184
IFB 4019000082 Contract No. 12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format ) SOLICITATION/CONTRACT NO. IFB 4019000082 MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante RFA NO._RFA # 38 DATE April 29 th , 2019 SECTION_1.5 Overall Requirements_ PAGE NO._21_ PARAGRAPH NO. MANUFACTURER'S REQUEST: [Contractor and METRO shall identify subcomponent vendors that shall submit installation/application approval documents with the completion of the pilot bus.] Please identify subcomponent vendors that shall submit installation/application approval documents. METRO'S RESPONSE: APPROVED DENIED APPROVED AS MODIFIED COMMENTS: All powertrain, cooling, charging and ITS. APPROVED BY: DATE: Andrei Dragomir 5/6/2019 Project Manager

12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 38 DATE April 29th, 2019

SECTION_1.5 Overall Requirements_ PAGE NO._21_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Contractor and METRO shall identify subcomponent vendors that shall submit installation/application approval documents with the completion of the pilot bus.]

Please identify subcomponent vendors that shall submit installation/application approval documents.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED

COMMENTS: All powertrain, cooling, charging and ITS.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 2: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 39 DATE April 29th, 2019

SECTION_1.5.1.2 Underbody Clearance_ PAGE NO._22_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Ramp Clearances: Approach angle shall be no less than 9o. ]

Our vehicles have an approach angle of 8.6 degrees including the skid bar, 9 degrees without the skid bar. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 3: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 40 DATE April 29th, 2019

SECTION_1.5.1.2 Underbody Clearance_ PAGE NO._23_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Wheel Area Clearance: Wheel area clearance shall be no less than 8 inches for parts fixed to the bus body and 6 inches for parts that move vertically with the axles.]

Wheel area clearance for parts that move vertically with the axles is 5 inches. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 4: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 41 DATE April 29th, 2019

SECTION_1.5.4.2 Maintenance and Inspection_ PAGE NO._24_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Routine scheduled maintenance, such as filter replacement and adjustments, shall not be required at intervals of less than 6,000 miles, except for routine daily service performed during the fueling operations.]

As per Cummins maintenance instructions, a maximum engine and oil filter change interval of 500 hours or 6 months is specified, which for vehicles averaging less than 10 MPH, may be an interval of less than 6000 miles. We request approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 5: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 42 DATE April 29th, 2019

SECTION_1.5.4.5 Interchangeability_ PAGE NO._25_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Components with identical functions shall be interchangeable to the extent practicable. These components shall include passenger window hardware, interior trim, lamps, lamp lenses and seat assemblies. Components with non-identical functions shall not be, or appear to be, interchangeable.]

Components installed on buses are interchangeable if installed in the same location on the bus. The 2 last windows on each side are not interchangeable with the other windows. On our vehicles the rear bench seats are molded/fiberglass bench seats (not cantilever) and do not have their own individual frame. These seats have inserts of the same material as the other seats on the bus. Please refer to attachment Mandatory RFA Attachment M2 for a description of our molded seats. We request approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 6: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 43 DATE April 29th, 2019

SECTION_2.1.1.1 Materials_ PAGE NO._26_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Frame and sidewalls shall be corrosion resistant for the life of the bus. Where fiberglass is used, the fiberglass shall be properly cured and samples taken, certified by the Contractor and shall require approval by METRO.]

Our exterior upper panels are made of fiberglass and exterior side lower panels are made of thermoplastic panels. This design allows for simple repairs without dismantling the bus. The fiberglass material withstands severe use, is lighter than metal and prevents corrosion. These are the same as in the previous order. Please refer to Mandatory RFA Attachment M10. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 7: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 44 DATE April 29th, 2019

SECTION_2.1.1.2 Finish and Color_ PAGE NO._27/28_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[METRO's colors shall be applied using a high-solids polyurethane finishing system designed to provide excellent gloss and durability that is formulated to meet commercial vehicle requirements.

Painted surfaces shall have a minimum 95 gloss and an orange peel rating of 7 or more on the ACT Test Panels Technologies orange peel standard panels. Wet sanding and polishing is not acceptable for any repairs.]

The Proposer would like to clarify that our gloss level is 80 and orange peel is a maximum of 5, without sanding or polishing. The Proposer will also apply the same paint process, resulting in the same paint quality as provided in previous order. We request your approval.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED X

COMMENTS: The orange peel shall be between 5 and 6.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 8: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 45 DATE April 29th, 2019

SECTION_2.1.1.2 Finish and Color_ PAGE NO._27_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All exterior surfaces of the bus shall be smooth and free of visible or protruding rivets, fasteners, wrinkles, bubbles, waves, and dents.]

The air intake panel is installed with 6 low profile button screws. Theses screws have a head thickness of 3 mm (0.12 in) including the washer so it does not protrude significantly, but are visible. The air intake panel does not need to be removed frequently so it has not been made as a door. The screws give access inside the panels. These screws have been selected to be aesthetically pleasing and non-protruding. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 9: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 46 DATE April 29th, 2019

SECTION_2.1.1.2 Finish and Color_ PAGE NO._27_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The bus shall be completely painted prior to installation of exterior lights, windows, mirrors and other items that are applied to the exterior of the bus.]

Since our buses are assembled on an assembly line, the bus is fully assembled and then painted as required with certain items masked or removed prior to painting. We request approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 10: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 47 DATE April 29th, 2019

SECTION_2.1.1.2 Finish and Color_ PAGE NO._28_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Proper adhesion between the basic surface and successive coats of the original paint shall be measured using an Elcometer adhesion tester as outlined in ASTM D4541-85.]

We request approval to use the adhesion test ASTM D3359 tape test which is the standard test used by our supplier. The Proposer's Supplier uses liquid paint on plastic, fiberglass or metal already painted with powder-coated paint, which is why this cross cut test ASTM D3359 better responds to this painting method on specific surfaces as listed above. This is the same standard test applied on previous orders.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 11: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 48 DATE April 29th, 2019

SECTION_2.1.1.2 Finish and Color_ PAGE NO._29_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Paint shall last a minimum of five (5) years with a minimum gloss of 90 as measured in ASTM E97-92, Standard Test Method For Directional Reflectance]

Axalta paint will usually keep around 92-95% of its original gloss after 5 years. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 12: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 49 DATE April 29th, 2019

SECTION_2.1.1.2 Finish and Color_ PAGE NO._29_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[At present, the METRO paint scheme includes two (2) paint colors, black and white (see an example of the METRO paint scheme on a 40-ft bus in the following drawing)]

The Proposer offers a Vehicle Rendering as described in Mandatory RFA Attachment M3. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 13: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 50 DATE April 29th, 2019

SECTION_2.1.2.1 Strength and Fatigue Life_ PAGE NO._31_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The structure of the bus shall be stainless steel series 300 and shall be designed to withstand the transit service vehicle conditions typical of an urban duty cycle throughout its service life.]

Our bus structure uses S41003, S30403 and S20400 stainless steels, depending on location. ASTM A240 UNS S41003 stainless steel is used on most of the tubular structure and body sheet of the vehicle. Please refer to Mandatory RFA Attachment M4 for further details. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 14: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 51 DATE April 29th, 2019

SECTION_2.1.2.10 Fire Protection_ PAGE NO._36_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[METRO requires that the passenger and engine compartments be separated by a bulkhead(s), which shall be a firewall. Only necessary openings shall be allowed in the firewall and these shall be fireproofed. Piping through the bulkhead shall have copper, brass, or other fireproof fittings sealed at the firewall. Wiring may pass through the bulkhead only if fireproof bulkhead connectors are provided to prevent fire propagation through the firewall. Standard fire resistant and UL rated bulkhead connectors are approved and shall also bewaterproof. On an exception basis only, wiring which cannot use a connector may pass through a conduit using fire retarding putty rated to at least 2000°F.]

The wall separating the passenger compartment from the engine compartment is built of stainless steel 14 GA (1.9 mm) thick panels and used as firewall. Stainless steel structure and sheets are used as firewall. As per previous builds and accepted configuration, we use Endothermic Firestop Caulking to seal the passageways of all piping going through the firewall and the resin impregnated wood blocks in the upper section where the coolant lines and electrical harness pass from the engine compartment to the baselight. Bulkhead fittings are not used and would require a major redesign resulting in reduced access for maintenance. Please refer to Attachment 2.1.2.10 - Fire Protection. This is the same configuration as per the previous order. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 15: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 52 DATE April 29th, 2019

SECTION_2.1.2.11 Fire Extinguisher_ PAGE NO._37_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Contractor shall furnish and install two each ten (10) pound rechargeable dry chemical ABC fire extinguishers in a cabinet.]

We propose to install two (2) ten (10) lbs. rechargeable dry chemical ABC fire extinguishers side by side vertically on the inclined face of the front curbside wheelhouse, same as previous order (not in a cabinet). Please refer to Mandatory RFA Attachment M8 for more details. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 16: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 53 DATE April 29th, 2019

SECTION_2.1.2.6 Welding_ PAGE NO._34_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Welds in structural tubing shall not bridge gaps larger than wall thickness of the thinner member.]

In certain areas the weld gap is larger than the wall thickness of the thinner member. However, weld beads are increased to ensure integrity. This design has passed the Ortech fatigue test. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 17: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 54 DATE April 29th, 2019

SECTION_2.1.2.7 Towing_ PAGE NO._34_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Towing provisions shall be provided on both ends of the bus. METROs intentions are to front frame lift tow.]

We recommend lifting the bus from the front in order to move an immobile bus. We do not recommend, at any time, rear-end lifting of any of our vehicles. In case of an emergency and as long as, the proper locations on the bus are used, rear towing may be acceptable (For example, pulling an immobile bus from the rear to remove it from a roadside ditch). We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 18: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 55 DATE April 29th, 2019

SECTION_2.1.2.7 Towing_ PAGE NO._34_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Front towing provisions shall be permanently attached to the bus structure.]

There are several hoisting and towing points on the vehicle. One of these is the tow eyes, for front towing. They are stored in the front compartment under the dash, near the operator. They need to be screwed into the holes at the front of the vehicle. They are designed ONLY for towing the vehicle for very short distances while its wheels are on the ground. Other hoisting and towing point are fixed underneath the bus structure. Please refer to the attachment of Mandatory RFA Attachment M6 for more details. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 19: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 56 DATE April 29th, 2019

SECTION_2.1.2.7 Towing_ PAGE NO._35_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The bus shall be equipped with airline quick disconnects (GladHands or airline quick disconnects), hard mounted at front and rear of the bus. Quick disconnects shall mate with Bendix P/N 278852 installed on METRO’s current wreckers. The coupling shall have a removable filter screen at its mouth opening and will be protected with a dummy coupling tethered to the bus frame.]

We request approval to provide standard connectors (such as Parker Hannifin Tru-Flate with a check valve) instead of quick disconnects (Glad Hands or airline quick disconnects), same as installed on the previous order. These connects do not mate with Bendix P/N 278852 connectors. A removable filter screen is not provided. Couplers have a one way check valve between the air supply tank and the quick disconnect to prevent loss of air. The current location behind the front bumper does not provide enough space for Glad Hand connectors. A choice of different connector types are available and can be discussed at the preproduction meeting.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 20: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 57 DATE April 29th, 2019

SECTION_2.1.3.1 Strength and Installation_ PAGE NO._38_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Exterior surface panels shall not be installed or retained with visible rivets or fasteners.]

We request approval for the following:- Rear air intake panel (LH) and opposite panel (RH), option are fastened with 6 flat head screws each- Skirt panels are fastened with fir tree, automotive type clips for quick change

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 21: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 58 DATE April 29th, 2019

SECTION_2.1.3.3 Rain Gutters_ PAGE NO._39_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Cross sections of the gutters shall be no less than one (1) inch square. Ends of rain gutters shall be rounded and have a finished appearance.]

We request approval to use our standard gutters, which have an area of 0.250 square inch where the water can accumulate. The ends of the gutters are not rounded; they are cut straight or at an angle.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 22: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 59 DATE April 29th, 2019

SECTION_2.1.4.1 Headroom_ PAGE NO._40_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Headroom above the aisle and at the centerline of the aisle seats shall be no less than seventy eight (78) inches over front and rear axle and no less than 90 inches at mid bus, except at overhead assists. Headroom at the back of the rear bench seat may be reduced to a minimum of sixty nine (69) inches but shall increase to normal ceiling height at the front of the seat cushion.]

We comply with APTA Standard Bus Procurement guidelines and also comply with this requirement from the front of the bus to the rear axle. As per APTA SBPG: Headroom above the aisle and at the centerline of the aisle seats shall be no less than 78 in. in the forward half of the bus tapering to no less than 74 in. forward of the rear settee. Headroom at the back of the rear bench seat may be reduced to a minimum of 56 in., but it shall increase to the ceiling height at the front of the seat cushion. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 23: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 60 DATE April 29th, 2019

SECTION_2.1.4.5 Construction_ PAGE NO._42/43_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Wainscot panels shall be gray melamine and subject to color approval.

The following colors and materials are required: Below windows in passenger area;

o Material; plastico Color; medium gray

Between windows in passenger area;o Material; plastico Color; medium gray.

Ceiling in passenger area;o Material; melamineo Color; light gray.

Operator’s area;o Material; Fiberglasso Color; Dark gray.]

Our interior panels are made of Arborite melamine, same as previous order. Wall panels (below windows), ceiling, or between windows are melamine. Driver's partition is thermoplastic. Driver's area is dark grey. Rear bulkhead is thermoplastic.A full description of the material used and colors are provided as part of Mandatory RFA Attachment M11. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 24: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 61 DATE April 29th, 2019

SECTION_2.1.4.6 Fastening_ PAGE NO._43_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Interior trim fasteners, where required, shall be rivets or recessed cross-head screws.]

Walls and ceiling panels are squeezed in place between the trims and the structure, with foam tape to prevent rattling. There are no visible fasteners used for the interior panels. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 25: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 62 DATE April 29th, 2019

SECTION_2.1.5.1 Height_ PAGE NO._44_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The floor may be inclined along the longitudinal axis of the bus, and the incline shall be no greater than 3.5o off the horizontal, except locally where 2o degree slope toward the door is allowed (Water shall not pool at the door entrances if some water gets past the door seals during wet weather or bus washing).]

We request your approval for a 1 degree slope toward the door, incline value is 3.5 +/- 0.5 degree at nominal for the rear podium section to the rear of the rear axle.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 26: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 63 DATE April 29th, 2019

SECTION_2.1.5.1 Height_ PAGE NO._44_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The floor may be inclined along the longitudinal axis of the bus, and the incline shall be no greater than 3.5o off the horizontal, except locally where 2o degree slope toward the door is allowed]

We request your approval for an incline value of 3.5 +/- 0.5 degree at nominal on the rear podium section from the rear of the rear axle.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 27: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 64 DATE April 29th, 2019

SECTION_2.1.5.2 Strength_ PAGE NO._44_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Alternative flooring material shall be utilized to minimize weight, but must exceed strength, water protection and anti-rot characteristics of 3/4", 7-ply, AC marine grade, ACQ pressure treated plywood and shall be warranted for the life of the bus.]

We request approval to use a 3/4" thick composite floor, which is durable, waterproof, resistant to rot, mildew and impervious to insects and termites. Please refer to Mandatory RFA Attachment M13 for additional information.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 28: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 65 DATE April 29th, 2019

SECTION_2.1.5.2 Strength_ PAGE NO._45_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Sheet metal screws shall not be used to retain the floor. Torq screws with attached washers are approved.]

The composite floor is bonded to the structure after its pre-treatment (glue is used to retain the floor). We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 29: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 66 DATE April 29th, 2019

SECTION_2.1.5.2 Strength_ PAGE NO._45_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All floor fasteners shall be serviceable from one side only. Tapping plates used for the floor fasteners shall be no less than the thickness of a standard nut if fasteners are a primary means of attachment.]

At the location of the partition stanchion and ADA barriers, tapping plates are thinner than standard nut size. Depending on location, some fasteners are not serviceable from one side only. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 30: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 67 DATE April 29th, 2019

SECTION_2.1.7.1 Construction_ PAGE NO._46_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All wheel housings shall be constructed of stainless steel.]

The Proposer offers rear wheelhouses constructed of reinforced fiberglass covered with grey thermoplastic that meet successfully the 2 in steel ball impact test with at least 200 ft-lb of energy without penetration & fire resistance as described in the Standard Bus Procurement Guidelines (White Book). Front wheel housings are stainless steel, as requested. We kindly request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 31: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 68 DATE April 29th, 2019

SECTION_2.1.8.2 Dimensions_ PAGE NO._47/48_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Door opening width shall be no less than 31.3 inches between grab rails with the doors fully opened. When open, the rear door shall leave n opening no less than 75.3 inches in height.]

We request approval for our rear door model which is 30 inches wide between grab rails with the doors fully open.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 32: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 69 DATE April 29th, 2019

SECTION_2.1.8.3 Door Glazing_ PAGE NO._48_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The upper section, half door height, of front doors shall be glazed for no less than thirty-eight percent (38%) of the respective door opening area of each section. The lower section of the door shall be glazed for no less than twenty-five percent (25%) of the door opening area of the section.]

The offered front door is fully glazed with center H cross-member located 2/3 of the way down. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 33: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 70 DATE April 29th, 2019

SECTION_2.1.8.3 Door Glazing_ PAGE NO._48_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The edge of 6-inch high curb shall be visible to the seated Operator through the closed door when the bus is 12 inches from the curb.]

Due to the height of the lower door hardware, the bus must be 18 inches away from the curb in order to see a 6 inch high curb. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 34: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 71 DATE April 29th, 2019

SECTION_2.1.8.3 Door Glazing_ PAGE NO._48_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The lower section of the rear door shall not be glazed.]

We request your approval for the lower section of the rear door to be glazed.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 35: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 72 DATE April 29th, 2019

SECTION_2.1.9.1 Interior_ PAGE NO._49_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All doors not hinged at the top shall be retained in place by a threated fastener system that will support any installed equipment load.]

The access doors not hinged at the top are mainly retained by quarter turn latches (using square keys). This system is easier and quicker to open. The locking device is captive. This system is reliable as it has been installed as a standard on all our buses. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 36: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 73 DATE April 29th, 2019

SECTION_2.1.9.2 Exterior_ PAGE NO._51_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[No electrical equipment other than the battery cables shall be located in the battery compartment.]

Voltage regulator, fuse block, buses bar and relay are located within the battery compartment. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 37: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 74 DATE April 29th, 2019

SECTION_2.1.9.2 Exterior_ PAGE NO._51_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The interior surface of battery compartment door shall be protected to prevent shorting in the event of an accident or if a battery comes loose.]

The interior surface of the battery compartment door is not protected against grounding. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 38: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 75 DATE April 29th, 2019

SECTION_2.1.9.2 Exterior_ PAGE NO._51_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The bus shall be equipped with an access door to allow removal of the diesel particulate filter (DPF), Selective Catalyst Reduction (SCR) and Decomposition tube.]

Due to our design, the DPF filter, SCR and decomposition tube do not have an access door and are accessible from underneath the vehicle. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 39: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 76 DATE April 29th, 2019

SECTION_2.1.9.2 Exterior_ PAGE NO._52_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A defroster door at the front of the bus must provide maintenance access.]

We request approval not to provide a defroster door at the front of the bus. The defroster is accessible through the access panels under the driver's dash.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 40: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 77 DATE April 29th, 2019

SECTION_2.2.1.1 Control_ PAGE NO._53_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The rear doors shall have solid lower panels and be equipped with an air actuated sensitive edge the whole length of the doors.]

We request approval to offer a rear slide glide exit door which is fully glazed with center cross-member located 2/3 of the way down.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 41: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 78 DATE April 29th, 2019

SECTION_2.2.1.1 Control

2.2.3.5 Operator Controls_ PAGE NO._52/64_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Unless the door control (with integrated kneel and ramp function) handle is accessible from outside the bus, an external toggle switch or button located in a hidden area near the front of the bus shall open or close the front door when the switch is in the "ON" position regardless of the position of the master run switch.

Kneel Switch integrated in Door Controller]

The Proposer offers a 5-Position Driver's Door Control Handle as presented in Mandatory RFA Attachment M16. The Kneeling and Ramp Switch Panel is apart from the Driver's Control Handle and it is presented in Mandatory RFA Attachment M22. We request your approval for this arrangement between the Driver's Control Handle and Kneeling and Ramp Switch Panel.

METRO'S RESPONSE:

APPROVED

DENIED X

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 42: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 79 DATE April 29th, 2019

SECTION_2.2.1.2 Door Bearings_ PAGE NO._53_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All friction points shall have replaceable bearings equipped with lubrication fittings sized for use with a standard American manufactured lube gun or be sealed and permanently lubricated.]

We request your approval to use standard bearings which are unsealed and permanently lubricated.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 43: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 80 DATE April 29th, 2019

SECTION_2.2.1.6 Roof Ventilators_ PAGE NO._55_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Ventilator shall cover an opening area no less than four hundred twenty five (425) square inches and shall be capable of being positioned as a scoop with either the leading or trailing edge open no less than four (4) inches, or with all four (4) edges raised simultaneously to a height no less than 3.25 inches.]

We request your approval for the leading or trailing edges to open 3-5/16 inches, or with all four (4) edges raised simultaneously to a height of 3-9/32 inches, as is inherent to the design of escape hatches offered.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 44: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 81 DATE April 29th, 2019

SECTION_2.2.2.1 Windshield Wipers_ PAGE NO._55/56_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Each windshield wiper shall be operated by its own motor. Each windshield wiper motor and mechanism shall be easily accessible for repairs and service and shall be removable as complete unit(s).]

The proposed windshield wiper system is the same as last order and uses a single electric motor using a single, common control. The windshield wiper motor and linkages are not removable as a complete unit. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 45: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 82 DATE April 29th, 2019

SECTION_2.2.2.1 Windshield Wipers_ PAGE NO._55_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Both wipers shall park along the center edges of the windshield glass.]

Street side (driver side) wiper parks along the lower horizontal edge of the windshield. Curbside wiper parks vertically along the curb side vertical edge of the windshield. Proposed configuration is the same as last order. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 46: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 83 DATE April 29th, 2019

SECTION_2.2.2.1 Windshield Wipers_ PAGE NO._55_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The windshield wiper arm shall use replaceable bronze or stainless steel non-replaceable bushing.]

Wiper bushing is metal-polymer compound (steel, porous bronze sinter, Teflon and polymer fillers). It is provided with the wipers and is therefore not replaceable. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 47: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 84 DATE April 29th, 2019

SECTION_2.2.2.2 Windshield Washers_ PAGE NO._56_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Washer hose shall be run through the front panel without the use of any fittings.]

The washer hose uses a “T” fitting under the dash to supply water to both wipers. This design has been utilized for a number of years with no major maintenance issues. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 48: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 85 DATE April 29th, 2019

SECTION_2.2.3.1 Exterior Lighting_ PAGE NO._57_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Dual 4 inch headlights shall be 12 volt LEDs.]

We request approval for headlights that operate on 24 volts.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 49: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 86 DATE April 29th, 2019

SECTION_2.2.3.1 Exterior Lighting_ PAGE NO._57_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Dual 4 inch headlights shall be 12 volt LEDs.]

We request approval for dual 90mm round (3.5 in) LED headlights.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 50: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 87 DATE April 29th, 2019

SECTION_2.2.3.1 Exterior Lighting_ PAGE NO._57_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Lamps at the rear of the bus shall be visible from behind when the engine service doors are opened.]

The center mounted brake light (Cyclops) is installed on the engine door and is the only light mounted at the rear of the bus that is not visible from behind with the engine door open. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 51: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 88 DATE April 29th, 2019

SECTION_2.2.3.1 Exterior Lighting_ PAGE NO._58_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The bus shall be equipped with a bus stop warning system consisting of two (2) additional 4" round LED lamps with yellow lenses, mounted in the center of the engine compartment door. In addition of the two (2) additional 4" round LED lamps with yellow lenses a 4” round LED lamp shall be added (Figure 3).]

We request approval to provide three (3) 18'' amber LED strips (Cyclops) mounted on the engine compartment door, same as last order, as there is no room for three(3) 4" round LED lamps in the center of the engine compartment door.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 52: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 89 DATE April 29th, 2019

SECTION_2.2.3.3 Passenger Interior Lighting_ PAGE NO._59/60_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Each individual interior light fixture shall be independently programmable and a photo sensor shall provide for the automatic adjustment of interior light levels relative to ambient light.]

We request your approval to use a lighting system that does not offer the programmable adjustment of light intensity and does not offer a photo sensor option. The light intensity can be adjusted on the LED driver of each baselight with DIP switch. The light can be ON, OFF or DIM (at a preset intensity of 10%, 20%, 40%, 60% and 80%). The intensity level and sequence of lights is individually programmable by us via the VBEA multiplex system, except for the last two lights at the rear of the vehicle, both sides, which are programmable as a group. A photo sensor is not available. Please refer to Mandatory RFA Attachment M21 for more details.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 53: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 90 DATE April 29th, 2019

SECTION_2.2.3.3 Passenger Interior Lighting_ PAGE NO._60_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All power supplies shall have an independent in-line fuse or circuit breaker and shall not have a voltage drop greater than 0.2 volts static or dynamic. All lighting assemblies shall be independently grounded to the frame.]

We request your approval to use a lighting system that does not have independent fuses for each lighting fixture. Instead, the VBEA multiplex module has the protection on the output of the module. Ground is made through multi pin connector on the frame.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 54: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 91 DATE April 29th, 2019

SECTION_2.2.3.3 Passenger Interior Lighting_ PAGE NO._61_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Light fixtures shall be totally enclosed, splash-proof, flush mount design for ease of cleaning.]

We request your approval to use a front door light that is surface mount and protrudes around 1’’ higher than the door operator surface. The lighting fixtures for the passengers are flush mount.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 55: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 92 DATE April 29th, 2019

SECTION_2.2.3.5 Operator Controls_ PAGE NO._61/62_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Switches and controls shall be essentially within the hand reach envelope described in SAE Recommended Practice J287 - Operator Hand Control Reach.]

All required controls are available on the lateral console, driver overhead panel or ramp kneel control panel within reach of the operator. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 56: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 93 DATE April 29th, 2019

SECTION_2.2.3.6 Instrumentation_ PAGE NO._64/65_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Illumination of the instruments shall be simultaneous with the marker lamps and utilize replaceable bulbs or LED lamps. All Tell Tale lamps are to utilize replaceable bulbs.]

We request approval that all tell-tale lights be long-duration LED not individually replaceable. The Proposer has been utilizing this technology for 6 years and has experienced very little if any mechanical issues with LED lighting.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 57: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 94 DATE April 29th, 2019

SECTION_2.2.3.6 Instrumentation_ PAGE NO._65_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The instrument panel shall also include air brake reservoir pressure gauge(s) with indicators for primary and secondary air tanks. The air gauges shall be directly plumbed to the air tanks and shall not be dependent on the electrical system.]

Air is plumbed directly into the ACTIA electronic instrument panel. The pressure is registered by transducers. Transducers then send the signal to the electronic gauge. This configuration allows us to utilize this signal for other uses including multiplex signals without the need of adding a separate transducer. We request that this configuration be accepted.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 58: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 95 DATE April 29th, 2019

SECTION_2.2.3.7 Onboard Diagnostics_ PAGE NO._66_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Space shall be provided on the panel for future addition of at least two (2) indicators as the capability of onboard diagnostic systems improves.]

The instrument cluster design doesn't allow the space for two additional indicators. However, the instrument cluster has more indicators than described in this specification. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 59: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 96 DATE April 29th, 2019

SECTION_2.2.3.7 Onboard Diagnostics_ PAGE NO._66_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Critical systems or components shall be monitored with a built in diagnostic system having visual and audible indicators.]

It is our understanding that this section refers to the dash panel tell tales which have indicator lamps and provide an audible alarm for certain signals. The tell tales are however not considered a diagnostic system. Our Volvo VBEA multiplex system, however, does not integrate visual indicators, a PC with a web browser is necessary to monitor multiplex I/O states. When faults are detected, the VBEA does have the means to activate the instrument panel audible alarm and activate the necessary tell tales, or customized messages on the LCD display. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 60: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 97 DATE April 29th, 2019

SECTION_2.3.1 General Requirements_ PAGE NO._66_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[To the extent practicable, all interior surfaces more than ten (10) inches below the lower edge of the side windows or windshield shall be shaped so that objects placed on them fall to the floor when the bus is parked on a level surface.]

The floor level ducts are flat on the top. It is possible to place a small object on them that will not fall to the ground. The top surface though is only 3.5 in wide with an 18 degrees slope. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 61: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 98 DATE April 29th, 2019

SECTION_2.3.1.2 Headlining_ PAGE NO._67/68_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Moldings and trim strips, as required to make the edges tamper-proof, shall be stainless steel or anodized aluminum, colored to complement the ceiling material.]

Headlining trim strips and moldings are plastic in order to complement the ceiling material. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 62: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 99 DATE April 29th, 2019

SECTION_2.3.1.3 Front End_ PAGE NO._68_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[There shall be a closeable locker or box near the Operator's seat where the Operator can stow a purse, lunch box or other personal belongings.]

Our buses are equipped with an operator storage box built in the dash, measuring approximately 8’’ X 15’’ X 9.5’’ inches. This storage box is equipped with a positive latching door. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 63: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 100

DATE April 29th, 2019

SECTION_2.3.2.4 Construction and Materials_ PAGE NO._71/72_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The ergonomically contoured seat inserts shall be vandal resistant in areas contacted and loaded by passengers in the normal seated position. The seat padding shall be at least one inch thick. Inserts shall be shaped for individuality, lateral support and comfort.

Seat backs shall be stainless steel. The upper rear portion of seat backs and upper rear surface of the modesty panels shall be constructed of stainless steel. Seats and other pads shall be securely attached and shall be detachable so that they are easily removable by METRO maintenance. The seats shall have protective edges that help prevent seat wear. To the extent practicable, seats shall be interchangeable throughout the bus. All material and workmanship shall conform to SPI standards and specifications in tests for plastic foam.]

Please refer to Mandatory RFA Attachment M2 for the passenger seat types offered and a description of each. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 64: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 101

DATE April 29th, 2019

SECTION_2.3.2.4 Construction and Materials_ PAGE NO._72_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The upper rear portion of seat backs and upper rear surface of the modesty panels shall be constructed of stainless steel.]

Please clarify this requirement for the upper rear surface of modesty panels. Which modesty panels is this referring to?

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED

COMMENTS: This statement only applies to the upper rear portion of the seat backs..

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 65: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 102

DATE April 29th, 2019

SECTION_2.3.2.4 Construction and Materials_ PAGE NO._72_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The upper rear portion of seat backs and upper rear surface of the modesty panels shall be constructed of stainless steel.]

In reference to the above requirement, we request approval to provide all modesty panels of melamine.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 66: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 103

DATE April 29th, 2019

SECTION_2.3.4 Floor Covering_ PAGE NO._73_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Description and sample of floor material and silicone caulking shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 25)]

We do not use Silicone caulking at seams. Silicone is not compatible with Urethane product used in our production line to bond the floor covering to the floor. Floor is in composite and the flooring is PVC, the urethane used to bond flooring cures with moisture. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 67: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 104

DATE April 29th, 2019

SECTION_2.3.4.1 Vestibule_ PAGE NO._73_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The floor in the vestibule shall be medium gray molted speckles, 3/16 inch thick, non-skid, ribbed, and rubber composition material.]

The floor covering in the vestibule is the same floor covering as in the rest of the bus (Gerfloor floor covering). It is not ribbed or rubber. It is PVC with high quality wear inset with silicone carbide granules, non-slip with a coefficient of friction >0.6. Please refer to Mandatory RFA Attachment M25. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 68: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 105

DATE April 29th, 2019

SECTION_2.3.4.2 Operator's Compartment_ PAGE NO._74_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The floor in the Operator's compartment shall be a medium-gray with mottled-speckles, 1/8 inch thick, smooth surface heavy duty rubber composition material.]

The floor covering in the operator's compartment is the same floor covering as in the rest of the bus (Gerfloor floor covering). It is not ribbed or rubber. It is PVC with high quality wear inset with silicone carbide granules, non-slip with a coefficient of friction >0.6. Please refer to Mandatory RFA Attachment M25. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 69: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 106

DATE April 29th, 2019

SECTION_2.3.4.3 Passenger Area_ PAGE NO._74_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The floor in the passenger area shall be of a non-skid rubber composition material. A one-piece medium gray-mottled speckles center strip shall extend from the rear seat to the standee be broken at steps if necessary). The material shall be 3/16 inch thick in the aisle section and longitudinally ribbed.]

Our buses use Gerfloor floor covering. It is not ribbed and has the same colour and texture throughout the bus. The floor covering is PVC with high quality wear inset with silicone carbide granules, non-slip with a coefficient of friction >0.6. Please refer to Mandatory RFA Attachment M25. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 70: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 107

DATE April 29th, 2019

SECTION_2.3.4.3 Passenger Area_ PAGE NO._74_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Silicone caulking shall be used at seams so no moisture may enter into the flooring material. ]

We do not use Silicone caulking at seams. Silicone is not compatible with the Urethane product used in our production line to bond the floor covering to the floor which cures moisture. Due to this bonding process, no additional trim or moldings are used. Nosing inside the vehicle does not have ribs. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 71: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 108

DATE April 29th, 2019

SECTION_2.4.1.2 Operator's Side Window_ PAGE NO._75_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The Operator's side window shall open sufficiently to permit the seated Operator to easily adjust the left outside rear view mirror.]

Since the seated operator cannot easily adjust the left outside rear view mirror, we are offering remote mirrors as a standard feature. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 72: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 109

DATE April 29th, 2019

SECTION_2.4.2 Side Windows and Rear Window2.4.2.1 Dimensions_ PAGE NO._76_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[If side windows or the rear window are used as an emergency escape, the release handles shall be positioned so passengers cannot use them as assists when standing. The release mechanisms will be designed with sufficient strength to preclude damage from normally expected abuse.]

Release handles are positioned on the window frame towards the rear of the bus. Please confirm that is sufficient to meet Houston Metro's requirement.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 73: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 110

DATE April 29th, 2019

SECTION_2.4.2.2 Materials_ PAGE NO._76_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Templates for window glazing material and exact color and tint density of windows shall be provided with pilot bus (Deliverable, See Appendix No.1, Item D4).]

Ricon does not provide templates for glass. Since these are hidden frame windows, the replacement glazing must also have an aluminum mounting frame bonded to the glass, and therefore the replacement glazing is only available from Ricon. The reason for this is that this element, the bonding of the glass to the frame is safety-critical. If it is done improperly, the glazing can detach from the side of the bus during service.

The Proposer suspects that this requirement might be a carry-over from previous RFQ’s for standard frames windows.

We request your approval not to provide Templates for Window Glazing.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 74: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 111

DATE April 29th, 2019

SECTION_2.4.2.4 Water Test_ PAGE NO._77_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[At a minimum the test shall consist of a thirty (30) minute saturation, starting with everything on the bus turned off. At the mid-point (15 minutes) everything on the bus shall be turned on and allowed to run for the remaining fifteen (15) minutes.]

We request approval for our standard water test which is 30 minutes long, of which the first 18 minutes are with the vehicle with the engine running and the ventilation system open at maximum. The last 12 minutes of the test are performed with the ventilation system closed. Please refer to Attachment 2.4.2.4 - Water Test for further information.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 75: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 112

DATE April 29th, 2019

SECTION_2.5.2.2 Sound Insulation_ PAGE NO._79_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The bus shall accelerate at full throttle from a standstill to forty-five (45) MPH, and back down to zero using a light pressure on brake pedal, on level commercial asphalt or concrete pavement in an area free of large reflecting surfaces within fifty (50) feet of the bus path.]

We request your approval to test the bus accelerating at full throttle from standstill to thirty five (35) MPH as per APTA white book requirement.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 76: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 113

DATE April 29th, 2019

SECTION_2.5.2.2 Sound Insulation_ PAGE NO._78_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The bus generated noise level experienced by a passenger at any seat location in the bus shall not exceed 83 dBA and the Operator shall not experience a noise level of more than 75 dBA under the following test conditions.]

For the interior noise test, we request your approval to measure the noise level in LAeq.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 77: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 114

DATE April 29th, 2019

SECTION_2.5.2.2 Sound Insulation_ PAGE NO._79_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Aside from the above test, any device emitting sound and signal in the interior or on the exterior of the bus shall not be adjustable below 20%.]

During the interior acceleration noise test for the measurement at the driver location, we request your approval to have the front windshield defroster fan and the overhead driver fan at their lowest setting, as these fans are not used simultaneously in service

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 78: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 115

DATE April 29th, 2019

SECTION_2.6.1.1 Visors_ PAGE NO._79_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Mounting of shade must be accomplished with tapping plates.]

Mounting of the shades does not use tapping plates. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 79: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 116

DATE April 29th, 2019

SECTION_2.6.1.1 Visors_ PAGE NO._80_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The sun shades shall cover full width of the window and at least one half (1/2) of the window height and be made of non-reflective gray material.]

The driver's window is large enough that is protrudes behind the driver's partition. Therefore, the sun shades do not cover the full width of the driver's window. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 80: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 117

DATE April 29th, 2019

SECTION_2.6.1.2 Exit Signal_ PAGE NO._80_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The chime system shall activate a "Stop Request" sign located on the front upper destination sign door visible to all passengers and the operator.]

Our front “stop requested’ sign is centered above the aisle in line with driver's partition. A telltale on the dash advises the driver of a stop request. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 81: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 118

DATE April 29th, 2019

SECTION_2.6.3.3 Vestibule_ PAGE NO._84_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The aisle side of the Operator's barrier and the modesty panels shall be fitted with vertical passenger assists that are functionally continuous with the overhead assist and that extend to within thirty six (36) inches of the floor.]

The street side overhead assist extends up to the ITS equipment box located on the wheelhouse, it is therefore not continuous to the operator barrier, however vertical assists are offered on the wheelhouse and the operator barrier, same as previous order to make the assists functionally continuous. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 82: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 119

DATE April 29th, 2019

SECTION_2.6.3.4 Overhead_ PAGE NO._84_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A continuous, full grip, overhead assist shall be provided except forward of the standee line and at the rear door.]

The street side overhead assist extends up to the ITS equipment box located on the wheelhouse, it is therefore not continuous to the operator barrier/standee line, however vertical assists are offered on the wheelhouse and the operator barrier, same as previous order to make the assists functionally continuous. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 83: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 120

DATE April 29th, 2019

SECTION_2.6.4 Exterior Route Information Displays_ PAGE NO._85_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All destination signs, run number sign and Operator's console mount locations and description/identification of all test methods, parameters and options shall be submitted as a Mandatory Request For Approval (see Section II of the Solicitation, Item 29).]

We request approval for a Luminator Destination sign as described in Mandatory RFA Attachment M29.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 84: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 121

DATE April 29th, 2019

SECTION_2.6.4.10 Run Number Sign_ PAGE NO._92_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A lightweight, serviceable, plastic hinged, illuminated, four-digit run number sign box shall be installed on the right front side of the dashboard. The sign box shall have four (4") inch individually controlled numbers on roller curtains.]

Will Houston accept as an approved equal a Luminator electronic Run Number Sign (12x40, white)?

METRO'S RESPONSE:

APPROVED

DENIED X

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 85: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 122

DATE April 29th, 2019

SECTION_2.6.4.5 Programming_ PAGE NO._88/89_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The sign system must be reprogrammable on the bus with the use of a memory transfer module, USB key, Wi-Fi and via the J1939 Transit Data Link. Either method of message list programming shall not inhibit the operator from inputting message codes via the control console keypad during normal operation.

The load module from the IBM/compatible PC to the vehicle sign controller shall be available in file form for alternate loading of the sign memory by the J-1939-Transit Data Link method of accessing the vehicle controller.

The Sign Controller shall accept, and respond to, all applicable commands of a SAE J-1939 interface in accordance with the protocol section, SAE J-1587.]

We are not aware of any Destination Sign that connects to the J1939 network for file upload or otherwise. We request approval for the destination sign to use J-1708 protocol only with no connection to a J-1939 network.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 86: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 123

DATE April 29th, 2019

SECTION_2.6.4.5 Programming_ PAGE NO._88_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The sign system must be reprogrammable on the bus with the use of a memory transfer module, USB key, Wi-Fi and via the J1939 Transit Data Link. Either method of message list programming shall not inhibit the operator from inputting message codes via the control console keypad during normal operation.]

Please confirm that the Destination Sign System should have its own WIFI capability.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED

COMMENTS: The destination sign shall have its own WIFI capability.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 87: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 124

DATE April 29th, 2019

SECTION_2.6.6 Next Stop Sign_ PAGE NO._94_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The contractor shall provide one SAE J-1939 compatible Next Stop Interior Signs at the front.]

Init provides a sign which is J-1708 compatible sign as currently deployed in the Houston Metro fleet. We request your approval to offer this sign.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 88: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 125

DATE April 29th, 2019

SECTION_2.7 Accessibility Equipment_ PAGE NO._94_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[As a minimum, all accessibility equipment and vehicle access dimensions shall comply with all applicable standards for accessible vehicles as set forth in the Department of Transportation (DOT) Regulations, Title 49: Transportation; PART 37—TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA), Subpart D—Acquisition of Accessible Vehicles By Public Entities, §37.71 Purchase or lease of new non rail vehicles by public entities operating fixed route systems, [56 FR 45621, Sept. 6, 1991, as amended at 76 FR 57936, Sept. 19, 2011] and this specification.]

The Proposer shall comply with Title 49 PART 38 - AMERICANS WITH DISABILITIES ACT (ADA) ACCESSIBILITY SPECIFICATIONS FOR TRANSPORTATION VEHICLES. PART 37 is not for bus OEMs. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 89: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 126

DATE April 29th, 2019

SECTION_2.7.2 Wheelchair Ramp Control_ PAGE NO._96_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The complete wheelchair ramp shall operate from the vehicle's electrical system and shall not in any way be tied into the vehicle’s hydraulic system.]

As specified in section 2.7.1, we request approval to offer an electro-hydraulic ramp with ramp hydraulics not tied into the vehicle's hydraulic system, as described in Mandatory RFA Attachment M31.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 90: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 127

DATE April 29th, 2019

SECTION_2.7.5 Flip Seats_ PAGE NO._98/99_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The base of the flip seat or barrier behind the wheelchair must extend across the entire thirty (30) inches of "clear floor space" in the securement area to provide a backstop for the wheelchair to resist forward acceleration of the vehicle.]

If the barriers extend to the full 30", the remaining aisle width between the 2 barriers will be too narrow to allow acceptable passenger flow, therefore the barriers are slightly shorter than 30 inches, as provided by the seat set manufacturer. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 91: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 128

DATE April 29th, 2019

SECTION_2.7.5 Flip Seats_ PAGE NO._98_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Flip Seats with a barrier shall be provided in the three (3) wheelchair securement areas. On the curb side of the bus the contactor shall provide four (4) flip seats and four (4) flip seats on the street side.]

Per The Agency's response to RFA #5, The Proposer requests approval to provide a 3+1 curb-side flip-seat arrangement along with flip-seats in the two (2) street-side Q-Pods.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 92: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 129

DATE April 29th, 2019

SECTION_3.1.2.2 Service_ PAGE NO._103_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Two (2) 4M mechanics shall be able to remove, replace and prepare the engine and transmission assembly for service in less than eight (8) man-hours.]

Our standard time to replace and prepare an engine is 12 hours and 6 hours to change a transmission. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 93: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 130

DATE April 29th, 2019

SECTION_3.1.2.2 Service_ PAGE NO._103_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The filter canister shall be equipped with an approved restriction indicator.]

The filter restriction indicator is not integrated to the canister. It is installed on the piping at the filter outlet. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 94: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 131

DATE April 29th, 2019

SECTION_3.1.2.2 Service_ PAGE NO._104_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All lubricant sumps shall be fitted with magnetic type external, American standard hex head drain plugs of a standard size.]

Cummins does not offer magnetic drain plugs. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 95: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 132

DATE April 29th, 2019

SECTION_3.1.2.2 Service_ PAGE NO._104_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All lubricant sumps shall be fitted with magnetic type external, American standard hex head drain plugs of a standard size.]

The ZF Ecolife does not support a magnetic drain plug. Oil pan contains 3 large magnets to capture metalic particles. Drain plug is standard design, cannot be changed. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 96: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 133

DATE April 29th, 2019

SECTION_3.1.2.3 Accessories_ PAGE NO._105_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The alternator shall be capable of providing a positive charge at all times to the electrical system with all systems in operation, at idle.]

Alternator may not provide a positive charge during a short peak current draw. We request your approval.

METRO'S RESPONSE:

APPROVED

DENIED X

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 97: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 134

DATE April 29th, 2019

SECTION_3.1.3.1 Engine_ PAGE NO._107_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[An auto neutral system (return to neutral) shall be incorporated into the engine parameters and shall be determined and require approval by METRO during the preproduction conference (See Appendix 2, Preproduction Conference, Item PPC 16).]

Auto neutral is offered, but it is not done through the engine template. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 98: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 135

DATE April 29th, 2019

SECTION_3.1.3.1 Engine_ PAGE NO._107_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The engine shall operate in excess of two hundred thousand (200,000) miles on the design operating profile without major failure or significant deterioration. Components of the fuel and control system shall operate for one hundred and fifty thousand (150,000) miles without replacement or major service.]

We refer to Cummins' statement in terms of useful life. Cummins Inc. do not publish Life numbers. Cummins products are designed for specific application and duty cycles and utilize Cummins Standard work requirements in the design of products. However, the Emissions useful life is compliant with EPA 2013 requirements of 435K Miles. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 99: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 136

DATE April 29th, 2019

SECTION_3.1.3.1 Engine_ PAGE NO._107/108_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The engine fast idle device will automatically activate with transmission in the neutral position and parking brake applied. The on/off switch will be located in the engine compartment for mechanic access.]

The ON/OFF switch is on the driver's panel not in the engine compartment. In addition to the drivers on/off high idle switch located in the driver’s area, our vehicles have a throttle switch in the rear run box which can be adjusted by the mechanic from 700 to 2200 RPM. We request your approval not to install an additional fast idle ON/OFF switch in the engine compartment, as the engine RPM can be adjusted by the mechanic using the throttle switch.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 100: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 137

DATE April 29th, 2019

SECTION_3.1.3.2 Cooling System_ PAGE NO._109_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A tube or two (2) sight glasses to determine satisfactory engine coolant level shall be provided and shall be accessible by opening an access door.]

Since our cooling system is located at the rear of the roof, we provide coolant level information through an electronic display located in the engine compartment. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 101: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 138

DATE April 29th, 2019

SECTION_3.1.3.2 Cooling System_ PAGE NO._110_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Fans shall be lightweight fiberglass. Radiator and charge air cooler shall have a powder coated steel frame and fan shroud.]

We request your approval to provide fans made of plastic. As the radiators are mounted on the rear of the roof, in the radiator compartment, fans do not have a shroud.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 102: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 139

DATE April 29th, 2019

SECTION_3.1.3.3 Transmission_ PAGE NO._113_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A retarder disable switch shall be accessible only in the engine compartment. The retarder shall be activated when the guard is closed. A pilot light, on the dash shall indicate, to the Operator that, the retarder is "OFF" by illuminating. Disabling of retarder shall be recorded for METRO data collection.]

A momentary retarder switch located in the driver's left overhead compartment linked to a timer function can be offered. The timer function works as the follows: when activated the retarder function is disabled for a total cumulative 2 minutes of breaking time without retarder. After this period, there is a 30 minutes brake cool down period during which the retarder cannot be disabled. A tell Tale indicator show the retarder status. Disabling of the retarder is not recorded. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 103: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 140

DATE April 29th, 2019

SECTION_3.1.3.3 Transmission_ PAGE NO._111_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A large remote mounted, shell and tube, rebuildable heat exchanger shall be provided capable of adequately cooling the transmission and retarder assembly.]

We are proposing a ZF EcoLife Transmission. The ZF Ecolife is not capable of utilizing a remote mount cooler. Rear mounted cooler is a plate type and is technically not rebuildable. However, ZF cooler provides adequate cooling for transmission and retarder. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 104: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 141

DATE April 29th, 2019

SECTION_3.1.3.3 Transmission_ PAGE NO._112_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[In case of failure of the onboard diagnostics, transmission fault codes must be accessible through the transmission shift selector without any additional external readers or software to aid service personal.]

The ZF Ecolife gear selector does not have a display that reads out fault codes. It does have a mini-USB diagnostic connector, but requires a ZF laptop with a ZF Testman tool and appropriate adapters to read out any codes. Otherwise, it’s a private CAN gear push button gear selector.

We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 105: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 142

DATE April 29th, 2019

SECTION_3.1.3.3 Transmission_ PAGE NO._112_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[An electronic transmission fluid level monitoring, fluid life, filter life and clutch life protection system shall be provided.]

The ZF Ecolife transmission does not support these functions. It can be equipped with an oil level sensor, but it is not intended to act an active fluid monitoring device. Its intention is to provide a quick easy way for a driver or a technician to quickly check the fluid level without needing to use the dipstick. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 106: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 143

DATE April 29th, 2019

SECTION_3.1.3.4 Engine Compartment Gauges_ PAGE NO._113_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Gauges indicating engine coolant temperature and engine oil pressure shall be flush mounted in a common panel located in a conspicuous place in the engine compartment. Voltmeter gauges indicating 24 and 12 volt operating voltages shall be provided in the engine compartment.]

Engine coolant temperature, engine oil pressure, voltmeter and hourmeter information are displayed as menu options in the ACTIA digital gauge in the tachometer on the rear engine run box, not as separate gauges. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 107: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 144

DATE April 29th, 2019

SECTION_3.2.1 General Requirements_ PAGE NO._115/116_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The axle shall be vented. To reduce likelihood of water entering when the axle is submerged, the vent line shall be a minimum of thirty- two (32) inches above street level and filtered to prevent entrance of foreign material.]

The vent line is located into a structure cavity at 28in from street level and secluded by splash apron to prevent entrance of water or foreign material. We request your approval.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED X

COMMENTS: Approved provided the installation is approved by the axle manufacturer.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 108: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 145

DATE April 29th, 2019

SECTION_3.2.1 General Requirements_ PAGE NO._115_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Lubricant drain plug shall be the magnetic type, external hex head of a standard size.]

For the proposed ZF axles, we request your approval to use oil drain plugs thread M36x1.5 with magnetic, female accepting DIN 908 (Allen Key 19mm).

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 109: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 146

DATE April 29th, 2019

SECTION_3.3.1 General Requirements_ PAGE NO._116_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All fasteners (bolts, nuts and studs) used in the suspension system shall meet SAE standards.]

All fasteners (bolts, nuts and studs) used in the suspension system DIN standards. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 110: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 147

DATE April 29th, 2019

SECTION_3.5.1.1 Actuation_ PAGE NO._120_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The Electronic Brake Monitoring System (EBMS) shall include both parking brake and service brake electronic monitoring utilizing a computer module with appropriate software, brake application pressure sensing via pressure transducer(s), associated cabling communicating the required electronic signals, and optical as well as mechanical sensing at the brake actuator / air disc caliper.]

We propose to offer the MGM e-stroke brake monitoring system. Although meeting the specification requested, this system does not specifically employ embedded optical and mechanical sensing at each wheel end which monitors operational conditions for air brake delivery and release, (as well as mechanical conditions inside the caliper that effect lining and pad clearance), and the proper mechanical functionality of air disc calipers at each wheel end position. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 111: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 148

DATE April 29th, 2019

SECTION_3.5.1.1 Actuation_ PAGE NO._121_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The system shall also provide additional capability for conducting electronic pre-trip and/or post trip inspection on air disc brake vehicles.]

Please clarify that our understanding meets the following requirement: "The system shall also provide additional capability for conducting electronic pre-trip and/or post trip inspection on air disc brake vehicles." We understand that a Zonar system is no longer a requirement (removed since IFB IB1500061, dated September 7, 2015). The Electronic Brake Monitoring System records fault history. This history can be reviewed pre and post-trip by logging in with a laptop.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED

COMMENTS: The Electronic Brake Monitoring System records fault history. This history can be reviewed pre and post-trip by logging in with a laptop.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 112: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 149

DATE April 29th, 2019

SECTION_3.5.1.1 Actuation_ PAGE NO._121/122_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Bus multiplex system and EBMS shall function as follows:1. Bus multiplex system continuously monitors J1939 for EBMS faults.2. EBMS broadcasts dragging brake fault via J1939.3. Bus multiplex monitors active drag fault for 10 seconds.4. If dragging condition remains active; bus multiplex turns ON dash display “Dragging Brake” text warning with amber field for 30 seconds.5. If dragging condition remains active; bus multiplex switches display to flashing red field and turns on 4 way flashers for 30 seconds.6. If dragging condition remains active; bus multiplex cuts throttle over 12 mph (20km) and limits throttle under 12mph (20km) to “limp home”.7. If dragging condition remains active; limited throttle under 12mph (20km) will remain active until vehicle is brought to a stop. Once stopped the interlocks apply and throttle is cut off. Vehicle remains running.8. Door interlock override switch ON/OFF will reset bus multiplex logic.9. Switch interlock override switch ON/OFF will allow vehicle to be driven over 12 mph (20km).]

The brake monitoring system we offer does not have the following functions:

3. Bus multiplex monitors active drag fault for 10 seconds.4. If dragging condition remains active; bus multiplex turns ON dash display “Dragging Brake” text warning with amber field for 30 seconds.5. If dragging condition remains active; bus multiplex switches display to flashing red field and turns on 4 way flashers for 30 seconds.6. If dragging condition remains active; bus multiplex cuts throttle over 12 mph (20km) and limits throttle under 12mph (20km) to “limp home”.7. If dragging condition remains active; limited throttle under 12mph (20km) will remain active until vehicle is brought to a stop. Once stopped the interlocks apply and throttle is cut off. Vehicle remains running.8. Door interlock override switch ON/OFF will reset bus multiplex logic.9. Switch interlock override switch ON/OFF will allow vehicle to be driven over 12 mph (20km).

We therefore request approval not to offer these features.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 113: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 150

DATE April 29th, 2019

SECTION_3.5.1.2 Friction Material_ PAGE NO._122_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The friction material shall have an overhaul or replacement life of at least one hundred thousand (100,000) miles when running on the designed operating profile.]

Since friction material wear is highly dependent on duty cycle and driver habits, we cannot confirm this value.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 114: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 151

DATE April 29th, 2019

SECTION_3.5.1.4 Air System_ PAGE NO._124_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All air system valves shall exhaust to the outside of the bus.]

Door valves exhaust within the baselight and driver's lateral console. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 115: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 152

DATE April 29th, 2019

SECTION_3.5.1.4 Air System_ PAGE NO._123_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Nylon lines may be grouped and shall be continuously supported every twenty-four (24) inches.]

In some areas without any risks of contact with surrounding components, nylon tubings are supported at intervals up to 30 inches, we have never had any issues with this configuration after thousands of vehicles produced. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 116: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 153

DATE April 29th, 2019

SECTION_3.5.1.4 Air System_ PAGE NO._124_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All air lines to the heating equipment and door controls shall be equipped with an in-line air filter/strainer.]

Compressed air supplied to door controls is only filtered from the main air dryer system. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 117: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 154

DATE April 29th, 2019

SECTION_3.5.1.4 Air System_ PAGE NO._124_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The air system shall be protected by a pressure relief valve set at one hundred fifty (150) psi and shall be equipped with check valves and pressure protection valves to assure partial operation in case of line failures.]

Safety Pressure relief valve on the ping tank is set at 175 psi to withstand pressure peaks from the turbocharged twin Wabco compressor. We are offering Haldex twin towers air dryers, same as previous order. Each tower contains its own pressure relief valve set at 160 psi. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 118: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 155

DATE April 29th, 2019

SECTION_3.5.1.5 Parking and Emergency Brake_ PAGE NO._125_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[This valve will "pop" out and apply the brakes when the pressure in the air system drops below forty (40) PSI.]

We normally set the pressure relief for brake application at 35psi. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 119: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 156

DATE April 29th, 2019

SECTION_3.5.1.6 Brake Balance Audit_ PAGE NO._125_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A Brake Balance Audit shall be conducted by the OEM suppliers of the axles and air system, to check brake balance and brake efficiency. The Brake Balance Audit shall require approval by METRO prior to acceptance of the pilot bus.]

The brake balance is done according to the Link protocol and is executed by Link (which is a specialized brake test group - independent 3rd party). Suppliers are not involved in this test. We request approval to provide brake balance test results from tests that were already performed on similar vehicles.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 120: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 157

DATE April 29th, 2019

SECTION_3.6.1.1 Wheels_ PAGE NO._126_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The wheel hubs shall be painted black.]

The Proposer's Hubs are “Primed” Black. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 121: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 158

DATE April 29th, 2019

SECTION_3.6.1.2 Tires_ PAGE NO._126_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[METRO will furnish tires for these buses through its tire contractor.]

Please clarify which tire brands Houston Metro will furnish.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED

COMMENTS: The current contractor is Bridgestone.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 122: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 159

DATE April 29th, 2019

SECTION_3.6.2.1 Diesel Fuel Tanks_ PAGE NO._127_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The fuel tank(s) shall be mounted in such a manner to permit the repair and replacement of the fuel pick up and return lines, or cover gasket, or if removable, or the fuel tank neck and gasket without the removal of the fuel tank(s).]

The fuel tank must be removed from the bus to repair or replace a fuel pick up, return lines or cover gasket. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 123: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 160

DATE April 29th, 2019

SECTION_3.6.2.1 Diesel Fuel Tanks_ PAGE NO._127_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The fuel tank(s) shall be made of stainless steel with internal baffles to reduce fuel sloshing regardless of the fuel level.]

We request approval to provide a polyethylene fuel tank on 40ft buses. This tank has the advantage of a reduced weight.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 124: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 161

DATE April 29th, 2019

SECTION_3.6.2.1 Diesel Fuel Tanks_ PAGE NO._127/128_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[DEF tank shall be equipped with an receptacle which is compatible with METRO’s current DEF nozzle and have a single point fill which eliminates the risk of cross contamination.]

Our DEF tank has a capacity of 10 gallons. Easily accessible, the DEF tank is equipped with conventional filler within one minute using a 10 gpm pump. We request approval to provide a DEF tank with a conventional filler neck.

METRO'S RESPONSE:

APPROVED

DENIED X

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 125: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 162

DATE April 29th, 2019

SECTION_3.6.3.2 Front Bumper_ PAGE NO._129_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The flexible portion of the bumper may increase the overall bus length specified in Section 1.6.1.1 by no more than six (6) inches.]

Romeo Rim bumpers extend by 6.7in the front shell of the bus. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 126: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 163

DATE April 29th, 2019

SECTION_3.6.3.3 Rear Bumper_ PAGE NO._129_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The three part rear bumper]

We request approval to provide a two-piece rear bumper.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 127: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 164

DATE April 29th, 2019

SECTION_3.6.4.1 General Requirements_ PAGE NO._131_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[System shall be able to detect electrical arcing in an output load circuit in order to alert maintenance personnel to potential electrical system malfunctions and possible fire hazards. Actual electrical arcing and current draw of selected outputs shall be viewable via laptop PC using either direct hookup or optional receiver/transmitter.]

Actual electrical arcing and current draw of selected outputs is not viewable via laptop PC as described. We do not provide an electrical arcing detection feature with the ability through programming to alert the operator and shut down predefined outputs. We request approval not to provide these features, as they are not available with our system.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 128: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 165

DATE April 29th, 2019

SECTION_3.6.4.1 General Requirements_ PAGE NO._131_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All circuits, except for those involved in propulsion system start-up, shall be protected by circuit breakers.]

The alternator is not protected by circuit breakers. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 129: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 166

DATE April 29th, 2019

SECTION_3.6.4.1 General Requirements_ PAGE NO._131_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The power generating system shall be rated sufficiently higher than the total possible electrical load to maintain the charge on the batteries at all operating conditions including the engine at low idle.]

Fast transients may be observed under certain conditions. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 130: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 167

DATE April 29th, 2019

SECTION_3.6.4.1 General Requirements_ PAGE NO._132_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Redundant grounds shall be used for all electrical equipment, except where it can be demonstrated that redundant grounds are not feasible or practicable. Each of these areas shall be determined and require approval by METRO during the preproduction conference (See Appendix 2, Preproduction Conference, Item PPC 23).]

We request approval to provide the same grounding configuration as provided on the previous order. All 24V loads return to the battery via the chassis ground, except the alternator and starter which use an additional redundant ground connection. As validated and accepted by Houston Metro on the previous order, our vehicle configuration does not require redundant grounds for the ITS system.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED X

COMMENTS: Approved provided all power and ground provided to the ITS cabinet is filtered.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 131: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 168

DATE April 29th, 2019

SECTION_3.6.4.1 General Requirements_ PAGE NO._132_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All front to rear electrical harnesses shall be installed above the window line of the bus and provide spares.]

Spares are used in main harnesses between major electrical distribution panels. Some harnesses are present under the window line to provide necessary electrical connections. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 132: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 169

DATE April 29th, 2019

SECTION_3.6.4.3 Wiring & Terminals_ PAGE NO._134/135_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The bus manufacturer shall provide wiring schematic runsheets prior to production of the pilot and shall provide final as-built drawings prior to production of the 10th bus. The wiring layout shall be determined and require approval by METRO during the preproduction conference (See Appendix 2, Preproduction Conference, Item PPC 27). Schematic runs will be on both computer disks and in book form (Deliverable, See Appendix No.1, Item D14).]

Drawings are sensitive information. We understand that METRO will make every effort to protect these documents. However, in a project such as this one, several suppliers shall provide confidential information to The Proposer, and The Proposer itself shall be producing intellectual property that must be protected. Referring to "and shall provide final as built drawings", The Proposer understands that METRO requires finalized wiring schematics only for item D14 and D54. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 133: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 170

DATE April 29th, 2019

SECTION_3.6.4.3 Wiring & Terminals_ PAGE NO._133/134_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All wiring between major electrical components and terminations, shall have double electrical insulation, be waterproof, and shall meet specification requirements of SAE Recommended Practice J-1292 and J1128-Type SXL or GXL. Except as interrupted by the master battery disconnect switch, battery and starter wiring shall be continuous cables with connections, secured by bolted terminals and shall conform to specification requirements of SAE Standard J1127, Jumbo Type SGT or SGX and SAE Recommended Practice J541-JUL83.

Double insulation shall be maintained as close to the terminals as practicable.

All harnesses shall contain a protective barrier through the use of convoluted loom, grommets, insulated clamps and a cable tie system.]

We use the following wire types with a max temp of 135°C: TXL type for AWG 18, GXL for AWG 16, SXL for AWG 14-10 (TXL, GXL & SXL are crossed linked Polyolefin insulated as per spec J1128). We use Tefzel type wires in the engine compartment. Tefzel has a maximum temperature of 250 deg. C and is therefore better suited for this application. Our standard wires do not come shielded; however they conform to SAE 1127/1128 standards. J1939 network cables and other cables where requested by system manufacturer are shielded. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 134: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 171

DATE April 29th, 2019

SECTION_3.6.4.3 Wiring & Terminals_ PAGE NO._134_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Terminals shall be full ring type or interlocking and corrosion resistant. T-splices must be used when it is less than twenty five thousand (25,000) circular mills of copper in cross section, a mechanical clamp is used in addition to solder on the splice, the wire supports no mechanical load in the area of the splice, and the wire is supported to prevent flexing. All terminals outside of passenger compartment must be coated after installation to prevent corrosion.]

Spade terminals are used in distribution panels. Ring terminal connections in exposed areas are treated with dielectric grease, however no dielectric grease is used in environmentally sealed connectors. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 135: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 172

DATE April 29th, 2019

SECTION_3.6.4.3 Wiring & Terminals_ PAGE NO._133_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Except as interrupted by the master battery disconnect switch, battery and starter wiring shall be continuous cables with connections, secured by bolted terminals and shall conform to specification requirements of SAE Standard J1127, Jumbo Type SGT or SGX and SAE Recommended Practice J541-JUL83. ]

Junction blocks (instead of continuous cables) are used between the battery and the starter circuit. This is required because the batteries are located in a separate compartment, away from the engine compartment and the engine (including the starter) is installed on a cradle. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 136: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 173

DATE April 29th, 2019

SECTION_3.6.4.4 Junction Boxes_ PAGE NO._135_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All relays, controllers, flashers, circuit breakers, and other electrical components shall be mounted in easily accessible junction boxes and be clearly identified.]

Relay and breakers are within the battery compartment (not accessible from the interior of the bus) at the floor level, same as previous order. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 137: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 174

DATE April 29th, 2019

SECTION_3.6.5.1 General Requirements_ PAGE NO._136_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All circuit breakers, with the exception of the head light circuit, which must be an automatic re-setting type, shall be manual reset types.]

We request approval for the headlight circuit to be controlled by the multiplexer.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 138: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 175

DATE April 29th, 2019

SECTION_3.6.5.2 Batteries_ PAGE NO._136_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Batteries shall be easily accessible for inspection and servicing only from outside the bus (curbside).]

We request approval for our battery compartment which is located on the street side of the bus.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 139: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 176

DATE April 29th, 2019

SECTION_3.6.5.2 Batteries_ PAGE NO._136_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Batteries shall be Absorbent Glass Material (AGM) group 31 series type, applicable to the mass transit industry.]

Since a capacitor starting system is requested, we request approval to provide two Odyssey PC2150 Group 31 AGM batteries. We request your approval.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED

COMMENTS: Currently the Houston METRO fleet uses Northstar Grou[p 31 AGM Batteries.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 140: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 177

DATE April 29th, 2019

SECTION_3.6.5.2 Batteries_ PAGE NO._137_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Voltage regulator, battery switches, etc., shall be mounted in a separate compartment.]

We request approval for the following components to be located in the battery compartment: Fuse block, Buses bar, relay and master switch.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 141: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 178

DATE April 29th, 2019

SECTION_3.6.5.5 Radio Noise Suppression_ PAGE NO._138_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Proper suppression equipment shall be provided in the electrical system to eliminate interference with radio and television transmission and reception, Part 15 of the FCC Rules and Regulations. This equipment shall not cause interference with any electronic system on the bus.]

We do not provide special additional equipment to eliminate interference. We do however ensure that existing equipment does not cause interference. We request your approval.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED X

COMMENTS: Approved provided filtered power is provided.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 142: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 179

DATE April 29th, 2019

SECTION_3.6.5.8 Passenger USB electrical outlets_ PAGE NO._139_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The contractor shall provide and install two (2) USB power-ports per seat arrangement.]

We will attempt to fulfill this requirement for the majority of the seating positions, however we may not be able to provide 100% coverage depending on the actual seat position (for example for some of the longitudinal seats). We request your approval.

METRO'S RESPONSE:

APPROVED X DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 143: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 180

DATE April 29th, 2019

SECTION_3.6.5.8 Passenger USB electrical outlets_ PAGE NO._139_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The contractor shall provide and install two (2) USB power-ports per seat arrangement.]

We request approval to provide the USB power ports accessible from the seat area, not necessarily installed on the seat.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 144: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 181

DATE April 29th, 2019

SECTION_3.7.1 Heating and Ventilation System_ PAGE NO._140_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The system run control, four (4) position switch, shall be located in the Operator's compartment providing the operator with "Off", "Heat" and "A/C" selection. The location of these controls shall be in a convenient position for the operator.]

Instead of a 4 position switch, we request approval to provide an on/off toggle switch and another heat/vent/cool toggle switch on the driver's overhead control panel. This is our standard configuration and was provided on the last order.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED X

COMMENTS: The switch shall be Off/Auto.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 145: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 182

DATE April 29th, 2019

SECTION_3.7.2 Operator's Heater and Windshield Defroster_ PAGE NO._141_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The defroster fan blower wheel shall be metal.]

We request your approval to use a defroster fan blower wheel made of glass filled plastic meeting the high temperature requirements, same as previous order. Mobile Climate Control (MCC) offer this blower fan standard for all our defrosters. Metal wheels are slightly noisier and provide lower air flow according to MCC.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 146: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 183

DATE April 29th, 2019

SECTION_3.7.2 Operator's Heater and Windshield Defroster_ PAGE NO._141_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The windshield shall be fully defogged with two (2) minutes.]

We request your approval to perform the standard defrost test per SAE J381.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 147: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 184

DATE April 29th, 2019

SECTION_3.7.3 Air Conditioning System_ PAGE NO._141_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[System design will include two (2) independent refrigerant circuits with interlaced evaporator coils.]

System will include a single refrigerant circuit with two evaporator coils. We request your approval.

METRO'S RESPONSE:

APPROVED

DENIED X

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 148: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 185

DATE April 29th, 2019

SECTION_3.7.3 Air Conditioning System_ PAGE NO._141_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Each circuit will provide refrigerant to both evaporator coils (50% of each compressor’s capacity to each of the two coils).]

A single circuit will feed the evaporator coils. We request your approval.

METRO'S RESPONSE:

APPROVED

DENIED X

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 149: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 186

DATE April 29th, 2019

SECTION_3.7.3 Air Conditioning System_ PAGE NO._141/142_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The system shall be capable of shutting down one compressor during non-peak hours, reducing electrical demand.]

The system will reduce the capacity of the system up to 50% via the VFD and also reduce electrical demand. We request your approval.

METRO'S RESPONSE:

APPROVED

DENIED X

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 150: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 187

DATE April 29th, 2019

SECTION_3.7.3 Air Conditioning System_ PAGE NO._142_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Compressors, blowers and fans shall all utilize 3-phase electric power supplied from a synchronous a.c. output voltage generator, belt-driven by the main bus engine.]

The system will utilize a 3 phase electric compressor powered by the generator and standard 24 VDC fans/blowers. We request your approval.

METRO'S RESPONSE:

APPROVED

DENIED X

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 151: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 188

DATE April 29th, 2019

SECTION_3.7.3. Air Conditioning System _ PAGE NO._141_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The air conditioning (A/C) system will be a fully-electric, self-contained, roof-mounted HVAC package with two (2) independent horizontal scroll compressors mounted internal to the housing.]

The Proposer would like to request approval to provide an Electric HVAC System which is a self-contained unit with a single scroll compressor internal to the housing as supplied Mobile Climate Control (MCC).

The System contains a single scroll compressor with single refrigerant circuit and utilizes a VFD to reduce capacity up to 50% during non-peak requirements. The System also uses 24VDC evaporator blowers and condenser fans instead of 3 phase high voltage electrical power supplied by the generator.

We request your approval.

METRO'S RESPONSE:

APPROVED

DENIED X

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 152: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 189

DATE April 29th, 2019

SECTION_3.7.4.2 Operator's Area_ PAGE NO._147_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The bus interior climate control system shall deliver at least one hundred fifty (150) cubic feet per minute of air to the Operator's area when operating in the ventilating and cooling modes. Adjustable nozzles shall permit variable distribution or shut down of the air flow.]

We request your approval to use a driver overhead fan (operator area climate control system) independent from the HVAC system, that is, the fan speed is manually controlled by a 2-speed toggle switch on the driver panel.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 153: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 190

DATE April 29th, 2019

SECTION_3.7.6.Heater _ PAGE NO._148_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Heater cores, heat exchangers and piping must be copper or bronze. Aluminum is acceptable for fins. Heat lines shall be copper up to each heater core. All copper lines shall be insulated.]

We propose the use of HePex as a water pipe material for water lines that pass inside the bus compartment only, same as previous order. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 154: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 191

DATE April 29th, 2019

SECTION_3.8.1 Provide and Install_ PAGE NO._149_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Electronic communication equipment provided by contractor and installed on the bus:

6. Communications radio9. Router to support machine to machine application]

In reference to the diagram and Bill Of Materials provided by Houston Metro in response to our RFA # 3, we request approval for the proposer not to be responsible for configuring the Cisco router.

We request approval to provide the same Radio with its options as per the previous order.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 155: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 192

DATE April 29th, 2019

SECTION_3.8.1 Provide and Install_ PAGE NO._149/150_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Electronic communication equipment provided by contractor and installed on the bus:18. Power Conditioner 12V and 24V]

We request approval to install the same components as previous order.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 156: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 193

DATE April 29th, 2019

SECTION_3.8.1.1 Bus Mounted Data Recorders_ PAGE NO._150/151_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[1) Data always collected and reported:2) Fault Indicators captured and reported:3) Last value observed:]

There seems to be a mix of requirements to connect to a J1939 network but also mention of J1587 messages and documentation. We request approval to provide only a J1939 network and J1708 functionality for the Passenger Counter system, Bus Sign System and Fare Box.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED X

COMMENTS: The passenger counters use ethernet cables for communication.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 157: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 194

DATE April 29th, 2019

SECTION_3.8.1.2 Standardized Connectors_ PAGE NO._152_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[While the Society of Automotive Engineers does not address the issue of standardized connectors or cables within J1939, MIL-C- 24308 Subminiature D Pin and Socket Connectors, that shall be used for device interconnection.]

We request approval to use the same connectors as on the last order.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 158: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 195

DATE April 29th, 2019

SECTION_3.8.1.3 General Cabling Requirements_ PAGE NO._152_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Use of tie-wraps is not acceptable.]

We request approval to use tie-wraps for wiring passing through the baselight compartment.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 159: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 196

DATE April 29th, 2019

SECTION_3.8.1.3 General Cabling Requirements_ PAGE NO._152_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All cables shall be supported with insulated clamps at least every five (5) feet. Use of tie-wraps is not acceptable.]

We request approval to install cabling same as per previous order.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 160: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 197

DATE April 29th, 2019

SECTION_3.8.1.5 Device Cabling to Device Access Box_ PAGE NO._152_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Any device which is located beyond a firewall shall have a suitable waterproof and fireproof bulkhead connector installed at the firewall before connecting to the Device Access Box.]

As per previous builds and accepted configuration, we use Endothermic Firestop Caulking to seal the passageways of all piping going through the firewall and the resin impregnated wood blocks in the upper section where the coolant lines and electrical harness pass from the engine compartment to the baselight. Bulkhead fittings are not used and would require a major redesign resulting in reduced access for maintenance. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 161: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 198

DATE April 29th, 2019

SECTION_3.8.1.5 Device Cabling to Device Access Box_ PAGE NO._152_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Any device which is located beyond a firewall shall have a suitable waterproof and fireproof bulkhead connector installed at the firewall before connecting to the Device Access Box.]

Please clarify what is meant by the Device Access Box.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED

COMMENTS: The equipment in the ITS cabinet.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 162: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 199

DATE April 29th, 2019

SECTION_3.8.1.5 Device Cabling to Device Access Box_ PAGE NO._152/153_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The wiring shall be shielded, color coded and clearly numbered with a wiring code, and in a common sheath.]

Wire shielding is used where required only and a common sheath is used for multi-conductors only. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 163: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 200

DATE April 29th, 2019

SECTION_3.8.1.7 Video Surveillance System_ PAGE NO._154_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[4. Exterior and interior cameras must be at least HD720 and IP (real time view for operator).]

IP and HD720 will be provided for cameras' primary stream. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 164: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 201

DATE April 29th, 2019

SECTION_3.8.1.7.1 Deliverables_ PAGE NO._155_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[k. Surveillance system has received the designation of the Qualified Anti-Terrorism Technology (QATT) under the Department of Homeland Security’s SAFETY Act.]

As per information from the Video Surveillance supplier, they have not received the Qualified-Anti-Terrorism Technology (QATT) designation yet. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 165: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 202

DATE April 29th, 2019

SECTION_3.8.1.7.1 Deliverables/3.8.1.7.3 Digital Video Recorder (DVR) General Requirements_ PAGE NO._154/ 164_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[38 Cameras]

We request approval to use the same IR settings as last order. Please note that the forward facing camera does not have IR illumination.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 166: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 203

DATE April 29th, 2019

SECTION_3.8.1.7.3 Digital Video Recorder (DVR) General Requirements_ PAGE NO._155_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[1. Environmental Performance: Temperature range (recording) within a range of 25 degrees, F to 130 degrees F.]

As per information from supplier, temperature for recording is 32F to 158F. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 167: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 204

DATE April 29th, 2019

SECTION_3.8.1.7.3 Digital Video Recorder (DVR) General Requirements_ PAGE NO._156_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[3 Emergency Powerb. Power source shall be maintenance-free and have an expected service life of at least five (5) years.]

We would like to clarify that the battery life of systems currently in service with Houston Metro is rated for 3 years. We request your approval for a 3 year service life for the battery.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 168: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 205

DATE April 29th, 2019

SECTION_3.8.1.7.3 Digital Video Recorder (DVR) General Requirements_ PAGE NO._159_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[17 Sensor Parameters]

The recorder is capable of acquiring and processing the required input Sensor Parameters, however the viewing software presently does not support appending this data to the video image. Metadata can be displayed in a separate window of the viewing software. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 169: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 206

DATE April 29th, 2019

SECTION_3.8.1.7.3 Digital Video Recorder (DVR) General Requirements_ PAGE NO._161_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[25 Event Save Switch]

Most systems do not keep a cache memory. The 20 seconds footage prior alarm activation won't be stored at 30 FPS but at 15FPS. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 170: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 207

DATE April 29th, 2019

SECTION_3.8.1.7.3 Digital Video Recorder (DVR) General Requirements_ PAGE NO._164_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[37 Decoding and Authentication]

As per information from system supplier:Video and files are protected per file, not per frame. Video is authenticated by proprietary encryption protocol/file format. Video will NOT play if changed in any way. We therefore request that this requirement be removed.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 171: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 208

DATE April 29th, 2019

SECTION_3.8.1.7.3 Digital Video Recorder (DVR) General Requirements_ PAGE NO._164/165_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[38 Camerasa. The location of ten (10) cameras to be installed in the general locations shown below shall be determined and require approval by METRO during the preproduction conference (See Appendix 2, Preproduction Conference, Item PPC 30).b. Exterior cameras and their housings shall be of such design and construction as to preclude water leakage into bus.d. Camera lens selection shall be appropriate to the desired areas of coverage, that is, provide maximum coverage to the area being recorded without sacrificing image quality and shall be determined and require approval by METRO during the preproduction conference with final adjustments made during pilot bus construction. The camera system representative shall be present during the Preproduction conference when camera system setup is being discussed. (See Appendix 2, Preproduction Conference, Item PPC 31).e. Cameras shall be installed in vandal-resistant housings using installation methods and hardware appropriate to ensuring stable, solid operation.f. Camera cabling shall be continuous from DVR to camera with no interconnections.]

We request approval to provide the same camera layout as per the previous order.

METRO'S RESPONSE:

APPROVED

DENIED

APPROVED AS MODIFIED X

COMMENTS: The specification requires 11 camera total.

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 172: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 209

DATE April 29th, 2019

SECTION_3.8.1.7.3 Digital Video Recorder (DVR) General Requirements_ PAGE NO._156_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[6 Troubleshooting and Maintenance]

Our offer will include a recorder that supports cellular connectivity.However, we propose to have it WIFI ready only as per previous order. Please confirm your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 173: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 210

DATE April 29th, 2019

SECTION_3.8.1.7.3 Digital Video Recorder (DVR) General Requirements_ PAGE NO._159_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[18 Digital Sensors and Devices

Shall support at least ten SAE-J1939 devices. System shall fully integrate with J1939 CAN-bus, to include support for diagnostic message reporting of video loss per camera, NVR alarm events, 3-axis accelerometer events, hard drive status, system temperature status, bus alarm acknowledgement and roll call acknowledgement.]

We request approval to provide the same system capabilities as per the previous order.

METRO'S RESPONSE:

APPROVED X DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 174: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 211

DATE April 29th, 2019

SECTION_3.8.1.7.3 Digital Video Recorder (DVR) General Requirements_ PAGE NO._159/162_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[19 Scripting26 Removable Storage Unit]

Systems offered are capable of recording multiple differing frame rates and resolutions per camera concurrently, however 2000 hours (83 days) of video retention at 30 frames per second per camera is not feasible. Following are estimates for storage retention based on 4 CIF which is the greatest required resolution noted in the specification. Additional estimates can be provided based on different parameters:

2TB SSD - Estimated Storage is Approximately 27 Days based on a 20 hour run day.

We request your approval for 27 days storage based on 20 hours run per day.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 175: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 212

DATE April 29th, 2019

SECTION_3.8.2.1 Compartment_ PAGE NO._167/168_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[A compartment shall be provided to accommodate communications and electronics control equipment near the Operator's seat. The electronic equipment compartment shall contain four (4) pull out shelves capable of withstanding one hundred (100) pounds of equipment weight per shelf and must be shock mounted.

Power requirements in the compartment are 24VDC Constant, 24VDC Ignition, 12VDC Constant, 12VDC Ignition, Battery Ground, and Chassis Ground. A 30 amp breaker shall be provided for each 12VDC and 24VDC power source in the compartment. All power provided in the radio compartment shall be conditioned.

The minimum total volume of radio equipment which shall be accommodated will be 20,400 cubic inches. The electronic cabinet shall be mounted on top of the street side wheel well. Each individual shelf shall be illuminated.]

The Proposer proposes its newest ITS cabinet which eliminates the need for sliding trays. Please see the RFA Attachment3.8.2.1. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 176: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 213

DATE April 29th, 2019

SECTION_3.9.7.1 Fire Detection_ PAGE NO._171_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[Programmable Heat Detectors (PHD’s) shall be solid state devices that have customizable individual set points which can be set by user/design engineer.]

Amerex PHD's are no longer available. We request approval to provide the Amerex Thermostat at 350 degrees F.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 177: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 214

DATE April 29th, 2019

SECTION_3.9.7.2 Extinguisher_ PAGE NO._172_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The actuator valve shall be capable of releasing suppression agent at the rate of .8 seconds per pound.]

The Amerex agent is released at a rate of 5lbs every 15 seconds, this is measured at pounds per second and not seconds per pound. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 178: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 215

DATE April 29th, 2019

SECTION_7.1 Requirements_ PAGE NO._220_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The bus manufacturer shall provide wiring schematic run sheets prior to production of the pilot and shall provide final as-built drawings prior to production of the 10th bus. The wiring layout shall be determined and require approval by METRO during the preproduction conference. Schematic runs will be on both computer disks and in book form (See Appendix 2, Preproduction Conference, Item PPC35) (Deliverable, See Appendix No.1, Item D54).]

Drawings are sensitive information. We understand that METRO will make every effort to protect these documents. However, in a project such as this one, several suppliers shall provide confidential information to The Proposer, and The Proposer itself shall be producing intellectual property that must be protected. Referring to "and shall provide final as built drawings", The Proposer understands that METRO requires finalized wiring schematics only for item D14 and D54. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 179: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 216

DATE April 29th, 2019

SECTION_8.2.4 Interior Noise_ PAGE NO._229_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The bus accelerating at full throttle from a standing start to forty-five (45) MPH and back to zero (0) on level pavement.]

We request your approval to test the bus accelerating at full throttle from standstill to thirty five (35) MPH as per APTA white book requirement.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 180: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 217

DATE April 29th, 2019

SECTION_8.2.4 Interior Noise_ PAGE NO._230_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[With the bus stationary, the interior noise shall be less than 79 dBA.With the bus accelerating, the interior noise shall be less than 83 dBA.]

For the interior noise test, we request your approval to measure the noise level in LAeq.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 181: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 218

DATE April 29th, 2019

SECTION_8.2.4 Interior Noise_ PAGE NO._229_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[All openings will be closed and all accessories will be operating during the test.]

During the interior acceleration noise test for the measurement at the driver location, we request your approval to have the front windshield defroster fan and the overhead driver fan at their lowest setting, as these fans are not used simultaneously in service

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager

Page 182: 12 REQUEST FOR APPROVAL (RFA FORM) · Web view12 REQUEST FOR APPROVAL (RFA FORM) (NOTE: See next page for instructions on the use of this form – must be submitted in Word format)

IFB 4019000082 Contract No.

12 REQUEST FOR APPROVAL (RFA FORM)

(NOTE: See next page for instructions on the use of this form – must be submitted in Word format )

SOLICITATION/CONTRACT NO. IFB 4019000082

MANUFACTURER Nova Bus REPRESENTATIVE Julie Laplante

RFA NO._RFA # 219

DATE April 29th, 2019

SECTION_SECTION IV - DELIVERIES OR PERFORMANCE ARTICLES3 ITEMS PURCHASED, DELIVERY AND COMPENSATION_ PAGE NO._4_ PARAGRAPH NO.

MANUFACTURER'S REQUEST:

[The Contractor shall provide METRO with all manufacturing and assembly diagrams for the pilot bus no less than 10-business days prior to the start of the pilot bus assembly.]

In reference to the statement "B. The Contractor shall provide METRO with all manufacturing and assembly diagrams for the pilot bus", our policy on manufacturing and assembly diagrams is to make this information available on site only. Should Metro request to review this information in advance, we will make these documents available on site for review only. We request your approval.

METRO'S RESPONSE:

APPROVED X

DENIED

APPROVED AS MODIFIED

COMMENTS:

APPROVED BY: DATE:Andrei Dragomir 5/6/2019Project Manager