22
BTS Site Specific Documentation 1144 – CABS LTE Flexi Multi Radio BTS 1 Site General Information 2 RF Final Site Configuration 3 Antenna System Installation Report 4 Antenna System Commissioning Report 5 BTS Installation Report Transmission Installation Report ! BTS Commissioning " Integration Report # $o%er System Installation Report & Site In'entory 1( Certifi)ates 11 Appen*i+

1144_CABS _SSD_LTE.doc

Embed Size (px)

DESCRIPTION

SSD for acceptance

Citation preview

AA101D - Site Name

BTS Site Specific Documentation

1144 CABS

LTE Flexi Multi Radio BTS1Site General Information

2RF Final Site Configuration

3Antenna System Installation Report

4Antenna System Commissioning Report

5BTS Installation Report

6Transmission Installation Report

7BTS Commissioning & Integration Report

8Power System Installation Report

9Site Inventory

10Certificates

11Appendix

LTE Flexi Multi Radio BTS

SITE SPECIFIC DOCUMENTATION

1144 CABS

Document Revision History

VersionAuthorDate ApprovedVersion History

1-0Taworn Pan-on4 September 2014First Issue

1. Site General Information

1.1 Site Details Summary Document

Site NameCABS

Site ID1144

AddressHarare, Zimbabwe

CoordinatesS -17.83028E 31.05083

1.2 Site Access Information

Site Access REQUIRED

Special Access Measures

Other CommentsROOFTOP SITE

2. RF Final Site Configuration

FORMCHECKBOX ( Insert the document RF Final Site Configuration from the radio network plan following this section.

3. ANTENNA SYSTEM INSTALLATION REPORT

3.1 Antenna System ConfigurationSECTOR 1SECTOR 2SECTOR 3

Antenna Type CodeDBXLH-8585B-VTMDBXLH-8585B-VTMDBXLH-8585B-VTM

Number of Antennas FORMCHECKBOX 1 FORMCHECKBOX 2 FORMCHECKBOX 1 FORMCHECKBOX 2 FORMCHECKBOX 1 FORMCHECKBOX 2

Set Direction0120 240

Mechanical Tilt000

Electrical Tilt 900444

Electrical Tilt 1800444

Mounting Height54m. AGL54m. AGL54m. AGL

3.2 Antenna Feeder Cable Configuration

Sector 1Sector 2Sector 3

-45O+45O-45O+45O-45O+45O

Cable 1Cable 2Cable 3Cable 4Cable 5Cable 6

Cable Label (

Item/Description (

1.Feeder Cable Type: (e.g. 1/2", 7/8, 1-5/8") n/a n/a n/a n/a n/a n/a

2.Installed Feeder Cable length: n/a n/a n/a n/a n/a n/a

3.Number of Earth kits installed:n/an/a n/a n/a n/a n/a

4.Number of EMPs installed:n/an/a n/a n/a n/a n/a

5.Internal Jumper Cable Lengths

a.)*BTS ( Feeder Cable n/a n/a n/a n/a n/a n/a

6.External Jumper Cable Lengths

a.)*Feeder Cable ( Antenna n/a n/a n/a n/a n/a n/a

b.)*RF Mod ( Antenna3m n/a n/a n/a n/a n/a

c.)*RF Mod ( Feeder Cablen/a n/a n/a n/a n/a n/a

d.)*2G SYS Mod ( RF Mod.Fiber 75m.Fiber 75m.Fiber 75m.Fiber 75m.Fiber 75m.Fiber 75m.

e.)*LTE SYS Mod ( RF Mod.n/a. n/a n/a n/a n/a n/a

* Complete row relevant to antenna configuration:

3.3 Antenna System Installation Checklist

DescriptionChecked

Antennas mounted according to Standard Procedures and Site Specific DocumentsSYMBOL 252 \f "Wingdings"

Antenna height checked according to Final Site ConfigurationSYMBOL 252 \f "Wingdings"

Antenna forward direction set and checked according to Final Site ConfigurationSYMBOL 252 \f "Wingdings"

Mechanical tilting angle set and checked according to Final Site Configuration SYMBOL 252 \f "Wingdings"

Electrical tilting angle set and checked according to Final Site ConfigurationSYMBOL 252 \f "Wingdings"

Antenna mounting clamps & tilting kits checked, all screws tightenedSYMBOL 252 \f "Wingdings"

Feeder cables installed according to Site Specific DocumentsSYMBOL 252 \f "Wingdings"

Feeder cables grounded at top of support structure close to the antennaSYMBOL 252 \f "Wingdings"

Feeder cables grounded at bottom of tower/mast SYMBOL 252 \f "Wingdings"

Feeder cables grounded at additional points (d > 80m) where applicable N/A FORMCHECKBOX N/A

Feeder cables grounded at the entry point to BTS N/A

Feeder cables secured in position with cable hangers and clampsSYMBOL 252 \f "Wingdings"

Feeder cables labelled correctly (at each end)SYMBOL 252 \f "Wingdings"

External jumper cable connectors checked and tightened at both ends SYMBOL 252 \f "Wingdings"

All external connectors checked for correct sealing SYMBOL 252 \f "Wingdings"

All jumper cable connectors checked and tightened at both endsSYMBOL 252 \f "Wingdings"

All jumper cables labelled correctly at both ends SYMBOL 252 \f "Wingdings"

Notes on Antenna System Installation 4. Antenna System Commissioning Report 4.1 Antenna System VSWR Measurement Results

SECTOR 1SECTOR 2SECTOR 3

Cable Label:

Sweeptests Measurement Results:

VSWR for complete Antenna System (NSN/Netone):n/an/an/an/an/an/a

RL for complete Antenna System (NSN/Netone):n/an/an/an/an/an/a

Checklist of Printed Sweeptests Results:

Full Antenna Subsystem: n/an/an/an/an/an/a

FORMCHECKBOX ( Copies of Antenna Test Result files are printed after this section.

Note: Feeder less solution no feeder installed on site.4.2 Antenna Measurement EquipmentModel:Serial Number:Manufacturer:Last Calibration Date:

N.B. Instrument calibration interval shall not exceed 12 month

4.3 Finishing Checklist

DescriptionChecked

All cables restored to normal position for BTS operationSYMBOL 252 \f "Wingdings"

All cable connectors properly tightenedSYMBOL 252 \f "Wingdings"

All external connectors sealed and waterproofSYMBOL 252 \f "Wingdings"

Black Plastic Cable Ties placed on all external sealed cable connections (to secure the PVC tape)SYMBOL 252 \f "Wingdings"

Antenna system configuration table completed in Section 3.1 aboveSYMBOL 252 \f "Wingdings"

Feeder inventory list completed in Section 3.2 aboveSYMBOL 252 \f "Wingdings"

Paper copy of the antenna line test results included following each sectionSYMBOL 252 \f "Wingdings"

All VSWR measurement results are within the defined test limits.SYMBOL 252 \f "Wingdings"

Notes on Antenna System Commissioning 5. bts INSTALLATION Report

5.1 BTS Configuration

Installed LTE Flexi BTS Configuration:

FORMCHECKBOX 1 + 1 + 1 FORMCHECKBOX Other: __________________

Installed 2G Flexi Multi Radio BTS Configuration:

FORMCHECKBOX 4+4+4+4+4+4 FORMCHECKBOX Other: __________________

FORMCHECKBOX 2 + 2 + 2 Feeder Site / Feeder less Site Configuration:

FORMCHECKBOX Feeder

FORMCHECKBOX Feeder less Installed LTE Flexi BTS Hardware Module/s:

FORMCHECKBOX FSMF SYSTEM MODULE

FORMCHECKBOX FXEB 1800 RF MODULE

Installed 2G Flexi Multi Radio Hardware Module/s:

FORMCHECKBOX ESMC SYSTEM MODULE

FORMCHECKBOX FXEB 1800 RF MODULE

FORMCHECKBOX FXDB 900 RF MODULE

FORMCHECKBOX FIQB TRANSMISSION SUBMODULE

FORMCHECKBOX FPFC POWER DISTRIBUTION MODULE

FORMCHECKBOX FPMA POWER MODULE

FORMCHECKBOX FPAA AC/DC SUBMODULE

FORMCHECKBOX FPBB BATTERY

FORMCHECKBOX Other: __________________

FORMCHECKBOX RF sharing on FXEB

BTS Equipment Installation Type and Location:

BTS EQUIPMENT (SYMBOL 252 \f "Wingdings")BTS EQUIPT INSTALLATION

TYPE (SYMBOL 252 \f "Wingdings")BTS EQUIPT INSTALLATION

LOCATION (SYMBOL 252 \f "Wingdings")REMARKS

FORMCHECKBOX LTE SYSTEM MODULE FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter

FORMCHECKBOX Outdoor

FORMCHECKBOX Tower

FORMCHECKBOX RooftopN/A

FORMCHECKBOX 2G SYSTEM MODULE FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter

FORMCHECKBOX Outdoor

FORMCHECKBOX Tower

FORMCHECKBOX RooftopN/A

FORMCHECKBOX RF MODULE 1

(Sector 1/2/3) FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter

FORMCHECKBOX Outdoor

FORMCHECKBOX Tower

FORMCHECKBOX RooftopN/A

FORMCHECKBOX RF MODULE 2

(Sector 4/5/6) FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter

FORMCHECKBOX Outdoor

FORMCHECKBOX Tower

FORMCHECKBOX RooftopN/A

FORMCHECKBOX RF MODULE 3

(LTE) FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter

FORMCHECKBOX Outdoor

FORMCHECKBOX Tower

FORMCHECKBOX Rooftop1800 Module (FXEB)

FORMCHECKBOX POWER MODULE 1 (FPFC) FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter

FORMCHECKBOX Outdoor

FORMCHECKBOX Tower

FORMCHECKBOX RooftopFPFC feed 3 x RF modules

FORMCHECKBOX POWER MODULE 2

FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter

FORMCHECKBOX Outdoor

FORMCHECKBOX Tower

FORMCHECKBOX RooftopN/A

FORMCHECKBOX POWER MODULE 3

FORMCHECKBOX Stack type FORMCHECKBOX Wall Mounted FORMCHECKBOX Pole Mounted FORMCHECKBOX Shelter

FORMCHECKBOX Outdoor

FORMCHECKBOX Tower

FORMCHECKBOX RooftopN/A

5.2 BTS Installation ChecklistDescriptionChecked

Delivery is complete and undamagedSYMBOL 252 \f "Wingdings"

Minimum clearances are metSYMBOL 252 \f "Wingdings"

Adapter mechanics are installed (for wall and pole installation)N/A

Plinth is installed according to the instructionsSYMBOL 252 \f "Wingdings"

Plinth is groundedSYMBOL 252 \f "Wingdings"

Transmission sub-module is installed according to the instructionsSYMBOL 252 \f "Wingdings"

Power supply cable is connectedSYMBOL 252 \f "Wingdings"

Modules are installed according to the instructionsSYMBOL 252 \f "Wingdings"

Modules are grounded to the plinthSYMBOL 252 \f "Wingdings"

Module back covers are installedSYMBOL 252 \f "Wingdings"

Cable entries are installedSYMBOL 252 \f "Wingdings"

Antenna cables are connected according to the configurationSYMBOL 252 \f "Wingdings"

Internal power cables are connectedSYMBOL 252 \f "Wingdings"

Transmission cables are connectedSYMBOL 252 \f "Wingdings"

Optical fibre cables are cleaned and connectedSYMBOL 252 \f "Wingdings"

External alarm cable is connectedN/A

Cables between the modules on the same plinth are routed via internal cable entriesSYMBOL 252 \f "Wingdings"

BTS External cables or cables between the modules on different plinths are routed via external cable entriesSYMBOL 252 \f "Wingdings"

Cables are tied properlySYMBOL 252 \f "Wingdings"

Cable connector seals are firmly in placeSYMBOL 252 \f "Wingdings"

Unused connectors are covered with IP sealsSYMBOL 252 \f "Wingdings"

BTS is switched on and all units are ready for commissioningSYMBOL 252 \f "Wingdings"

Module front covers are installedSYMBOL 252 \f "Wingdings"

Site is clean and installation completedSYMBOL 252 \f "Wingdings"

Notes on BTS Installation

6. TRANSMISSION iNSTALLATION6.1 Transmission Configuration

SUBMODULE INSTALLED (SYMBOL 252 \f "Wingdings")INTERFACE USED (SYMBOL 252 \f "Wingdings")

FORMCHECKBOX LTE FORMCHECKBOX E1 Interface 1 FORMCHECKBOX E1 Interface 2 FORMCHECKBOX E1 Interface 3

FORMCHECKBOX E1 Interface 4 FORMCHECKBOX Gb Ethernet EIF 1

FORMCHECKBOX Fast Ethernet EIF 2 FORMCHECKBOX Fast Ethernet EIF 3

FORMCHECKBOX FIQB (2G) FORMCHECKBOX E1 Interface 1 FORMCHECKBOX E1 Interface 2 FORMCHECKBOX E1 Interface 3

FORMCHECKBOX E1 Interface 4 FORMCHECKBOX Gb Ethernet EIF 1

FORMCHECKBOX Fast Ethernet EIF 2 FORMCHECKBOX Fast Ethernet EIF 3

6.2 Transmission Installation Checklist

DescriptionChecked

Transmission Sub module installed properlySYMBOL 252 \f "Wingdings"

Transmission cables installed as per specificationsSYMBOL 252 \f "Wingdings"

Transmission DDF installed as per specificationsSYMBOL 252 \f "Wingdings"

Transmission cables connected to specified transmission DDFSYMBOL 252 \f "Wingdings"

Notes on Transmission Installation7. BTS COMMISSIONING AND INTEGRATION REPORT

7.1 Site Commissioning Parameters

ITEMVALUE

BTS NameCABS

BTS ID 911281

BTS IP Address10.26.17.20

MME Name

MME ID

MME IP

NTP IP10.26.8.84

Netmask255.255.255.248

Frequency1800 (1/1/1)

Tx Power20W

BTS SW Release VersionLN4.0_ENB_1202_902_09

7.2 BTS Commissioning Report

FORMCHECKBOX ( Insert printed copy of BTS Commissioning Report following this section.

7.3 BTS Integration

Test Handset Details

MODELSERIAL NUMBERPHONE NUMBERSIM NUMBER

Voice Call (MOC Call) Success

CELL OKNAINITIALS / DATECOMMENTS

CELL 1 FORMCHECKBOX

FORMCHECKBOX

13 April 2015

CELL 2 FORMCHECKBOX

FORMCHECKBOX

13 April 2015

CELL 3 FORMCHECKBOX

FORMCHECKBOX

13 April 2015

Voice Call (MTC Call) Success

CELL OKNAINITIALS / DATECOMMENTS

CELL 1 FORMCHECKBOX

FORMCHECKBOX

13 April 2015

CELL 2 FORMCHECKBOX

FORMCHECKBOX

13 April 2015

CELL 3 FORMCHECKBOX

FORMCHECKBOX

13 April 2015

PS Call Success

CELL OKNAINITIALS / DATECOMMENTS

CELL 1 FORMCHECKBOX

FORMCHECKBOX

13 April 2015

CELL 2 FORMCHECKBOX

FORMCHECKBOX

13 April 2015

CELL 3 FORMCHECKBOX

FORMCHECKBOX

13 April 2015

8. pOWER SYSTEM INSTALLATION REPORT8.1 BTS Power Supply Configuration FORMCHECKBOX Tap to Existing:LTE System Module Circuit Breaker:

2G System Module Circuit Breaker: 60A

Input Voltage to System Module: 54.24

RF Module Circuit Breaker: 60A

Input Voltage to RF Module: 54.24

FORMCHECKBOX Not Applicable

Rectifier Equipment ImplementationPower System 1 / Serial No.

Power System 2 / Serial No.

Power System 3 / Serial No.

PC Serial No.

Rectifier Module type FORMCHECKBOX ELTEK FORMCHECKBOX Other: ____________________

Rectifier Serial No. Rectifier 1:

Rectifier 2:

Rectifier 3:

Rectifier 4:Rectifier 1:

Rectifier 2:

Rectifier 3:

Rectifier 4:

Battery Back-up InfoBattery Manufacturer:

No of Battery Banks: Battery Breakers (100A/bank):

Battery Unit Serial

Numbers:BANK1

Bat1 ______________

Bat2 ______________

Bat3 ______________

Bat4 ______________BANK1

Bat1 ______________

Bat2 ______________

Bat3 ______________

Bat4 ______________BANK1

Bat1 ______________

Bat2 ______________

Bat3 ______________

Bat4 ______________BANK1

Bat1 ______________

Bat2 ______________

Bat3 ______________

Bat4 ______________

Battery Open Circuit Voltages:

Bank 1 _________V

Block 1 _________V

Block 2 _________V

Block 3 _________V

Block 4 _________V Bank 2 _________V

Block 1 _________V

Block 2 _________V

Block 3 _________V

Block 4 _________V

Bank 3 _______V

Block 1 _______V

Block 2 _______V

Block 3_ ______V

Block 4 _______V Bank 4 _________V

Block 1 _________V

Block 2 _________V

Block 3 _________V

Block 4 _________V

NOTE: Battery Open CCT shall be carried out in warehouse prior delivery of batteries to site. Battery Open Circuit Voltage below 12.30VDC should not be installed and are to be replaced!9. SITE INVENTORY

9.1 NSN Supplied Equipment

DescriptionProduct CodeSerial NumberQuantity

LTE/2G BTS Antenna 1DBXLH-8585B-VTM14CN1030209081

LTE/2G BTS Antenna 2DBXLH-8585B-VTM14CN1030362841

LTE/2G BTS Antenna 3DBXLH-8585B-VTM14CN1030362881

LTE System Module - FSMF472181AEA1433636111

2G System Module - ESMC

RF Module 1 FXDB

RF Module 2 FXDB

RF Module 3 FXDB

RF Module 1 FXEB472501AL61441010111

RF Module 2 FXEB

RF Module 3 FXEB

Transmission FIQB

Power Module 1

Power Module 2

Power Module 3

AC/DC Sub module 1

AC/DC Sub module 2

AC/DC Sub module 3

Battery 1

Battery 2

Battery 3

Battery 4

Battery 5

Battery 6

Battery 7

Battery 8

Battery 9

9.2 Changes to Site Inventory

New unitOld unitNOKIA Fault Report Number

Name / VersionSerial NumberName / VersionSerial Number

10. cERTIFICATES10.1 GSM Flexi MultiradioBTS SITE PUNCH LIST FORMCHECKBOX ( Insert printed copy of signed GSM Flexi MultiradioBTS Site Punch List following this section.

10.2 FAT CERTIFICATE

FORMCHECKBOX ( Insert printed copy of signed FAT Certificate following this section.COMPLETED BY:NAME:_______________________________ SIGNED:_______________________ DATE: ___/___/___ (NSN Representative)GSM FLEXI MULTIRADIO BTS SITE PUNCH LIST

NETONE NOKIA SIEMENS NETWORKSSITE DATA

ItemData

Site ID1144

Site NameCABS

Installed by / Date15 November 2014

Commissioned by / Date15 November 2014

Integrated by / Date13 April 2015

PUNCH LIST

Select the correct check number and point to check in Flexi MultiRadio BTS Implementation Check List. Type the description of point to check and your comments for failure description.When completed, type what was done.

Check no.Defect/Failure DescriptionOwnerRaised by /dateCompleted by / date

PUNCH LIST APPROVED BY:

NETONE REPRESENTATIVE:_____________________________________DATE: ____ / ____ / ________

(

)

NSN REPRESENTATIVE:_______________________________________DATE: ____ / ____ / ________

(

)

final ACCEPTANCE TESTING (Fat)

NETONE NOKIA SIEMENS NETWORKSSite Provisional Acceptance certificate for telecom implementation works

INDENT Number:SITE ADDRESS:

Site ID:1144

Site Name:CABS

STAGECOMPLETE (Initials/Signature)

GSM FLEXI MULTIRADIO BTS Site Installation

GSM FLEXI MULTIRADIO BTS Site Commissioning

GSM FLEXI MULTIRADIO BTS Site Integration

GSM BTS Site Folder and Attached Documents

Nokia Networks hereby states that the whole of supplies detailed above have been inspected, implemented, tested and unless otherwise stated conform to the specified requirements in the contract or order identified above.

NETONE REPRESENTATIVE:_________________________________________DATE: ____ / ____ / ________

(

)

NSN REPRESENTATIVE:___________________________________________DATE: ____ / ____ / ________

(

)

11. appendix

11.1 BTS Installation Document

FORMCHECKBOX ( Insert printed copy of BTS Installation Document following this section.

Number/VersionCopyright Nokia NetworksPage

1-0Company Confidential

Paper Copy Uncontrolled2(22)