    Anacostia WaterfrontTransportation Master Plan2013 UpdateDecember 12, 2013

    1

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    2/21

    Sanjay Kumar, P.E.DDOT Program ManagerAnacostia Waterfront [email protected]

    (202) 741-5356

    Richard Staudinger, P.E.

    Anacostia Waterfront Initiative

    Richard. [email protected](202) 513-4605

    Tonights Speakers

    2

    mailto:[email protected]:Richard.%[email protected]:Richard.%[email protected]:[email protected]
  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    3/21

    Partnering Agencies

    DC Water Office of the Deputy Mayor for Planning and

    Economic Development

    Department of General Services

    Department of Public Works

    District Department of the Environment

    Federal Highway Administration

    National Park Service

    Office of Planning

    3

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    4/21

    6:30 p.m. Sign In

    6:45 p.m. AWI Transportation Master PlanOverview Presentation

    7:15 p.m. Open House

    8:30 p.m. Adjourn

    Meeting Agenda

    4

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    5/21

    Anacostia WaterfrontFINAL REPORT JUNE 2005

    30-Year, $10 Billion Program

    Created by March 2000 Memorandum ofUnderstanding Between the District and19 Other Federal and Regional Agencies

    5 Key Themes:

    o

    Restore:A clean and active river.o Connect:Eliminating barriers and

    gaining access.

    o Play:A great riverfront park system.

    o Celebrate:Cultural destinations ofdistinct character.

    o Live:Building strong waterfrontneighborhoods.

    Creating a World-Class Waterfront

    5

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    6/21

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    7/21

    AWI Transportation Master Plan

    Continuous Pedestrian and BicycleAccess Along Waterfront

    Modal Shift to Public Transit

    Great Urban Boulevards withMixed Uses, Landscaping andGreat Civic Spaces

    Redesign Bridges in the Traditionof Great Civic Architecture

    7

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    8/21

    AWI Transportation Master Plan

    Reduce Highway and FreewayBarriers Between Neighborhoodsand Waterfront Parks

    Reconnect the City Street Grid toWaterfront Parks

    Support and Foster Economic

    Development

    8

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    9/21

    Whats New Since 2008 TMP ?

    Projects increased from 31 to 52

    Corridors increased from four to six 16 projects completed

    Remaining projects vary in status from Planning,Environmental Documentation, Design or Construction.

    Projects no longer under active consideration:

    o Tunnel connecting I-395 with I-295

    o Extension of Massachusetts Avenue over the AnacostiaRiver

    o Reconfiguration of the Pennsylvania Avenue / I-295interchange

    9

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    10/21

    Transportation Projects by Phase

    10

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    11/21

    AWI Transportation Corridors

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    12/21

    Projects Status

    1. Frederick Douglass Memorial

    Bridge RehabilitationCompleted

    2. Ballpark Roadways

    (2008 Near-Term Improvements)Completed

    3. South Capitol St Phase 1

    Segments 1 & 2

    Design

    4. South Capitol St Phase 2

    Segments 4 & 5Design

    5. I-295/Malcolm X Bridge

    Rehabilitation

    Completed

    6. I-295/Malcolm X Interchange Design

    12

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    13/21

    Projects Status

    1. Suitland Parkway Pedestrian/Bike

    TrailPlanning

    2. South Capitol St Phase 2

    Segment 3Design

    3. Martin Luther King, Jr. AvenueTwo-Way Reconstruction Completed

    4. Martin Luther King, Jr. Avenue

    Two-Way Widening

    Design

    13

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    14/21

    Projects Status

    1. Pennsylvania & Potomac Ave

    SE Intersection

    Environmental

    Documentation

    2. Pennsylvania Ave & DC 295

    Entrance Ramp ImprovementsCompleted

    3. Pennsylvania Ave & Minnesota

    Ave IntersectionDesign

    4. Pedestrian Bridge: Anacostia

    High School to Anacostia ParkCompleted

    5. 11th Street Bridge Project-

    Phase 1Completed

    6. 11th Street Bridge Project -

    Phase 2

    Under

    Construction

    7. Barney Circle and SoutheastBoulevard

    EnvironmentalDocumentation

    8. Virginia Avenue / CSX National

    Gateway12th Street SE

    Environmental

    Documentation

    14

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    15/21

    Projects Status

    1. Kenilworth Corridor NearTerm

    ImprovementsCompleted

    2. Nannie Helen Burroughs Interchange Completed

    3. East Capitol Street Interchange Planning

    4. Benning Road Interchange Planning

    5. Eastern Avenue Interchange Completed

    6. Kenilworth Avenue Mainline

    ImprovementsPlanning

    7. Parkside Pedestrian Bridge Design

    8. DC 295/Kenilworth Pedestrian

    BridgesDesign

    15

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    16/21

    Projects Status

    1. 4th Street SW Reconstruction Completed

    2. Maine Avenue SW Improvements Completed

    3. The Wharf

    Infrastructure Design4. Maryland Avenue SW / CSX

    National GatewayPlanning

    5. M Street SE/SW Transportation

    StudyPlanning

    16

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    17/21

    Planning

    Design

    Completed

    Anacostia Riverwalk Trails Corridor

    17

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    18/21

    Projects Status

    1. DC StreetcarPlanning, Design

    and Construction

    2. Water Taxi Planning

    3. Soccer Stadium Planning

    4. St. Elizabeths East

    InfrastructureDesign

    5. 14thStreet Bridge

    Improvements

    Environmental

    Documentation6. DC Water Clean Rivers/

    CSO Project

    Design and

    Construction

    7. Anacostia Park Master

    Plan

    Environmental

    Documentation

    8. Long Bridge StudyEnvironmental

    DocumentationAWI Master Drainage Plan

    Design and

    Construction

    Private DevelopmentDesign and

    Construction

    18

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    19/21

    Sources of Project Funding

    Local14%

    Federal

    25%Private

    53%

    Uncommitted8%

    19

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    20/21

    MoreInformation

    20

  • 8/13/2019 12-12-2013 AWI Master Plan Presentation With Projects Final

    21/21

    Thank You and

    Open House!

    21