117th HSJV Weekly Meeting Rev 12

Embed Size (px)

Citation preview

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    1/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    2/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Please Turn off your

    mobile! Or Switch to

    vibration mode!

    Check! Right Now!

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    3/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Dont Panic1

    Switch Off All Electrical Equipment2

    Dont Run, Walk Fast!3

    Go to the Assembly Point4

    Wait for the Final Instruction5

    SCREEN

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    4/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1. Safety Moment

    2. Previous Meeting

    3. HSE Programs

    Investigation Lesson Learnt

    4. HSE Statistics

    Performance per Area and Total

    5. HSE Findings Summary

    Findings analysis- cause wise,

    Company, and Area

    HSE Findings by Company

    Reported Property Damage

    Evaluation by Findings Score

    6. Weekly Inspection

    Committee Inspection

    Weekly Inspection

    7. Environmental Issues

    8. Action Plans

    Seoyong Hilalco

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    5/53BARAKAH NUCLEAR POWER PLANT PROJECT

    http://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/SAFETY%20MOMENT%2018TH%20MARCH%202013.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hazmat%20May%2006%20-%20.pptxhttp://localhost/var/www/apps/conversion/tmp/scratch_3/Hanlim%20Safety%20Moment%20-%20employer's%20duty.pptx
  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    6/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    7/53BARAKAH NUCLEAR POWER PLANT PROJECT

    NO. ITEMS ACTION PLANS ACTION BYDUE

    DATESTATUS

    1CCAP

    Findings

    KEPCO representative mentioned that KEPCO

    continues to report HSE findings thru CCAP. The

    numbers are to be checked and reflected in this

    meeting.HSJV Next

    Meeting

    2 High HSEFindings

    All findings issued to respective subcontractors are

    rated by a scoring system established by HSE.

    Findings under Hilalco reached 7.1 points landing

    them on top. The organization will come back with

    their plans next week

    Hilalco NextMeeting

    3Investigation

    Result

    The output from investigation and lesson learnt

    from recent serious incident involving toppled crane

    will be shared on next meeting.

    HSJVNext

    Meeting

    4Advan Action

    Plans

    The CEO of Advan will be on site tomorrow (30

    April) to have a direct evaluation of organizations

    HSE management .

    Advan Information

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    8/53

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    9/53BARAKAH NUCLEAR POWER PLANT PROJECT

    Description

    Date/Time : 01 May 2013, 7:00 AM

    Venue : CO Conference RoomSubject : Presentation of Corrective Actions

    Attendees : Advan CEO, HSJV, KEPCO

    Subcontractor Site Managers

    Summary of Action Plan

    - ADVAN

    1. Completing HSE organization

    2. HSE education and t raining achievement

    (Supervisor/Worker/Rigger/Korean)

    3. Inspection of JHA/PTW

    4. Disciplinary action for involved person- HSJV

    1. Disciplinary action for involved person

    2. Investigation and follow up action for CAR

    3. Feedback of actions taken to KEPCO

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    10/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    11/53BARAKAH NUCLEAR POWER PLANT PROJECT

    Team Selection

    Determine

    Sequence of

    Events

    Develop

    corrective

    actions

    Define Causal

    Factors

    Analyze eachcausal factors

    root causes

    Presentation ofreport

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    12/53BARAKAH NUCLEAR POWER PLANT PROJECT

    Sequence of Events

    13 April 2 013 : HSJV Architectural Dept.

    contacted subcontractor on relocation ofTower Crane 10

    16 April 2013 : Relocat ion postpone

    17 April 2013 :

    6:00 AM schedule for relocation set 21st

    April

    11:30 AM supervisor informed by

    construction manager

    1:30 PM team returns to worksite

    2:15 PM team starts lifting of counterweight

    block

    3:10 PM team lifts 14 th counterweight block

    3:15 PM tower crane #10 tilts and collapse

    4:00 PM investigation team appointed from

    KEPCO & ENEC

    4:15 PM police arrives at site

    Causal Factor : Team lifts the 14th

    counterweight block

    Root Cause : not qualified, workpackage/permit needs improvement (NI),

    enforcement NI, no preparation,

    scheduling NI

    Corrective and Preventive Actions :

    1. Re-evaluation of permit issuer, and permit

    holders

    2. Conduct internal audi ts

    3. Strict implementation no PTW, no work

    policy.

    4. Obtain work permit prior work

    5. Improve scheduling, planning and

    preparation of work

    Lesson learnt :

    Deployment of qualified personnel to ensure

    implementation of PTW system

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    13/53BARAKAH NUCLEAR POWER PLANT PROJECT

    Sequence of Events

    13 April 2013 :

    6:00 AM IP and team attended tool box

    meeting

    06:15 AM IP and team assigned to

    fix/align embed sleeve pipes.

    06:30 AM IP and team prepares sleeve

    pipe

    08:00 AM Supervisor demonstrate

    insertion of sleeve pipe

    09:00 AM IP collects measurement of

    sleeve

    09:55 AM IP aligns sleeve but pipe fell

    pressing finger of IP

    10:15 AM IPs injury cleaned inside clinic

    1:30 PM IP receives treatment from

    hospital

    Causal Factor : IP works alone

    Root Cause : Instruction needs

    improvement, communication, and

    supervision

    Corrective and Preventive Actions :

    1. Ensure instructions are understood

    2. Use of visual aids to enhance

    communication

    3. Close supervision on new members

    Lesson learnt :Guidance for newly hired personnel.

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    14/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Description

    BNPP will implement traffic scheme for paved road/non-paved road.

    Heavy vehicle is prohibited from the use of paved road to protect damages

    by trucks. To prevent and minimize dust emerging from ground.

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    15/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Description

    Bulk bags are classified as lifting

    accessory which requires third party

    inspection as stated in Abu Dhabi code,

    COP 34.0 Safe Use of Lifting Equipment

    and Lifting Accessories. This bag is not

    allowed on site.

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    16/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    17/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    18/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend : Ancillary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipment Shop

    Power Block Cut Off Wall, Wharf Area, Concrete Block Area

    * : 41 cases (Oct- Dec. 2011), 64 cases (2012), 22 (2013)

    ItemAncillary Area Camp Area Office Area Power Block Village 1 Village 2 HSJV Total NMDC Total

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    For the

    WeekCum

    Near Misses 0 0 0 0 0 2 0 13 0 0 0 0 0 15 0 0

    Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0First Aid Cases

    (FA) 0 2 0 0 1 5 3 27 0 4 0 2 4 40 0 0

    Medical

    Treatment Cases

    (MTC)1 1 0 1 0 4 0 5 0 1 0 1 1 13 0 0

    Restricted Work

    Cases (RWC) 0 2 0 1 0 0 0 3 0 0 0 0 0 6 0 0

    LTIs 0 0 0 0 0 0 0 3 0 0 0 0 0 3 0 0

    Property/Vehicle

    Accidents 0 2 0 1 0 4 0 7 0 1 0 1 0 16 0 0

    Environmental

    Release 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    For this week Cumulative

    One Strike Policy 4 127*

    (This Week From April 27 May 3 , 2013)

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    19/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    20/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    (This Week From April 27 May 3, 2013)

    TOTAL

    Near Miss

    CAR

    OC & WF

    0 0 0 0

    10 47 178 235

    0 26 404 430

    10 73 582 665

    Findings

    Issued

    TotalKE

    P

    C

    O

    H

    S

    J

    V

    S

    U

    B

    C

    O

    N

    Status

    Open Closed

    KEPCO HSJV Subcon KEPCO SubconHSJV

    0 0 0 0 0 0

    10 7 0 0 40 178

    0 0 0 0 26 404

    10 7 0 0 66 582

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    21/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    12

    34

    6

    78

    910

    1216

    1819

    2424

    2526

    2732

    3536

    3738

    3947

    59

    0 10 20 30 40 50 60 70

    Steel Erection

    LOTO

    Supervision

    Manual Handling

    Documents

    Training

    PTW

    Environmental

    Poor Illumination

    Excavation

    Color Coding

    Working at Height

    Hot Works

    Health & Welfare

    Waste Management

    Fall Protection

    Hand & Power Tools

    Electrical Safety

    Plant & Equipment

    PPE

    Material Management

    Fire Prevention

    Signs, Barriers & barricades

    Lifting

    Access & Egress

    Scaffolding

    (This Week From April 27 May 3, 2013)

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    22/53

    BARAKAH NUC EAR POWER P ANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    23/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    24/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    115

    84

    50

    310

    56

    52 4

    10

    31

    47

    76

    20

    12

    3 4 1 10

    10

    20

    3040

    50

    60

    70

    8090

    100

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    25/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90Steel Erection

    Supervision

    Documents

    TrainingManual Handling

    Poor Illumination

    PTW

    Excavation

    Environmental

    Color Coding

    Hot Works

    Waste Management

    Working at HeightHand & Power Tools

    Health & Welfare

    Electrical Safety

    Plant & Equipment

    Fall Protection

    Fire Prevention

    PPE

    Material Management

    LiftingSigns, Barriers & Barricades

    Access & Egress

    Scaffolding

    Housekeeping

    3, Signs, Barriers,

    Barricades

    5, Lifting

    16, Scaffolding

    3, Electrical Safety

    7, Signs, Barriers,

    Barricades

    6, Health and Welfare

    14, Housekeeping

    7, Housekeeping

    4, Housekeeping2, Access and

    Egress

    12, Housekeeping

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    26/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    0

    100

    200

    300

    400

    500

    600

    700

    800

    0

    10

    20

    30

    40

    50

    60

    70

    80

    Seoy

    ong

    Seoyong(PB)

    TowersT

    ech

    Gu

    san

    Jong

    hap

    Jonghap(PB)

    YounCh

    ang

    YounChang(PB)

    Hwac

    hon

    W

    BG

    Hilalco

    Ad

    van

    Hanlim

    Uwell

    Yo

    oA

    Hyundai

    C&I

    Samjin

    Eug

    ene

    Daemy

    ung

    Seo

    bonD&I

    AlRaeel

    D

    OW

    Sam

    ho

    Geumhwa

    Sungch

    angSeil

    KEPCO/HSJVSUBCON

    Manpower

    (This Week From April 27 May 3 , 2013)

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    27/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Action Plan for Company requiring assistance and support from the system

    1. Joint Inspection will be carried out by Area Management Team.

    2. Spot Training will be given to workers about major findings

    3. Action plan will be submitted to HSJV HSE Team develop by D&I

    0.0

    2.0

    4.0

    6.0

    1.1

    4.24.9

    4.2

    1.0 1.2 0.4

    1.7

    1.20.2

    1.4

    4.1

    5.0

    2.0

    1.0 1.2

    Findings Score = Number of Causal x Risk(Factor Score)

    Source: CAR, Near Miss, Walkthrough andObservation Card reported by KEPCO & HSJV

    Legend : (I) Infra, (PB) Power Block

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    28/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    29/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Top Hazards

    Cause Nos

    Housekeeping 11

    Access & Egress 6

    Control Measure Due Date

    Proper management of

    cables using cables hangersDone

    Ensure that access are

    properly inspected and

    passed the standard

    Done

    Total No. of Findings: 39Housekeeping, 11

    Access & Egress,

    6

    Fire Prevention, 4

    Material

    Management, 4

    Scaffolding, 3

    Fall Protection, 2

    PTW, 2

    PPE, 1

    Hand & PowerTools, 1

    Lifting, 1

    Waste

    Management, 1

    Signs, Barriers &

    Barricades, 1

    Color Coding, 1 Hot Works, 1

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    30/53

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    31/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Top Hazards

    Cause Nos

    Housekeeping 7

    Scaffolding 7

    Control Measure Due Date

    Provide cable hangers &

    ensure that protrudingnails are removed from

    unused woods.

    Done

    Scaffolding planks & toe

    boards should be properly

    installed according to

    standard.

    Done

    Total No. of Findings : 42Housekeeping, 7

    Scaffolding, 7

    Waste

    Management, 6

    Lifting, 5Excavation, 4

    Access & Egress,

    4

    Fall Protection, 4

    Health &

    Welfare, 3

    Material

    Management, 2

    Electrical Safety,

    2

    Working at

    Height, 2

    Poor

    Illumination, 2

    Signs, Barriers &

    Barricades, 1

    Hand & Power

    Tools, 1

    PPE, 1

    Plant &

    Equipment, 1

    Training, 1Color Coding, 1

    Source: CAR, Near Miss, Walkthrough and Observation Card

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    32/53

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    33/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Inspection Date Attendees Remark

    Committee Inspection 2013-04-30 HSJV, KEPCO, HSE Management Team 9 Findings

    Weekly Inspection 2013-05-01 HSJV HSE Team 15 Findings

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    34/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    I tem No. LOCATION Area/Activity RECOMMENDED ACTIONS RESPONSIBLE STATUS

    1Seoyong / First Aid

    Room

    1. Provision of appropriate First Aid Box with chec klist attached.

    2. First Aid - Criteria/Requirements Checklist should be posted on

    the first aid room.

    3. Provision of "what to do" list/guidelines in applying first aid

    treatment.

    4. Immediate repair on defective floor.

    Seoyong Open

    2Samjin / First Aid

    Room

    1. First Aid - Criteria/Requirements Checklist should be posted on

    the first aid room.

    2. Provision of "what to do" list/guidelines in applying first aid

    treatment.

    Samjin Closed

    3Advan / First Aid

    Room

    1. First Aid - Criteria/Requirements Checklist should be posted on

    the first aid room.

    2. Provision of "what to do" list/guidelines in applying first aid

    treatment.

    3. Immediate action needed to provide cover on the said

    electrical panel.

    Advan Closed

    4Hilalco / First Aid

    Room

    1. Provision of appropriate First Aid Room.

    2. . First Aid - Criteria/Requirements Checklist should be posted

    on the first aid room.

    3. Provision of "what to do" list/guidelines in applying first aid

    treatment.

    Hilalco Open

    5 AB1Lifting / Waste

    Disposal

    Tool Box Meeting for all Riigers and Supervisors involved that no

    lifting of nylon bags directly.

    All involved

    Subcons / HSJVOpen

    6 AB1Younchang/ First

    Aid Room

    1. Provision of proper First Aid Box.

    2. Provision of "what to do" list/guidelines for First Aid Trained

    Personnel to follow in case of first aid treatment.

    Younchang Open

    7 TGB Geumhwa

    1. First Aid - Criteria/Requirements Checklist should be

    developed and posted inside the First Aid Room next to the First

    Aid Boxes.

    2. Provision of "what to do" list/guidelines for First Aid Trained

    Personnel to follow in case of first aid treatment.

    Geumhwa Closed

    8 O&M BldgSeobon / First Aid

    Room

    1. Provision of appropriate First Aid Room.

    2. First Aid - Criteria/Requirements Checklist should be posted on

    the first aid room.

    3. Provision of "what to do" list/guidelines in applying first aid

    treatment.

    Seobon Open

    Provision of adequate welfare facilities for Heat Stress

    Prevention. (Shelters and Toilets)Done

    The Committee agreed that there should be a provision of the

    Heat Stress Prevention Campaign Banners posted at site. Design

    will be provided by ENEC.

    Open

    1. No Criteria or Guideline Checklist for First Aid Requirements.

    2. Rely only to Kepco Clinic for Initial Treatment

    Laydown

    1. No Criteria or Guideline Checklist for First Aid Requirements.

    2. Rely only to Kepco Clinic for Initial Treatment

    1. Inappropriate First Aid Box.

    2. No Criteria or Guideline Checklist for First Aid Requirements.

    3. Rely only to Kepco Clinic for Initial Treatment

    4. Defective floor, prone to tripping hazard. Might cause foot injury.

    FINDINGS

    9All

    Locations

    All area and

    activities

    1. No appropriate First Aid Room utilized the HSE Office as First Aid

    Room.

    2. No Criteria or Guideline Checklist for First Aid Requirements.

    3. Rely only to Kepco Clinic for Initial Treatment

    1. No appropriate First Aid Room, utilized Site Office as First AidRoom.

    2. No Criteria or Guideline Checklist for First Aid Requirements.

    3. Rely only to Kepco Clinic for Initial Treatment

    HSJV / All Sub-

    ContractorsHeat Stress Prevention Campaign Banner not available at site.

    1. No Criteria or Guideline Checklist for First Aid Requirements.

    2. Rely only to Kepco Clinic for Initial Treatment

    3. Found First Aid Room Electrical Panel not covered. Exposure of

    conductive terminals.

    Heat Stress Prevention not yet fully prepared.

    Lifting of Nylon Bags containing mixed waste materials without steel

    waste box.

    1. Checklist available for the First Aid Kit but inappropriate First Aid

    Box was used.

    2.Rely only to Kepco Clinic for Initial Treatment

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    35/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Description

    Standard is set for first aid

    room facility at site ensuring

    management of incident are

    handled as per medical

    practices.

    The minimum requirements for

    first aid room shall be followed

    by Subcontractors.

    Subcontractors to ensure room

    can accommodate number of

    incidents. The project is

    following a ratio of 1:50 in

    number of first aid personnel.

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    36/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1

    1

    1

    1

    1

    2

    3

    5

    0 1 2 3 4 5 6

    Damaged lifting gear

    Unsafe Operation

    Lifting gear no color coding

    Insufficient Permit

    No Supervisor

    Equipment no TPC

    Lifting gear no TPC

    Lifting Radius not secured

    Findings per Causal

    Key item : Lifting with Crane

    3 3

    1

    2

    3

    1

    2

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    Advan Gusan Hilalco HSJV Seobon Seoyong (PB) Towerstech

    Findings per Company

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    37/53

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    38/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.Source of

    InjuryArea Description

    Immediate

    Action

    Planned

    Supervisor

    Preventive Action

    1 Pain and skinabrasion

    YOO A

    Welder

    Ancillary areawelding shop

    30-04-2013

    16:30

    The worker a welder

    performed gas cutting

    on pipe when suddenly

    his small finger came incontact with hot

    surface. Worker

    sustained superficial

    burn.

    Assessed by Dr.

    Kim

    Cleansing

    &wound

    dressing done Anti-bacterial

    cream applied

    (Flamazine)

    Will need wound

    dressing - Daily

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    39/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.Source of

    InjuryArea Description

    Immediate

    Action

    Planned

    Supervisor

    Preventive Action

    2

    Low back

    pain lifting

    30kg cable

    Jonghap

    Electrical Helper

    Power Block

    28-04-2013

    10:00

    The worker complained of

    sudden pain, low backarea after lifting a 20-30kg

    cable.

    Assessed by Dr.

    Kim

    Topical analgesic

    applied and

    given

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    40/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No. Source ofInjury

    Area Description ImmediateAction

    PlannedSupervisor

    Preventive Action

    3

    Injury cut

    wound left

    ring finger

    Advan

    Carpenter

    AB Area of

    Power Block

    02-05-2013

    08:25

    Injured person was

    instructed by hissuperior to replace tie

    rod at concrete spacer,

    so as injured person

    released the tie rod,

    the spacer moved and

    trapped his finger.

    Assessed by Dr.

    Kim

    Wound cleansing

    and dressing done

    Steri-strip

    application

    Tetanus toxoid

    injection given at

    left deltoid

    muscle.

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    41/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No. Source ofInjury

    Area Description ImmediateAction

    PlannedSupervisor

    Preventive Action

    4

    Injury

    Crashed by

    stock of

    plywood-

    right index

    finge

    HSJV

    Labour

    Construction

    Office Area

    02-05-2013

    13:30

    The injured person

    while moving plywoodwas pressed by the

    material during

    placement at back of

    pickup. Injured persons

    finger suffered light

    abrasion.

    Assessed by Dr.

    Kim

    Wound dressing

    done.

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    42/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.Source of

    InjuryArea Description

    Immediate

    Action

    Planned

    Supervisor

    Preventive Action

    5

    Injury cut

    wound left

    index finger

    Youn Chang

    Pipe fitter

    Power Block /

    AB No. 2

    02-05-2013

    10:20

    The worker tried to

    replace a new cutting

    disc on portable

    grinder however whiletool was switched off,

    IP immediately started

    to detach rotating

    wheel thus his index

    finger came in contact

    with the slowing disc.

    Assessed by Dr.

    Kim

    Wound cleansing

    and dressing done

    Tetanus injection

    given at left

    deltoid muscle

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    43/53

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    44/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Inspection Date: 1st May

    Inspection Course:

    Village 2 Municipal waste area Village 2 STP Power Block Area Temporary waste Area

    Inspection Item:

    Waste Segregation, Disposal, Recycle

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    45/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Village 2

    Description Seepage of treated water from adjacent plantation area. Foul smell.

    Action taken Area backfill carried out. Provision of dike to prevent seepage.

    Status CLOSED

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    46/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location AQMS Station

    Description Not barricaded and inadequate signboards

    Action taken Provided physical barricades and appropriate signages

    Status CLOSED

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    47/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Village 1

    Description Inappropriate waste segregation in GMET waste skip

    Action taken Spot Training and Waste Management Awareness conducted. Sorting and segregation of wastematerials been carried out.

    Status CLOSED

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    48/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    No.0 DateAction by

    CompanyDescription Status Closing Date

    Expiration

    Date

    Ref. No.

    CAR

    Main

    AreaSub-Area Issued By

    Issuer

    Company

    1 2013.04.18 HSJVSeepage of treated water from

    adjacent plantation area. Foul smell.CLOSED 2013.05.03 2013.04.26

    ENV-IR-

    13-0002

    Village

    2STP

    Anthony

    ManuelENEC

    2 2013.04.18 HSJVNot barricaded and inadequate

    signboardsCLOSED 2013.05.03 2013.04.26

    ENV-IR-

    13-0002Lay

    down

    AQMS

    Station

    Anthony

    ManuelENEC

    3 2013.04.18 TowerstechInappropriate waste segregation in

    GMET waste skipCLOSED 2013.05.03 2013.04.26

    ENV-IR-

    13-0002

    Village

    1

    Waste

    Skips

    Anthony

    ManuelENEC

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    49/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend:Collected - Waste from Site to Temporary Storage AreaDisposal - Waste from Temporary Storage Area to Landfill Area

    Recycle - Treated waste ( GMET) to Recycling Plants

    WASTE MANAGEMENT UPDATE

    Week = 25/04/2013

    01/05/2013

    WASTE TYPEThis week Last week

    Collected (m3) Disposal (m3) Recycled (m3) Recycle(%) Collected (m3) Disposal (m3) Recycled (m3) Recycle(%)

    Paper 56 0 45 48 0 0

    Metal 128 0 45 24 0 0

    Construction 96 585 0 104 540 0

    Concrete

    0 0 0 0 0 0Wood(Good) 0 0 0 0 0 0

    Wood(Bad) 344 485 45 352 315 45

    Plastic 136 0 0 104 0 0

    Municipal 0 328 0 0 312 0

    Hazardous 0 0 0 0 0 0

    Total Solid Waste 760 1,077 90 11.84% 632 1,167 45 7%

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    50/53

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    51/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    52/53

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/22/2019 117th HSJV Weekly Meeting Rev 12

    53/53