CEBU POWER PLANT PROJECT COMMISSIONING TEST RECORD Item No. : Equipment : System : COMMISSIONING CHECK SHEET No. Description Specification Remarks 1. Electric Motor Manufacturer Type Serial Number Protection Class Output (kW) Voltage / Phase / Herz Current (A) at full load Speed (rpm) Connection Method 2. Pump Manufacturer Type Serial Number Total Head (m) Speed (rpm) No. Check Point Witness Rem 1. Motor Name Plate Rating Visual Voltage ± 10% Frequency ± 0.04 Connection with the motor with main terminal box draw Visual All Gaskets Visual All bolts and nuts Visual Check oil level for oil lubricated Visual Foreign materials and general cleanliness in mo Visual Switch on of the space heater when motor is sto Visual Megohmmeter (applying 1000 V) 100 M-ohm The rotor turns freely Visual Rotation ( Viewed from load side) C.W 2. Pump Parallel 0.1mm '(T.I.R) Angular 0.05mm Complete Installation Visual Other accessories installation Visual Foundation bolts Visual Check Line-Up to Suction Visual All bolts and nuts Visual Suction Valve Open Discharge Valve Visual Prime Visual Flushing, Sealing is available Visual Check Level for Lube Oil Visual Certified by Name Signature Dat Test Executor Rated Capacity (㎥/h) Acceptance Criteria Recording /Check Alignment between pump and motor

1[1]. Pump ()

Embed Size (px)

DESCRIPTION

pump

Citation preview

Page 1: 1[1]. Pump  ()

CEBU POWER PLANT PROJECT

COMMISSIONING TEST RECORD

Item No. : Equipment : System :

COMMISSIONING CHECK SHEETNo. Description Specification Remarks

1. Electric Motor ManufacturerTypeSerial NumberProtection ClassOutput (kW)Voltage / Phase / HerzCurrent (A) at full loadSpeed (rpm)Connection Method

2. Pump ManufacturerTypeSerial Number

Total Head (m)Speed (rpm)

No. Check Point Witness Remarks

1. MotorName Plate Rating VisualVoltage ± 10%Frequency ± 0.04Connection with the motor with main terminal box drawing VisualAll Gaskets VisualAll bolts and nuts VisualCheck oil level for oil lubricated VisualForeign materials and general cleanliness in motor VisualSwitch on of the space heater when motor is stop VisualMegohmmeter (applying 1000 V) 100 M-ohmThe rotor turns freely VisualRotation ( Viewed from load side) C.W

2. PumpParallel 0.1mm '(T.I.R)

Angular 0.05mmComplete Installation VisualOther accessories installation VisualFoundation bolts VisualCheck Line-Up to Suction VisualAll bolts and nuts VisualSuction Valve OpenDischarge Valve VisualPrime VisualFlushing, Sealing is available VisualCheck Level for Lube Oil Visual

Certified by Name Signature Date

Test Executor

Rated Capacity (㎥/h)

Acceptance Criteria

Recording /Check

Alignment between pump and motor

Page 2: 1[1]. Pump  ()

DOOSAN

KEPCO SPC

Page 3: 1[1]. Pump  ()

7-1. Test Data Sheet for Motor Solo Run Test.

CEBU POWER PLANT PROJECT

MOTOR SOLO RUN TEST RECORD

Item No. Equipment System

Manufacturer Starting Current (A) Serial No.

Output (KW) Rated Current (A) Temperature (deg.C)

Voltage (V) Motor Speed (rpm) Humidity (%)

No. Description Criteria Recording Remarks

1

2 Noise Level(dB A)

3

Vertical (DE/NDE)

Horizontal (DE/NDE)

Axial (DE/NDE)

Item Time(min) 0 30 60 90 120 150 180 210 240 Remarks

"R" Phase

"S" phase

"T" Phase

DE Side

NDE Side

Test Start Time Logging Start Time Logging End Time

<Measure Point>

Certified by Name Signature Date

Test Executor

DOOSAN

Rotation Direction (Viewed from load side)

Vib

rati

on

(mm

/se

c. R

MS

)

Current (A)(No load)

Motor Temp' (deg.C)

Remarks:

Page 4: 1[1]. Pump  ()

KEPCO SPC

Page 5: 1[1]. Pump  ()

CEBU POWER PLANT PROJECT

COMMISSIONING TEST RECORD

Item No. : Equipment : System :

PUMP LOAD TEST RECORD

No.Check Time

0 min. 30 min. 60 min. 90 min. 120 min. RemarksCheck Item

1

Suction

Discharge

TDH (Bar) = Dis.- Suc

2

MotorNDE

DE

PumpNDE

DE

3

Motor

"V" (NDE/DE) / / / / /

"H" (NDE/DE) / / / / /

"A" (NDE/DE) / / / / /

Pump

"V" (DE/NDE) / / / / /

"H" (DE/NDE) / / / / /

"A" (DE/NDE) / / / / /

4

"R" Phase

"S" Phase

"T" Phase

5

6 Noise Level (dB(A)) at 1 m distance

7 Revolution (rpm)

8

"U" Phase

"U" Phase Spare

"V" Phase

"V" Phase Spare

"W" Phase

"W" Phase Spare

9 Flow Rate (t/hr)

Remarks : Start Time ; Logging Start Time ;

Certified by Name Signature Date

Test Executor

Pressure(Bar G)

Te

mp

. (℃

)V

ibra

tio

n(m

m/s

ec

. R

MS

)

Current (A)at Full Load

Ambient Temp. (℃)

MotorWinding Temp (℃)

<Measure Point>

Page 6: 1[1]. Pump  ()

DOOSAN