Upload
anacostiawaterfront
View
220
Download
0
Embed Size (px)
Citation preview
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
1/21
Anacostia WaterfrontTransportation Master Plan2013 UpdateDecember 12, 2013
1
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
2/21
Sanjay Kumar, P.E.DDOT Program ManagerAnacostia Waterfront [email protected]
(202) 741-5356
Richard Staudinger, P.E.
Anacostia Waterfront Initiative
Richard. [email protected](202) 513-4605
Tonights Speakers
2
mailto:[email protected]:Richard.%[email protected]:Richard.%[email protected]:[email protected]8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
3/21
Partnering Agencies
DC Water Office of the Deputy Mayor for Planning and
Economic Development
Department of General Services
Department of Public Works
District Department of the Environment
Federal Highway Administration
National Park Service
Office of Planning
3
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
4/21
6:30 p.m. Sign In
6:45 p.m. AWI Transportation Master PlanOverview Presentation
7:15 p.m. Open House
8:30 p.m. Adjourn
Meeting Agenda
4
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
5/21
Anacostia WaterfrontFINAL REPORT JUNE 2005
30-Year, $10 Billion Program
Created by March 2000 Memorandum ofUnderstanding Between the District and19 Other Federal and Regional Agencies
5 Key Themes:
o
Restore:A clean and active river.o Connect:Eliminating barriers and
gaining access.
o Play:A great riverfront park system.
o Celebrate:Cultural destinations ofdistinct character.
o Live:Building strong waterfrontneighborhoods.
Creating a World-Class Waterfront
5
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
6/21
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
7/21
AWI Transportation Master Plan
Continuous Pedestrian and BicycleAccess Along Waterfront
Modal Shift to Public Transit
Great Urban Boulevards withMixed Uses, Landscaping andGreat Civic Spaces
Redesign Bridges in the Traditionof Great Civic Architecture
7
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
8/21
AWI Transportation Master Plan
Reduce Highway and FreewayBarriers Between Neighborhoodsand Waterfront Parks
Reconnect the City Street Grid toWaterfront Parks
Support and Foster Economic
Development
8
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
9/21
Whats New Since 2008 TMP ?
Projects increased from 31 to 52
Corridors increased from four to six 16 projects completed
Remaining projects vary in status from Planning,Environmental Documentation, Design or Construction.
Projects no longer under active consideration:
o Tunnel connecting I-395 with I-295
o Extension of Massachusetts Avenue over the AnacostiaRiver
o Reconfiguration of the Pennsylvania Avenue / I-295interchange
9
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
10/21
Transportation Projects by Phase
10
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
11/21
AWI Transportation Corridors
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
12/21
Projects Status
1. Frederick Douglass Memorial
Bridge RehabilitationCompleted
2. Ballpark Roadways
(2008 Near-Term Improvements)Completed
3. South Capitol St Phase 1
Segments 1 & 2
Design
4. South Capitol St Phase 2
Segments 4 & 5Design
5. I-295/Malcolm X Bridge
Rehabilitation
Completed
6. I-295/Malcolm X Interchange Design
12
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
13/21
Projects Status
1. Suitland Parkway Pedestrian/Bike
TrailPlanning
2. South Capitol St Phase 2
Segment 3Design
3. Martin Luther King, Jr. AvenueTwo-Way Reconstruction Completed
4. Martin Luther King, Jr. Avenue
Two-Way Widening
Design
13
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
14/21
Projects Status
1. Pennsylvania & Potomac Ave
SE Intersection
Environmental
Documentation
2. Pennsylvania Ave & DC 295
Entrance Ramp ImprovementsCompleted
3. Pennsylvania Ave & Minnesota
Ave IntersectionDesign
4. Pedestrian Bridge: Anacostia
High School to Anacostia ParkCompleted
5. 11th Street Bridge Project-
Phase 1Completed
6. 11th Street Bridge Project -
Phase 2
Under
Construction
7. Barney Circle and SoutheastBoulevard
EnvironmentalDocumentation
8. Virginia Avenue / CSX National
Gateway12th Street SE
Environmental
Documentation
14
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
15/21
Projects Status
1. Kenilworth Corridor NearTerm
ImprovementsCompleted
2. Nannie Helen Burroughs Interchange Completed
3. East Capitol Street Interchange Planning
4. Benning Road Interchange Planning
5. Eastern Avenue Interchange Completed
6. Kenilworth Avenue Mainline
ImprovementsPlanning
7. Parkside Pedestrian Bridge Design
8. DC 295/Kenilworth Pedestrian
BridgesDesign
15
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
16/21
Projects Status
1. 4th Street SW Reconstruction Completed
2. Maine Avenue SW Improvements Completed
3. The Wharf
Infrastructure Design4. Maryland Avenue SW / CSX
National GatewayPlanning
5. M Street SE/SW Transportation
StudyPlanning
16
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
17/21
Planning
Design
Completed
Anacostia Riverwalk Trails Corridor
17
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
18/21
Projects Status
1. DC StreetcarPlanning, Design
and Construction
2. Water Taxi Planning
3. Soccer Stadium Planning
4. St. Elizabeths East
InfrastructureDesign
5. 14thStreet Bridge
Improvements
Environmental
Documentation6. DC Water Clean Rivers/
CSO Project
Design and
Construction
7. Anacostia Park Master
Plan
Environmental
Documentation
8. Long Bridge StudyEnvironmental
DocumentationAWI Master Drainage Plan
Design and
Construction
Private DevelopmentDesign and
Construction
18
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
19/21
Sources of Project Funding
Local14%
Federal
25%Private
53%
Uncommitted8%
19
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
20/21
MoreInformation
20
8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final
21/21
Thank You and
Open House!
21