49
MIT OpenCourseWare http://ocw.mit.edu 11.307 Beijing Urban Design Studio Summer 2008 For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.

11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

MIT OpenCourseWare http://ocw.mit.edu

11.307 Beijing Urban Design Studio Summer 2008

For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.

Page 2: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

L`]�Û]paZd]�eg\md]

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 3: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Pollution and function

Page 4: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Pollution and function

Page 5: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Investment method

Page 6: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Afl]jY[lagfk�Z]lo]]f�^mf[lagfk�)

Page 7: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Afl]jY[lagfk�Z]lo]]f�^mf[lagfk�*

Page 8: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Afl]jY[lagfk�Z]lo]]f�^mf[lagfk�+

Page 9: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Afl]jY[lagfk�Z]lo]]f�^mf[lagfk�,

Page 10: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Afl]jY[lagfk�Z]lo]]f�^mf[lagfk�-

Page 11: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Afl]jY[lagfk�Z]lo]]f�^mf[lagfk�.

Page 12: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Afl]jY[lagfk�Z]lo]]f�^mf[lagfk��/

Page 13: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Development process

Page 14: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Land use proportions

Page 15: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

䋼䞣ད㾘⦄᳝ॖ᠓

HdY[]e]fl�g^�h`Yk]�)

SELECTION OF BASES FOR [ PHASE O ] ߱ྟ䰊↉ⱘ䗝ᢽ

1. ENERGY STATION | 㛑䞣 EFFICIENT & TOTALLY COVERAGING NET

������㛑䞣キᔶ៤ⱘ㔥㒰ৃҹ᳝ᬜ㽚ⲪᭈϾऎඳ

2. HUGE WORKSHOP IN GOOD CONDITION | 3. EXISTING HOUSING AREA | ⦄ᄬⱘৃሙԣऎඳ4. CLOSENESS TO RAILWAY | 䪕䏃Ѹ䗮ⱘৃ䖒ᗻ

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 16: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Phase 0 land use

Page 17: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

H`Yk]�)�dYf\�mk]

Page 18: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

H`Yk]�*�dYf\�mk]

Page 19: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

H`Yk]�+�dYf\�mk]

Page 20: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

H`Yk]�,�dYf\�mk]

Page 21: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

H`Yk]�-�dYf\�mk]

Page 22: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

)2*(((

Page 23: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

views

Page 24: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

views

Page 25: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 26: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 27: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 28: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 29: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 30: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 31: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 32: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 33: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 34: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 35: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 36: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

Programmatic transitioning

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 37: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

Programmatic transitioning

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 38: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

Programmatic transitioning

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 39: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

Programmatic transitioning

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 40: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

Existing structures

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 41: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Provisional transition

Page 42: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

Reprogramming of structures

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 43: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter
Page 44: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

Prototypical development north of the Little Hot Lake

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 45: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

Living machine diagram

pre-treated water from a settling tank that has allowed solids to fall out of suspension

biofilter of bark and humic material - first filtration

aerobic tanks - a series of both closed dark and open top tanks with photosynthetic algae to fix oxygen to the water

aquaculture tanks - filter feeders eat the algae and plankton that have fed on the smaller particles and detritus feeding fish eat larger particles

filtered water can now be used for irrigating the soil remediation facilities

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 46: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Living machine plan

Page 47: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

Living machine section

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 48: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

Living machine view

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

Page 49: 11.307 Beijing Urban Design Studio Summer 2008 For ...€¦ · Living machine diagram pre-treated water from a settling tank that has allowed solids to fall out of suspension biofilter

long narrow strip keith case - zhang ruoxi - ma xiaoying - kristina katich - marissa grace desmond

lald]�g^�kda\]�af�Zgl`�dYf_mY_]k