BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
2/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Please Turn off your
mobile! Or Switch to
vibration mode!
Check! Right Now!
7/22/2019 117th HSJV Weekly Meeting Rev 12
3/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Dont Panic1
Switch Off All Electrical Equipment2
Dont Run, Walk Fast!3
Go to the Assembly Point4
Wait for the Final Instruction5
SCREEN
7/22/2019 117th HSJV Weekly Meeting Rev 12
4/53
BARAKAH NUCLEAR POWER PLANT PROJECT
1. Safety Moment
2. Previous Meeting
3. HSE Programs
Investigation Lesson Learnt
4. HSE Statistics
Performance per Area and Total
5. HSE Findings Summary
Findings analysis- cause wise,
Company, and Area
HSE Findings by Company
Reported Property Damage
Evaluation by Findings Score
6. Weekly Inspection
Committee Inspection
Weekly Inspection
7. Environmental Issues
8. Action Plans
Seoyong Hilalco
7/22/2019 117th HSJV Weekly Meeting Rev 12
5/53BARAKAH NUCLEAR POWER PLANT PROJECT
http://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/SAFETY%20MOMENT%2018TH%20MARCH%202013.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hanlim%20Safety%20Moment%20-%20employer's%20duty.pptx7/22/2019 117th HSJV Weekly Meeting Rev 12
6/53
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
7/53BARAKAH NUCLEAR POWER PLANT PROJECT
NO. ITEMS ACTION PLANS ACTION BYDUE
DATESTATUS
1CCAP
Findings
KEPCO representative mentioned that KEPCO
continues to report HSE findings thru CCAP. The
numbers are to be checked and reflected in this
meeting.HSJV Next
Meeting
2 High HSEFindings
All findings issued to respective subcontractors are
rated by a scoring system established by HSE.
Findings under Hilalco reached 7.1 points landing
them on top. The organization will come back with
their plans next week
Hilalco NextMeeting
3Investigation
Result
The output from investigation and lesson learnt
from recent serious incident involving toppled crane
will be shared on next meeting.
HSJVNext
Meeting
4Advan Action
Plans
The CEO of Advan will be on site tomorrow (30
April) to have a direct evaluation of organizations
HSE management .
Advan Information
7/22/2019 117th HSJV Weekly Meeting Rev 12
8/53
7/22/2019 117th HSJV Weekly Meeting Rev 12
9/53BARAKAH NUCLEAR POWER PLANT PROJECT
Description
Date/Time : 01 May 2013, 7:00 AM
Venue : CO Conference RoomSubject : Presentation of Corrective Actions
Attendees : Advan CEO, HSJV, KEPCO
Subcontractor Site Managers
Summary of Action Plan
- ADVAN
1. Completing HSE organization
2. HSE education and t raining achievement
(Supervisor/Worker/Rigger/Korean)
3. Inspection of JHA/PTW
4. Disciplinary action for involved person- HSJV
1. Disciplinary action for involved person
2. Investigation and follow up action for CAR
3. Feedback of actions taken to KEPCO
7/22/2019 117th HSJV Weekly Meeting Rev 12
10/53
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
11/53BARAKAH NUCLEAR POWER PLANT PROJECT
Team Selection
Determine
Sequence of
Events
Develop
corrective
actions
Define Causal
Factors
Analyze eachcausal factors
root causes
Presentation ofreport
7/22/2019 117th HSJV Weekly Meeting Rev 12
12/53BARAKAH NUCLEAR POWER PLANT PROJECT
Sequence of Events
13 April 2 013 : HSJV Architectural Dept.
contacted subcontractor on relocation ofTower Crane 10
16 April 2013 : Relocat ion postpone
17 April 2013 :
6:00 AM schedule for relocation set 21st
April
11:30 AM supervisor informed by
construction manager
1:30 PM team returns to worksite
2:15 PM team starts lifting of counterweight
block
3:10 PM team lifts 14 th counterweight block
3:15 PM tower crane #10 tilts and collapse
4:00 PM investigation team appointed from
KEPCO & ENEC
4:15 PM police arrives at site
Causal Factor : Team lifts the 14th
counterweight block
Root Cause : not qualified, workpackage/permit needs improvement (NI),
enforcement NI, no preparation,
scheduling NI
Corrective and Preventive Actions :
1. Re-evaluation of permit issuer, and permit
holders
2. Conduct internal audi ts
3. Strict implementation no PTW, no work
policy.
4. Obtain work permit prior work
5. Improve scheduling, planning and
preparation of work
Lesson learnt :
Deployment of qualified personnel to ensure
implementation of PTW system
7/22/2019 117th HSJV Weekly Meeting Rev 12
13/53BARAKAH NUCLEAR POWER PLANT PROJECT
Sequence of Events
13 April 2013 :
6:00 AM IP and team attended tool box
meeting
06:15 AM IP and team assigned to
fix/align embed sleeve pipes.
06:30 AM IP and team prepares sleeve
pipe
08:00 AM Supervisor demonstrate
insertion of sleeve pipe
09:00 AM IP collects measurement of
sleeve
09:55 AM IP aligns sleeve but pipe fell
pressing finger of IP
10:15 AM IPs injury cleaned inside clinic
1:30 PM IP receives treatment from
hospital
Causal Factor : IP works alone
Root Cause : Instruction needs
improvement, communication, and
supervision
Corrective and Preventive Actions :
1. Ensure instructions are understood
2. Use of visual aids to enhance
communication
3. Close supervision on new members
Lesson learnt :Guidance for newly hired personnel.
7/22/2019 117th HSJV Weekly Meeting Rev 12
14/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Description
BNPP will implement traffic scheme for paved road/non-paved road.
Heavy vehicle is prohibited from the use of paved road to protect damages
by trucks. To prevent and minimize dust emerging from ground.
7/22/2019 117th HSJV Weekly Meeting Rev 12
15/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Description
Bulk bags are classified as lifting
accessory which requires third party
inspection as stated in Abu Dhabi code,
COP 34.0 Safe Use of Lifting Equipment
and Lifting Accessories. This bag is not
allowed on site.
7/22/2019 117th HSJV Weekly Meeting Rev 12
16/53
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
17/53
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
18/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend : Ancillary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipment Shop
Power Block Cut Off Wall, Wharf Area, Concrete Block Area
* : 41 cases (Oct- Dec. 2011), 64 cases (2012), 22 (2013)
ItemAncillary Area Camp Area Office Area Power Block Village 1 Village 2 HSJV Total NMDC Total
For the
WeekCum
For the
WeekCum
For the
WeekCum
For the
WeekCum
For the
WeekCum
For the
WeekCum
For the
WeekCum
For the
WeekCum
Near Misses 0 0 0 0 0 2 0 13 0 0 0 0 0 15 0 0
Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0First Aid Cases
(FA) 0 2 0 0 1 5 3 27 0 4 0 2 4 40 0 0
Medical
Treatment Cases
(MTC)1 1 0 1 0 4 0 5 0 1 0 1 1 13 0 0
Restricted Work
Cases (RWC) 0 2 0 1 0 0 0 3 0 0 0 0 0 6 0 0
LTIs 0 0 0 0 0 0 0 3 0 0 0 0 0 3 0 0
Property/Vehicle
Accidents 0 2 0 1 0 4 0 7 0 1 0 1 0 16 0 0
Environmental
Release 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
For this week Cumulative
One Strike Policy 4 127*
(This Week From April 27 May 3 , 2013)
7/22/2019 117th HSJV Weekly Meeting Rev 12
19/53
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
20/53
BARAKAH NUCLEAR POWER PLANT PROJECT
(This Week From April 27 May 3, 2013)
TOTAL
Near Miss
CAR
OC & WF
0 0 0 0
10 47 178 235
0 26 404 430
10 73 582 665
Findings
Issued
TotalKE
P
C
O
H
S
J
V
S
U
B
C
O
N
Status
Open Closed
KEPCO HSJV Subcon KEPCO SubconHSJV
0 0 0 0 0 0
10 7 0 0 40 178
0 0 0 0 26 404
10 7 0 0 66 582
7/22/2019 117th HSJV Weekly Meeting Rev 12
21/53
BARAKAH NUCLEAR POWER PLANT PROJECT
12
34
6
78
910
1216
1819
2424
2526
2732
3536
3738
3947
59
0 10 20 30 40 50 60 70
Steel Erection
LOTO
Supervision
Manual Handling
Documents
Training
PTW
Environmental
Poor Illumination
Excavation
Color Coding
Working at Height
Hot Works
Health & Welfare
Waste Management
Fall Protection
Hand & Power Tools
Electrical Safety
Plant & Equipment
PPE
Material Management
Fire Prevention
Signs, Barriers & barricades
Lifting
Access & Egress
Scaffolding
(This Week From April 27 May 3, 2013)
Source: CAR, Near Miss, Walkthrough and Observation Card
7/22/2019 117th HSJV Weekly Meeting Rev 12
22/53
BARAKAH NUC EAR POWER P ANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
23/53
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
24/53
BARAKAH NUCLEAR POWER PLANT PROJECT
115
84
50
310
56
52 4
10
31
47
76
20
12
3 4 1 10
10
20
3040
50
60
70
8090
100
7/22/2019 117th HSJV Weekly Meeting Rev 12
25/53
BARAKAH NUCLEAR POWER PLANT PROJECT
0
10
20
30
40
50
60
70
80
90Steel Erection
Supervision
Documents
TrainingManual Handling
Poor Illumination
PTW
Excavation
Environmental
Color Coding
Hot Works
Waste Management
Working at HeightHand & Power Tools
Health & Welfare
Electrical Safety
Plant & Equipment
Fall Protection
Fire Prevention
PPE
Material Management
LiftingSigns, Barriers & Barricades
Access & Egress
Scaffolding
Housekeeping
3, Signs, Barriers,
Barricades
5, Lifting
16, Scaffolding
3, Electrical Safety
7, Signs, Barriers,
Barricades
6, Health and Welfare
14, Housekeeping
7, Housekeeping
4, Housekeeping2, Access and
Egress
12, Housekeeping
7/22/2019 117th HSJV Weekly Meeting Rev 12
26/53
BARAKAH NUCLEAR POWER PLANT PROJECT
0
100
200
300
400
500
600
700
800
0
10
20
30
40
50
60
70
80
Seoy
ong
Seoyong(PB)
TowersT
ech
Gu
san
Jong
hap
Jonghap(PB)
YounCh
ang
YounChang(PB)
Hwac
hon
W
BG
Hilalco
Ad
van
Hanlim
Uwell
Yo
oA
Hyundai
C&I
Samjin
Eug
ene
Daemy
ung
Seo
bonD&I
AlRaeel
D
OW
Sam
ho
Geumhwa
Sungch
angSeil
KEPCO/HSJVSUBCON
Manpower
(This Week From April 27 May 3 , 2013)
7/22/2019 117th HSJV Weekly Meeting Rev 12
27/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Action Plan for Company requiring assistance and support from the system
1. Joint Inspection will be carried out by Area Management Team.
2. Spot Training will be given to workers about major findings
3. Action plan will be submitted to HSJV HSE Team develop by D&I
0.0
2.0
4.0
6.0
1.1
4.24.9
4.2
1.0 1.2 0.4
1.7
1.20.2
1.4
4.1
5.0
2.0
1.0 1.2
Findings Score = Number of Causal x Risk(Factor Score)
Source: CAR, Near Miss, Walkthrough andObservation Card reported by KEPCO & HSJV
Legend : (I) Infra, (PB) Power Block
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
28/53
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
29/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Top Hazards
Cause Nos
Housekeeping 11
Access & Egress 6
Control Measure Due Date
Proper management of
cables using cables hangersDone
Ensure that access are
properly inspected and
passed the standard
Done
Total No. of Findings: 39Housekeeping, 11
Access & Egress,
6
Fire Prevention, 4
Material
Management, 4
Scaffolding, 3
Fall Protection, 2
PTW, 2
PPE, 1
Hand & PowerTools, 1
Lifting, 1
Waste
Management, 1
Signs, Barriers &
Barricades, 1
Color Coding, 1 Hot Works, 1
Source: CAR, Near Miss, Walkthrough and Observation Card
7/22/2019 117th HSJV Weekly Meeting Rev 12
30/53
7/22/2019 117th HSJV Weekly Meeting Rev 12
31/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Top Hazards
Cause Nos
Housekeeping 7
Scaffolding 7
Control Measure Due Date
Provide cable hangers &
ensure that protrudingnails are removed from
unused woods.
Done
Scaffolding planks & toe
boards should be properly
installed according to
standard.
Done
Total No. of Findings : 42Housekeeping, 7
Scaffolding, 7
Waste
Management, 6
Lifting, 5Excavation, 4
Access & Egress,
4
Fall Protection, 4
Health &
Welfare, 3
Material
Management, 2
Electrical Safety,
2
Working at
Height, 2
Poor
Illumination, 2
Signs, Barriers &
Barricades, 1
Hand & Power
Tools, 1
PPE, 1
Plant &
Equipment, 1
Training, 1Color Coding, 1
Source: CAR, Near Miss, Walkthrough and Observation Card
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
32/53
7/22/2019 117th HSJV Weekly Meeting Rev 12
33/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Inspection Date Attendees Remark
Committee Inspection 2013-04-30 HSJV, KEPCO, HSE Management Team 9 Findings
Weekly Inspection 2013-05-01 HSJV HSE Team 15 Findings
7/22/2019 117th HSJV Weekly Meeting Rev 12
34/53
BARAKAH NUCLEAR POWER PLANT PROJECT
I tem No. LOCATION Area/Activity RECOMMENDED ACTIONS RESPONSIBLE STATUS
1Seoyong / First Aid
Room
1. Provision of appropriate First Aid Box with chec klist attached.
2. First Aid - Criteria/Requirements Checklist should be posted on
the first aid room.
3. Provision of "what to do" list/guidelines in applying first aid
treatment.
4. Immediate repair on defective floor.
Seoyong Open
2Samjin / First Aid
Room
1. First Aid - Criteria/Requirements Checklist should be posted on
the first aid room.
2. Provision of "what to do" list/guidelines in applying first aid
treatment.
Samjin Closed
3Advan / First Aid
Room
1. First Aid - Criteria/Requirements Checklist should be posted on
the first aid room.
2. Provision of "what to do" list/guidelines in applying first aid
treatment.
3. Immediate action needed to provide cover on the said
electrical panel.
Advan Closed
4Hilalco / First Aid
Room
1. Provision of appropriate First Aid Room.
2. . First Aid - Criteria/Requirements Checklist should be posted
on the first aid room.
3. Provision of "what to do" list/guidelines in applying first aid
treatment.
Hilalco Open
5 AB1Lifting / Waste
Disposal
Tool Box Meeting for all Riigers and Supervisors involved that no
lifting of nylon bags directly.
All involved
Subcons / HSJVOpen
6 AB1Younchang/ First
Aid Room
1. Provision of proper First Aid Box.
2. Provision of "what to do" list/guidelines for First Aid Trained
Personnel to follow in case of first aid treatment.
Younchang Open
7 TGB Geumhwa
1. First Aid - Criteria/Requirements Checklist should be
developed and posted inside the First Aid Room next to the First
Aid Boxes.
2. Provision of "what to do" list/guidelines for First Aid Trained
Personnel to follow in case of first aid treatment.
Geumhwa Closed
8 O&M BldgSeobon / First Aid
Room
1. Provision of appropriate First Aid Room.
2. First Aid - Criteria/Requirements Checklist should be posted on
the first aid room.
3. Provision of "what to do" list/guidelines in applying first aid
treatment.
Seobon Open
Provision of adequate welfare facilities for Heat Stress
Prevention. (Shelters and Toilets)Done
The Committee agreed that there should be a provision of the
Heat Stress Prevention Campaign Banners posted at site. Design
will be provided by ENEC.
Open
1. No Criteria or Guideline Checklist for First Aid Requirements.
2. Rely only to Kepco Clinic for Initial Treatment
Laydown
1. No Criteria or Guideline Checklist for First Aid Requirements.
2. Rely only to Kepco Clinic for Initial Treatment
1. Inappropriate First Aid Box.
2. No Criteria or Guideline Checklist for First Aid Requirements.
3. Rely only to Kepco Clinic for Initial Treatment
4. Defective floor, prone to tripping hazard. Might cause foot injury.
FINDINGS
9All
Locations
All area and
activities
1. No appropriate First Aid Room utilized the HSE Office as First Aid
Room.
2. No Criteria or Guideline Checklist for First Aid Requirements.
3. Rely only to Kepco Clinic for Initial Treatment
1. No appropriate First Aid Room, utilized Site Office as First AidRoom.
2. No Criteria or Guideline Checklist for First Aid Requirements.
3. Rely only to Kepco Clinic for Initial Treatment
HSJV / All Sub-
ContractorsHeat Stress Prevention Campaign Banner not available at site.
1. No Criteria or Guideline Checklist for First Aid Requirements.
2. Rely only to Kepco Clinic for Initial Treatment
3. Found First Aid Room Electrical Panel not covered. Exposure of
conductive terminals.
Heat Stress Prevention not yet fully prepared.
Lifting of Nylon Bags containing mixed waste materials without steel
waste box.
1. Checklist available for the First Aid Kit but inappropriate First Aid
Box was used.
2.Rely only to Kepco Clinic for Initial Treatment
7/22/2019 117th HSJV Weekly Meeting Rev 12
35/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Description
Standard is set for first aid
room facility at site ensuring
management of incident are
handled as per medical
practices.
The minimum requirements for
first aid room shall be followed
by Subcontractors.
Subcontractors to ensure room
can accommodate number of
incidents. The project is
following a ratio of 1:50 in
number of first aid personnel.
7/22/2019 117th HSJV Weekly Meeting Rev 12
36/53
BARAKAH NUCLEAR POWER PLANT PROJECT
1
1
1
1
1
2
3
5
0 1 2 3 4 5 6
Damaged lifting gear
Unsafe Operation
Lifting gear no color coding
Insufficient Permit
No Supervisor
Equipment no TPC
Lifting gear no TPC
Lifting Radius not secured
Findings per Causal
Key item : Lifting with Crane
3 3
1
2
3
1
2
0
0.5
1
1.5
2
2.5
3
3.5
Advan Gusan Hilalco HSJV Seobon Seoyong (PB) Towerstech
Findings per Company
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
37/53
7/22/2019 117th HSJV Weekly Meeting Rev 12
38/53
BARAKAH NUCLEAR POWER PLANT PROJECT
No.Source of
InjuryArea Description
Immediate
Action
Planned
Supervisor
Preventive Action
1 Pain and skinabrasion
YOO A
Welder
Ancillary areawelding shop
30-04-2013
16:30
The worker a welder
performed gas cutting
on pipe when suddenly
his small finger came incontact with hot
surface. Worker
sustained superficial
burn.
Assessed by Dr.
Kim
Cleansing
&wound
dressing done Anti-bacterial
cream applied
(Flamazine)
Will need wound
dressing - Daily
7/22/2019 117th HSJV Weekly Meeting Rev 12
39/53
BARAKAH NUCLEAR POWER PLANT PROJECT
No.Source of
InjuryArea Description
Immediate
Action
Planned
Supervisor
Preventive Action
2
Low back
pain lifting
30kg cable
Jonghap
Electrical Helper
Power Block
28-04-2013
10:00
The worker complained of
sudden pain, low backarea after lifting a 20-30kg
cable.
Assessed by Dr.
Kim
Topical analgesic
applied and
given
7/22/2019 117th HSJV Weekly Meeting Rev 12
40/53
BARAKAH NUCLEAR POWER PLANT PROJECT
No. Source ofInjury
Area Description ImmediateAction
PlannedSupervisor
Preventive Action
3
Injury cut
wound left
ring finger
Advan
Carpenter
AB Area of
Power Block
02-05-2013
08:25
Injured person was
instructed by hissuperior to replace tie
rod at concrete spacer,
so as injured person
released the tie rod,
the spacer moved and
trapped his finger.
Assessed by Dr.
Kim
Wound cleansing
and dressing done
Steri-strip
application
Tetanus toxoid
injection given at
left deltoid
muscle.
7/22/2019 117th HSJV Weekly Meeting Rev 12
41/53
BARAKAH NUCLEAR POWER PLANT PROJECT
No. Source ofInjury
Area Description ImmediateAction
PlannedSupervisor
Preventive Action
4
Injury
Crashed by
stock of
plywood-
right index
finge
HSJV
Labour
Construction
Office Area
02-05-2013
13:30
The injured person
while moving plywoodwas pressed by the
material during
placement at back of
pickup. Injured persons
finger suffered light
abrasion.
Assessed by Dr.
Kim
Wound dressing
done.
7/22/2019 117th HSJV Weekly Meeting Rev 12
42/53
BARAKAH NUCLEAR POWER PLANT PROJECT
No.Source of
InjuryArea Description
Immediate
Action
Planned
Supervisor
Preventive Action
5
Injury cut
wound left
index finger
Youn Chang
Pipe fitter
Power Block /
AB No. 2
02-05-2013
10:20
The worker tried to
replace a new cutting
disc on portable
grinder however whiletool was switched off,
IP immediately started
to detach rotating
wheel thus his index
finger came in contact
with the slowing disc.
Assessed by Dr.
Kim
Wound cleansing
and dressing done
Tetanus injection
given at left
deltoid muscle
7/22/2019 117th HSJV Weekly Meeting Rev 12
43/53
7/22/2019 117th HSJV Weekly Meeting Rev 12
44/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Inspection Date: 1st May
Inspection Course:
Village 2 Municipal waste area Village 2 STP Power Block Area Temporary waste Area
Inspection Item:
Waste Segregation, Disposal, Recycle
7/22/2019 117th HSJV Weekly Meeting Rev 12
45/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Village 2
Description Seepage of treated water from adjacent plantation area. Foul smell.
Action taken Area backfill carried out. Provision of dike to prevent seepage.
Status CLOSED
7/22/2019 117th HSJV Weekly Meeting Rev 12
46/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Location AQMS Station
Description Not barricaded and inadequate signboards
Action taken Provided physical barricades and appropriate signages
Status CLOSED
7/22/2019 117th HSJV Weekly Meeting Rev 12
47/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Village 1
Description Inappropriate waste segregation in GMET waste skip
Action taken Spot Training and Waste Management Awareness conducted. Sorting and segregation of wastematerials been carried out.
Status CLOSED
7/22/2019 117th HSJV Weekly Meeting Rev 12
48/53
BARAKAH NUCLEAR POWER PLANT PROJECT
No.0 DateAction by
CompanyDescription Status Closing Date
Expiration
Date
Ref. No.
CAR
Main
AreaSub-Area Issued By
Issuer
Company
1 2013.04.18 HSJVSeepage of treated water from
adjacent plantation area. Foul smell.CLOSED 2013.05.03 2013.04.26
ENV-IR-
13-0002
Village
2STP
Anthony
ManuelENEC
2 2013.04.18 HSJVNot barricaded and inadequate
signboardsCLOSED 2013.05.03 2013.04.26
ENV-IR-
13-0002Lay
down
AQMS
Station
Anthony
ManuelENEC
3 2013.04.18 TowerstechInappropriate waste segregation in
GMET waste skipCLOSED 2013.05.03 2013.04.26
ENV-IR-
13-0002
Village
1
Waste
Skips
Anthony
ManuelENEC
7/22/2019 117th HSJV Weekly Meeting Rev 12
49/53
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend:Collected - Waste from Site to Temporary Storage AreaDisposal - Waste from Temporary Storage Area to Landfill Area
Recycle - Treated waste ( GMET) to Recycling Plants
WASTE MANAGEMENT UPDATE
Week = 25/04/2013
01/05/2013
WASTE TYPEThis week Last week
Collected (m3) Disposal (m3) Recycled (m3) Recycle(%) Collected (m3) Disposal (m3) Recycled (m3) Recycle(%)
Paper 56 0 45 48 0 0
Metal 128 0 45 24 0 0
Construction 96 585 0 104 540 0
Concrete
0 0 0 0 0 0Wood(Good) 0 0 0 0 0 0
Wood(Bad) 344 485 45 352 315 45
Plastic 136 0 0 104 0 0
Municipal 0 328 0 0 312 0
Hazardous 0 0 0 0 0 0
Total Solid Waste 760 1,077 90 11.84% 632 1,167 45 7%
7/22/2019 117th HSJV Weekly Meeting Rev 12
50/53
7/22/2019 117th HSJV Weekly Meeting Rev 12
51/53
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
52/53
BARAKAH NUCLEAR POWER PLANT PROJECT
7/22/2019 117th HSJV Weekly Meeting Rev 12
53/53