AA101D - Site Name
BTS Site Specific Documentation
1144 CABS
LTE Flexi Multi Radio BTS1Site General Information
2RF Final Site Configuration
3Antenna System Installation Report
4Antenna System Commissioning Report
5BTS Installation Report
6Transmission Installation Report
7BTS Commissioning & Integration Report
8Power System Installation Report
9Site Inventory
10Certificates
11Appendix
LTE Flexi Multi Radio BTS
SITE SPECIFIC DOCUMENTATION
1144 CABS
Document Revision History
VersionAuthorDate ApprovedVersion History
1-0Taworn Pan-on4 September 2014First Issue
1. Site General Information
1.1 Site Details Summary Document
Site NameCABS
Site ID1144
AddressHarare, Zimbabwe
CoordinatesS -17.83028E 31.05083
1.2 Site Access Information
Site Access REQUIRED
Special Access Measures
Other CommentsROOFTOP SITE
2. RF Final Site Configuration
FORMCHECKBOX ( Insert the document RF Final Site Configuration from the radio network plan following this section.
3. ANTENNA SYSTEM INSTALLATION REPORT
3.1 Antenna System ConfigurationSECTOR 1SECTOR 2SECTOR 3
Antenna Type CodeDBXLH-8585B-VTMDBXLH-8585B-VTMDBXLH-8585B-VTM
Number of Antennas FORMCHECKBOX 1 FORMCHECKBOX 2 FORMCHECKBOX 1 FORMCHECKBOX 2 FORMCHECKBOX 1 FORMCHECKBOX 2
Set Direction0120 240
Mechanical Tilt000
Electrical Tilt 900444
Electrical Tilt 1800444
Mounting Height54m. AGL54m. AGL54m. AGL
3.2 Antenna Feeder Cable Configuration
Sector 1Sector 2Sector 3
-45O+45O-45O+45O-45O+45O
Cable 1Cable 2Cable 3Cable 4Cable 5Cable 6
Cable Label (
Item/Description (
1.Feeder Cable Type: (e.g. 1/2", 7/8, 1-5/8") n/a n/a n/a n/a n/a n/a
2.Installed Feeder Cable length: n/a n/a n/a n/a n/a n/a
3.Number of Earth kits installed:n/an/a n/a n/a n/a n/a
4.Number of EMPs installed:n/an/a n/a n/a n/a n/a
5.Internal Jumper Cable Lengths
a.)*BTS ( Feeder Cable n/a n/a n/a n/a n/a n/a
6.External Jumper Cable Lengths
a.)*Feeder Cable ( Antenna n/a n/a n/a n/a n/a n/a
b.)*RF Mod ( Antenna3m n/a n/a n/a n/a n/a
c.)*RF Mod ( Feeder Cablen/a n/a n/a n/a n/a n/a
d.)*2G SYS Mod ( RF Mod.Fiber 75m.Fiber 75m.Fiber 75m.Fiber 75m.Fiber 75m.Fiber 75m.
e.)*LTE SYS Mod ( RF Mod.n/a. n/a n/a n/a n/a n/a
* Complete row relevant to antenna configuration:
3.3 Antenna System Installation Checklist
DescriptionChecked
Antennas mounted according to Standard Procedures and Site Specific DocumentsSYMBOL 252 \f "Wingdings"
Antenna height checked according to Final Site ConfigurationSYMBOL 252 \f "Wingdings"
Antenna forward direction set and checked according to Final Site ConfigurationSYMBOL 252 \f "Wingdings"
Mechanical tilting angle set and checked according to Final Site Configuration SYMBOL 252 \f "Wingdings"
Electrical tilting angle set and checked according to Final Site ConfigurationSYMBOL 252 \f "Wingdings"
Antenna mounting clamps & tilting kits checked, all screws tightenedSYMBOL 252 \f "Wingdings"
Feeder cables installed according to Site Specific DocumentsSYMBOL 252 \f "Wingdings"
Feeder cables grounded at top of support structure close to the antennaSYMBOL 252 \f "Wingdings"
Feeder cables grounded at bottom of tower/mast SYMBOL 252 \f "Wingdings"
Feeder cables grounded at additional points (d > 80m) where applicable N/A FORMCHECKBOX N/A
Feeder cables grounded at the entry point to BTS N/A
Feeder cables secured in position with cable hangers and clampsSYMBOL 252 \f "Wingdings"
Feeder cables labelled correctly (at each end)SYMBOL 252 \f "Wingdings"
External jumper cable connectors checked and tightened at both ends SYMBOL 252 \f "Wingdings"
All external connectors checked for correct sealing SYMBOL 252 \f "Wingdings"
All jumper cable connectors checked and tightened at both endsSYMBOL 252 \f "Wingdings"
All jumper cables labelled correctly at both ends SYMBOL 252 \f "Wingdings"
Notes on Antenna System Installation 4. Antenna System Commissioning Report 4.1 Antenna System VSWR Measurement Results
SECTOR 1SECTOR 2SECTOR 3
Cable Label:
Sweeptests Measurement Results:
VSWR for complete Antenna System (NSN/Netone):n/an/an/an/an/an/a
RL for complete Antenna System (NSN/Netone):n/an/an/an/an/an/a
Checklist of Printed Sweeptests Results:
Full Antenna Subsystem: n/an/an/an/an/an/a
FORMCHECKBOX ( Copies of Antenna Test Result files are printed after this section.
Note: Feeder less solution no feeder installed on site.4.2 Antenna Measurement EquipmentModel:Serial Number:Manufacturer:Last Calibration Date:
N.B. Instrument calibration interval shall not exceed 12 month
4.3 Finishing Checklist
DescriptionChecked
All cables restored to normal position for BTS operationSYMBOL 252 \f "Wingdings"
All cable connectors properly tightenedSYMBOL 252 \f "Wingdings"
All external connectors sealed and waterproofSYMBOL 252 \f "Wingdings"
Black Plastic Cable Ties placed on all external sealed cable connections (to secure the PVC tape)SYMBOL 252 \f "Wingdings"
Antenna system configuration table completed in Section 3.1 aboveSYMBOL 252 \f "Wingdings"
Feeder inventory list completed in Section 3.2 aboveSYMBOL 252 \f "Wingdings"
Paper copy of the antenna line test results included following each sectionSYMBOL 252 \f "Wingdings"
All VSWR measurement results are within the defined test limits.SYMBOL 252 \f "Wingdings"
Notes on Antenna System Commissioning 5. bts INSTALLATION Report
5.1 BTS Configuration
Installed LTE Flexi BTS Configuration:
FORMCHECKBOX 1 + 1 + 1 FORMCHECKBOX Other: __________________
Installed 2G Flexi Multi Radio BTS Configuration:
FORMCHECKBOX 4+4+4+4+4+4 FORMCHECKBOX Other: __________________
FORMCHECKBOX 2 + 2 + 2 Feeder Site / Feeder less Site Configuration:
FORMCHECKBOX Feeder
FORMCHECKBOX Feeder less Installed LTE Flexi BTS Hardware Module/s:
FORMCHECKBOX FSMF SYSTEM MODULE
FORMCHECKBOX FXEB 1800 RF MODULE
Installed 2G Flexi Multi Radio Hardware Module/s:
FORMCHECKBOX ESMC SYSTEM MODULE
FORMCHECKBOX FXEB 1800 RF MODULE
FORMCHECKBOX FXDB 900 RF MODULE
FORMCHECKBOX FIQB TRANSMISSION SUBMODULE
FORMCHECKBOX FPFC POWER DISTRIBUTION MODULE
FORMCHECKBOX FPMA POWER MODULE
FORMCHECKBOX FPAA AC/DC SUBMODULE
FORMCHECKBOX FPBB BATTERY
FORMCHECKBOX Other: __________________
FORMCHECKBOX RF sharing on FXEB
BTS Equipment Installation Type and Location:
BTS EQUIPMENT (SYMBOL 252 \f "Wingdings")BTS EQUIPT INSTALLATION
TYPE (SYMBOL 252 \f "Wingdings")BTS EQUIPT INSTALLATION
LOCATION (SYMBOL 252 \f "Wingdings")REMARKS
FORMCHECKBOX LTE SYSTEM MODULE FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter
FORMCHECKBOX Outdoor
FORMCHECKBOX Tower
FORMCHECKBOX RooftopN/A
FORMCHECKBOX 2G SYSTEM MODULE FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter
FORMCHECKBOX Outdoor
FORMCHECKBOX Tower
FORMCHECKBOX RooftopN/A
FORMCHECKBOX RF MODULE 1
(Sector 1/2/3) FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter
FORMCHECKBOX Outdoor
FORMCHECKBOX Tower
FORMCHECKBOX RooftopN/A
FORMCHECKBOX RF MODULE 2
(Sector 4/5/6) FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter
FORMCHECKBOX Outdoor
FORMCHECKBOX Tower
FORMCHECKBOX RooftopN/A
FORMCHECKBOX RF MODULE 3
(LTE) FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter
FORMCHECKBOX Outdoor
FORMCHECKBOX Tower
FORMCHECKBOX Rooftop1800 Module (FXEB)
FORMCHECKBOX POWER MODULE 1 (FPFC) FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter
FORMCHECKBOX Outdoor
FORMCHECKBOX Tower
FORMCHECKBOX RooftopFPFC feed 3 x RF modules
FORMCHECKBOX POWER MODULE 2
FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter
FORMCHECKBOX Outdoor
FORMCHECKBOX Tower
FORMCHECKBOX RooftopN/A
FORMCHECKBOX POWER MODULE 3
FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter
FORMCHECKBOX Outdoor
FORMCHECKBOX Tower
FORMCHECKBOX RooftopN/A
5.2 BTS Installation ChecklistDescriptionChecked
Delivery is complete and undamagedSYMBOL 252 \f "Wingdings"
Minimum clearances are metSYMBOL 252 \f "Wingdings"
Adapter mechanics are installed (for wall and pole installation)N/A
Plinth is installed according to the instructionsSYMBOL 252 \f "Wingdings"
Plinth is groundedSYMBOL 252 \f "Wingdings"
Transmission sub-module is installed according to the instructionsSYMBOL 252 \f "Wingdings"
Power supply cable is connectedSYMBOL 252 \f "Wingdings"
Modules are installed according to the instructionsSYMBOL 252 \f "Wingdings"
Modules are grounded to the plinthSYMBOL 252 \f "Wingdings"
Module back covers are installedSYMBOL 252 \f "Wingdings"
Cable entries are installedSYMBOL 252 \f "Wingdings"
Antenna cables are connected according to the configurationSYMBOL 252 \f "Wingdings"
Internal power cables are connectedSYMBOL 252 \f "Wingdings"
Transmission cables are connectedSYMBOL 252 \f "Wingdings"
Optical fibre cables are cleaned and connectedSYMBOL 252 \f "Wingdings"
External alarm cable is connectedN/A
Cables between the modules on the same plinth are routed via internal cable entriesSYMBOL 252 \f "Wingdings"
BTS External cables or cables between the modules on different plinths are routed via external cable entriesSYMBOL 252 \f "Wingdings"
Cables are tied properlySYMBOL 252 \f "Wingdings"
Cable connector seals are firmly in placeSYMBOL 252 \f "Wingdings"
Unused connectors are covered with IP sealsSYMBOL 252 \f "Wingdings"
BTS is switched on and all units are ready for commissioningSYMBOL 252 \f "Wingdings"
Module front covers are installedSYMBOL 252 \f "Wingdings"
Site is clean and installation completedSYMBOL 252 \f "Wingdings"
Notes on BTS Installation
6. TRANSMISSION iNSTALLATION6.1 Transmission Configuration
SUBMODULE INSTALLED (SYMBOL 252 \f "Wingdings")INTERFACE USED (SYMBOL 252 \f "Wingdings")
FORMCHECKBOX LTE FORMCHECKBOX E1 Interface 1 FORMCHECKBOX E1 Interface 2 FORMCHECKBOX E1 Interface 3
FORMCHECKBOX E1 Interface 4 FORMCHECKBOX Gb Ethernet EIF 1
FORMCHECKBOX Fast Ethernet EIF 2 FORMCHECKBOX Fast Ethernet EIF 3
FORMCHECKBOX FIQB (2G) FORMCHECKBOX E1 Interface 1 FORMCHECKBOX E1 Interface 2 FORMCHECKBOX E1 Interface 3
FORMCHECKBOX E1 Interface 4 FORMCHECKBOX Gb Ethernet EIF 1
FORMCHECKBOX Fast Ethernet EIF 2 FORMCHECKBOX Fast Ethernet EIF 3
6.2 Transmission Installation Checklist
DescriptionChecked
Transmission Sub module installed properlySYMBOL 252 \f "Wingdings"
Transmission cables installed as per specificationsSYMBOL 252 \f "Wingdings"
Transmission DDF installed as per specificationsSYMBOL 252 \f "Wingdings"
Transmission cables connected to specified transmission DDFSYMBOL 252 \f "Wingdings"
Notes on Transmission Installation7. BTS COMMISSIONING AND INTEGRATION REPORT
7.1 Site Commissioning Parameters
ITEMVALUE
BTS NameCABS
BTS ID 911281
BTS IP Address10.26.17.20
MME Name
MME ID
MME IP
NTP IP10.26.8.84
Netmask255.255.255.248
Frequency1800 (1/1/1)
Tx Power20W
BTS SW Release VersionLN4.0_ENB_1202_902_09
7.2 BTS Commissioning Report
FORMCHECKBOX ( Insert printed copy of BTS Commissioning Report following this section.
7.3 BTS Integration
Test Handset Details
MODELSERIAL NUMBERPHONE NUMBERSIM NUMBER
Voice Call (MOC Call) Success
CELL OKNAINITIALS / DATECOMMENTS
CELL 1 FORMCHECKBOX
FORMCHECKBOX
13 April 2015
CELL 2 FORMCHECKBOX
FORMCHECKBOX
13 April 2015
CELL 3 FORMCHECKBOX
FORMCHECKBOX
13 April 2015
Voice Call (MTC Call) Success
CELL OKNAINITIALS / DATECOMMENTS
CELL 1 FORMCHECKBOX
FORMCHECKBOX
13 April 2015
CELL 2 FORMCHECKBOX
FORMCHECKBOX
13 April 2015
CELL 3 FORMCHECKBOX
FORMCHECKBOX
13 April 2015
PS Call Success
CELL OKNAINITIALS / DATECOMMENTS
CELL 1 FORMCHECKBOX
FORMCHECKBOX
13 April 2015
CELL 2 FORMCHECKBOX
FORMCHECKBOX
13 April 2015
CELL 3 FORMCHECKBOX
FORMCHECKBOX
13 April 2015
8. pOWER SYSTEM INSTALLATION REPORT8.1 BTS Power Supply Configuration FORMCHECKBOX Tap to Existing:LTE System Module Circuit Breaker:
2G System Module Circuit Breaker: 60A
Input Voltage to System Module: 54.24
RF Module Circuit Breaker: 60A
Input Voltage to RF Module: 54.24
FORMCHECKBOX Not Applicable
Rectifier Equipment ImplementationPower System 1 / Serial No.
Power System 2 / Serial No.
Power System 3 / Serial No.
PC Serial No.
Rectifier Module type FORMCHECKBOX ELTEK FORMCHECKBOX Other: ____________________
Rectifier Serial No. Rectifier 1:
Rectifier 2:
Rectifier 3:
Rectifier 4:Rectifier 1:
Rectifier 2:
Rectifier 3:
Rectifier 4:
Battery Back-up InfoBattery Manufacturer:
No of Battery Banks: Battery Breakers (100A/bank):
Battery Unit Serial
Numbers:BANK1
Bat1 ______________
Bat2 ______________
Bat3 ______________
Bat4 ______________BANK1
Bat1 ______________
Bat2 ______________
Bat3 ______________
Bat4 ______________BANK1
Bat1 ______________
Bat2 ______________
Bat3 ______________
Bat4 ______________BANK1
Bat1 ______________
Bat2 ______________
Bat3 ______________
Bat4 ______________
Battery Open Circuit Voltages:
Bank 1 _________V
Block 1 _________V
Block 2 _________V
Block 3 _________V
Block 4 _________V Bank 2 _________V
Block 1 _________V
Block 2 _________V
Block 3 _________V
Block 4 _________V
Bank 3 _______V
Block 1 _______V
Block 2 _______V
Block 3_ ______V
Block 4 _______V Bank 4 _________V
Block 1 _________V
Block 2 _________V
Block 3 _________V
Block 4 _________V
NOTE: Battery Open CCT shall be carried out in warehouse prior delivery of batteries to site. Battery Open Circuit Voltage below 12.30VDC should not be installed and are to be replaced!9. SITE INVENTORY
9.1 NSN Supplied Equipment
DescriptionProduct CodeSerial NumberQuantity
LTE/2G BTS Antenna 1DBXLH-8585B-VTM14CN1030209081
LTE/2G BTS Antenna 2DBXLH-8585B-VTM14CN1030362841
LTE/2G BTS Antenna 3DBXLH-8585B-VTM14CN1030362881
LTE System Module - FSMF472181AEA1433636111
2G System Module - ESMC
RF Module 1 FXDB
RF Module 2 FXDB
RF Module 3 FXDB
RF Module 1 FXEB472501AL61441010111
RF Module 2 FXEB
RF Module 3 FXEB
Transmission FIQB
Power Module 1
Power Module 2
Power Module 3
AC/DC Sub module 1
AC/DC Sub module 2
AC/DC Sub module 3
Battery 1
Battery 2
Battery 3
Battery 4
Battery 5
Battery 6
Battery 7
Battery 8
Battery 9
9.2 Changes to Site Inventory
New unitOld unitNOKIA Fault Report Number
Name / VersionSerial NumberName / VersionSerial Number
10. cERTIFICATES10.1 GSM Flexi MultiradioBTS SITE PUNCH LIST FORMCHECKBOX ( Insert printed copy of signed GSM Flexi MultiradioBTS Site Punch List following this section.
10.2 FAT CERTIFICATE
FORMCHECKBOX ( Insert printed copy of signed FAT Certificate following this section.COMPLETED BY:NAME:_______________________________ SIGNED:_______________________ DATE: ___/___/___ (NSN Representative)GSM FLEXI MULTIRADIO BTS SITE PUNCH LIST
NETONE NOKIA SIEMENS NETWORKSSITE DATA
ItemData
Site ID1144
Site NameCABS
Installed by / Date15 November 2014
Commissioned by / Date15 November 2014
Integrated by / Date13 April 2015
PUNCH LIST
Select the correct check number and point to check in Flexi MultiRadio BTS Implementation Check List. Type the description of point to check and your comments for failure description.When completed, type what was done.
Check no.Defect/Failure DescriptionOwnerRaised by /dateCompleted by / date
PUNCH LIST APPROVED BY:
NETONE REPRESENTATIVE:_____________________________________DATE: ____ / ____ / ________
(
)
NSN REPRESENTATIVE:_______________________________________DATE: ____ / ____ / ________
(
)
final ACCEPTANCE TESTING (Fat)
NETONE NOKIA SIEMENS NETWORKSSite Provisional Acceptance certificate for telecom implementation works
INDENT Number:SITE ADDRESS:
Site ID:1144
Site Name:CABS
STAGECOMPLETE (Initials/Signature)
GSM FLEXI MULTIRADIO BTS Site Installation
GSM FLEXI MULTIRADIO BTS Site Commissioning
GSM FLEXI MULTIRADIO BTS Site Integration
GSM BTS Site Folder and Attached Documents
Nokia Networks hereby states that the whole of supplies detailed above have been inspected, implemented, tested and unless otherwise stated conform to the specified requirements in the contract or order identified above.
NETONE REPRESENTATIVE:_________________________________________DATE: ____ / ____ / ________
(
)
NSN REPRESENTATIVE:___________________________________________DATE: ____ / ____ / ________
(
)
11. appendix
11.1 BTS Installation Document
FORMCHECKBOX ( Insert printed copy of BTS Installation Document following this section.
Number/VersionCopyright Nokia NetworksPage
1-0Company Confidential
Paper Copy Uncontrolled2(22)