  • SQUARE 959LOTS 32 & 33

    ?????? ?????? ??????

    ??????

    ??????

    ???????

    H STREET, N.E.

    10th

    STR

    EE

    T, N

    .E.

    SO

    UTH

    75.

    00'

    NO

    RTH

    75.

    00'

    EAST 33.00'

    WEST 33.00'

    2,475 s.f.

    EX 8" W (2079-7) (9-7-09)EX 8" W (2079-8) (9-14-09)

    EX

    8" W

    (TE

    -J20

    ) (8-

    24-9

    1)

    EX

    8" W

    (239

    74) (

    11-1

    4-47

    )

    EX

    12"

    GA

    S

    EX

    2" G

    AS

    EX

    12"

    GA

    S

    EX 15" S (78-41)

    EX

    18"

    S (7

    5-29

    8)

    ????

    EXISTING CONDITIONS SURVEY

    NO. REVISIONSDATE

    PHONE (301)-262-1630

    1776 I STREET NW 9TH FLOOR #90030

    FAX (301)-262-1680WASHINGTON, DC 20006 WWW.JASEDLLC.COM

    DRAWN BY: JAS

    DATE: OCTOBER 2012

    SCALE: 1" = 10'

    SHEET NO.:

    DWG FILE: 195-SITEPLAN.DWG

    WASHINGTON, D.C.NORTHEAST

    LOTS 32 & 33 - SQUARE 9591001 H STREET

    VICINITY MAP

    C-100

    1. The measured horizontal datum is based on the land records of the office of the surveyorof the district of columbia.

    2. Vertical datum is based on dcwasa sewer invert = 28.81 located at the south east cornerof 10th Street N.E. and H street N.E.

    3. Topography and planimetric locations shown hereon are field run 1-foot contour intervalsby Deetec Engineers & Surveyors in September 2012.

    4. Utility locations shown hereon are based on field observations and available records.Their locations are to be considered approximate and must be verified by the appropriateutility provider and located by test pitting prior to any construction.

    GENERAL NOTES

  • SQUARE 959LOTS 32 & 33

    ?????? ?????? ??????

    ??????

    ??????

    ???????

    H STREET, N.E.

    10th

    STR

    EE

    T, N

    .E.

    SO

    UTH

    75.

    00'

    NO

    RTH

    75.

    00'

    EAST 33.00'

    WEST 33.00'

    2,475 s.f.

    EX 8" W (2079-7) (9-7-09)EX 8" W (2079-8) (9-14-09)

    EX

    8" W

    (TE

    -J20

    ) (8-

    24-9

    1)

    EX

    8" W

    (239

    74) (

    11-1

    4-47

    )

    EX

    12"

    GA

    S

    EX

    2" G

    AS

    EX

    12"

    GA

    S

    EX 15" S (78-41)

    EX

    18"

    S (7

    5-29

    8)

    EXISTING FACADEALONG H STREETTO BE PRESERVED

    EXISTING REAR WALLTO BE PRESERVED

    REMOVE EXISTINGDISPLAY WINDOW

    REMOVE EXISTINGDISPLAY WINDOW

    REMOVE EXISTINGBUILDING WALLS

    REMOVE ALL PERTINENTSTRUCTURAL COLUMNS,WALLS, AND BUILDINGELEMENTS WITHIN BUILDINGSTRUCTURE AS NECESSARY

    1" WATER LATERALFROM PUBLIC MAIN

    REMOVE EXISTING1" DOMESTIC LINE

    DISCONNECT EXISTING

    REMOVE EXISTINGMETER & VALVE ????

    DEMOLITION PLAN

    NO. REVISIONSDATE

    PHONE (301)-262-1630

    1776 I STREET NW 9TH FLOOR #90030

    FAX (301)-262-1680WASHINGTON, DC 20006 WWW.JASEDLLC.COM

    DRAWN BY: JAS

    DATE: OCTOBER 2012

    SCALE: 1" = 10'

    SHEET NO.:

    DWG FILE: 195-SITEPLAN.DWG

    WASHINGTON, D.C.NORTHEAST

    LOTS 32 & 33 - SQUARE 9591001 H STREET

    CALL "MISS UTILITY" AT 1-800-257-7777, 48 HOURS PRIOR TO THESTART OF WORK. THE EXCAVATOR MUST NOTIFY ALL PUBLIC UTILITYCOMPANIES WITH UNDERGROUND FACILITIES IN THE AREA OFPROPOSED EXCAVATION AND HAVE THOSE FACILITIES LOCATED BYTHE UTILITY COMPANIES PRIOR TO COMMENCING EXCAVATION.

    C-200

    Utility locations shown hereon are based on field observations and available records. Theirlocations are to be considered approximate and must be verified by the appropriate utilityprovider and located by test pitting prior to any construction.

    VICINITY MAP

  • SQUARE 959LOTS 32 & 33

    ?????? ?????? ??????

    ??????

    ??????

    ???????

    H STREET, N.E.

    10th

    STR

    EE

    T, N

    .E.

    SO

    UTH

    75.

    00'

    NO

    RTH

    75.

    00'

    EAST 33.00'

    WEST 33.00'

    2,475 s.f.

    PROP. CURB COCK

    PROP. 2" METER PITEX 8" W (2079-7) (9-7-09)EX 8" W (2079-8) (9-14-09)

    EX

    8" W

    (TE

    -J20

    ) (8-

    24-9

    1)

    EX

    8" W

    (239

    74) (

    11-1

    4-47

    )

    EX

    12"

    GA

    S

    EX

    2" G

    AS

    EX

    12"

    GA

    S

    EX 15" S (78-41)

    EX

    18"

    S (7

    5-29

    8)

    PROP. C/O

    ANY EXISTING DOMESTICWATER SERVICE ANDMETER TO BE REMOVED

    CONNECT TO EXISTING 8"WATER WITH 8"x6" TEEAND 8" SLEEVE

    PROP. 6" GATE VALVE

    PROP. 6"x4" REDUCERPROP 2" DOMEST TAP

    LINE TO EXIST. 15"CONNECT STORM

    COMBINED SEWER

    FIRE SERVICE DOUBLE CHECKDETECTOR ASSEMBLY/BACKFLOWPREVENTER TO BE INSTALLEDINSIDE BUILDING. DEVICE SHALLBE A "WATTS" SERIES 709 DCDAOR APPROVED EQUIV. DEVICESHALL MEET ASSE STD 1048.

    DOMESTIC SERVICE DOUBLECHECK VALVE ASSEMBLYBACKFLOW PREVENTERSHALL BE A WATT LF709 OREQUAL & MEET ASSE 1015.

    CONNECT TO EXIST.15" COMBINED SEWER

    CONC THRUST BLOCK

    PROP CORPORATION STOP

    PROP BLDG

    1" WATER LATERALFROM PUBLIC MAIN

    DISCONNECT EXISTING

    ????

    SITE & UTILITY PLAN

    NO. REVISIONSDATE

    PHONE (301)-262-1630

    1776 I STREET NW 9TH FLOOR #90030

    FAX (301)-262-1680WASHINGTON, DC 20006 WWW.JASEDLLC.COM

    DRAWN BY: JAS

    DATE: OCTOBER 2012

    SCALE: 1" = 10'

    SHEET NO.:

    DWG FILE: 195-SITEPLAN.DWG

    WASHINGTON, D.C.NORTHEAST

    LOTS 32 & 33 - SQUARE 9591001 H STREET

    CALL "MISS UTILITY" AT 1-800-257-7777, 48 HOURS PRIOR TO THESTART OF WORK. THE EXCAVATOR MUST NOTIFY ALL PUBLIC UTILITYCOMPANIES WITH UNDERGROUND FACILITIES IN THE AREA OFPROPOSED EXCAVATION AND HAVE THOSE FACILITIES LOCATED BYTHE UTILITY COMPANIES PRIOR TO COMMENCING EXCAVATION.

    C-300

    GENERAL CONSTRUCTION NOTES

    1. Contact: Notify the following DC Water departments prior to the commencement of utilityconstruction:

    a) Construction Inspection Section at 202-787-4024 at least two weeks prior to thecommencement of utility construction to schedule pre-construction meeting.

    b) Water Services at 202-612-3400 or 3460 at least one week prior to the commencement ofutility construction.

    c) Sewer Services at 202-264-3824 or 3829 at least one week prior to the commencement ofutility construction.

    2. Standards: All construction, materials, and appurtenances shall comply with the latest editions ofthe DC Water Project Design Manual, Standard Details & Design Guidelines, and Specifications.

    3. Lead Service Replacement: If this project includes the replacement of a water main that hasexisting lead water service laterals, the Contractor is responsible for contacting the DC WaterConstruction Inspection Section at 202-787-4024 at least 90 days prior to construction to allowadequate time to initiate standard lead service replacement protocol.

    4. Owner Responsibility: The Owner is responsible for all work and costs associated withexcavation, installation, and restoration of public space to perform a water/sewerconnection/abandonment. Once the Contractor has obtained a Public Space Permit he/she mustthen contact DC Water prior to performing the excavation to install/inspect the utility work. TheOwner shall be held responsible for all damages to existing structures and utilities caused byconstruction activity.

    5. DC Water Responsibility: DC Water is only responsible for installation of small water service taps(2" diameter and less) to the public main, small water service tap removals from the public main,furnishing & installing the meter in public space, and inspection of work performed on the publicsystems.

    6. Miss Utility: Contact Miss Utility at 800-257-7777 48 hours before any digging.

    7. Plan Set: A set of signed & sealed and DC Water stamped Plans shall be kept at all times at thejob site on which all changes or variations in the work, including all existing utilities, are to berecorded and/or corrected daily.

    8. Abandonments: The Owner must physically disconnect existing water, sewer, and storm lateralsthat are to be abandoned at their connection to the public main.

    9. Unmetered Water: There shall be no unmetered connections to the City's water system, includingconnections bypassing meters for testing on-site plumbing or for obtaining construction water.

    10. Pressure Testing Against Valves: Pressure testing against valves will not be allowed.

    11. Water Meter Installation: To schedule the installation of a domestic water meter contact DCWater at 202-612-3600. DC Water will furnish and install the meter after the connection to the mainhas been made and the meter pit/vault has been installed.

    12. Cross Contamination Control: ASSE 1048 certified backflow prevention assemblies are requiredon all fire services and are to be located inside the building (unless an external location isnecessary or required by DC Water) where it is supplied, owned, operated, and maintained by theOwner. DC Water does not furnish nor install fire double check detector fire protection backflowprevention assemblies.

    13. Utility Service Disruptions: Phase all utility work to maintain utility services to thesurrounding area during all phases of construction. Limit required utility shut-downs innumber and duration. Coordinate these shut downs with DC Water ConstructionInspection staff.

    14. Water Valve Operation: The Contractor is required to coordinate with DC Water for allnecessary water main shut downs with adequate advanced notice. Only DC Wateremployees may shut down a public water main. A certified plumber is only authorized toturn off valves inside meter pits.

    15. Water Gate Valve Location: Locate gate valves for domestic and fire services asclose to the public water main tee as possible. However, if necessary adjustments arerequired due to conflicts, coordinate with a DC Water inspector.

    16. Material: The Contractor is responsible for submitting shop cuts to the appropriateDC Water office for approval or obtaining a DC Water approval stamp for all work inpublic space in advance of installation. Only approved materials may be used.

    17. Temporary Conditions Minimum Cover: A nominal four feet of cover is required for allwater mains at final grade. Cover of less than four feet requires DC WATER approval.

    18. As-Built: Developers, contractors and/or plumbers must submit final constructionas-built information to the appropriate DC Water inspector(s) for review and approval,upon completion of installation of new services or abandonment of existing services.When the final as-built is approved the deposit will be returned to the applicant. See DCWater as-built requirements for additional information.

    19. Conflicts: The Contractor shall field verify the location of existing DC Waterinfrastructure prior to installation of proposed utilities. A minimum of one foot vertical andfive feet horizontal clearance from other utilities shall be maintained.

    20. Fire Hydrant Use: The use of a fire hydrant as a water source is prohibited unless apermit has been obtained from DC Water for use of a specific hydrant(s). Daily orextended use permits can be obtained from the DC Water Permit OperationsDepartment.

    21. Fire Hydrant Status: The Contractor shall notify FEMS at 202-277-1889, prior totaking any fire hydrant out of service or rendering any hydrant inaccessible for anyreason. FEMS is also to be provided with the location of any new installation of privatefire hydrants.

    22. DC Water Safety Office: The DC Water Safety Office can be contacted at202-787-4350.

    CONSTRUCTION NARRATIVE:

    The property is located at 1001 H Street, N.E. Washington D.C. and the current use is an empty retailstore. The owner of the property wishes to perform structural modifications and additions to convert it intoa restaurant / bar . The existing 1" domestic water service will be upgraded to a 2" copper, a new 4" fireline will be installed, along with a new 4" sanitary and 4" storm line.

    PROP 4" FIRE

    HOR. 1" = 10'VERT. 1" = 5'

    4" FIRE PROFILEHOR. 1" = 10'VERT. 1" = 5'

    4" SANITARY PROFILE

    PROP 4" SAN@ 2.00%

    HOR. 1" = 10'VERT. 1" = 5'

    4" STORM PROFILE

    PROP 4" STORM@ 2.00%

    Utility locations shown hereon are based on field observations and available records. Theirlocations are to be considered approximate and must be verified by the appropriate utilityprovider and located by test pitting prior to any construction.

    VICINITY MAP

  • SITE & UTILITY PLAN DETAILS

    NO. REVISIONSDATE

    PHONE (301)-262-1630

    1776 I STREET NW 9TH FLOOR #90030

    FAX (301)-262-1680WASHINGTON, DC 20006 WWW.JASEDLLC.COM

    DRAWN BY: JAS

    DATE: OCTOBER 2012

    SCALE: AS NOTED

    SHEET NO.:

    DWG FILE: 195-SITEPLAN.DWG

    WASHINGTON, D.C.NORTHEAST

    LOTS 32 & 33 - SQUARE 9591001 H STREET

    C-400

    ?

  • SITE & UTILITY PLAN DETAILS

    NO. REVISIONSDATE

    PHONE (301)-262-1630

    1776 I STREET NW 9TH FLOOR #90030

    FAX (301)-262-1680WASHINGTON, DC 20006 WWW.JASEDLLC.COM

    DRAWN BY: JAS

    DATE: OCTOBER 2012

    SCALE: AS NOTED

    SHEET NO.:

    DWG FILE: 195-SITEPLAN.DWG

    WASHINGTON, D.C.NORTHEAST

    LOTS 32 & 33 - SQUARE 9591001 H STREET

    C-500

  • SSF

    SBD

    SQUARE 959LOTS 32 & 33

    ?????? ?????? ??????

    ??????

    ??????

    ???????

    H STREET, N.E.

    10th

    STR

    EE

    T, N

    .E.

    SO

    UTH

    75.

    00'

    NO

    RTH

    75.

    00'

    EAST 33.00'

    WEST 33.00'

    2,475 s.f.

    EX 8" W (2079-7) (9-7-09)EX 8" W (2079-8) (9-14-09)

    EX

    8" W

    (TE

    -J20

    ) (8-

    24-9

    1)

    EX

    8" W

    (239

    74) (

    11-1

    4-47

    )

    EX

    12"

    GA

    S

    EX

    2" G

    AS

    EX

    12"

    GA

    S

    EX 15" S (78-41)

    EX

    18"

    S (7

    5-29

    8)

    SBD

    SB

    D

    SBD

    SBD

    SB

    DS

    BD

    SB

    DS

    BD

    SB

    DS

    BD

    750 s.f.STOCKPILE

    AREA

    PROP BLDG

    ????

    SEDIMENT CONTROL PLAN

    NO. REVISIONSDATE

    PHONE (301)-262-1630

    1776 I STREET NW 9TH FLOOR #90030

    FAX (301)-262-1680WASHINGTON, DC 20006 WWW.JASEDLLC.COM

    DRAWN BY: JAS

    DATE: OCTOBER 2012

    SCALE: 1" = 10'

    SHEET NO.:

    DWG FILE: 195-SITEPLAN.DWG

    WASHINGTON, D.C.NORTHEAST

    LOTS 32 & 33 - SQUARE 9591001 H STREET

    CALL "MISS UTILITY" AT 1-800-257-7777, 48 HOURS PRIOR TO THESTART OF WORK. THE EXCAVATOR MUST NOTIFY ALL PUBLIC UTILITYCOMPANIES WITH UNDERGROUND FACILITIES IN THE AREA OFPROPOSED EXCAVATION AND HAVE THOSE FACILITIES LOCATED BYTHE UTILITY COMPANIES PRIOR TO COMMENCING EXCAVATION.

    C-600

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTURE

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHWATERSHED PROTECTION DIVISIONU.S. DEPARTMENT OF AGRICULTURE

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTURE

    NATURAL RESOURCE CONSERVATION SERVICE DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHWATERSHED PROTECTION DIVISION WATERSHED PROTECTION DIVISION

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTH

    The total disturbed area is 4,100 s.f.

    The total estimated fill for the project is determined to be 0 c.y.The total estimated excavation for the project is determined to be 850 c.y.

    DESIGN CERTIFICATION

    LEGEND

    CONSTRUCTION NARRATIVE:

    The property is located at 1001 H Street, N.E. Washington D.C. and the current use is an empty retailstore. The owner of the property wishes to perform structural modifications and additions to convert it intoa restaurant / bar. Straw bale dike should be installed around the proposed excavations. The sequence ofconstruction should be followed for installation of all sediment control devices. Additional sedimentcontrols should be installed where possible and as instructed by the sediment control inspector. Aftersediment control devices have been installed, the proposed construction can begin. After site work iscompleted, stabilize all disturbed areas and remove sediment control devices with the approval of theinspector.

    Stormwater management is not required because the disturbed area is less than 5,000 s.f.

    EXISTING CONTOUR

    EXISTING SPOT

    SILT FENCE

    STRAW BALE DIKE

    LIMITS OF DISTURBANCE

    VICINITY MAP

  • SEDIMENT CONTROL PLAN NOTES & CERTIFICATIONS

    NO. REVISIONSDATE

    PHONE (301)-262-1630

    1776 I STREET NW 9TH FLOOR #90030

    FAX (301)-262-1680WASHINGTON, DC 20006 WWW.JASEDLLC.COM

    DRAWN BY: JAS

    DATE: OCTOBER 2012

    SCALE: AS NOTED

    SHEET NO.:

    DWG FILE: 195-SITEPLAN.DWG

    WASHINGTON, D.C.NORTHEAST

    LOTS 32 & 33 - SQUARE 9591001 H STREET

    C-700

    H/ USE ON POORLY DRAINED SOILS-DITCHES OR WATERWAYS, BIRDSFOOT TREEFOILIS BEST FOR ZONES 5B, 6A, ABOVE 2,000 FT

    1/4-1/2WEEPING

    MAY BE USED AS A NURSE CROP FOR MID-SUMMER PERMANENT SEEDINGS. ADD 2 LBS/AC TO PERMANENT SEED MIXMAY BE USED AS NURSE CROP FOR MID-SUMMER PERMANENT SEEDINGS. ADD 10 LBS/AC TO THE PERMANENT SEEDING MIX

    BETWEEN FALL AND SPRING SEEDING DATES, USE MULCH ONLY IF GROUND IS FROZEN AND RESEED WHEN THAWED

    MAY BE USED AS A NURSE CROP FOR LATE FALL/EARLY WINTER PERMANENT SEEDINGS, ADD 56 LBS/AC TO THE PERMANENT SEEDING MIXTURE

    REFER TO FIGURE A - ADOPTED FROM USDA, ARS MISCELLANEOUS PUBLICATION #1475, JANUARY 1990

    40

    41

    42

    TEMPORARY SEED MIX

    39

    LOVEGRASS

    ANNUAL RYEGRASS

    MILLET -

    -

    X1/4-1/2

    1/2

    37APPLICABLE ON SLOPES OF 3:1 OR FLATTER

    36

    41

    42

    .094 lbs

    50 lbs

    50 lbs

    38

    1.15

    1.15 11/1 11/1

    - -X--X

    XX --

    X - ---X

    7a and 7b

    TEMPORARY SEEDING RATES, DEPTHS, AND DATES

    4/30INCHESPER ACRE SQ. FT.

    CHOOSE ONE:BARLEYOATSRYE

    BARLEY OR

    FOXTAIL MILLETRYE PLUS X

    X

    XXX1-2

    1-21-2

    1

    39

    40

    2.5 bu. (122 lbs)3.0 bu. (96 lbs)2.5 bu. (140 lbs)

    150 lbs

    3.22

    2.802.21

    3.45

    36PLANTING

    DEPTH

    2/1-

    SPECIES MINIMUM SEEDING RATES

    LBS/100010/317/315/314/30 8/14 11/1511/308/14

    -X

    10/1BYBY

    10/15

    X-

    10/15-X

    BY

    10/1510/15XX

    XXX

    X XXX

    X

    ----

    --

    --- X

    XXX

    XX

    3837HARDNESS ZONES AND SEEDING DATES6a and 5b6b

    8/1-6/1-3/15-3/1- 5/1- 8/15-8/15-5/1-

    STANDARD AND SPECIFICATION FOR DUST CONTROL

    J/ TALL FESCUE MAY BE SEEDED ALONE. THE HARD FESCUE PROVIDES BETTER SHADE TOLERANCE AND PRODUCES A BETTER STANDI/ USE IN AREAS OF MOIST SHADE. POA TRIVIALIS THRIVES IN WET SHADY AREAS

    K/ LOW FERTILITY GRASS. REQUIRES INFREQUENT MOWING. GOOD COMPANION FOR WILDFLOWERS

    XX7a

    .2310BIRDSFOOT TREEFOIL (19%)

    XX7a

    E/ USE ON LOW MAINTENANCE, STEEP SLOPES. USE TALL FESCUE IN DRAUGHTY COND. CROWN VETCH BEST FOR 5B, 6A, 6B

    G/ WEEPING LOVEGRASS MAY BE SEEDED WITH TALL FESCUE IN MID-SUMMER. SERECIA LESPEDEZA IS BEST SUITED FOR ZONES 7A & 7BF/ SUITABLE FOR SEEDING IN MID-SUMMER.

    D/ BEST USE ON SHADY SLOPES NOT ON POORLY DRAINED CLAYSC/ POPULAR MIX-PRODUCES PERMANENT GROUNDCOVER QUICKLY. BLUEGRASS THICKNESS STANDB/ USED IN MEDIAN AREAS BY SHA. SHADE TOLERANTA/ USED BY SHA ON SLOPED AREAS. ADD A LEGUME FOR SLOPES > 3:1

    HARD FESCUE (100%)11 1.7.75

    X7a X

    X

    X

    XX

    X

    X

    X

    6b

    6a

    5b

    7b

    MOIST TO DRY

    X

    K

    10 .23BIRDSFOOT TREEFOIL (7%)

    HARD FESCUE (20%)TALL FESCUE (80%)10 120

    303.4.69

    TALL FESCUE (86%)POA TRIVIALIS (7%)

    9.2310

    125 2.9

    XX6aDRY

    X

    X

    XX

    X

    X

    XX6b

    5b

    6a

    6b

    WET TO DRY J

    XX

    XX

    X

    X

    5b

    7b

    7a

    6b

    MODERATELYWET TO

    X

    X

    I

    REED CANARYGRASS (75%)REDTOP (6%) PLUS

    8 .92403 .07

    35

    SERECIA LESPEDEZA (83%)

    WEEPING LOVEGRASS (2%) PLUSTALL FESCUE (83%)

    WEEPING LOVEGRASS (17%)

    SERECIA LESPEDEZA (15%)

    7

    6

    1103

    2.5.07

    420

    .09

    .46

    20 .46

    XX

    XX

    X

    XX

    X

    X

    5b

    6b

    7a

    7b

    XX6aDRYMODERATELYWET TO

    X

    X

    H

    X XX

    X

    X

    XX

    X

    X7b

    7a

    6a

    5b

    X XX6aDRY

    DRY

    DRY TO VERY

    DRY TO VERY

    G

    F

    110 2.5TALL FESCUE (85%) OR,

    FLATPEAPLUS CROWNVETCH ORPERENNIAL RYEGRASS (50%),

    5

    .4620

    2020

    .46

    .46

    PERENNIAL RYEGRASS (20%)CHEWINGS FESCUE (80%),RED FESCUE OR4 60 .92

    1560

    .34

    .92

    XX5b E

    XX

    X

    X

    X X

    7b

    7a

    6b

    6a

    MOIST TO DRY

    X

    X

    X

    X

    XX

    X

    X

    X

    6b

    6a

    5b

    7b

    MOIST TO DRY

    X

    D

    KENTUCKY BLUEGRASS (10%),

    REDTOP (10%)

    KENTUCKY BLUEGRASS (5%)PERENNIAL RYEGRASS (10%),TALL FESCUE (85%),3

    10 .23.3415

    125 2.9

    KENTUCKY BLUEGRASS (50%),

    REDTOP (5%)

    CREEPING RED FESCUE OR A HARD FESCUE (40%),2

    34

    3.4150

    XX

    X X

    X X

    XX6b

    5b

    6a

    6b

    MOIST TO DRY C

    X

    X

    X

    X

    XX5b

    7b

    6b

    7a

    XX6aDRY TO DRYMODERATELYMOIST TO

    X

    X

    B

    PERMANENT SEEDING FOR LOW MAINTENANCE AREAS

    SEED MIXMIX

    CANADA BLUEGRASS (10%),TALL FESCUE (75%),

    (USE CERTIFIED MATERIAL IF AVAILABLE)

    1

    31

    3.4150

    SQ FTLBS/1000LBS/AC

    PLANTING RATE33

    8/15-32

    XX5b

    3/1-5/15

    3/15-6/1 8/14

    5/16-10/1510/1

    8/1-6/2-7/31

    RECOMMENDED PLANTING DATES

    NESSZONES

    HARDI-USDASITE

    XX6a

    MOIST TO DRY

    CONDITIONS

    A

    S

    TE

    ON

    8/15-11/15

    37.0 STANDARDS AND SPECIFICATIONSFOR

    LAND GRADING

    DefinitionReshaping of the existing land surface in accordance with a plan as determined by engineering survey and layout.

    PurposeThe purpose of a land grading specification is to provide for erosion control and vegetative establishment on those areas where the existing landsurface is to be reshaped by grading according to plan.

    Design CriteriaThe grading plan should be based upon the incorporation of building designs and street layouts that fit and utilize existing topography anddesirable natural surroundings to avoid extreme grade modifications. Information submitted must provide sufficient topographic surveys and soilinvestigations to determine limitations that must be imposed on the grading operation related to slope stability, effect on adjacent properties anddrainage patterns, measures for drainage and water removal and vegetative treatment, etc.

    The plan must show existing and proposed contours of the area(s) to be graded. The plan shall also include practices for erosion control, slopestabilization, safe disposal of runoff water and drainage, such as waterways, lined ditches, reverse slope benches (include grade and crosssection), grade stabilization structures, retaining walls, and surface and subsurface drains. The plan shall also include phasing of these practices.The following shall be incorporated into the plan:

    1. Provisions shall be made to safely conduct surface runoff to storm drains, protected outlets or to stable water courses to insure that surfacerunoff will not damage slopes or other graded areas.

    2. Cut and fill slopes that are to be stabilized with grasses shall not be steeper than 2:1. (Where the slope is to be mowed the slope should be nosteeper than 3:1; 4:1 is preferred because of safety factors related to mowing steep slopes.) Slopes exceeding 2:1 shall require special designand stabilization considerations that shall be adequately shown on the plans.

    3. Reverse benches shall be provided whenever the vertical interval (height) of any 2:1 slope exceeds 20 feet; for 3:1 slope it shall be increasedto 30 feet and for 4:1 to 40 feet. Benches shall be located to divide the slope face as equally as possible and shall convey the water to a stableoutlet. Soils, seeps, rock outcrops , etc., shall also be taken into consideration when designing benches.

    a. Benches shall be a minimum of six-feet wide to provide for ease of maintenance.

    b. Benches shall be designed with a reverse slope of 6:1 or flatter to the toe of the upper slope and with a minimum of one foot in depth.Bench gradient to the outlet shall be between 2 percent and 3 percent, unless accompanied by appropriate design and computations.

    c. The flow length within a bench shall not exceed 800' unless accompanied by appropriate design and computations. For flow channelstabilization, see temporary swale.

    4. Surface water shall be diverted from the face of all cut and/or fill slopes by the use of earth dikes, ditches and swales or conveyed downslopeby the use of a designed structure, except where:

    a. The face of the slope is or shall be stabilized and the face of all graded slopes shall be protected from surface runoff until they arestabilized.

    b. The face of the slope shall not be subject to any concentrate flows of surface water such as from natural drainageways, graded swales,downspouts, etc.

    c. The face of the slope will be protected by special erosion control materials, to include, but not limited to: approved vegetativestabilization practices (see section G), rip-rap or other approved stabilization methods.

    5. Cut slopes occurring in ripable rock shall be serrated as shown in detail 70, Serrated Slopes on the following diagram. These serrations shallbe made with conventional equipment as the excavation is made. Each step or serration shall be constructed on the contour and will have stepscut at nominal two-foot intervals with nominal three-foot horizontal shelves. These steps will vary depending on the slope ratio or the cut slope.The nominal slope line is 1:5:1. These steps will weather and act to hold moisture, lime, fertilizer and seed thus producing a much quicker andlonger lived vegetative cover and better slope stabilization. Overland flow shall be diverted from the top of all serrated cut slopes and carried to asuitable outlet.

    6. Subsurface drainage shall be provided where necessary to intercept seepage that would otherwise adversely affect slope stability or createexcessively wet site conditions.

    7. Slopes shall not be created so close to property lines as to endanger adjoining properties without adequately protecting such properties againstsedimentation, erosion, slippage, settlement, subsidence or other related damages.

    8. Fill material shall be free of snow, ice, frozen materials, trash, brick, clay lumps, hazardous material, broken concrete, tree roots, sod, ashes,cinders, glass, plaster, orgainic matter, brush, logs, stumps, building debris and any other foreign material. It should be free of stones over two (2)inches in diameter where compacted by hand or mechanical tampers or over eight (8) inches in diameter where compacted by rollers or otherequipment. Frozen material shall not be placed in the fill nor shall the fill material be placed on a frozen foundation.

    9. Stockpiles, borrow areas and spoil shall be shown on the plans and shall be subject to the provisions of this Standard and Specifications.

    10. All disturbed areas shall be stabilized structurally or vegetatively in compliance with 42.0 Standards and Specifications for VegetativeStabilization.

    ??????????????

    1. The grading plans and specifications shall specify and delineate the use and extent of fills in accordance with the following classifications:

    ???????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????

    impaired by settlement.

    ????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????

    not be especially impaired by moderate settlement.

    ???????????????????????????????????????????????????????????????????????????????????????????????????????????

    ????????????????

    1. All class 1 and 2 fills shall consist of readily compactible soils meeting the following minimum requirements:

    a. Fill material shall be free of snow, ice, frozen materials, trash, clay lumps, hazardous materials, tree roots, sod, ashes, cinders, glass,plaster, orgainc matter, brush, logs, stumps, building debris, organic or other deleterious materials subject to decay, and highshrink-swell soils.

    b. Irreducible materials other than rock (such as concrete or brick) shall only be allowed only upon approval of the Watershed ProtectionDivision.

    c. No rock or approved irreducible material with a maximum dimension greater than eighteen (18) inches shall be buried or placed inany portion of the fill, with the top two and one-half (2-1/2) feet below finished grade, foundations, utility service connections havingnothing larger than eight (8) inches, unless permitted by the Building Official after receipt of a report by a geotechnical engineercertifying that he has investigated the property and the fill materials, and that a fill including oversized materials may be constructed tomeet the intent of the Watershed Protection Division.

    2. All class 3 fills shall meet the following minimum requirements:

    a. Irreducible materials other than rock (such as concrete or brick) shall only be allowed upon approval of the Watershed ProtectionDivision.

    b. Class 3 fills may include the more difficult to compact soils, at other than optimum moisture content; rock and similar approvedmaterials without limit to size provided no detectable voids are formed, into which overlying soils may later be washed; and top soil,intermittently layered with nonorganic soil. In other than rock gardens, at least twelve (12) inches of soil must cover all rock, or approvedirreducible materials with a maximum dimension greater than eight (8) inches.

    3. The material must be free of contamination levels of any pollutant which is, or may be considered to represent, a possible health hazard to thepublic or may be detrimental to surface or ground water quality, or which may cause damage to property or the drainage system.

    4. All fill material shall be free of hazardous materials and shall be in compliance with the applicable articles (article numbers 204, 206, 207.04,208, 804.02, 804.03, 804.04, 805.02) of the District of Columbia DPW Standard Specification for Highways and Structures 1996.

    ??????????????????

    1. Each layer of class 1 and class 2 fills shall be compacted at optimum moisture content (plus or minus two (2) percentage points), and to aminimum of ninetyfive (95) to ninety (90) percent, respectively, of maximum density as determined in the laboratory by the Standard Proctor Test(AASHTO T-99, ASTM D-698). Each layer of class 3 fills shall be compacted sufficiently to support customarily used tracked spreading equipmentand upon completion to be stable and after planting to prevent erosion. Other methods of compaction that the Director deems appropriate andresults in an equal or better quality of compaction for Class 1 and 2 fills may be accepted.

    a. Lower degrees of compaction may be permitted by the Watershed Protection Division after receipt of a report by a geotechnicalengineer certifying that the geotechnical engineer has investigated the subsoils of the site, has tested representative fill materials andthat, in the opinion of the geotechnical engineer, such lower degree of compaction will be adequate for the intended use of the fill.

    b. In-place (field) density shall be determined in accordance with the ASTM test Method D-1556-82E, D-2922-91 or AASHTO T-191-86,T-238-86.

    c. All fills shall be placed in approximately horizontal layers, each layer having a loose thickness of not more than eight (8) inches forclass 1, twelve (12) inches for class 2, and two (2) feet for class 3 fills. If approved by the Watershed Protection Division, thicker liftsmay be permitted only upon submittal of adequate density test documentation of limited test fills.

    ?????????????????????

    1. The top eight (8) inches of soil in cut, or the required class 2 fill sections to be used as subgrade for support of patios, building floor slabs,driveways, parking pads and lots, sidewalks, and other structures which would not be especially impaired by moderate settlement shall becompacted, or recompacted, to at least ninety (90%) of maximum density as determined by the Standard Proctor Test.

    Slopes

    1. Slopes of site grading drainage, and other improvements and facilities shall be determined by the preparer of the plan to suit the specific siteand in accordance with accepted engineering practice.

    a. No fill or cut shall be made which created an exposed surface steeper in slope than two (2) horizontal to one (1) vertical unlessspecifically waived by the Watershed Protection Division after receipt of a report by a geotechnical engineer certifying that the engineer????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????????

    to be used is of a low maintenance type and will effectively control erosion.

    b. The Watershed Protection Division may require that slopes be constructed with exposed surface flatter than those shown in Detail 69,or may require such other measures as the Watershed Protection Division deems necessary for stability and safety.

    c. Sides of temporary excavations made for foundations, buildings, and utility installations shall be protected, shored, or sloped as requiredby applicable District of Columbia regulations.

    42.0 STANDARDS AND SPECIFICATIONSFOR

    VEGETATIVE STABILIZATION

    DefinitionUsing vegetation as cover for barren soil to protect it from forces that cause erosion.

    PurposeVegetative Stabilization specifications are used to promote the establishment of vegetation on exposed soil. When soil is stabilized with vegetation, the soil isless likely to erode and more likely to allow infiltration of rainfall, thereby reducing sediment loads and runoff to downstream areas, and improving wildlifehabitat and visual resources.

    Conditions Where Practice AppliesThis practice shall be used on denuded areas as specified on the plans and may be used on highly erodible or critically eroding areas. This specification isdivided into Temporary Seeding, to quickly establish vegetative cover for short duration (up to one year), and Permanent Seeding, for long term vegetativecover. Examples of applicable areas for Temporary Seeding are temporary soil stockpiles, cleared areas being left idle between construction phases, earthdikes, etc. and for Permanent Seeding are lawns, dams, cut and fill slopes and other areas at final grade, former stockpile and staging areas, etc.

    Effects on Water Quality and QuantityPlanting vegetation in disturbed areas will have an effect on the water budget, especially on volumes and rates of runoff, infiltration, evaporation,transpiration, percolation, and groundwater recharge. Vegetation, over time, will increase organic matter content and improve the water holding capacity ofthe soil and subsequent plant growth. Vegetation will help reduce the movement of sediment, nutrients, and other chemicals carried by runoff to receivingwaters. Plants will also help protect groundwater supplies by assimilating those substances present within the root zone. Sediment control devices mustremain in place during grading, seedbed preparation, seeding, mulching and vegetative establishment to prevent large quantities of sediment and associatedchemicals and nutrients from washing into surface waters.

    Section I - Vegetative Stabilization Methods and Materials

    A. Site Preparation

    i. Install erosion and sediment control structures (either temporary or permanent) such as diversions, grade stabilization structures, bermswaterways, or sediment control basins.

    ii. Perform all grading operations at right angles to the slope. Final grading and shaping is not usually necessary for temporary seeding.

    iii. Schedule required soil tests to determine soil amendment composition and application rates for sites having disturbed area over 5 acres.

    B. Soil Amendments (Fertilizer and Lime Specifications)

    i. Soil tests must be performed to determine the exact ratios and application rates for both lime and fertilizer on sites having disturbed areas over 5acres. Soil analysis may be performed by the University of the District of Columbia or a certified commercial laboratory. Soil samples taken forengineering purposes may also be used for chemical analyses.

    ii. Fertilizers shall be uniform in composition, free flowing and suitable for accurate application by approved equipment. Manure may be substitutedfor fertilizer with prior approval from the appropriate approval authority. Fertilizers shall all be delivered to the site fully labeled according to theapplicable state fertilizer laws and shall bear the name, trade name or trademark and warrantee of the producer.

    iii. Lime materials shall be ground limestone (hydrated or burnt lime may be substituted) which contains at least 50% total oxides (calcium oxide plusmagnesium oxide). Limestone shall be ground to such fineness that at least 50% will pass through a #100 mesh sieve and 98 - 100% will passthrough a #20 mesh sieve.

    iv. Incorporate lime and fertilizer into the top 3 - 5" of soil by disking or other suitable means.

    C. Seedbed Preparation

    i. Temporary Seeding

    a. Seedbed preparation shall consist of loosening soil to a depth of 3" to 5" by means of suitable agricultural or construction equipment, such asdisc harrows or chisel plows or rippers mounted on construction equipment. After the soil is loosened, it should not be rolled or dragged smoothbut left in the roughened condition. Sloped areas (greater than 3: 1) should be tracked leaving the surface in an irregular condition with ridgesrunning parallel to the contour of the slope.

    b. Apply fertilizer and lime as prescribed on the plans.

    c. Incorporate lime and fertilizer into the top 3 - 5" of soil by disking or other suitable means.

    ii. Permanent Seeding

    a. Minimum soil conditions required for permanent vegetative establishment:

    1. Soil pH shall be between 6.0 and 7.0.

    2. Soluble salts shall be less than 500 parts per million (ppm).

    3. The soil shall contain less than 40% clay but enough fine grained material (> 30% silt plus clay) to provide the capacity to hold a moderateamount of moisture. An exception is if lovegrass or serecia lespedeza is to be planted, then a sandy soil (< 30% silt plus clay) would be acceptable

    4. Soil shall contain 1.5% minimum organic matter by weight.

    5. Soil must contain sufficient pore space to permit adequate root penetration.

    6. If these conditions cannot be met by soils on site, adding topsoil is required in accordance with Section 38 Standard and Specification forTopsoil.

    b. Areas previously graded in conformance with the drawings shall be maintained in a true and even grade, then scarified or otherwise loosened to adepth of 3 - 5" to permit bonding of the topsoil to the surface area and to create horizontal erosion check slots to prevent topsoil from sliding down aslope.

    c. Apply soil amendments as per soil test or as included on the plans.

    d. Mix soil amendments into the top 3- 5" of topsoil by disking or other suitable means. Lawn areas should be raked to smooth the surface, removelarge objects like stones and branches, and ready the area for seed application. Where site conditions will not permit normal seedbed preparation,loosen surface soil by dragging with a heavy chain or other equipment to roughen the surface. Steep slopes (steeper than 3: 1) should be tracked bya dozer leaving the soil in an irregular condition with ridges running parallel to the contour of the slope. The top 1 - 3" of soil should be loose andfriable. Seedbed loosening may not be necessary on newly disturbed areas.

    D. Seed Specifications

    i. All seed must meet the requirements of the District of Columbia DPW Standard and Specifications for Highways and Structures and specification42.0 Vegetative Stabilization. All seed shall be subject to re-testing by a recognized seed laboratory. All seed used shall have been tested within the6 months immediately preceding the date of sowing such material on this job.

    Note: Seed tags shall be made available to the inspector to verify type and rate of seed used.

    ii. Inoculant - The inoculant for treating legume seed in the seed mixtures shall be a pure culture of nitrogen-fixing bacteria prepared specifically forthe species. Inoculants shall not be used later than the date indicated on the container. Add fresh inoculant as directed on package. Use four timesthe recommended rate when hydroseeding. Note: It is very important to keep inoculant as cool as possible until used. Temperatures above 75-80degrees F can weaken bacteria and make the inoculant less effective.

    E. Methods of Seeding: Apply seed uniformly with hydroseeder (slurry includes seed and fertilizer), broadcast or drop seeder, or a cultipacker seeder.

    i. Hydroseeding:

    a. If fertilizer is being applied at the time of seeding, the application rates amounts will not exceed the following: nitrogen; maximum of 100 lbs. peracre total of soluble nitrogen; P2O5 (phosphorous): 200 lbs/ac; K2O (potassium): 200 lbs/ac.

    b. Lime - use only ground agricultural limestone, (Up to 3 tons per acre may be applied by hydroseeding). Normally, not more than 2 tons areapplied by hydroseeding at anyone time. Do not use burnt or hydrated lime when hydroseeding.

    c. Seed and fertilizer shall be mixed on site and seeding shall be done immediately and without interruption.

    ii. Dry Seeding: This includes use of conventional drop or broadcast spreaders.

    a. Seed spread dry shall be incorporated into the subsoil at the rates prescribed on the Temporary or Permanent Seeding Summaries or Tables 42or 43. The seeded area shall then be rolled with a weighted roller to provide good seed to soil contact.

    b. Where practical, seed should be applied in two directions perpendicular to each other. Apply half the seeding rate in each direction.

    iii. Drill or Cultipacker Seeding: Mechanized seeders that apply and cover seed with soil.

    a. Cultipacking seeders are required to bury the seed in such a fashion as to provide at least 1/4 inch of soil covering. Seedbed must be firm afterplanting.

    b. Where practical, seed should be applied in two directions perpendicular to each other. Apply half the seeding rate in each direction.

    F. Mulch Specifications (In order of preference)

    i. Straw shall consist of thoroughly threshed wheat, rye or oat straw, reasonably bright in color, and shall not be musty, moldy, caked, decayed, orexcessively dusty and shall be free of noxious weed seeds as specified by the NRCS Seed Law.

    Note: Only sterile straw mulch should be used in areas where one species of grass is desired.

    ii. Wood Cellulose Fiber Mulch (WCFM)

    a. WCFM shall consist of specially prepared wood cellulose processed into a uniform fibrous physical state.

    b. WCFM shall be dyed green or contain a green dye in the package that will provide an appropriate color to facilitate visual inspection of theuniformly spread slurry.

    c. WCFM, including dye, shall contain no germination or growth inhibiting factors.

    d. WCFM materials shall be manufactured and processed in such a manner that the wood cellulose fiber mulch will remain in uniform suspensionin water under agitation and will blend with seed, fertilizer and other additives to form a homogeneous slurry. The mulch material shall form ablotter-like ground cover, on application, having moisture absorption and percolation properties and shall cover and hold grass seed in contact withthe soil without inhibiting the growth of the grass seedlings.

    e. WCFM material shall contain no elements or compounds at concentration levels that will be phyto-toxic.

    f. WCFM must conform to the following physical requirements: fiber length to approximately 10 mm., diameter approximately 1 mm., pH range of4.0 to 8.5, ash content of 1.6% maximum and water holding capacity of 90% minimum.

    G. Mulching Seeded Areas - Mulch shall be applied to all seeded areas immediately after seeding.

    i. If grading is completed outside of the seeding season, mulch alone shall be applied as prescribed in this section andmaintained until the seeding seasonreturns and seeding can be performed in accordance with these specifications.

    ii. When straw mulch is used, it shall be spread over all seeded areas at the rate of 2 tons/acre. Mulch shall be applied to auniform loose depth of between 1" and 2". Mulch applied shall achieve a uniform distribution and depth so that the soilsurface is not exposed. If a mulch anchoring tool is to be used, the rate should be increased to 2.5 tons/acre.

    iii. Wood cellulose fiber used as a mulch shall be applied at a net dry weight of 1,500 lbs. per acre. The wood cellulose fibershall be mixed with water, and the mixture shall contain a maximum of 50 lbs. of wood cellulose fiber per 100 gallons ofwater.

    H. Securing Straw Mulch (Mulch Anchoring): Mulch anchoring shall be performed immediately following mulch application tominimize loss by wind or water. This may be done by one of the following methods (listed by preference), depending upon size ofarea and erosion hazard:

    i. A mulch anchoring tool is a tractor drawn implement designed to punch and anchor mulch into the soil surface a minimumof two (2) inches. This practice is most effective on large areas, but is limited to flatter slopes where equipment can operatesafely. If used on sloping land, this practice should be used on the contour if possible.

    ii. Wood cellulose fiber may be used for anchoring straw. The fiber binder shall be applied at a net dry weight of 750pounds/acre. The wood cellulose fiber shall be mixed with water and the mixture shall contain a maximum of 50 pounds ofwood cellulose fiber per 100 gallons of water.

    iii. Application of liquid binders should be heavier at the edges where wind catches mulch, such as in valleys and on crestsof banks. The remainder of area should appear uniform after binder application. Synthetic binders - such as Acrylic DLR(Agro-Tack), DCA-70, Petroset, Terra Tax II, Terra Tack AR or other approved equal may be used at rates recommended bythe manufacturer to anchor mulch.

    iv. Lightweight plastic netting may be stapled over the mulch according to manufacturer's recommendations. Netting isusually available in rolls 4' to 15' feet wide and 300 to 3,000 feet long.

    I. Incremental Stabilization - Cut Slopes

    i. All cut slopes shall be dressed, prepared, seeded and mulched as the work progresses. Slopes shall be excavated andstabilized in equal increments not to exceed 15'.

    J. Incremental Stabilization of Embankments - Fill Slopes

    i. Embankments shall be constructed in lifts as prescribed on the plans.

    ii. Slopes shall be stabilized immediately when the vertical height of the multiple lifts reaches 15', or when the gradingoperation ceases as prescribed in the plans.

    iii. At the end of each day, temporary berms and pipe slope drains should be constructed along the top edge of theembankment to intercept surface runoff and convey it down the slope in a non-erosive manner to a sediment trappingdevice.

    Section II - Temporary Seeding

    Vegetation - annual grass or grain used to provide cover on disturbed areas for up to 12 months. For longer duration ofvegetative cover, Permanent Seeding is required.

    See Table 43.

    Section III: Permanent Seeding

    Seeding grass and legumes to establish ground cover for a minimum period of one year on disturbed areas generally receivinglow maintenance.

    See table 42.

    Section IV - Sod: To provide quick cover on disturbed areas (2:1 grade or flatter).

    A. General specifications

    i. Class of turfgrass sod shall be Maryland or Virginia State Certified or Approved. Sod labels shall be made available to thejob foreman and inspector.

    ii. Sod shall be machine cut at a uniform soil thickness of 3/4", plus or minus 1/4", at the time of cutting. Measurement forthickness shall exclude top growth and thatch. Individual pieces of sod shall be cut to the suppliers width and length.Maximum allowable deviation from standard widths and lengths shall be 5 percent. Broken pads and torn or uneven endswill not be acceptable.

    iii. Standard size sections of sod shall be strong enough to support their own weight and retain their size and shape whensuspended vertically with a firm grasp on the upper 10 percent of the section.

    iv. Sod shall not be harvested or transplanted when moisture content (excessively dry or wet) may adversely affect itssurvival.

    v. Sod shall be harvested, delivered, and installed within a period of 36 hours. Sod not transplanted within this period shallbe approved by an agronomist or soil scientist prior to its installation.

    B. Sod Installation

    i. During periods of excessively high temperature or in areas having dry subsoil, the subsoil shall be lightly irrigatedimmediately prior to laying the sod.

    ii. The first row of sod shall be laid in a straight line with subsequent rows placed parallel to and tightly wedged against eachother. Lateral joints shall be staggered to promote more uniform growth and strength. Ensure that sod is not stretched oroverlapped and that all joints are butted tight in order to prevent voids, which would cause air drying of the roots.

    iii. Wherever possible, sod shall be laid with the long edges parallel to the contour and with staggering joints. Sod shall berolled and tamped, pegged or otherwise secured to prevent slippage on slopes and to ensure solid contact between sodroots and the underlying soil surface.

    iv. Sod shall be watered immediately following rolling or tamping until the underside of the new sod pad and soil surfacebelow the sod are thoroughly wet. The operations of laying, tamping and irrigating for any piece of sod shall be completedwithin eight hours.

    C. Sod Maintenance

    i. In the absence of adequate rainfall, watering shall be performed daily or as often as necessary during the first week and insufficient quantities to maintain moist soil to a depth of 4". Watering should be done during the heat of the day to preventwilting.

    ii. After the first week, sod watering is required as necessary to maintain adequate moisture content.

    iii. The first mowing of sod should not be attempted until the sod is firmly rooted. No more than 1/3 of the grass leaf shall beremoved by the initial cutting or subsequent cuttings. Grass height shall be maintained between 2" and 3" unless otherwisespecified.

    Section V - Turfgrass Establishment

    Areas where turfgrass may be desired include lawns, parks, playgrounds, and commercial sites which will receive a medium tohigh level of maintenance. Areas to receive seed shall be tilled by disking or other approved methods to a depth of 2 to 4 inches,leveled and raked to prepare a proper seedbed. Stones and debris over 1 1/2 inches in diameter shall be removed. The resultingseedbed shall be in such condition that future mowing of grasses will pose no difficulty.

    Note: Choose certified material. Certified material is the best guarantee of cultivar purity.

    A. Turfgrass Mixtures

    i. Kentucky Bluegrass - Full sun mixture - For use in areas that receive intensive management. Recommended CertifiedKentucky Bluegrass Cultivars Seeding Rate: 1.5 to 2.0 pounds/1000 square feet. A minimum of three bluegrass cultivarsshould be chosen ranging from a minimum of 10% to a maximum of 35% of the mixture by weight.

    ii. Kentucky Bluegrass/Perennial Rye - Full sun mixture - For use in full sun areas where rapid establishment is necessaryand when turf will receive medium to intensive management. Certified Perennial Ryegrass Cultivars/Certified KentuckyBluegrass Seeding rate: 2 pounds mixture/1000 square feet. A minimum of 3 Kentucky Bluegrass Cultivars must be chosen,with each cultivar ranging from 10% to 35% of the mixture by weight.

    iii. Tall Fescue/Kentucky Bluegrass - Full sun mixture - For use in drought prone areas and/or for areas receiving low tomedium management in full sun to medium shade. Recommended mixture includes; certified Tall Fescue Cultivars 95-100%, certified Kentucky Bluegrass Cultivars 0- 5%. Seeding rate: 5 to 8 lb/l000 sf. One or more cultivars may be blended.

    iv. Kentucky Bluegrass/Fine Fescue - Shade Mixture - For use in areas with shade in Bluegrass lawns. For establishment inhigh quality, intensively managed turf area. Mixture includes; certified Kentucky Bluegrass Cultivars 30-40% and certifiedFine Fescue 60-70%. Seeding rate: 1 1/2- 3 lbs/1000 square feet. A minimum of 3 Kentucky bluegrass cultivars must bechosen, with each cultivar ranging from a minimum of 10% to a maximum of 35% of the mixture by weight.

    Note: Turfgrass varieties should be selected from those listed in the most current University of Maryland Publication, AgronomyMimeo #77, "Turfgrass Cultivar Recommendations for Maryland".

    B. Ideal times of seeding

    ??????????????????????????????????????????

    C. Irrigation

    If soil moisture is deficient, supply new seedings with adequate water for plant growth (1/2" - 1" every 3 to 4 days depending onsoil texture) until they are firmly established. This is especially true when seedings are made late in the planting season, inabnormally dry or hot seasons, or on adverse sites.

    D. Repairs and Maintenance

    Inspect all seeded areas for failures and make necessary repairs, replacements, and reseedings within the planting season.

    i. Once the vegetation is established, the site shall have 95% groundcover to be considered adequately stabilized.

    ii. If the stand provides less than 40% ground coverage, reestablish following original lime, fertilizer, seedbed preparationand seeding recommendations.

    iii. If the stand provides between 40% and 94% ground coverage, overseeding and fertilizing using half of the rates originallyapplied may be necessary.

    iv. Maintenance fertilizer rates for permanent seedings are shown in Table 41.

    38.0 STANDARD AND SPECIFICATIONSFOR

    TOPSOIL

    DefinitionPlacement of topsoil over a prepared subsoil prior to establishment of permanent vegetation.

    PurposeTo provide a suitable soil medium for vegetative growth. Soils of concern have low moisture content, low nutrient levels, low pH, materials toxic to plants,and/or unacceptable soil gradation.

    Conditions Where Practice AppliesI. This practice is limited to areas having 2:l or flatter slopes where:

    a. The texture of the exposed subsoil/parent material is not adequate to produce vegetative growth.

    b. The soil material is so shallow that the rooting zone is not deep enough to support plants or furnish continuing supplies of moisture and plantnutrients.

    c. The original soil to be vegetated contains material toxic to plant growth.

    d. The soil is so acidic that treatment with limestone is not feasible.

    II. For the purpose of these Standards and Specifications, areas having slopes steeper than 2:1 require special consideration and design for adequatestabilization. Areas having slopes steeper than 2:1 shall have the appropriate stabilization shown on the plans.

    Construction and Material Specifications

    I. Topsoil salvaged from the existing site may be used provided that it meets the standards as set forth in these specifications. Typically, the depth oftopsoil to be salvaged for a given soil type can be found in the representative soil profile section in the Soil Survey published in the NRCS District ofColumbia Soil Survey Manual.

    II. Topsoil Specifications - Soil to be used as topsoil must meet the following:

    i. Topsoil shall be a loam, sandy loam, clay loam, silt loam, sandy clay loam, loamy sand. Other soils may be used if recommended by anagronomist or soil scientist and approved by the Watershed Protection Division. Regardless, topsoil shall not be a mixture of contrasting texturedsubsoils and shall contain less than 5% by volume of cinders, stones, slag, coarse fragments, gravel, sticks, roots, trash, or other materials largerthan 11/2 " in diameter.

    ii. Topsoil must be free of plants or plant parts such as bermuda grass, quackgrass, Johnsongrass, nutsedge, poison ivy, thistle, other posionousplants or others as specified.

    iii. Where the subsoil is either highly acidic or composed of heavy clays, ground limestone shall be spread at the rate of 4-8 tons/acre (200-400pounds per 1,000 square feet) prior to the placement of topsoil. Lime shall be distributed uniformly over designated areas and worked into the soilin conjunction with tillage operations as described in the following procedures.

    III. For sites having disturbed areas under 5 acres:

    i. Place topsoil (if required) and apply soil amendments as specified in 42.0 Vegetative Stabilization - Section I - Vegetative Stabilization Methodand Materials.

    IV. For sites having disturbed areas over 5 acres:

    i. On soil meeting Topsoil specifications, obtain test results dictating fertilizer and lime amendments required to bring the soil into compliance with thefollowing:

    a. pH for topsoil shall be between 6.0 and 7.5. If the tested soil demonstrates a pH of less than 6.0, sufficient lime shall be perscribed to raise thepH to 6.5 or higher.

    b. Organic content of topsoil shall be not less than 1.5 percent by weight.

    c. Topsoil having soluble salt content greater than 500 parts per million shall not be used.

    d. No sod or seed shall be placed on soil which has been treated with soil sterilants or chemicals used for weed control until sufficient time haselapsed (14 days min.) to permit dissipation of phyto-toxic materials.

    Note: Topsoil substitutes or amendments, as recommended by a qualified agronomist or soil scientist and approved by the Waterhed Protection Agency,may be used in lieu of natural topsoil.

    ii. Place topsoil (if required) and apply soil amendments as specified in 42.0 Vegetative Stabilization - Section I- Vegetative Stabilization Method andMaterials.

    V. Topsoil Application

    i. When topsoiling, maintain needed erosion and sediment control practices such as diversions, Grade Stabilization Structures, Earth Dikes, SlopeSilt Fence and Sediment Traps and Basins.

    ii. Grades on the areas to be topsoiled, which have been previously established, shall be maintained, albeit 4" - 8" higher in elevation.

    iii. Topsoil shall be uniformly distributed in a 4" - 8" layer and lightly compacted to a minimum thickness of 4". Spreading shall be performed in sucha manner that sodding or seeding can proceed with a minimum of additional soil preparation and tillage. Any irregularities in the surface resultingfrom topsoiling or other operations shall be corrected in order to prevent the formation of depressions or water pockets.

    iv. Topsoil shall not be placed while the topsoil or subsoil is in a frozen or muddy condition, when the subsoil is excessively wet or in a conditionthat may otherwise be detrimental to proper grading and seedbed preparation.

    VI. Alternative for Permanent Seeding - Instead of applying the full amounts of lime and commercial fertilizer, composted sludge and amendments may beapplied as specified below:

    i. Composted Sludge Material for use as a soil conditioner for sites having disturbed areas over 5 acres shall be tested to prescribe amendments and forsites having disturbed areas under 5 acres shall conform to the following requirements:

    a. Composted sludge shall be supplied by, or originate from, a person or persons that are permitted (at the time of acquisition of the compost) byeither the state of Maryland or the state of Virgina.

    b. Composted sludge shall contain at least 1 percent nitrogen, 1.5 percent phosphorus, and 0.2 percent potassium and have a Ph of 7.0 to 8.0. Ifcompost does not meet these requirements, the appropriate constituents must be added to meet the requirements prior to use.

    c. Composted sludge shall be applied at a rate of 1 ton/1,000 square feet.

    ii. Composted sludge shall be amended with a potassium fertilizer applied at the rate of 4 lb/1,000 square feet, and 1/3 the normal lime application rate.

    References: Guideline Specifications, Soil Preparation and Sodding. MD- V A, Pub. #1, Cooperative Extension Service, University of Maryland and VirginiaPolytechnic Institutes. Revised 1973.

    1. The contractor shall conduct operations and maintain the project site as to minimize thecreation and dispersion of dust. dust control shall be used throughout the work at the site.

    2. The contractor must provide clean water, free from salt, oil and other deleterious material tobe used for on-site dust control.

    3. The contractor shall supply water spraying equipment capable of accessing all work areas.

    4. The contractor shall implement strict dust control measures during active construction periodson-site. These control measures will generally consist of water applications that shall beapplied a minimum of once per day during dry weather or more often.

    5. For water application to undisturbed soil surfaces, the contractor shall:

    a. apply water with equipment consisting of tank, spray bar, pump with discharge pressuregauge.

    b. arrange spray bar height, nozzle spacing and spray pattern to provide complete coverageof ground with water.

    c. disperse water through nozzles on spray bar at 20 psi (137.8 k pa) minimum. Keep areasdamp without creating nuisance conditions such as ponding.

    6. For water application to soil surfaces during demolition and/or excavation, the contractor shall:

    a. apply water with equipment consisting of a tank,pump with discharge gauge, hoses andmist nozzles.

    b. locate tank and spraying equipment so that the entire excavation area can be mistedwithout interfering with demolition and/or excavation equipment or operations. keep areasdamp without creating nuisance conditions such as ponding.

    c. apply water spray in a manner to prevent movement of spray beyond the site boundaries.

    1. Applicant shall set up a pre-constructtion meeting with the District of ColumbiaDepartment of the Environment prior to any land disturbing activity.

    2. Notify "Miss Utility" at least 48 hours in advance before beginning construction.

    3. Install all sediment control devices per approved plan. Begin work after obtainingapproval from the sediment control inspector .

    4. Perform demolition activities per demolition plan.

    5. Install proposed utility lines & start renovations / modifications of building.

    6. After completion of site work, stabilize site.

    7. With the approval of the sediment control inspector, remove all sediment control devices.

    SEQUENCE OF CONSTRUCTION

  • SEDIMENT CONTROL PLAN DETAILS

    NO. REVISIONSDATE

    PHONE (301)-262-1630

    1776 I STREET NW 9TH FLOOR #90030

    FAX (301)-262-1680WASHINGTON, DC 20006 WWW.JASEDLLC.COM

    DRAWN BY: JAS

    DATE: OCTOBER 2012

    SCALE: AS NOTED

    SHEET NO.:

    DWG FILE: 195-SITEPLAN.DWG

    WASHINGTON, D.C.NORTHEAST

    LOTS 32 & 33 - SQUARE 9591001 H STREET

    C-800

    BOTTOM PLATE FOREACH PIPE WITHWATERTIGHTCONNECTION

    8.Any fill material shall be in compliance with 37.0 LandGrading and shall be in compliance with the applicablearticles (article numbers 204, 208, 206, 207.04, 804.03,804.02, 805.02, 804.04 and/or 804.02) of the District ofColumbia DPW Standard Specification for Highways andStructures 1996.

    1. Cut slopes occurring in ripable rock shall be serratedas shown. Serrations shall be made with conventionalequipment as the excavation is made.

    2. Each step or serration shall be constructed on thecontour and will have steps cut at nominal two-footintervals with nominal three-foot horizontal shelves.

    3. Steps will vary depending on the slope ratio or the cutslope.

    4. Overland flow shall be diverted from the top of allserrated cut slopes and carried to a suitable outlet.

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTURE

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHWATERSHED PROTECTION DIVISION

    NATURAL RESOURCE CONSERVATION SERVICE

    NATURAL RESOURCE CONSERVATION SERVICENATURAL RESOURCE CONSERVATION SERVICE

    U.S. DEPARTMENT OF AGRICULTUREDISTRICT OF COLUMBIA DEPARTMENT OF HEALTH

    WATERSHED PROTECTION DIVISIONDISTRICT OF COLUMBIA DEPARTMENT OF HEALTH

    U.S. DEPARTMENT OF AGRICULTURE

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTURE

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTUREWATERSHED PROTECTION DIVISION

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHWATERSHED PROTECTION DIVISION

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHWATERSHED PROTECTION DIVISION

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTURE

    U.S. DEPARTMENT OF AGRICULTURENATURAL RESOURCE CONSERVATION SERVICE

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHWATERSHED PROTECTION DIVISION

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHWATERSHED PROTECTION DIVISION WATERSHED PROTECTION DIVISION

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHU.S. DEPARTMENT OF AGRICULTURE

    NATURAL RESOURCE CONSERVATION SERVICE

    NATURAL RESOURCE CONSERVATION SERVICEDISTRICT OF COLUMBIA DEPARTMENT OF HEALTH

    WATERSHED PROTECTION DIVISIONDISTRICT OF COLUMBIA DEPARTMENT OF HEALTH

    U.S. DEPARTMENT OF AGRICULTURE

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTURE

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTUREWATERSHED PROTECTION DIVISION

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHWATERSHED PROTECTION DIVISION WATERSHED PROTECTION DIVISION

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHU.S. DEPARTMENT OF AGRICULTURE

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTURE

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTURE

    WATERSHED PROTECTION DIVISIONDISTRICT OF COLUMBIA DEPARTMENT OF HEALTH

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHWATERSHED PROTECTION DIVISION

    U.S. DEPARTMENT OF AGRICULTURENATURAL RESOURCE CONSERVATION SERVICE

    4. Irreducible materials other than rock (such as concreteor brick) shall only be allowed only upon approval of theWatershed Protection Division.

    5.All fill material shall be in compliance with 37.0 Land Gradingand shall be in compliance with the applicable articles (articlenumbers 204, 208, 206, 207.04, 804.03, 804.02, 805.02, 804.04and/or 804.02) of the District of Columbia DPW StandardSpecification for Highways and Structures 1996.

    3.Fill material shall be free of snow, ice, frozen materials,trash, brick, clay lumps, hazardous material, broken concrete,tree roots, sod, ashes, cinders, glass, plaster, orgainic matter,brush, logs, stumps, building debris and organic or otherdeleterious materials subject to decay, and high shrink-swellsoils.

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTURE

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHWATERSHED PROTECTION DIVISION

    4' min.

    HOOK AND CHAIN FOR REMOVAL

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTURE

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTH

    DETAIL 34 - PORTABLE SEDIMENT TANK (HORIZONTAL)

    WATERSHED PROTECTION DIVISIONDISTRICT OF COLUMBIA DEPARTMENT OF HEALTH

    NATURAL RESOURCE CONSERVATION SERVICEU.S. DEPARTMENT OF AGRICULTURE NATURAL RESOURCE CONSERVATION SERVICE

    U.S. DEPARTMENT OF AGRICULTURE

    WATERSHED PROTECTION DIVISION DISTRICT OF COLUMBIA DEPARTMENT OF HEALTHWATERSHED PROTECTION DIVISION

    DISTRICT OF COLUMBIA DEPARTMENT OF HEALTH

    WATERSHED PROTECTION DIVISIONDISTRICT OF COLUMBIA DEPARTMENT OF HEALTH NATURAL RESOURCE CONSERVATION SERVICE

    U.S. DEPARTMENT OF AGRICULTURE

    NATURAL RESOURCE CONSERVATION SERVICE

    WATERSHED PROTECTION DIVISION U.S. DEPARTMENT OF AGRICULTUREDISTRICT OF COLUMBIA DEPARTMENT OF HEALTH

    WATERSHED PROTECTION DIVISION

    DETAIL 2 - STABILIZED CONSTRUCTION ENTRANCE WITH WASH RACK

    TOP ELEVATION

    NOTCH ELEVATION

    C-100C-200C-300C-400C-500C-600C-700C-800