SOFTWARE PROJECT MANAGEMENT

ByDr. M V S PERI SASTRY. B.E,Ph.D

Page 2: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

04/21/23 Dr. SASTRY-PROJ350-010 2

S/W Engineering

Software Project Management

S D L C

Program Development

Page 3: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

04/21/23 Dr. SASTRY-PROJ350-010 3

What is a Project

•A Special Activity (Not A Routine Activity)•Generally involves One-time Effort•Has a defined Goal•Has specific Scope•Has definite Duration•Has a Budget•Needs Resources•Needs Organising, Communicating, Record Keeping and Analyzing•Needs to be Managed (Projects do not ‘just happen’)

Page 4: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

04/21/23 Dr. SASTRY-PROJ350-010 4

COMPUTER SYSTEM PROJECT MANAGEMENT (PROJ 350)

Engineering Project Management (Plan, Estimate, execute, Get Feed-back, Modify, Organize & Maintain)

Methodologies (PERT , CPM, Gantt ) Software Tools (MS_Project ) Project Planning Tasks and Priorities Deliverables Estimating Resources Scheduling Monitoring Managing Closing the Project

Page 5: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

04/21/23 Dr. SASTRY-PROJ350-010 5

Project Phases

•Requirements Engineering (Study)•Project Feasibility Report / Proposal•Analysis ( S.R.S)•Design (S.D.D)•Development (Drawings & Code)•Testing (Test Plans and Reports) •Live Implementation•Maintenance

Page 6: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

04/21/23 Dr. SASTRY-PROJ350-010 6

Base_Line of a project

•A Base_Line is ‘a snapshot of the project that can be used to compare against changes that it undergoes as it progresses towards completion’

•A Base_line as per IEEE Std. 610.12.1990 is‘A specification or a product that has been formally reviewed and agreed upon, that thereafter serves as the basis of further development, and that can be changed only through formal change control procedures’

Page 7: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

04/21/23 Dr. SASTRY-PROJ350-010 7

Base_Line Documents of a project

•Project Proposal or Definition Document•Project Plan•Gantt Charts , Project NetWork Diagrams , P E R T charts etc;•Agreements •System Requirement Specification•System Design Document•Test Plans and Test Reports•Progress Reports• Other Legal Documents (Environment clearences, Safety and Electrical & Telecom Clearences etc;)

Page 8: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

SOFTWARE PROJECT PLAN OUTLINE : 

SCOPE Project objectives.Major functions.Other characteristics.Development Scenario / Development platforms. RESOURCES Human Resources, Hardware Resources & Software Resources.Availability windows. GRAY AREASIdentification of Gray Areas.Efforts required from buyer of software and from supplier of software to estimate, evaluate and resolve Gray Areas.

Page 9: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

COSTS : This can be reviewed by the steering Committee if there are any differences between the buyer of the software and supplier of software. After the estimates are presented here, the actual cost can be worked out by applying these estimates on the rates prevailing as fixed and escalation terms. These will be discussed in commercial terms. Here, at this point of software project plan, the estimates of the efforts will be signed off by both supplier of software and the buyer of software.

SCHEDULETask network

Gant chart / Bar chart Task resource table  The software project plan mainly will be a consequence of function and

performance allocations performed as part of the systems engineering study of the project planning phase. Estimation is accomplished using one of a number of techniques that also rely on historical productivity data as well as the methodology that is chosen.

04/21/23 Dr. SASTRY-PROJ350-010 9

SOFTWARE PROJECT PLAN OUTLINE Continued

Page 10: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

04/21/23 Dr. SASTRY-PROJ350-010 10

Software Design Description/Specification (SDD)

(SDD, Baseline Document, Culmination of Design, complete Design Description, Modules, Data Bases,

Files and Program Specifications, Test Plans / Schemes, Modularity, Control and cohesion ( Ref:

IEEE 830-1984) ) 1.0) Scope 1.1 System Objectives 1.2 Hardware Software and Human Interfaces 1.3 Major Software Functions 1.4 Externally Defined data Base 1.5 Major Design Constraints , limitations2) Reference Documents 2.1 Existing Software Documentation 2.2 System Documentation 2.3 Vendor (Hardware or Software ) Documents 2.4 Technical Reference

Page 11: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

04/21/23 Dr. SASTRY-PROJ350-010 11

Software Design Description/Specification

(SDD Continued 1) 3) Design Description

3.1 Data Description

3.1.1) Review of Data Flow 3.1.2) Review of Data Structure

3.2 Derived Program Structure

3.3 Interfaces within Structure

4.0) ModulesFor Each Module: 4.1 Processing Narrative 4.2 Interface Description 4.3 Design Language (or Other) description 4.4 Modules Used

4.5 Data Organization

4.6 Comments

Page 12: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

04/21/23 Dr. SASTRY-PROJ350-010 12

Software Design Description/Specification

(SDD Continued 2) 5.0) File Structure and Global Data

5.1 External File Structure 5.1.1 Logical Structure 5.1.2 Logical Record Description

5.1.3 Access Method 5.2 Global Data 4.3 File and Data Cross Reference6.0 Requirements Cross Reference

7.0 Test Provisions 7.1 Test Guidelines 7.2 Integration Strategy

7.3 Special Considerations 8.0 Packaging

8.1 Special Program Overlay Provisions 8.2 Transfer Considerations 9.0 Special Notes 10.0 Appendices

Page 13: 11/24/2015Dr. SASTRY-PROJ350-0101 SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D

SCHEDULE

Task network Gant chart / Bar chart Task resource table  The software project plan mainly will be a consequence of function and

performance allocations performed as part of the systems engineering study of the project planning phase. Estimation is accomplished using one of a number of techniques that also rely on historical productivity data as well as the methodology that is chosen.