1. The borehole record
In order to identify the stratification and the geotechnical characteristics of each soil layer a 8m
deep borehole was perform. resulted the soil stratification and the characteristics presented below.
Layer Hi(m)Geotechnical primary
indicesValues
Vegetal layer 0.7m
S13.6 - 0.1i
γs [kN/m3] 26.70
γ [kN/m3] 21 - 0.1i
w p [%] 14 + 0.3i
wL [%] 44 + 0.4iw [%] 15 + 0.5i
Clay [%] 44 - 0.2i
Silt [%] 40 + 0.4i
Sand [%] 16 - 0.2i
[°] - odd numbers 20 + 0.5i
c' [kPa] - odd numbers 34 - 0.3i
[°] - even numbers 30 - 0.5i
c' [kPa] - even numbers 28 + 0.3i
ε1 [%] 2.5 - 0.02i
ε2 [%] 3.4 - 0.02i
ε3 [%] 5 - 0.02i
S2 1.5 + 0.1i
γs [kN/m3] 26.70
γ [kN/m3] 19.4 - 0.05i
w p [%] 19 - 0.1i
wL [%] 30 + 0.4i
w [%] 22 - 0.1i
Clay [%] 55 + 0.1i
Silt [%] 20 - 0.2i
Sand [%] 25 + 0.1i
[°] 25 - 0.25i
c' [kPa] 30 + 0.5iε1 [%] 3.5 + 0.02i
ε2 [%] 6.4 + 0.02i
ε3 [%] 7.9 + 0.02i
S3 - Marly
clay as the
bedrock
…………
γ [kN/m3] 20
Ic 0.96
Ip [%] 10
c' [kPa] 65
The following activities are required to be completed:
- soil identification;
-
calculation of the subsequent geotechnical indices: γd, n, e, Sr, Ip, Ic, M2 - 3;
- characterization of the soils based on: Sr, Ip, Ic, M2 - 3;
- borehole record form.
7/21/2019 1.1 Borehole Record
http://slidepdf.com/reader/full/11-borehole-record 2/2
Group - 3306
1. The borehole record
In order to identify the stratification and the geotechnical characteristics of each soil layer a 8m
deep borehole was perform, resulted the soil stratification and the characteristics presented below.
Layer Hi(m)Geotechnical primary
indicesValues
Vegetal layer 0.65m
S1 4.1 - 0.1i
γs [kN/m3] 26.70γ [kN/m3] 20 - 0.05i
w p [%] 18 - 0.2i
wL [%] 23 + 1iw [%] 21 - 0.25i
Clay [%] 50 - 0.25i
Silt [%] 35 + 0,5i
Sand [%] 15 - 0,25i
[°] - odd numbers 35 - 0,5i
c' [kPa] - odd numbers 22 + 0,15i
[°] - even numbers 25 + 0,5i
c' [kPa] - even numbers 25 - 0,15i
ε1 [%] 3 - 0,02i
ε2 [%] 3,5 - 0,02iε3 [%] 5,2 - 0,02i
S22 + 0.1i
γs [kN/m3] 26.70
γ [kN/m3] 18.9 - 0.05i
w p [%] 19 - 0.1i
wL [%] 30 + 0.4i
w [%] 25 - 0.1i
Clay [%] 55 + 0.1i
Silt [%] 20 - 0.2i
Sand [%] 25 + 0.1i
[°] 26 - 0.5i
c' [kPa] 30 + 0.5i
ε1 [%] 3.5 + 0.02i
ε2 [%] 6.4 + 0.02i
ε3 [%] 7.9 + 0.02i
S3 Marly
clay as the
bedrock
…………
γ [kN/m3] 20
Ic 0.96
Ip [%] 10
c' [kPa] 65
The following activities are required to be completed:
-
soil identification;- calculation of the subsequent geotechnical indices: γd, n, e, Sr, Ip, Ic, M2 - 3;
- characterization of the soils based on: Sr, Ip, Ic, M2 - 3;
- borehole record form.