentlyfor every Im length range. The driving ofpiles shan be measured from the tip of theshoes up to the level as shown in the drawings.The raker piles shall be measured along theaxis of the pile.3.8 The measurement of handling, transporta-tion and pitching of piles shall be enumeratedfor each occasion.3.9 For stripping the heads of the piles, thelength to be stripped shall be stated andmeasured per linear metre.3.10 Stripping off the head of the piles for bondlength shall be enumerated.3.11 When concrete piles are lengthened inposition. after they have been lowered, thecement concrete when used for lengtheningshall be measured as a separate item. Thisitem shall include the extra labour involved instripping the exposed end to form connectionof new with old work and any excavation,if required.4. METHOD OF MEASUREMENT OFTIMBER PILES4.1 Timber piles shall be described andmeasured in running metre Slating the speciesof timber [ . r t e IS: 2911 (Part 2)-1980t] andsize of the pile. If over 5'0 m in length, thelength extra over 5 m shall be measured instages of one metre.Method of measurement of building and civilengineerins works: Part 8 Steel-work and ironwork( thiril rellision ).tCode of practice for design and construction of pilefoundations: Part 2 Timberpiles (first "lIiJioll).

    2

  • 5/14/2018 1200 -Part 23 - Measurement of Bldgs & Civil Engg W

    4/7

    4.1.1 The diameter of the pile shall be arrivedat by measuring girth at two metres below thelarge end of the pile. Any tolerance on thecross-sectional dimensions of timber in permit-ting above or below those shown in drawingsshall be specified.4.1.2 Shaping and shoeing of pile shall beenumerated, stating the approximate weight ofthe shoe and size of the pile.

    4.2 Handling. transportation and pitching ofpiles shall be enumerated for each occasion.4.3 Driving timber piles shall be measured frornthe tip of the shoe to the ground level as shownin the drawings or as found at site at the timeof driving. The method of measurement ofdriving pile shall be the same as given in 3.7.This item shall also include cutting the top ofthe pile and dressing it for fixing mild steel ringagainst splitting during driving.4.4 The supply and fixing of iron rings to thepile head before driving and also the labourinvolved in cutting off the ringed portion orany portion damaged in driving shall be in-eluded in the description of the item.4.5 Joints in piles shall be described and enu-merated.5. METHOD OF MEASUREMENT OFSTEEL SHEET PILES ( PERMANENT)5.1 Supply only of sheet piles shall be measuredby weight [set IS : 1200{Part 8 )-1975"']. Thedescription of the item shall include thecross-sectional shape, nomenclature of manu-facture, specification of material, details offabrication, such as, lengthening by means ofwelding; riveting, drilling or burning holes,joining or fixing of structural rolled steelsections. handling and transportation to thesite. etc. Piles exceeding 12 m in length shallbe described separately stating the lengths infurther stages of 3m,5.2 All struts, anchor bolts, anchor plates, turnbuckles, walling, etc; shall be measured separa-tely in accordance with IS: ]200 (Part 8)-1975....5.3 When sheet piles are to be painted prior todriving, such painting shall be measured insquare metres obtained by multiplying the.Iength by the perimeter of the fabricated sheetpile measured along the profile. Descriptionof the item shall include the method of pre-paration of surface; number of coats, mode ofpainting and the like.

    ~Met~od of measurement of building and civilengmeermg works: Part 8 Steelwork and ironwork (thirdr ll li si (l ll ) .

    IS : 1200 (Part 23) - 19885.4: Lifting, handling, pitching, engagingthrough interlocks or clutches of an adjacentsheet piles and driving shall be measuredseparately for each type in square metresobtained by multiplying the length of theembedded portion of the pile in soil and halfof the perimeter as defined in IS : 2314-1986.The length of the embedded portion shall beobtained by measuring from the level of theground where the tip of the sheet pile firsttouches before driving, to the ultimate level ofthe tip of the piles after driving.5.S Wherever sheet piles are to be driven under/in water necessitating the use of special hammersand/or loader frames, such piles shall be des-cribed and measured separately.5.6 Driving corner piles and junction piles shallbe measured in running metres representingthe length of embedment.5. 7 Cutting or burning through steel piles shallbe measured in running metres as extra overthe pile. The disposal of cut length shall bedescribed.5.8 Extraction of piles other than those describ-ed in 5.6 shall be measured separately insquare metres obtained by multiplying theembedded length in soil by the nominal widthof piles from the centre of the clutches.Operations such as lifting. handling and remov-ing from the site shall be described and includedin the item.6. METHOD OF MEASUREMENT OFCAST IN SITU DRIVEN CONCRETEPILES6.1 The description of the pile shall state thenominal diameter, grade of concrete, size ofaggregate reinforcing bars, length of the cageand the pile.6.2 Forming pile shafts including concrete, anddriving casings to a given level shall be measuredas one item in running metres.6.3 Reinforcement including bars to be left inthe pile cap for embedding shall be measuredseparately [see IS: 1200(Part 8 )-1975t].6.4 The length of the cast in situ piles shall bemeasured from the toe of the pile to the pilecut off level. The description of the pile shallstate the diameter land the type of casing, thegrade of concrete, and details of reinforcementof the core.6.5 The provision of pile shoes shall be includedin the item.SpecificatioD for steel sheet pilling sections (jiril,.Mlln).tMethod of measurement of building: and civilengineering works: Part Il Steelwork and ironwork ( thirdrlllision ).

    3

  • 5/14/2018 1200 -Part 23 - Measurement of Bldgs & Civil Engg W

    5/7

    18 1_ (Part 23) ~19.."I Empty boring shall be measured separatelyin running metres and the length shall be fromworkin_gground level to the cut off level of thepile. The type of filling shall be stated.7. METHOD OF MEASUREMENT OFCAST IN SITU BORED REINPORCEDCONCRETE PILES7.1 Empty boring shall be measured separatelyin running metres and the length shaH be fromworking level to the cut off level of the pile.The type of filling shall be stated.7.2 The boring through boulders and rockstrata shall be measured extra over.7.3 Reinforcement in pile including bars to beleft in the pile cap for embedment shall bemeasured separately.7.4 The description of the pile shall state thenominal diameter, grade of concrete, size ofaggregate, the reinforcing bars, the length ofcage, and the provision of liners, if any.7.S Permanent mild steel liners, if provided,shall be measured separately in weight inaccordance with IS : 1200 (Part 8 ).1975* fromworking level to foundation level.7.6 In case of under-reamed or bulb basedpiles, the bulbs shall be measured and enume-rated. The description of piles shan state thediameter of the bulb.8. METHOD OF MEASUREMENT OFREINFORCED CEMENT CONCllETESHEET PILES8.1 The reinforced cement concrete sheet pilesshall be measured in cubic metres arrived at bymultipJying the cross-sectional area of the pileby the length of the pile as cast from the headof the pile to the tip of the shoes.8.2 The description of the item shall includethe cross-sectional shape, grade of concrete,size of aggregate and extra strength of the head.Any requisite mould shall be included in thedescription as also necessary strapping, bohsand lifting holes.8.3 Lifting, handling, pitching engaging throughadjacent piles and driving shall be measuredseparately for each type in square metres obtain-ed by multiplying the length of the embeddedportion of the pile and half the parameter ofthe section. The length of the embeded portionshall be obtained by measuring from the levelof the ground where the tip of the pile first

    Method uf measurement of building and civilengineering works: Part 8 Stcelwcek and ironwork (IhirdUllision ).

    touches before driving to the ultimate level ofthe tip of the piles after driving.8.4 Wherever sheet piles are to be drivenunder fi n water necessitating the use of specialhammers and'or loader frames, such piles shallbe described by measuring separately,8.5 Driving corner piles and junction piles shallbe measured separately.8.6 Cutting piles shall be measured in runningmetres as extra over. The disposal of cut lengthshall be described.&7 The extraction of piles other than due todefective driving shall be measured separatelyin square metres as mentioned in 8.3.9. METHOD OF MEASUREMENT OFTIMBER SHEET PILES9.1 The timber sheet piles shall be describedand measured in running metres stating thespecies of timber and cross-section.9.2 Handling. transportation and pitching ofpiles shall be enumerated for each occasion.9.3 Driving limber sheet piles shall be measuredin square metres obtained by multiplying thelength of the embedded portion of the pile insoil and half the perimeter of the construction.9.4 Whenever sheet piles are to be drivenunder/in water necessitating the use of specialhammers and/or loader frames. such piles shallbe described and measured separately.9.5 The corner and junction piles shall bemeasured separately.9.6 Cutting pile shall be measured in runningmetres as extra over. The disposal of cut lengthshall be described.9.7 The extraction of piles other than due todefective driving shall be measured separatelyas in 9.3.

    10. METHOD OF MEASUREMENT OFBORED PRECAST CONCRETE PILES10.1 The precast reinforced concrete boredpiles shall be described according to grade ofconcrete, and size of aggregate section andlength, the extra strength of the heads beingstated. Any requisite mould shall be includedin the description as also the necessarystrapping, bolts and lifting holes.10.2 The cement concrete shall be measuredseparately in cubic metres arrived at by multi-plying the cross-sect ional area of the pile by thelength of pile as cast from the head of the pile

  • 5/14/2018 1200 -Part 23 - Measurement of Bldgs & Civil Engg W

    6/7

    to the tip. No deduction shali be made forchamfers. tapered points or the volume of rein-forcement or holes for lifting piles.10.3 The formwork, llnb and sleeve. shall beincluded in the description of the item.ID.i The reinforcement shall be measuredseparately [SII IS : 1200(Part 8 )-]975' ].1'~ Placing pUe .haft shall be measured inrunning metres from founding level to workinglevel of the pile.10.6 Empty boring shan be measured leparatelyin running metres and the length shaU be from Method of meQure:ment of buildinr and civil enlineer-ins woru: Part 8 Steelwork and iroDwork ( , fWd r n is il 1 l1 ) .

    18 I1280(Part 2S) ~working ground level to the cut off level of thepile. The boring through boulders and rockstrata except in respect of isolated boulders netexceeding the dia.meter of the pile shaft .haJl bemade measured as extra' over. .10.7 The measurement of handling, trans,.portation and pitching of piles shall be enume--rated for each occasion.10.8 FOT strappin$' the heads of the pile. thelength to be stripped shall be stated andmeasured in running metres.10.9 Stripping off the heads of the pile for bondlength shall be enumerated.10.10 Grouting shall be measured in cubicmetres descrlbing fully the type of method.

    5

  • 5/14/2018 1200 -Part 23 - Measurement of Bldgs & Civil Engg W

    7/7

    Bureau o r Indian StandardsBIS is a statutory institution established under the Bureau of Indian Standards Act, 1986 to promoteharmonious development of the activities of standardization, marking and quality certification of goods andattending to connected matters in the country.CopyrightBIS has the copyright of all its publications. No part of these publications may be reproduced in any formwithout the prior permission in writing of BIS. This docs not preclude the free use, in the course ofimplementing the standard, of necessary details, such as symbols and sizes, type or grade designations.Enquiries relating to copyright be addressed to the Director (Publication), BlS.Review orIndian StandardsAmendments are issued to standards as the need arises on the basis of comments. Standards are also reviewedperiodically; a standard along with amendment" is reaffirmed when such review indicates that no changes areneeded; if the review indicates that changes are needed, it is taken up for revision. Users of Indian Standardsshould ascertain that they are in possession of the latest amendments or edition by referring to the latest issueof 'BIS Handbook' and 'Standards Monthly Additions',

    Amendments Issued Since PuhlicatlonAmend No. Date of Issue Text Affected

    BUREAU OF IND IAN STANDARDSHeadquarters:Manak Bhavan, 9 Bahadur Shah Zafar Marg, New Delhi t 10002Telephones: 3230131,3233375,3239402Regional Offices:Central Manak Bhavan, 9 Bahadur Shah Zafar MargNEW DELHI 110002Eastern 1/14 C.I.T. Scheme V II M , V .L P. R oad, M anikto la

    CALCUTI A 700054Northern SCQ 335-336, Sector 34~A, CHANDIGARH 160022

    Telegrams: Manaksanstha(Common to all offices)

    Telephone3237617,3233841

    Western Manakalaya, E9 MIDC, Marol, Andhcri (East)MUMBAI 400093Branohes AHMADABAD. BANGALORE. BHOPAL. BHUBANESHWAR.

    COIMBATORE. FARIDABAD. GHAZIABAD. GUWAHATI.HYDERA13AD. JAIPUR. KANPUR. LUCKNOW. NAGPUR.PATNA. PUNE. THIRUVANANTHAPURAM.

    {33784 99, 337 856133786 26, 337 91 20{60 38 43602025

    {235 0216,23504422351519,2352315{ 832 92 95, 832 78 5883278 91,832 78 92