Bundesnetzagentur 21.10.2011 1 www.bundesnetzagentur.de New Rules on Capacity Management – Regulatory Aims and Measures Markus Backes Berlin, 14th October 2011 Management of Gas Networks, Berlin 2 What happened in 2011? 24.02.2011 KARLA-Gas & Preliminarly Conversion fee NCG 01.04.2011 3 Market areas 01.10.2011 2 Market areas 24.08.2011 Preliminarly Conversion fee Gaspool

110916 Backes Management of Gas Networks Ber...2011/10/14  · 2 Market3 L-Gas Market areas-areas Large Market areas Firm capacity 3 H-Gas Market areas Management of Gas Networks,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 110916 Backes Management of Gas Networks Ber...2011/10/14  · 2 Market3 L-Gas Market areas-areas Large Market areas Firm capacity 3 H-Gas Market areas Management of Gas Networks,

Bundesnetzagentur 21.10.2011

1

www.bundesnetzagentur.de

New Rules on Capacity Management– Regulatory Aims and Measures

Markus BackesBerlin, 14th October 2011

Management of Gas Networks, Berlin 2

What happened in 2011?

24.02.2011KARLA-Gas &

PreliminarlyConversion fee

NCG

01.04.20113 Market

areas

01.10.20112 Market

areas

24.08.2011PreliminarlyConversionfee Gaspool

Page 2: 110916 Backes Management of Gas Networks Ber...2011/10/14  · 2 Market3 L-Gas Market areas-areas Large Market areas Firm capacity 3 H-Gas Market areas Management of Gas Networks,

Bundesnetzagentur 21.10.2011

2

Management of Gas Networks, Berlin 3

GasNZV requires reduction

Challenges

Cross-quality market area

Large zones

Reduction of market areas in 2011

2 Market-areas3 L-Gas Market areas

LargeMarketareas

Firmcapacity

3 H-Gas Market areas

Management of Gas Networks, Berlin 4

GasNZV requires reduction

Challenges

Cross-quality market area

Large zones

Reduction of market areas in 2011

2 Market-areas

LargeMarketareas

Firmcapacity

Page 3: 110916 Backes Management of Gas Networks Ber...2011/10/14  · 2 Market3 L-Gas Market areas-areas Large Market areas Firm capacity 3 H-Gas Market areas Management of Gas Networks,

Bundesnetzagentur 21.10.2011

3

Management of Gas Networks, Berlin 5

Challenges in capacity provision

No restrictions on FZK within themarket area

Market area A

Entry FZK 30 units

Usual demand 40 units

30

70

10

Market area B

Entry FZK 70 units

Usual demand 60 units

coupling FZK10 units

FZK = firm, freely allocable capacity

usual demand: 60

usual demand: 40

Entry B

Entry A

Management of Gas Networks, Berlin 6

Challenges in capacity provision

Still no restrictions on FZK within the new market area In times of low demand whole market can be supplied

through „Entry B“

but no possibility to move 20 units from B to A, only 10

30

70

FZK = firm, freely allocable capacity

100

50

demand: 20

demand: 30

Entry B

Entry A

Page 4: 110916 Backes Management of Gas Networks Ber...2011/10/14  · 2 Market3 L-Gas Market areas-areas Large Market areas Firm capacity 3 H-Gas Market areas Management of Gas Networks,

Bundesnetzagentur 21.10.2011

4

Management of Gas Networks, Berlin 7

Conversion fee model – key points

Conversion fee model

Cost seperation

Conversion GABi Gas

Melting the conversionfee to zero

within four years

Two different capsfor conversion fee

Conversion fee+ neutrality charge

Management of Gas Networks, Berlin 8

Market-based allocation

Better connection of hubs

Reduction of transaction cost(for shippers)

Free-up unused capacity

Capacity auctions

Bundled products

Restriction ofrenomination rights

“KARLA Gas” – Aims and Measures

§

Page 5: 110916 Backes Management of Gas Networks Ber...2011/10/14  · 2 Market3 L-Gas Market areas-areas Large Market areas Firm capacity 3 H-Gas Market areas Management of Gas Networks,

Bundesnetzagentur 21.10.2011

5

Management of Gas Networks, Berlin 9

Determination Capacity Management

Bundling by 1st October 2011

Obligatory to bundle at cross-border points if adjacent TSOsupports bundling (exemptions possible: GATRAC, Link4Hubs,ect.)

Use of bundled capacity product by single nomination

MG „A“

MG „B“

Netz 1

Netz 2

MG „A“

MG „B“

Netz 1

Netz 2

MG „A“

MG „B“

Netz 1

Netz 2

Old: "single booking" of entry- and exitcapacity

New: "bundling" of entry- and exitcapacity

Management of Gas Networks, Berlin 10

Determination Capacity Management

NR

NiB

B

0,8B

0,9B

0,2B

0,1B

0,5B

NR= 0,5(B

+ N i)

N R= 0,5NiN R

= Ni

Restriction of Renomination Rights by 1st April 2012

Protection for small portfolio’s

Moderate scope

Page 6: 110916 Backes Management of Gas Networks Ber...2011/10/14  · 2 Market3 L-Gas Market areas-areas Large Market areas Firm capacity 3 H-Gas Market areas Management of Gas Networks,

Bundesnetzagentur 21.10.2011

6

Management of Gas Networks, Berlin 11

“KARLA Gas” – auction results

12 Auctions

ended after 1stDay

225Auctionswithoutdemand

38 Auctions

ended after no morethan 4 days

(Congestion-)premium of7,75 – 44,33%

Auction: Quarterly ProductsQ4/2011 – Q3/2013,

373,2 GWh/h on offer

22,5 GWh/h sold (≈6%)

Management of Gas Networks, Berlin 12

Auctions shows congestion(premium) at:

L-Gas Entry points fromthe Netherlands toGaspool & NCG

H-Gas Entry Emden toNCG

H-Gas Exit Lasow toPoland

Oude

“KARLA Gas” – auctions results

Vreden

Emden

Lasow

2 Market Areas

Page 7: 110916 Backes Management of Gas Networks Ber...2011/10/14  · 2 Market3 L-Gas Market areas-areas Large Market areas Firm capacity 3 H-Gas Market areas Management of Gas Networks,

Bundesnetzagentur 21.10.2011

7

13

Markus BackesZugang zu Gasfernleitungsnetzen/ Internationaler Gashandel

Tel.: +49 (0)228 14-5904E-Mail: [email protected]