Upload
rosanna-morton
View
239
Download
0
Tags:
Embed Size (px)
Citation preview
11/26/2003IVOA Small Projects Meeting 2003 1
Potential R&D focuses for China-VO
Chenzhou CuiNational Astronomical Observatory of China
Chinese Virtual Observatory
11/26/2003IVOA Small Projects Meeting 2003 2
Outlines
• IVOA emphasis• Pro and con for small VO projects• China-VO R&D focuses
– Integration– Data Access Services– VO-enabled telescope– VO-enabled LAMOST– Education
11/26/2003IVOA Small Projects Meeting 2003 3
Outlines
• IVOA emphasis• Pro and con for small VO projects• China-VO R&D focuses
– Integration– Data Access Services– VO-enabled telescope– VO-enabled LAMOST– Education
11/26/2003IVOA Small Projects Meeting 2003 4
IVOA emphasis
Mission:
• to facilitate coordination of development
• to foster interoperability
11/26/2003IVOA Small Projects Meeting 2003 5
IVOA emphasis
• Working Groups• Resource Registry Data Modeling • Content Description (UCD) Data Access
Layer • VOTable VO Query Language • Grid & Web Services Standards &
Processes
Explore technologiesDevelop standardsRecommend best practices
11/26/2003IVOA Small Projects Meeting 2003 6
IVOA emphasis
• Most popular topics: – Interoperability
– Resource Registry
– Data Model
– Web&Grid Technology
– VOQL
– VOTable
– DAL
Source from: Statistics for IVOA Web
11/26/2003IVOA Small Projects Meeting 2003 7
NVO
• Building the Framework for the National Virtual Observatory
» from: Paul Messina, Alex Szalay
• NVO is not about building portals and applications, but rather emphasizes building standards and infrastructure.
» from: Ray Plante
11/26/2003IVOA Small Projects Meeting 2003 8
The NVO Environment
• Many resources, distributed curation– Thousands of individually accessible resources:
Catalogs, observatory archives, surveys, spectra, services
– Tens of data-providing centersNASA data centers, observatories, universities,
research groups• Must build on the existing infrastructure
Data providers already support services using…Databases, CGI, metadata, ….
• Vast majority of data is publicly accessibleDelivered over HTTP
• Buy-in cost is a critical issue– Incremental compliance– Toolkits are helpful from: Ray Plante
11/26/2003IVOA Small Projects Meeting 2003 9
Enabling Standards and Technologies
• Data Formats– FITS – an existing standard for astronomical images & tables– VOTable – an XML schema for transmitting astronomical tables
• Data Access Protocols– Cone Search – for searching catalogs by sky position– Simple Image Access (SIA) – to search for/create images based on sky
positionHTTP Get Queries return VOTable documents prototypes!
Currently in development within the IVOA:– SkyNode – more generalized approach to catalog searching – VO Registries – for publishing and discovering resources
Web Services
• Grid Technologies– Chimera & Pegasus – virtual data catalog and workflow
management• Replica Catalog Service – built-in caching of results on the grid
– Condorfrom: Ray Plante
11/26/2003IVOA Small Projects Meeting 2003 10
AstroGrid
• The end goal of the project (phase B) is to produce software which will enable the creation of a working, grid−enabled Virtual Observatory (VO) based around key UK astronomical data centres.
» (AstroGrid Red Book)
11/26/2003IVOA Small Projects Meeting 2003 11
AstroGrid
The work breaks into a few major strands:• Continuing research and development; • Developing the software infrastructure that will
make a VO possible;• Developing user tools to make it possible to do
science with AstroGrid.– portals, visualization tools, analysis tools, data
mining algorithms, workflow editors, and so on
» from: AstroGrid Red Book
11/26/2003IVOA Small Projects Meeting 2003 12
AstroGrid top−level practical goals
• to develop … standards for data, metadata, data exchange and provenance
• to develop a software infrastructure for data services • to establish a physical grid of resources shared by AstroGrid and key
data centres • to construct and maintain an AstroGrid Service and Resource Registry• to implement a working Virtual Observatory system based around key
UK databases and of real scientific use to astronomers• to provide a user interface to that VO system• to provide, either by construction or by adaptation, a set of science
user tools to work with that VO system• to establish a leading position for the UK in VO work
» from: AstroGrid Red Book
11/26/2003IVOA Small Projects Meeting 2003 13
Outlines
• IVOA emphasis• Pro and con for small VO projects• China-VO R&D focuses
– Integration– Data Access Services– VO-enabled telescope– VO-enabled LAMOST– Education
11/26/2003IVOA Small Projects Meeting 2003 14
Outlines
• IVOA emphasis• Pro and con for small VO projects• China-VO R&D focuses
– Integration– Data Access Services– VO-enabled telescope– VO-enabled LAMOST– Education
11/26/2003IVOA Small Projects Meeting 2003 15
Disadvantages
Limited: • Astronomy Research Level• Astronomical Resources
– Data, Instruments and Telescopes
• Technology– Software Develop, Database, Network
• Funding– Is limited for us all
11/26/2003IVOA Small Projects Meeting 2003 16
Advantages
• Great interests from native astronomers and IT experts
• No historical backpacks– existing infrastructure, data service, CGI-
scripts, etc.
• No large gaps among various projects– XML, Web Services, Grid, etc.
11/26/2003IVOA Small Projects Meeting 2003 17
Outlines
• IVOA emphasis• Pro and con for small VO projects• China-VO R&D focuses
– Integration– Data Access Services– VO-enabled telescope– VO-enabled LAMOST– Education
11/26/2003IVOA Small Projects Meeting 2003 18
Outlines
• IVOA emphasis• Pro and con for small VO projects• China-VO R&D focuses
– Integration– Data Access Services– VO-enabled telescope– VO-enabled LAMOST– Education
11/26/2003IVOA Small Projects Meeting 2003 19
China-VO R&D focuses
Unlike NVO and AstroGrid, as a small VO project,
• China-VO will emphasize on applications and portals.
• But we will take part in the developments of IVOA standards and infrastructure actively.
11/26/2003IVOA Small Projects Meeting 2003 20
Integration
existing Software Packages, Toolkits, Libraries– Astronomical Utilities – Image Manipulation – Math and Statistics– Plotting
IRAF, MIDAS, AIPS, …need much user interactionalmost impossible for integration
the more simple I/O and simple user interfacethe more easier to integrate
11/26/2003IVOA Small Projects Meeting 2003 21
Astronomical Utilities
• Coordinate conversion– equatorial (RA, Dec) to horizon (alt,
azimuth) coordinates
• Date conversion– calendar date to Julian Date
• Units conversion– Magnitude to flux
• Ephemeris calculation– Sun set/rise, eclipse
11/26/2003IVOA Small Projects Meeting 2003 22
Image Manipulation
• Format conversion– Jpg, gif, tiff,fits,…
• Image edit– Rotate, resize, filter,…
• image correlation, image aligning• FITS image manipulation
– (C)FITSIO
11/26/2003IVOA Small Projects Meeting 2003 23
Math and Statistics
data analysis – simple math
operations– differentiating– integrating– statistics– Fast Fourier
Transform (FFT)– (de)convolution– data smoothing– data filtering– Peak picking– data sorting
curve fitting– linear fitting– nonlinear fitting
11/26/2003IVOA Small Projects Meeting 2003 24
Plotting
• 1D– spectrum, time series, …
• 2D– Line, Scatter, bar, column, pie, …– histogram, polar, vector,…
• 3D– bar, scatter, surface, contour, …
11/26/2003IVOA Small Projects Meeting 2003 25
Data Access Services
• IVOA DAL and Interoperability standards– VOTable, SIA, UCD, VOQL, etc.
• easy access to national and international astronomical datasets
• especially important for countries absent of large observation instruments
11/26/2003IVOA Small Projects Meeting 2003 26
Major data resources in China
National
– BATC 15 color sky survey: 360 GB
– Huairou & Yunnan solar observation:700 GB
– Miyun meter-wave sky survey: 5GB
11/26/2003IVOA Small Projects Meeting 2003 27
Major data resources in China
InternationalCDS/ADC Catalog 100G2MASS catalogs 40G
2dF 7G
ROSAT 38GDSS I 80GDSS II 620G
SDSS EDR 60G
Einstein X-ray Survey
5G
ADS Mirror 400GSDSS DR1?
11/26/2003IVOA Small Projects Meeting 2003 28
VO-enabled telescope
Current projects:
• NAOC 2.16m telescope• Yunnan observatory 2.4m
telescope • public internet observatory
wide-field camera, 35cm, 60cm
• Tsinghua Univ. 40cm public telescope
NAOC 2.16 m telescope
11/26/2003IVOA Small Projects Meeting 2003 29
VO-enabled LAMOST
• VO-enabled– LAMOST data– LAMOST telescope– LAMOST Spectral Analysis Pipeline
11/26/2003IVOA Small Projects Meeting 2003 30
VO-enabled LAMOST
11/26/2003IVOA Small Projects Meeting 2003 31
VO-based Education
• international education resource access• bilingual Skymap• English-Chinese astronomical dictionary• …
• China-VO education portal
11/26/2003IVOA Small Projects Meeting 2003 32
Q & A
?www. .org
Thank You