    7:00 PRESENTATION High Drive Improvement Project - Julie Happy (presentingon behalf of Jan Quintrall)

    High Drive Redesign

    Came to neighbors with project 20% designed.

    Divided into two segments: 29thto Manito Blvd and Manito to Hatch Rd.

    Signature Status for this project.

    Improve pedestrian safety and bike accommodation

    Maintain parking for trail system

    Reduce combined sewer overflow Pavement/Water Main Replacement

    Combined Sewer System will have storage facilities at Browne St., Lamonte St.,and Hatch St.

    Design Options 3 to start and taken to people in the neighborhood

    A new Option 4 was developed

    Segment 1

    Varying width asphalt trail instead of 8 concrete sidewalk

    Bike lanes on both sides

    Natural buffer strip and parking where topography allows

    Segment 2

    6 sidewalk on bluff side only Parking provided on bluff side between Manito and Skyview

    4 planting strip on bluff side

    Bike lanes on both sides

    Segment 2b

    No parking

    4 buffer strip on bluff side

    Bike lanes on both sides

    Truck traffic: Semis not allowed now, signage going up

    Speed Limit currently 30, traffic study in the spring will assess traffic calming of

    new design before lowering it. Crosswalks nothing concrete yet

    Roundabouts nothing planned now, take up lots of space. 29thand High Drive ismost likely candidate10 years from now.

    Construction to start spring 2014 and run through summer 2015 in two phases.

    Feedback still being taken for a couple more weeks (2 weeks from Jefferson meeting).

    Q&A

    Paul Kropp Can you please walk through all the features of the current option 4.

  • 8/13/2019 11-13-13_SNC_Minutes

    2/5

    What is the current option doing to manage stormwater. A: Segment 1 will use existingmedians as swales and maintain the trees. Current design is 2 deep to meet the runoffneeds. Buffer strip will vary from 0-3 and the trail will vary from 6-8.

    Segment 2a will have parking since there are no cross streets

    Segment 2b will have no parking. Buffer strip will have irrigation for homeowners.

    Some neighbors were concerned with narrow lanes. Some had comments related to

    power pole placement in or near sidewalks.

    7:30 NEIGHBORHOOD BUSINESS

    Approval of Minutes please refer to website above for posted minutes.

    Approved as written

    Treasurers Report Approval

    Same as last month

    Spokane Police Resource Officer Lt. Dave Richards Lt. Richards is now the Southside Precinct Captain. HQ is East Central COPS

    building (old convent). Will have 1 detective and 2 NCOs in our precinct.

    Community Assembly Report Shelly ORourke

    Worked on goals for Community Assembly

    Waste Management Andy Hoye

    Oct. 8tha new interlocal agreement b/w city and county were discussed. Tippingfee staying at $107, so no real changes for us as far as charges.

    Pedestrian & Trails (PeTT Committee) Paul Kropp

    In 2014 PeTT will work on better supporting the integrated project concept. EarlSmall has resigned as our representative. Looking for a new Southgate rep. Citywill be setting future priorities in 2014, it is critical that our neighborhood have arep. They meet the 2

    ndTuesday of the month.

    Neighborhood Planning Update Land Use Committee

    LUC met on Friday, Nov. 8th. Discussed many issues

    Update on ISP Implementationo Final FINAL version has been approved by Planning Director

    o Planning Director drafted a memo outlining the implementation of the ISPthat includes neighborhood review of any new project plans int eh DstrictCenter

    A resolution has been drafted by Councilman Snyder to prod the city to followpublished design guidelines and standards and make sure projects in the DCfollow these guidelines.

    Ted and Kerry will make updates to the memo and resolution

    City clarified that they are charging SEPA mitigation fees

  • 8/13/2019 11-13-13_SNC_Minutes

    3/5

    Ted gave an update on Target permitting and the Transportation Tours.

    Announcements

    Lincoln Heights DC Planning Workshop is 5-7pm at ESD 101 on Wed. Nov. 20th.

    Jackie Caro introduced herself as our ONS rep. She is responsible for 6neighborhoods and will come to our meetings quarterly or more if we request it.

    Ted told everyone about the comment period for Horizon 2040 ending on Nov.16th

    Ray Tansy told everyone about E-lerts from the Spokane Police Department.

    Nomination of Officers for 2014

    Chair Ted Teske

    Vice Chair Teresa Kafentzis

    Secretary Teresa Kafentzis

    Treasurer Ray Tansy

    CA Representative Shelley ORourke

    Elections will be held at the December neighborhood council meeting

    8:00 PRESENTATION Dan Buller from City of Spokane Ben Burr Trail ImprovementPlan

    Presented to the East Central neighborhood.

    Proposed project runs from Underhill Park to Liberty Park

    Old interurban railroad grade

    Included in Comp Plan alongside Fish Lake and Centennial Trails

    Project has been under consideration for approx. 20 years

    ECNC asked city in 2005 to pursue money to improve the trail

    Capital Programs applied for a received federal transportation funds.

    One requirement of the funds was the city pave the trail and create it at a certainwidth (10 min., 12 preferred)

    Project is in early phase of design and the city is currently soliciting public input

    Connections will be added to downtown bike network (on E. 3rdSt.) and toCentennial Trail

    1stsegment is the existing gravel portion between Liberty Park and UnderwoodPark

    To connect to Centennial Trail you have to go along Hamilton Embankment andthere is ROW that needs to be obtained

    MLK Blvd will be extended on the south side of the river to tie in to Trent viaBrowns Building Supply

    Ben Burr Trail will be aligned with MLK bike lanesFunding Agency Requirements:

    o Applied for a Shared Use Trailo Pavedo 12 ideal, 10 minimumo 12 rationale is for ease of passing b/w bikers and peds and to allow for

    easy 2-way traffico 2 shoulders on each side

  • 8/13/2019 11-13-13_SNC_Minutes

    4/5

    o 14 total width minimumo protective railings where there are sharp dropoffs.o Construction in 2014

    Send your comments to:[email protected] visit

    http://beta.spokanecity.org/blog/2013/10/25/input-sought onbenburrtrailimprovements/

    Carolyn Jacobs, East Central resident who lives adjacent to the Ben Burr Trailo Said neighbors were shocked at the proposal and that there was no

    communication b/w city and neighborhood. They have been using EastCentral Community Development funds to improve trail since 1981. 2000were the latest trail improvements. She wants the natural aspect of the trailmaintained as much as possible. She encourages us to walk the trail beforewe make our comments. The East Central neighborhood plan calls for biketrails connecting their parks

    Andy Hoye spoke about riding this trail recently. Thought it was very cool and

    impossibly neat. He entered off of Hartson, not a good bike access; he wentaround through 3rd

    Ave and Liberty Park instead. Fiske is really steep at the eastend of existing trail. Andy said where the concept falls apart is getting from 11thand Fiske to the Southgate neighborhood. Andy has completely changed his mind,the trail doesnt connect to downtown or the South Hill

    Comment deadline: another month, December 13thor so

    Kerry asked about if they could make the connection to the far south hill?

    The money is all or nothing, we could reapply, but it could take another 20 or 30years.

    We cant push to the south with this money, plus there is nothing but homes to thesouth.

    Bruce Gage from East Central said the best connection from downtown is SE Blvd.But if you go down through Perry you can connect via Pittsburgh stairs aboveLiberty Park

    John Kafentzis asked why would you not want to encourage more people to use thispublic trail? The paving on the south end of Ben Burr Trail in Southgate alloweda more diverse group of people to use the facility.

    8:30 Adjourn

    2013 Officers:Teresa Kafentzis, Chair [email protected]

    Ted Teske, Vice Chair and Secretary [email protected]

    Ray Tansy, Treasurer [email protected]

    Shelley ORourke, Community Assembly RepresentativeEligible Voters must meet by-law criteria of:

    Residing in, owning property in, or owning a business within the SNCboundaries

  • 8/13/2019 11-13-13_SNC_Minutes

    5/5

    Have attended two consecutive meetings prior to this one

    Voting membership lapses on the sixth successive unexcused absence