    Multiple Bridge and CulvertOpenings

    With HEC-RAS

    Objective: To become familiar with

    the multiple opening flow options.

  • 7/27/2019 11 Multiple Openings in Bridges

    2/21

    Multiple Openings

    Divided Flow Approach

    Multiple Opening Approach

    Entering Multiple Opening Data

    Multiple Opening Output

  • 7/27/2019 11 Multiple Openings in Bridges

    3/21

    Divided Flow Approach

    High Ground

    1

    2

    3

    4

    5

    6

    7

    8

    Q

    Q

    T

    T

    Stagnation Point

    Stagnation Point

    Q Q12

  • 7/27/2019 11 Multiple Openings in Bridges

    4/21

    A Multiple Opening

    Multiple Opening Test Plan: Multiple Opening planLegend

    Ground

    Bank Sta

    Inef f

  • 7/27/2019 11 Multiple Openings in Bridges

    5/21

    Example of Multiple Opening (see previous slide)

    There is a bridge opening over the main stream and aculvert group in the overbank area.

    Types of openings: bridges, culvert groups (a group ofculverts is considered to be a single opening), andconveyance areas.

    In the above example, the low area on the side wouldnot act hydraulically as a weir. Therefore, instead ofincluding it as part of the bridge, it should be modeledas a separate, conveyance opening.

    Up to seven openings can be modeled at a givenlocation, and any combination of bridges and culvertgroups can be used.

    A maximum of two conveyance type openings can beused and the conveyance area must be on theextreme left or extreme right side.

  • 7/27/2019 11 Multiple Openings in Bridges

    6/21

    Multiple Opening

    0 200 400 600 800 1000510

    515

    520

    525

    530

    535

    540

    RS=3.5 Upstream (Multiple Opening)

    Station (f t)

    Elevation

    (ft)

    Legend

    Ground

    Inef f

    Bank Sta

    Stag Limit

    #1

    #2

    #3

  • 7/27/2019 11 Multiple Openings in Bridges

    7/21

    Plan View of Multiple Opening

  • 7/27/2019 11 Multiple Openings in Bridges

    8/21

    Locating Stagnation Points

    Stagnation Pointfloats inside

    overlapping arrows.

    For low flow,Stagnation Points

    should always be

    inside of ineffective

    area block!400 500 600 700 800

    510

    515

    520

    525

    530

    RS=3.5 Upstream (Multiple Opening)

    Station (ft )

    Elevation

    (ft)

    Legend

    Ground

    Inef f

    Bank Sta

    Stag Limit

    #2#3

  • 7/27/2019 11 Multiple Openings in Bridges

    9/21

    Computational Procedure for Multiple

    Opening

    1. Program assumes a flow distribution

    2. Energy computed for each opening

    3. Energies compared for each opening

    4. Flows are adjusted and procedure is

    repeated

    5. Program iterates until convergence or

    maximum number of trials

  • 7/27/2019 11 Multiple Openings in Bridges

    10/21

    Multiple Opening Limitations

    This is a one-dimensionalmodel!

    Energy grade line is assumed constant

    upstream and downstream of opening

    Stagnation points are not allowed tomigrate past the edge of adjacent

    opening.

  • 7/27/2019 11 Multiple Openings in Bridges

    11/21

    Divided Flow Tradeoffs

    Energies for each reach/opening canbe different

    Energies for each reach/opening

    may be too different User must decide how to split the

    cross sections.

  • 7/27/2019 11 Multiple Openings in Bridges

    12/21

    Entering Multiple Opening Data

    Multiple opening data are entered in thesame manner as any other bridge or

    culvert

    From the Geometric Data window, pressthe Bridge/Culvert button and select the

    appropriate reach

    Enter the river station

  • 7/27/2019 11 Multiple Openings in Bridges

    13/21

    Enter Deck and Road Data

    200 400 600 800 1000 1200510

    515

    520

    525

    530

    535

    RS=3.5 Upst ream (Multiple Opening)

    Station (f t)

    Elevation

    (ft)

    Legend

    Ground

    Ineff

    Bank Sta

    Stag Limit

    #1#2

  • 7/27/2019 11 Multiple Openings in Bridges

    14/21

    Pier and Abutment Data

    200 400 600 800 1000 1200510

    515

    520

    525

    530

    535

    RS=3.5 Upst ream (Multiple Opening)

    Station (ft )

    Elevation

    (ft)

    Legend

    Ground

    Inef f

    Bank Sta

    Stag Limit

    #1#2

  • 7/27/2019 11 Multiple Openings in Bridges

    15/21

    Bridge Modeling Approach

  • 7/27/2019 11 Multiple Openings in Bridges

    16/21

    Enter Culvert Data

    700 750 800 850 900 950

    520

    522

    524

    526

    528

    530

    RS=3.5 Upst ream (Multiple Opening)

    Station (ft )

    Elevation

    (ft)

    Legend

    Ground

    Ineff

    Bank Sta

    Stag Limit

    #2#3

  • 7/27/2019 11 Multiple Openings in Bridges

    17/21

    Defining the Openings

  • 7/27/2019 11 Multiple Openings in Bridges

    18/21

    Multiple Opening Output

    0 200 400 600 800 1000510

    515

    520

    525

    530

    535

    540

    Multiple Opening Test Plan: Multiple Opening plan

    Station (f t)

    Elevation

    (ft)

    Legend

    EG PF 4

    WS PF 4

    EG PF 3

    WS PF 3

    EG PF 2

    WS PF 2

    EG PF 1

    WS PF 1

    Ground

    Inef f

    Bank Sta

    .08 .04 .08

  • 7/27/2019 11 Multiple Openings in Bridges

    19/21

    Bridge and Culvert Output

  • 7/27/2019 11 Multiple Openings in Bridges

    20/21

    Conveyance Output

  • 7/27/2019 11 Multiple Openings in Bridges

    21/21

    Multiple Opening Profile Table