Route CR-18 ProjectDescription
EASTERN VALLEY ROAD (CR-18), WIDENING TO 3 LANES FROM MCASHAN DRIVE TO LETSON FARM PARKWAY
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064232 STPBH 3715 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2020 $1,600 $400 $2,000
100064233 STPBH 3715 () UTILITIES
ADDITIONAL ROADWAY LANES
2020 $1,360 $340 $1,700
100064234 STPBH 3715 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2020 $5,045 $1,261 $6,306
TOTAL COST: $8,005 $2,001 $10,006
Route CR-2303 ProjectDescription
CR-2303 (LAKESHORE PKWY) AT I-65 INTERCHANGE MODIFICATIONS.
Type of Work RAMP REVISIONS
Project Length in Miles 0.560 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040771 STPBHF 7026 (601) CONSTRUCTION
RAMP REVISIONS
2020 $10,723 $2,681 $13,403
TOTAL COST: $10,723 $2,681 $13,403
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
1 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-30 ProjectDescription
CR-30 (OLD SPRINGVILLE RD) IMPROVEMENTS TO VARIOUS INTERSECTIONS FROM CARDINAL DRIVE TO CR-153 (CLAY/TRUSSVILLE RD) CITY OF CLAY
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056273 STPBH 7245 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $2,040 $510 $2,550
100056275 STPBH 7245 () UTILITIES
INTERSECTION IMPROVEMENTS
2022 $1,128 $282 $1,410
TOTAL COST: $3,168 $792 $3,960
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
2 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-337 ProjectDescription
RESURFACE AND DRAINAGE IMPROVEMENTS ON CR-337 (MCCALLA ROAD) FROM CR-20 (OLD TUSCALOOSA HIGHWAY) TO CR-18 (EASTERN VALLEY ROAD)
Type of Work RESURFACING
Project Length in Miles 1.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059497 ACAA59497 ATRP (007) CONSTRUCTION
RESURFACING
2019 $1,257 $314 $1,571
TOTAL COST: $1,257 $314 $1,571
Route CR-337 ProjectDescription
RESURFACING AND TURN LANES ON CR-337 (MCCALLA ROAD) FROM CR-18 (EASTERN VALLEY ROAD) TO CR-20 (OLD TUSCALOOSA HIGHWAY)
Type of Work TURN LANES
Project Length in Miles 0.960 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060502 STPBH 3713 () RIGHT OF WAY
TURN LANES 2019 $1,572 $393 $1,965
100060504 STPBH 3713 () UTILITIES
TURN LANES 2019 $560 $140 $700
TOTAL COST: $2,132 $533 $2,665
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
3 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-46 ProjectDescription
CR-46 (HUEYTOWN ROAD) ADDITIONAL TURN LANES AND INTERSECTION IMPROVEMENTS FROM WALKER AVENUE TO NORTH OF HILLSIDE DRIVE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056290 STPBH 7021 (600) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $1,200 $300 $1,500
TOTAL COST: $1,200 $300 $1,500
Route CR-52 ProjectDescription
CR-52 (MORGAN RD) ADDITIONAL LANES FROM I-459 TO CR-2 (SOUTH SHADES CREST RD)
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 2.470 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007542 STPBH 7002 (600) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2019 $9,907 $2,477 $12,383
TOTAL COST: $9,907 $2,477 $12,383
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
4 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-6 ProjectDescription
>PARKWOOD RD IMPROVEMENTS - PHASE 3 PARKWOOD ROADATPINELANE SE AND HILLTOP ROAD.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007636 STPBH 9802 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $9 $2 $11
100007630 STPBH 9802 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $709 $177 $886
TOTAL COST: $718 $179 $897
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
5 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-65 ProjectDescription
BRIDGES ON CR-65 MINOR RD TO BIRMINGPORT RD (ENS ADM)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.050 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007588 STPBH 7147 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,710 $427 $2,137
TOTAL COST: $1,710 $427 $2,137
Route CR-65 ProjectDescription
CR-65 (HILLCREST RD) FROM SR-5(US-78) TO CORRIDOR X (PRELIMINARY ENGINEERING-DESIGN)
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 2.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040404 STPBH 7174 (600) PRELIMINARY ENGINEERING
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $487 $122 $608
100038801 STPBH 7174 () RIGHT OF WAY
GRADE, DRAIN, BASE, PAVE AND BRG
2021 $6,650 $1,663 $8,313
100040405 STPBH 7174 () UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2022 $158 $39 $197
100038803 STPBH 7174 () CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2022 $8,800 $2,200 $11,000
TOTAL COST: $16,095 $4,024 $20,118
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
6 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-94 ProjectDescription
CR-94 (DANIEL PAYNE DRIVE) ADD CONTINUOUS TWO-WAY LEFT TURN LANE FROM CR-105 (CHERRY AVE) TO I-65 (PROJECT SPONSOR THE CITY OF BIRMINGHAM)
Type of Work TURN LANES
Project Length in Miles 2.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100042371 STPBH 3716 () RIGHT OF WAY
TURN LANES 2020 $45 $11 $56
100042372 STPBH 3716 () UTILITIES
TURN LANES 2020 $146 $36 $182
100042373 STPBH 3716 () CONSTRUCTION
TURN LANES 2020 $1,947 $487 $2,433
TOTAL COST: $2,138 $534 $2,672
Route CR-NA ProjectDescription
FINLEY BLVD. EXT FROM 26TH STREET (US-31) TO 27TH AVENUE NEAR 32ND STREET NORTH
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059888 STPBH 7173 () UTILITIES
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $3,041 $760 $3,801
100046959 STPBH 7173 () CONSTRUCTION
GRADE, DRAIN, BASE, PAVE AND BRG
2020 $19,882 $4,971 $24,853
TOTAL COST: $22,924 $5,731 $28,655
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
7 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
>VARIOUS INTERSECTIONS - PHASE 7 1. MT. OLIVE RD AT NEW FOUND RD./MT OLIVE-BROOKSIDE RD 2. UNION GROVE AT BANKHEAD HWY 3. HEFLIN AV AT RIDERWOOD TR 4. TARRANT RD AT PINEYWOOD RD /SKELTON AVE 5.TYLER LOOP RD AT SWEENEY HOLLOW RD 6.CHALKVILLE RD.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060490 STPBH 9802 (904) UTILITIES
INTERSECTION IMPROVEMENTS
2019 $80 $20 $100
100007628 STPBH 9802 (904) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $5,245 $1,311 $6,556
TOTAL COST: $5,325 $1,331 $6,656
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT 2 LOCATIONS; SITE 1. MAYFIELD RD. AND MONTEVALLO RD., SITE 3. CROSSHAVEN DR. AND GREEN VALLEY DR.
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007629 STPBH 9802 (924) CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $2,655 $664 $3,318
TOTAL COST: $2,655 $664 $3,318
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
8 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
GALLERIA BOULEVARD EXTENSION FROM CR-458 (LORNA ROAD) TO SR-150
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 0.350 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056488 STPBH 3715 (255) UTILITIES
GRADE, DRAIN, BASE AND PAVE
2020 $400 $100 $500
100056489 STPBH 3715 (255) CONSTRUCTION
GRADE, DRAIN, BASE AND PAVE
2020 $3,200 $800 $4,000
TOTAL COST: $3,600 $900 $4,500
Route CR-NA ProjectDescription
HOOVER TOPICS PROJECT-PATTON CHAPEL RD, PHASE III FROM CRAYRICH DRIVE TO CHAPEL LANE. COORDINATE WITH JEFFERSON CO. PROJECT. ADD 3RD LANE.
Type of Work TURN LANES
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007555 STPBH 7020 (601) CONSTRUCTION
TURN LANES 2019 $2,017 $504 $2,521
TOTAL COST: $2,017 $504 $2,521
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
9 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
>GARDENDALE - MAIN STREET FR TARRANT DR. TO REDMAYNE RD. PROJECT SPONSOR: JEFFERSON COUNTY.
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007597 STPBH 7164 (600) RIGHT OF WAY
WIDENING AND RESURFACING (RDWY)
2020 $275 $69 $343
100007595 STPBH 7164 (600) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2021 $1,638 $409 $2,047
TOTAL COST: $1,912 $478 $2,390
Route CR-NA ProjectDescription
EAST LAKE BLVD FROM 39TH ST TO 40TH ST N, ADD TURN LANES ; WEST OF B'HAM INTERNATIONAL AIRPORT (PHASE 2)
Type of Work TURN LANES
Project Length in Miles 0.170 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100053046 STPBH 7173 () CONSTRUCTION
TURN LANES 2020 $240 $60 $300
TOTAL COST: $240 $60 $300
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
10 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
JEFFERSON COUNTY TOPICS (PHASE 9) TARRANT HUFFMAN ROAD FROM SR-79 (OLD PINSON HIGHWAY) TO TREADWELL ROAD
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 1.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100007609 STPBH 7229 (602) CONSTRUCTION
ADDITIONAL ROADWAY LANES
2021 $3,691 $923 $4,614
TOTAL COST: $3,691 $923 $4,614
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT ON SPRINGDALE ROAD OVER FIVE MILE CREEK BIN# 15837
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059460 STPBH 3717 (250) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,644 $411 $2,055
TOTAL COST: $1,644 $411 $2,055
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
11 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
OXMOOR BLVD-GREEN SPRINGS TO BARBER COURT. INTERSECTION IMPROVEMENTS AT BARBER CT. AND OXMOOR RD. AND I-65 AND CONTINUOUS TWO WAY TURN LANE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 1.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029563 STPBH 9802 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $243 $61 $304
100029566 STPBH 9802 () UTILITIES
UTILITY ADJUSTMENT
2020 $658 $164 $822
100029510 STPBH 9802 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $3,597 $899 $4,496
TOTAL COST: $4,498 $1,125 $5,623
Route CR-NA ProjectDescription
ITS TRAFFIC SIGNALIZATION, SYSTEM WIDE TIMING PLAN AND PHASE 1 EQUIPMENT UPGRADE PLAN FOR TRAFFIC SIGNAL SYSTEM AT 100 INTERSECTIONS
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039866 CMAQ NR01 () PRELIMINARY ENGINEERING
SIGNALIZATION 2020 $747 $187 $933
100039867 CMAQ NR01 () CONSTRUCTION
SIGNALIZATION 2020 $1,352 $338 $1,691
TOTAL COST: $2,099 $525 $2,624
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
12 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
ITS TRAFFIC SIGNALIZATION 100 INTERSECTION. PHASE 2
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039868 CMAQ NR04 () PRELIMINARY ENGINEERING
SIGNALIZATION 2020 $575 $144 $719
100039869 CMAQ NR04 () CONSTRUCTION
SIGNALIZATION 2020 $3,452 $863 $4,315
TOTAL COST: $4,027 $1,007 $5,034
Route CR-NA ProjectDescription
ITS TRAFFIC SIGNALIZATION 100 INTERSECTION. PHASE 3
Type of Work SIGNALIZATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039870 CMAQ NR06 () PRELIMINARY ENGINEERING
SIGNALIZATION 2020 $575 $144 $719
100039871 CMAQ NR06 () CONSTRUCTION
SIGNALIZATION 2020 $3,452 $863 $4,315
TOTAL COST: $4,027 $1,007 $5,034
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
13 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE REPLACEMENT (BIN# 000282) ON PRATT HIGHWAY AT BLACK CREEK NEAR SANDUSKY IN BIRMINGHAM
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.250 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059893 STPBH 1602 (519) RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $800 $200 $1,000
100033434 HPP-STPBH 1602 (519) UTILITIES
BRIDGE REPLACEMENT
2019 $424 $106 $530
100059894 STPBH 1602 (519) CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,680 $420 $2,100
TOTAL COST: $2,904 $726 $3,630
Route CR-NA ProjectDescription
RESURFACE RUTLEDGE DRIVE FROM CR-56(ALLISON BONNETT MEMORIAL DRIVE) TO WOODWARD ROAD AND RESURFACE WILKES ROAD FROM WOODWARD ROAD TO SR-5 (US-11) CITY OF MIDFIELD
Type of Work RESURFACING
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059488 ACAA59488 ATRP (006) CONSTRUCTION
RESURFACING
2019 $674 $169 $843
TOTAL COST: $674 $169 $843
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
14 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AND ADDITIONAL TURN LANE AT CALDWELL MILL ROAD AND JAGUAR DRIVE IN THE CITY OF HOOVER
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062345 CMAQ 3714 () PRELIMINARY ENGINEERING
INTERSECTION IMPROVEMENTS
2020 $40 $10 $50
100062346 CMAQ 3714 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $40 $10 $50
100062347 CMAQ 3714 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $90 $22 $112
100062348 CMAQ 3714 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $692 $173 $865
TOTAL COST: $862 $216 $1,078
Route CR-NA ProjectDescription
ROADWAY AND INTERSECTION IMPROVEMENTS ON CAHABA RIVER ROAD FROM SR-38 (US-280) TO KEY DRIVE
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 3.350 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063245 STPBH 3716 (252) RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2020 $800 $200 $1,000
100063246 STPBH 3716 (252) UTILITIES
INTERSECTION IMPROVEMENTS
2021 $1,000 $250 $1,250
100063247 STPBH 3716 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2021 $4,150 $1,037 $5,187
TOTAL COST: $5,950 $1,487 $7,437
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
15 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS CAHABA RD/SR-38(US-280)/CULVER RD/LANE PARK RD-CITY OF MOUNTAIN BROOK
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064200 CMAQ 3715 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $300 $75 $375
100064201 CMAQ 3715 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $420 $105 $526
100064202 CMAQ 3715 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $1,779 $445 $2,224
TOTAL COST: $2,499 $625 $3,124
Route CR-NA ProjectDescription
UPGRADE AND REPLACE INTERSTATE LIGHTING AT VARIOUS LOCATION IN THE CITY OF BIRMINGHAM
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064216 STPBH 3716 () CONSTRUCTION
LIGHTING 2019 $800 $200 $1,000
TOTAL COST: $800 $200 $1,000
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
16 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
PAVEMENT REHABILITATION ON LAKESHORE PARKWAY FROM VENICE ROAD TO THE BIRMINGHAM CITY LIMITS
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064225 STPBH 3715 () CONSTRUCTION
PAVEMENT REHABILITATION
2019 $800 $200 $1,000
TOTAL COST: $800 $200 $1,000
Route CR-NA ProjectDescription
INTERSECTION IMPROVEMENTS AT REX LAKE ROAD AND ZEIGLER ROAD
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064311 CMAQ 3715 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $160 $40 $200
100064312 CMAQ 3715 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $160 $40 $200
100064313 CMAQ 3715 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $480 $120 $600
TOTAL COST: $800 $200 $1,000
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
17 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route CR-NA ProjectDescription
BRIDGE RECONSTRUCTION AND REHABILITATION FOR OLD BROOK TRAIL BRIDGE (BIN # 012869) OVER LITTLE SHADES CREEK AND CANTERBURY ROAD BRIDGE (BIN # 002873) OVER WATKINS CREEK, CITY OF MOUNTAIN BROOK
Type of Work BRIDGE REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066111 STPBH 3716 (256) RIGHT OF WAY
BRIDGE REHABILITATION
2020 $80 $20 $100
100066112 STPBH 3716 (256) UTILITIES
BRIDGE REHABILITATION
2020 $80 $20 $100
100066113 STPBH 3716 () CONSTRUCTION
BRIDGE REHABILITATION
2020 $880 $220 $1,100
TOTAL COST: $1,040 $260 $1,300
Route CR-NA ProjectDescription
13TH STREET SOUTH - ADD BIKE LANES AND STREETSCAPE IMPROVEMENTS FROM 1ST AVE SOUTH TO 10TH AVE SOUTH
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068127 CMAQ 3718 () PRELIMINARY ENGINEERING
STREETSCAPE
2019 $299 $75 $374
100068128 CMAQ 3718 () UTILITIES
STREETSCAPE
2021 $82 $21 $103
100068129 CMAQ 3718 () CONSTRUCTION
STREETSCAPE
2021 $1,714 $429 $2,143
TOTAL COST: $2,096 $524 $2,620
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
18 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -20 ProjectDescription
CONGESTION MGT. TRAFFIC SYS, SUPPLEMENTAL ITS DEVICES ALONG I-20/I-59 FROM 0.75 MILE WEST OF ENSLEY AVE (EXIT 120) TO I-65 (EXIT 124) AND ALONG SR-38 (US-280) FROM SR-119 TO I-59 (EXIT 126), INCLUDES FIBER, POLES, ECT, NONE ELECTRONICS
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046082 CMAQ NR05 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $89 $22 $111
100046083 CMAQ NR05 () CONSTRUCTION
UNCLASSIFIED 2020 $1,181 $295 $1,477
TOTAL COST: $1,270 $317 $1,587
Route I -20 ProjectDescription
CONGESTION MGT. TRAFFIC SYS, SUPPLEMENTAL ITS DEVICES ALONG I-20/I-59 FR DMS #5 (3/4 MI WEST OF ENSLEY AVE (EXIT120)) TO I-65 (EXIT 124) AND ALONG US-280 FR SR-119 TO I-20/I-59 (EXIT 126), INCLUDES CCTV, RADAR, ETC. ELECTRONIC DEVICES AND EQUIPMENT
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100046084 CMAQ NR05 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $52 $13 $66
100046086 CMAQ NR05 () CONSTRUCTION
UNCLASSIFIED 2020 $1,049 $262 $1,312
100046085 CMAQ NR05 () SPECIAL
UNCLASSIFIED 2020 $193 $48 $242
TOTAL COST: $1,295 $324 $1,619
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
19 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -20 ProjectDescription
PAVEMENT REHABILITATION ON I-20 FROM EXIT 140 TO THE JEFFERSON/ST CLAIR COUNTY LINE
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068066 IM I020 () CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $6,300 $700 $7,000
TOTAL COST: $6,300 $700 $7,000
Route I -459 ProjectDescription
INCHG LGT ON I-459ATCR-18 (EXIT #1) AND CR-52 (EXIT #6) (PRIORITY #29)
Type of Work LIGHTING
Project Length in Miles 4.564 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100005120 IM I459 () CONSTRUCTION
LIGHTING 2020 $1,617 $180 $1,797
TOTAL COST: $1,617 $180 $1,797
Route I -459 ProjectDescription
COLONNADE DRIVE RELOCATION (GRADE, DRAIN, BASE, PAVE, AND RETAINING WALL)
Type of Work RAMP REVISIONS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100038955 IM I459 (306) CONSTRUCTION
RAMP REVISIONS
2021 $1,854 $206 $2,059
TOTAL COST: $1,854 $206 $2,059
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
20 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -459 ProjectDescription
I-459, RAMP MODIFICATIONS AT THE SR-38 (US-280) INTERCHANGE (PHASE 3)
Type of Work RAMP REVISIONS
Project Length in Miles 0.080 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063754 IM I459 () CONSTRUCTION
RAMP REVISIONS
2022 $26,250 $2,917 $29,167
TOTAL COST: $26,250 $2,917 $29,167
Route I -459 ProjectDescription
INTERCHANGE AT I-459 AND CR-2 (SOUTH SHADES CREST ROAD) INCLUDES BRIDGE OVER INTERSTATE AND RAMP BRIDGE OVER RAILROAD, CITY OF HOOVER
Type of Work INTERCHANGE
Project Length in Miles 0.002 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062062 STPBHF I459 (310) PRELIMINARY ENGINEERING
INTERCHANGE
2020 $1,200 $300 $1,500
100056292 STPBHF I459 (310) RIGHT OF WAY
INTERCHANGE
2021 $1,600 $400 $2,000
TOTAL COST: $2,800 $700 $3,500
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
21 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -59 ProjectDescription
PAVEMENT REHABILITATION ON I-20/59 FROM ARKADELPHIA ROAD TO THE SOUTH END OF THE CENTRAL BUSINESS DISTRICT BRIDGE NEAR 15TH STREET AND ON I-65 FROM SOUTH OF 1 ST. AVENUE NORTH TO 16TH STREET NORTH
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063656 IM I059 (410) CONSTRUCTION
PAVEMENT REHABILITATION
2019 $13,909 $1,545 $15,455
TOTAL COST: $13,909 $1,545 $15,455
Route I -59 ProjectDescription
RESURFACE I-59 FROM 1ST AVENUE NORTH (MP 132.160) TO I-459 (MP 137.19) IN TRUSSVILLE
Type of Work RESURFACING
Project Length in Miles 4.990 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062068 IM I059 () CONSTRUCTION
RESURFACING
2020 $12,593 $1,399 $13,993
TOTAL COST: $12,593 $1,399 $13,993
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
22 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -59 ProjectDescription
ADD LANES ON I-59 FROM 18TH/19TH STREET (EXIT112) TO VALLEY ROAD (EXIT 118)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 6.270 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056495 NH I059 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2021 $291 $73 $364
100039736 IM-NH I059 () RIGHT OF WAY
ADDITIONAL ROADWAY LANES
2023 $341 $42 $383
TOTAL COST: $633 $115 $748
Route I -59 ProjectDescription
SIGN REHAB ON I-59 FROM TUSCALOOSA CL TO ST.CLAIR CL; I-65 FROM SHELBY CL TO EXIT 280 (WARRIOR); I-459 FROM I-59 S OF TRUSSVILLE (PHASE 3)
Type of Work SIGN REHABILITATION
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100042475 IM I059 () CONSTRUCTION
SIGN REHABILITATION
2019 $3,766 $418 $4,184
TOTAL COST: $3,766 $418 $4,184
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
23 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -59 ProjectDescription
I-59 FR MP 132.16AT1ST AV N TO MP 137.19ATI-459 6 LANES
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 4.990 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064120 NH I059 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2020 $1,682 $420 $2,102
100045051 NH I059 () UTILITIES
ADDITIONAL ROADWAY LANES
2022 $117 $29 $146
100004982 NH I059 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2023 $37,537 $9,384 $46,921
TOTAL COST: $39,335 $9,834 $49,169
Route I -59 ProjectDescription
RECONSTRUCTION AND LANE ADDITION ON I-59 FROM I-459 TO CR-10 (CHALKVILLE MOUNTAIN ROAD)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 2.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064600 IM-NH I059 () PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2019 $442 $78 $520
100064602 IM-NH I059 () CONSTRUCTION
ADDITIONAL ROADWAY LANES
2022 $19,138 $3,377 $22,515
TOTAL COST: $19,580 $3,455 $23,035
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
24 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
ROADWAY LIGHTING I-65 FROM 5100' SOUTH OF ALFORD AVENUE TO 6TH AVENUE NORTH
Type of Work LIGHTING
Project Length in Miles 7.700 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048475 STPBH I065 (445) CONSTRUCTION
LIGHTING 2021 $5,556 $1,389 $6,945
TOTAL COST: $5,556 $1,389 $6,945
Route I -65 ProjectDescription
CONCRETE PAVEMENT REHAB, UNDERSEAL, GRINDING, PAVERLAID SURFACE TREATMENT, UNDERDRAIN, SHOULDER PAVEMENT,GUARDRAIL ON I-65 FROM US-31 TO RALEIGH AVENUE. OVERPASS (PRIORITY #35)
Type of Work PAVEMENT REHABILITATION
Project Length in Miles 3.760 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100055415 IM I065 () CONSTRUCTION
PAVEMENT REHABILITATION
2019 $9,320 $1,036 $10,356
TOTAL COST: $9,320 $1,036 $10,356
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
25 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route I -65 ProjectDescription
PLANING, RESURFACING, STRIPING, MARKINGS AND SAFETY IMPROVEMENTS TO GUARDRAILS AND GUARDRAIL END ANCHORS ON I-65 FROM MOUNT OLIVE INTERCHANGE TO .78 MILE NORTH OF SR-160
Type of Work PREVENTATIVE MAINTENANCE LEVEL 2
Project Length in Miles 13.400 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060142 IM-HSIP I065 (484) CONSTRUCTION
PREVENTATIVE MAINTENANCE LEVEL 2
2019 $20,036 $2,226 $22,262
TOTAL COST: $20,036 $2,226 $22,262
Route NA- ProjectDescription
OXMOOR VALLEY GREENWAY-BIKE TRAIL PROJECT SPONSOR:CITY OF BIRMINGHAM (1.) FROM SAND RIDGE/LITTLE SHADES CREEK TO OXMOOR VILLAGE CENTER.
Type of Work UNCLASSIFIED
Project Length in Miles 2.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029522 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $1,450 $363 $1,813
TOTAL COST: $1,450 $363 $1,813
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
26 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
HOOVER-TRAFFIC CONTROL CENTER
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029518 STPBH 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $198 $49 $247
TOTAL COST: $198 $49 $247
Route NA- ProjectDescription
SHADES CREEK GREENWAY MULTI-PURPOSE TRAIL - PHASE TWO GRADE, DRAIN, BASE, PAVE, BRIDGE, STRIPING, SIGNING AND LANDSCAPING CITY OF HOMEWOOD JEFFERSON COUNTY
Type of Work UNCLASSIFIED
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029525 CMAQ 9802 (911) CONSTRUCTION
UNCLASSIFIED 2019 $2,945 $736 $3,682
100029526 CMAQ 9802 (912) CONSTRUCTION
UNCLASSIFIED 2021 $4,735 $1,184 $5,919
TOTAL COST: $7,680 $1,920 $9,600
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
27 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
BESSEMER RAIL TO TRAIL CONVERSION PROJECT FROM THE HOOVER CITY LIMITS NEAR PARKWOOD TO SR-150 AT LAKESHORE PARKWAY CONNECTION -CITY OF BESSEMER PROJECT SPONSOR
Type of Work UNCLASSIFIED
Project Length in Miles 4.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029565 CMAQ 9802 () RIGHT OF WAY
UNCLASSIFIED 2020 $633 $158 $791
100029524 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $1,114 $278 $1,392
TOTAL COST: $1,746 $437 $2,183
Route NA- ProjectDescription
"CBD INCIDENT AND CONGESTION MANAGMENT PROGRAM"
Type of Work UNCLASSIFIED
Project Length in Miles 0.270 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029534 CMAQ 9802 (926) CONSTRUCTION
UNCLASSIFIED 2020 $1,367 $342 $1,709
TOTAL COST: $1,367 $342 $1,709
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
28 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CONGESTION MGT TRAFFIC SYSTEM (PHASE 7) FIBER OPTIC CABLE MESSAGE SIGNS AND VEHICLE DETECTION DEVICES, SR-3 FR UNIV. BLVD TO SR-38 THEN SR-38 FR SR-3 TO SR-119
Type of Work UNCLASSIFIED
Project Length in Miles 16.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029515 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $4,603 $1,151 $5,754
TOTAL COST: $4,603 $1,151 $5,754
Route NA- ProjectDescription
CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM / PHASE 3 AND 3A PROJECT SPONSOR: ALDOT, TRANSPORTATION MANAGEMENT CENTER TO BE BUILT AT 3RD DIVISION COMPLEX
Type of Work UTILITY ADJUSTMENT
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100040855 CMAQ 9802 () UTILITIES
UTILITY ADJUSTMENT
2020 $12 $3 $14
100029517 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2021 $4,881 $1,220 $6,102
TOTAL COST: $4,893 $1,223 $6,116
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
29 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CONGESTION MGT / AREAWIDE TRAFFIC SYSTEM (PHASE 4) PROJECT SPONSOR:ALDOT,REGIONAL HIGHWAY RADIO: TO BE BUILTATCORNER 26TH ST AND 12 AVE N
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100029519 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $575 $144 $719
TOTAL COST: $575 $144 $719
Route NA- ProjectDescription
TRUSSVILLE GREENWAY AND WALKWAY MULTI-USE TRAIL-GREENWAY FROM CHALKVILLE MTN RD (CR-10) TO CALUMET PARKWAY NEAR SR-7 (US-11), (PHASE 1)
Type of Work UNCLASSIFIED
Project Length in Miles 5.900 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100052630 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $1,151 $288 $1,439
TOTAL COST: $1,151 $288 $1,439
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
30 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
OLD LEEDS ROAD BICYCLE LANES FROM IRONDALE CITY LIMITS/ BERMUDA DR TO GRANTS MILL. WIDEN TO 31 FT TO ACCOMMODATE TWO 14-FOOT WIDE TRAVEL LANES WITH THE REMAINDER AS PAVED SHOULDER. PROJECT SPONSOR: IRONDALE
Type of Work UNCLASSIFIED
Project Length in Miles 0.090 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032371 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $600 $150 $750
TOTAL COST: $600 $150 $750
Route NA- ProjectDescription
>SHADES CREEK GREENWAY MULTI-USE TRAIL SHADES CREEK GREENWAY - 1. ON-ROAD CONNECTION VIA ELDER STREET MONCLAIR ROAD AND CRESTWOOD BLVD FROM 15TH STREET TO 20TH ST. 2. OFF-ROAD TRAIL ALONG SHADESCREEK. CONNECTORS ALONG GREENWAY TRAIL INCLUD
Type of Work UNCLASSIFIED
Project Length in Miles 2.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100032397 CMAQ 9802 () RIGHT OF WAY
UNCLASSIFIED 2019 $63 $16 $78
TOTAL COST: $63 $16 $78
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
31 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CITY OF BIRMINGHAM ARTERIAL CCTV 41 INTERSECTIONS WITH FIBER OPTIC CABLE INSTALLED, PHASE 2.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033183 CMAQ 9802 () CONSTRUCTION
UNCLASSIFIED 2020 $426 $106 $532
TOTAL COST: $426 $106 $532
Route NA- ProjectDescription
VILLAGE CREEK GREENWAY (PHASE 3) FROM HUFFMAN PARK TO 65TH STREET N
Type of Work UNCLASSIFIED
Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039850 CMAQ NR03 () RIGHT OF WAY
UNCLASSIFIED 2021 $174 $44 $218
100039851 CMAQ NR03 () CONSTRUCTION
UNCLASSIFIED 2022 $1,763 $441 $2,204
TOTAL COST: $1,938 $484 $2,422
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
32 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
VILLAGE CREEK GREENWAY (PHASE 2) FROM 3RD STREET TO TALLAPOOSA STREET
Type of Work UNCLASSIFIED
Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039846 CMAQ NR02 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2019 $513 $128 $641
100039847 CMAQ NR02 () RIGHT OF WAY
UNCLASSIFIED 2020 $259 $65 $324
100039848 CMAQ NR02 () CONSTRUCTION
UNCLASSIFIED 2021 $2,619 $655 $3,273
TOTAL COST: $3,390 $848 $4,238
Route NA- ProjectDescription
VILLAGE CREEK GREENWAY (PHASE 3) FROM HUFFMAN PARK TO 65TH STREET N
Type of Work UNCLASSIFIED
Project Length in Miles 5.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039849 CMAQ NR03 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $345 $86 $432
TOTAL COST: $345 $86 $432
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
33 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
VALLEY CREEK GREENWAY FROM 12TH STREET AT RICKWOOD FIELD TO AVENUE W AT FIVE POINTS WEST
Type of Work UNCLASSIFIED
Project Length in Miles 1.950 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039852 CMAQ NR06 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $460 $115 $575
100039853 CMAQ NR06 () RIGHT OF WAY
UNCLASSIFIED 2020 $138 $35 $173
100039854 CMAQ NR06 () CONSTRUCTION
UNCLASSIFIED 2020 $460 $115 $575
TOTAL COST: $1,059 $265 $1,323
Route NA- ProjectDescription
ITS FIBER OPTIC PLAN, CITY WIDE FOR ITS ARTERIAL INCIDENT MGT.
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039861 STPBH NR01 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $135 $34 $169
TOTAL COST: $135 $34 $169
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
34 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
ITS MONITORS, VIDEO CAMERA, 7 LOCATIONS. EMERGENGY RESPONSE ROUTING
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039864 STPBH NR01 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $19 $5 $23
100039865 STPBH NR01 () CONSTRUCTION
UNCLASSIFIED 2020 $187 $47 $234
TOTAL COST: $206 $51 $257
Route NA- ProjectDescription
ITS MONITORS, VIDEO CAMERAS NSRR, 41ST ST NORTH TO BRUSSELS CIRCLE ( RAILROAD CROSSING)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039872 STPBH NR01 () PRELIMINARY ENGINEERING
UNCLASSIFIED 2020 $140 $35 $175
100039873 STPBH NR01 () CONSTRUCTION
UNCLASSIFIED 2020 $234 $58 $292
TOTAL COST: $374 $94 $468
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
35 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CAHABA RIVER EAST GREENWAY; OFF CR-115-1 (OLD ROCKY RIDGE RD) NEAR CHESTNUT RIDGE (SUB-DIVISION) AND CAHABA RIVER
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039922 CMAQ CN07 (911) CONSTRUCTION
UNCLASSIFIED 2020 $449 $112 $561
TOTAL COST: $449 $112 $561
Route NA- ProjectDescription
CAHABA RIVER GREENWAY-PHASE 3 (TRUSSVILLE) CORRIDOR STUDY FOR A PEDESTRIAN BRIDGE OVER THE CAHABA RIVER, SOUTH OF SR-7 (US-11)
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048496 CMAQ PE07 (912) PRELIMINARY ENGINEERING
CORRIDOR STUDY
2020 $41 $10 $52
TOTAL COST: $41 $10 $52
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
36 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
CAHABA RIVER GREENWAY-PHASE 4 (TRUSSVILLE) CORRIDOR STUDY FOR WALKWAY AND TRAILHEAD CONNECTING CONNECTING SENIOR CENTER TO THE CAHABA RIVER GREENWAY, NORTH OF SR-7 (US-11)
Type of Work CORRIDOR STUDY
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048497 CMAQ PE07 (911) PRELIMINARY ENGINEERING
CORRIDOR STUDY
2020 $41 $10 $52
TOTAL COST: $41 $10 $52
Route NA- ProjectDescription
RESURFACING, SIDEWALK ADDITIONS AND DRAINAGE IMPROVEMENTS ALONG POLLY REED ROAD FROM SR-75 TO REED ROAD NE
Type of Work UNCLASSIFIED
Project Length in Miles 0.400 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100054521 STPBH 3716 (250) CONSTRUCTION
UNCLASSIFIED 2019 $2,724 $681 $3,405
TOTAL COST: $2,724 $681 $3,405
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
37 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
STREETSCAPE AND TRANSPORTATION IMPROVEMENTS ON 16TH STREET CORRIDOR FROM 11TH AVE NORTH TO I-65 WITHIN FOUNTAIN HEIGHTS NEIGHBORHOOD
Type of Work STREETSCAPE
Project Length in Miles 0.550 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056316 STPBH 7117 () CONSTRUCTION
STREETSCAPE
2019 $2,613 $653 $3,266
TOTAL COST: $2,613 $653 $3,266
Route NA- ProjectDescription
SIDEWALKS ON PARTS OF 24 TH STREET NORTH, BERKLEY AVENUE, ARLINGTON AVENUE AND OWEN AVENUE IN BESSEMER
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056510 CMAQ NR13 (954) CONSTRUCTION
SIDEWALK 2019 $546 $137 $683
TOTAL COST: $546 $137 $683
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
38 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SIDEWALKS ALONG CR-99 (COLUMBIANA RD) FROM SR-3 (US-31,MONTGOMERY HIGHWAY) TO SHADES CREST RD IN VESTAVIA HILLS
Type of Work SIDEWALK
Project Length in Miles 1.350 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056515 CMAQ NR13 () PRELIMINARY ENGINEERING
SIDEWALK 2020 $189 $47 $236
100056516 CMAQ NR13 () RIGHT OF WAY
SIDEWALK 2021 $92 $23 $115
100056517 CMAQ NR13 () UTILITIES
SIDEWALK 2022 $90 $22 $112
TOTAL COST: $371 $93 $463
Route NA- ProjectDescription
REED HARVEY GREENWAY ALONG FIVE MILE CREEK FROM BOBOLINK LANE TO CENTER POINT BALL PARK
Type of Work UNCLASSIFIED
Project Length in Miles 2.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056520 CMAQ RW13 () RIGHT OF WAY
UNCLASSIFIED 2019 $90 $23 $113
100056521 CMAQ UT14 () UTILITIES
UNCLASSIFIED 2019 $87 $22 $108
100056522 CMAQ CN14 () CONSTRUCTION
UNCLASSIFIED 2019 $568 $142 $710
TOTAL COST: $745 $186 $931
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
39 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SIDEWALK ALONG CR-1142 (CHAPEL ROAD) FROM PARK AVE TO STONE BROOK PKWY (CITY OF HOOVER)
Type of Work SIDEWALK
Project Length in Miles 1.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056541 CMAQ 7282 (600) CONSTRUCTION
SIDEWALK 2019 $824 $206 $1,030
TOTAL COST: $824 $206 $1,030
Route NA- ProjectDescription
SIDEWALK ON VALLEY STREET, TYLER ROAD, CLOUDLAND DRIVE, SAVOY STREET AND CLEARVIEW ROAD IN BLUFF PARK GRADE, DRAIN, CURB AND GUTTER, AND SIDEWALK
Type of Work SIDEWALK
Project Length in Miles 1.420 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056547 CMAQ 3715 (254) CONSTRUCTION
SIDEWALK 2019 $742 $185 $927
TOTAL COST: $742 $185 $927
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
40 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SIDEWALKS ALONG SR-150 (JOHN HAWKINS PKWY) FROM CAHABA RIVER ESTATES RD. TO SR-3 (US-31, MONTGOMERY HWY) CITY OF HOOVER
Type of Work SIDEWALK
Project Length in Miles 1.810 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056557 CMAQ NR13 (961) RIGHT OF WAY
SIDEWALK 2020 $109 $27 $137
100056558 CMAQ NR13 (961) UTILITIES
SIDEWALK 2021 $102 $26 $128
100056559 CMAQ NR13 () CONSTRUCTION
SIDEWALK 2021 $2,830 $708 $3,538
TOTAL COST: $3,042 $760 $3,802
Route NA- ProjectDescription
SIDEWALKS ALONG CR-42 (MASSEY ROAD) FROM SR-3 (US-31, MONTGOMERY HIGHWAY) TO CR-99 (COLUMBIANA ROAD) IN VESTAVIA HILLS
Type of Work SIDEWALK
Project Length in Miles 0.760 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100057172 CMAQ 7030 (600) RIGHT OF WAY
SIDEWALK 2019 $72 $18 $90
100057173 CMAQ 7030 (600) UTILITIES
UTILITY ADJUSTMENT
2020 $73 $18 $91
100057174 CMAQ 7030 (600) CONSTRUCTION
SIDEWALK 2020 $752 $188 $940
TOTAL COST: $897 $224 $1,121
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
41 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
STREET IMPROVEMENTS ON 19TH STREET ENSLEY FROM ENSLEY AVENUE TO BUSH BOULEVARD PAVING, SIDEWALKS, CURB AND GUTTER, AND STORM DRAINAGE
Type of Work STREETSCAPE
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100033432 STPBH 3716 (251) CONSTRUCTION
STREETSCAPE
2019 $661 $165 $827
TOTAL COST: $661 $165 $827
Route NA- ProjectDescription
BIRMINGHAM SAFE ROUTES TO SCHOOL, SIDEWALKS ON TARRANT-HUFFMAN ROAD FROM WILLIAMSBURG TO ROEBUCK DR, AND WALKWAY TO CONNECT ROSE DR TO GASTON MIDDLE AND NORTH ROEBUCK ELEMENTARY SCHOOLS
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048384 STPBH CN07 (906) CONSTRUCTION
SIDEWALK 2020 $253 $63 $316
TOTAL COST: $253 $63 $316
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
42 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
BUILDING COMMUNITIES PROGRAMS FY 2019-2020
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062376 STPBH NR19 () SPECIAL
UNCLASSIFIED 2019 $550 $138 $688
TOTAL COST: $550 $138 $688
Route NA- ProjectDescription
NORWOOD NEIGHBORHOOD STREETSCAPE ALONG 12TH AVE NORTH FROM 24TH STREET NORTH TO 31ST STREET NORTH
Type of Work STREETSCAPE
Project Length in Miles 0.630 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100059190 CMAQ 3715 (257) CONSTRUCTION
STREETSCAPE
2020 $520 $130 $650
TOTAL COST: $520 $130 $650
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICE FOR SUBRECIPIENT (FY 2014 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100062364 STPBH TR16 () TRANSIT
UNCLASSIFIED 2020 $1,018 $255 $1,273
TOTAL COST: $1,018 $255 $1,273
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
43 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
VULCAN TRAIL EXTENSION FROM 11TH PLACE SOUTH TO GREEN SPRINGS HIGHWAY
Type of Work UNCLASSIFIED
Project Length in Miles 0.900 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064288 CMAQ 3715 (267) RIGHT OF WAY
UNCLASSIFIED 2019 $40 $10 $50
100064289 CMAQ 3715 (267) UTILITIES
UNCLASSIFIED 2020 $40 $10 $50
100064290 CMAQ 3715 () CONSTRUCTION
UNCLASSIFIED 2020 $320 $80 $400
TOTAL COST: $400 $100 $500
Route NA- ProjectDescription
PEDESTRIAN IMPROVEMENTS- BIKELANES, SIDEWALKS, AND CROSSWALKS- 2ND AVENUE SOUTH FROM 28TH STREET TO 30TH STREET, AND 29TH STREET FROM 2ND AVENUE TO 3RD AVENUE
Type of Work UNCLASSIFIED
Project Length in Miles 0.600 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064292 CMAQ 3715 (262) RIGHT OF WAY
UNCLASSIFIED 2019 $75 $19 $94
100064293 CMAQ 3715 (262) UTILITIES
UNCLASSIFIED 2020 $83 $21 $104
100064294 CMAQ 3715 () CONSTRUCTION
UNCLASSIFIED 2020 $600 $150 $750
TOTAL COST: $758 $190 $948
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
44 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
41ST STREET STREETSCAPE- FROM 1ST AVENUE SOUTH TO 5TH AVENUE SOUTH
Type of Work STREETSCAPE
Project Length in Miles 0.400 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064297 CMAQ 3715 () CONSTRUCTION
STREETSCAPE
2019 $816 $204 $1,020
TOTAL COST: $816 $204 $1,020
Route NA- ProjectDescription
ZOO SIDEWALK CONNECTOR FROM POINCIANA DRIVE TO 20TH PLACE SOUTH, ALONG 20TH PLACE SOUTH TO CAHABA ROAD
Type of Work SIDEWALK
Project Length in Miles 0.300 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064299 CMAQ 3715 (268) CONSTRUCTION
SIDEWALK 2019 $496 $124 $619
TOTAL COST: $496 $124 $619
Route NA- ProjectDescription
SIDEWALKS AND STREETSCAPE ON GREENSPRINGS HIGHWAY FROM VALLEY AVENUE TO 16TH STREET SOUTH
Type of Work SIDEWALK
Project Length in Miles 1.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064303 CMAQ 3715 () CONSTRUCTION
SIDEWALK 2019 $1,600 $400 $2,000
TOTAL COST: $1,600 $400 $2,000
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
45 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SIDEWALKS, BICYCLE LANES, CROSSWALKS, LANDSCAPE AND SIGNAGE INSTALLATION ALONG 22ND ST. N., 12TH AVE. N., 20TH ST. N., AND SHUTTLESWORTH DRIVE/HUNTSVILLE ROAD
Type of Work SIDEWALK
Project Length in Miles 1.800 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064315 CMAQ 3715 (263) RIGHT OF WAY
SIDEWALK 2019 $40 $10 $50
100064316 CMAQ 3715 (263) UTILITIES
SIDEWALK 2020 $40 $10 $50
100064317 CMAQ 3715 () CONSTRUCTION
SIDEWALK 2020 $960 $240 $1,200
TOTAL COST: $1,040 $260 $1,300
Route NA- ProjectDescription
OZONE AWARENESS PROGRAM FOR JEFFERSON AND SHELBY COUNTIES FY 2019 AND FY 2020
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064488 CMAQ NR19 (900) SPECIAL
UNCLASSIFIED 2018 $400 $100 $500
TOTAL COST: $400 $100 $500
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
46 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICES FOR SUBRECIPIENT (FY 2015 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065085 STPBH TR17 () TRANSIT
UNCLASSIFIED 2020 $2,000 $500 $2,500
TOTAL COST: $2,000 $500 $2,500
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2014 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065086 STPBH TR16 () TRANSIT
UNCLASSIFIED 2020 $400 $100 $500
TOTAL COST: $400 $100 $500
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICES FOR SUBRECIPIENT ( FY 2016 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065087 STPBH TR18 () TRANSIT
UNCLASSIFIED 2020 $1,818 $455 $2,273
TOTAL COST: $1,818 $455 $2,273
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
47 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2015 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065088 STPBH TR17 () TRANSIT
UNCLASSIFIED 2020 $1,080 $270 $1,350
TOTAL COST: $1,080 $270 $1,350
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2016 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065089 STPBH TR18 () TRANSIT
UNCLASSIFIED 2020 $950 $237 $1,187
TOTAL COST: $950 $237 $1,187
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, PURCHASE OF SERVICES FOR SUBRECIPIENT (FY 2017 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065090 STPBH TR19 () TRANSIT
UNCLASSIFIED 2020 $1,826 $456 $2,282
TOTAL COST: $1,826 $456 $2,282
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
48 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
SECTION 5310 FLEXIBLE FUNDS TRANSFER TO FTA FOR PARATRANSIT CONSORTIUM, BUSES/CAPITAL EQUIPMENT (FY 2017 APPORTIONMENT)
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065091 STPBH TR19 () TRANSIT
UNCLASSIFIED 2020 $953 $238 $1,191
TOTAL COST: $953 $238 $1,191
Route NA- ProjectDescription
18TH STREET REVITALIZATION FROM 28TH AVENUE SOUTH TO A POINT APPROXIMATELY 1000' NORTH OF ROSEDALE DRIVE IN THE CITY OF HOMEWOOD
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065219 CMAQ TA15 (903) RIGHT OF WAY
STREETSCAPE
2019 $82 $21 $103
100065220 CMAQ TA15 (903) UTILITIES
STREETSCAPE
2019 $82 $21 $103
100064505 TAPAA-CMAQ TA15 (903)
CONSTRUCTION
STREETSCAPE
2019 $1,200 $300 $1,500
TOTAL COST: $1,365 $341 $1,706
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
49 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
DOWNTOWN STREETSCAPE AND SIDEWALKS ALONG B.Y. WILLIAMS SR. DRIVE IN THE CITY OF MIDFIELD.
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065503 CMAQ TA14 (930) RIGHT OF WAY
SIDEWALK 2019 $82 $21 $103
100065504 CMAQ TA14 (930) UTILITIES
SIDEWALK 2019 $82 $21 $103
100062999 TAPAA-CMAQ TA14 (930)
CONSTRUCTION
SIDEWALK 2019 $899 $225 $1,123
TOTAL COST: $1,063 $266 $1,329
Route NA- ProjectDescription
PEDESTRIAN AND STREETSCAPE IMPROVEMENTS UNDERNEATH THE I-59/I-20 CBD BRIDGE
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065615 ACIM-ACCMAQ-CMAQ 3716 ()
CONSTRUCTION
STREETSCAPE
2020 $32,675 $4,787 $37,462
TOTAL COST: $32,675 $4,787 $37,462
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
50 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
BIKESHARE WAYFINDING SIGNS AT VARIOUS LOCATIONS IN DOWNTOWN BIRMINGHAM
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066622 CMAQ 3717 () CONSTRUCTION
UNCLASSIFIED 2019 $1,120 $280 $1,400
TOTAL COST: $1,120 $280 $1,400
Route NA- ProjectDescription
WOODLAWN NEIGHBORHOOD STREETSCAPE PHASE 2 (CITY OF BIRMINGHAM)
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066709 CMAQ 3717 () CONSTRUCTION
STREETSCAPE
2019 $1,224 $306 $1,530
TOTAL COST: $1,224 $306 $1,530
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
51 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
STREETSCAPE AND OTHER PEDESTRIAN IMPROVEMENTS ALONG THE FOLLOWING BLOCKS IN DOWNTOWN BIRMINGHAM: 4TH AVE. N FROM 15TH N TO 17TH N, 5TH AVE. N FROM 15TH N TO 17TH N,15TH ST. N FROM 4TH AVE. N TO 5TH AVE. N, 16TH ST. N FROM 4TH AVE. N TO 5TH AVE. N.
Type of Work STREETSCAPE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100067027 CMAQ 3717 () UTILITIES
STREETSCAPE
2019 $122 $31 $153
100067028 CMAQ 3717 () CONSTRUCTION
STREETSCAPE
2019 $408 $102 $510
TOTAL COST: $530 $133 $663
Route NA- ProjectDescription
SIDEWALKS ALONG PINE RIDGE ROAD FROM OVERBROOK ROAD TO OLD LEEDS ROAD
Type of Work SIDEWALK
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068125 CMAQ 3718 () RIGHT OF WAY
SIDEWALK 2020 $41 $10 $51
100068124 CMAQ 3718 () UTILITIES
SIDEWALK 2020 $82 $20 $102
100068126 CMAQ 3718 () CONSTRUCTION
SIDEWALK 2020 $1,906 $476 $2,382
TOTAL COST: $2,028 $507 $2,535
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
52 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route NA- ProjectDescription
BIRMINGHAM RIDE SHARE PROGRAMS APPORTIONMENT FY 2019 - FY 2020
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100068135 STPBH TR18 () SPECIAL
UNCLASSIFIED 2019 $1,300 $0 $1,300
TOTAL COST: $1,300 $0 $1,300
Route SR-119 ProjectDescription
REPLACE BRIDGE, BIN 001308, SR-119 OVER UNNAMED BRANCH, 1.3 MILES NORTH SHELBY COUNTY LINE (SUFF=56.3, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049954 BR 0119 () PRELIMINARY ENGINEERING
BRIDGE REPLACEMENT
2019 $228 $57 $285
100049986 BR 0119 () RIGHT OF WAY
BRIDGE REPLACEMENT
2019 $57 $14 $71
100049987 BR 0119 () UTILITIES
BRIDGE REPLACEMENT
2022 $35 $9 $44
100049955 BR 0119 () CONSTRUCTION
BRIDGE REPLACEMENT
2023 $2,362 $591 $2,953
TOTAL COST: $2,682 $671 $3,353
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
53 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-150 ProjectDescription
PEDESTRIAN BRIDGE OVER SR-150 BETWEEN BERKLEY AVE AND CLARENDON AVE - CITY OF BESSEMER
Type of Work PEDESTRIAN OVERPASS
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064228 CMAQ 3715 () RIGHT OF WAY
PEDESTRIAN OVERPASS
2019 $83 $21 $104
100064229 CMAQ 3715 () UTILITIES
PEDESTRIAN OVERPASS
2020 $84 $21 $105
100064230 CMAQ 3715 () CONSTRUCTION
PEDESTRIAN OVERPASS
2020 $841 $210 $1,051
TOTAL COST: $1,008 $252 $1,260
Route SR-150 ProjectDescription
BRIDGE REPLACEMENT ON SR-150 OVER LITTLE SHADES CREEK BIN # 2866
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100066943 BR 0150 (505) UTILITIES
BRIDGE REPLACEMENT
2019 $245 $61 $306
100066944 BR 0150 () CONSTRUCTION
BRIDGE REPLACEMENT
2020 $1,236 $309 $1,545
TOTAL COST: $1,481 $370 $1,851
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
54 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-3 ProjectDescription
BR REPL AND APP ON SR-3 (US-31) BIN# 002243 OVER SOU RR #3-37-15.8B
Type of Work BRIDGES AND APPROACHES
Project Length in Miles 0.100 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100003818 BR 7044 (600) PRELIMINARY ENGINEERING
BRIDGES AND APPROACHES
2023 $126 $31 $157
TOTAL COST: $126 $31 $157
Route SR-3 ProjectDescription
SR-3(US-31) FROM COLUMBIANA RD TO SHADES CREST RD VESTAVIA HILLS, TRAFFIC CONTROL CENTER
Type of Work UNCLASSIFIED
Project Length in Miles 3.265 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039842 CMAQ 7012 () CONSTRUCTION
UNCLASSIFIED 2020 $636 $159 $796
TOTAL COST: $636 $159 $796
Route SR-3 ProjectDescription
SLOPE STABILIZATION ON SR-3 (US-31) AT BROOKWOOD MEDICAL CENTER DRIVE
Type of Work SLIDE CORRECTION
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056427 NH 0003 () CONSTRUCTION
SLIDE CORRECTION
2020 $91 $23 $114
TOTAL COST: $91 $23 $114
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
55 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-3 ProjectDescription
SR-3 (US-31) LIGHTING SYSTEM FROM PATTON CHAPEL ROAD TO I-65 CITY OF HOOVER
Type of Work LIGHTING
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064209 STPBH 3715 () CONSTRUCTION
LIGHTING 2020 $1,600 $400 $2,000
TOTAL COST: $1,600 $400 $2,000
Route SR-3 ProjectDescription
AUXILIARY LANES ON SR-3(US-31/RED MOUNTAIN EXPRESSWAY) BETWEEN HIGHLAND AVE AND 21ST AVE.
Type of Work STREETSCAPE
Project Length in Miles 1.598 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100064507 CMAQ 0003 () CONSTRUCTION
STREETSCAPE
2019 $2,602 $650 $3,252
TOTAL COST: $2,602 $650 $3,252
Route SR-38 ProjectDescription
BRIDGE WIDENING ON SR-38 (US-280) OVER I-459 FROM SUMMIT BOULEVARD TO BLUE LAKE DRIVE
Type of Work BRIDGE WIDENING
Project Length in Miles 0.500 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100060860 BR 0038 () CONSTRUCTION
BRIDGE WIDENING
2022 $267 $67 $334
TOTAL COST: $267 $67 $334
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
56 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-4 ProjectDescription
REPLACE BRIDGE, BIN 000884, SR-4 (US-78) OVER LITTLE CAHABA RIVER (SUFF=58.4, STATUS=FO)
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.200 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100049988 BR 0004 () RIGHT OF WAY
BRIDGE REPLACEMENT
2020 $58 $14 $72
100049989 BR 0004 () UTILITIES
BRIDGE REPLACEMENT
2022 $35 $9 $44
100049957 BR 0004 () CONSTRUCTION
BRIDGE REPLACEMENT
2022 $2,639 $660 $3,299
TOTAL COST: $2,732 $683 $3,415
Route SR-4 ProjectDescription
INTERSECTION IMPROVEMENTS AT PARKWAY DRIVE SR-4 (US-78) AND PRESIDENT STREET IN THE CITY OF LEEDS
Type of Work INTERSECTION IMPROVEMENTS
Project Length in Miles 0.260 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100065396 STPAA 0004 () RIGHT OF WAY
INTERSECTION IMPROVEMENTS
2019 $412 $103 $515
100065397 STPAA 0004 () UTILITIES
INTERSECTION IMPROVEMENTS
2020 $416 $104 $520
100063799 STPAA 0004 () CONSTRUCTION
INTERSECTION IMPROVEMENTS
2020 $2,522 $631 $3,153
TOTAL COST: $3,351 $838 $4,188
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
57 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-5 ProjectDescription
BRIDGE REPLACEMENT (BIN 007627) ON SR-5 OVER LOCUST FORK OF BLACK WARRIOR RIVER
Type of Work BRIDGE REPLACEMENT
Project Length in Miles 0.681 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100002809 BR 0005 (517) CONSTRUCTION
BRIDGE REPLACEMENT
2019 $5,135 $1,284 $6,418
TOTAL COST: $5,135 $1,284 $6,418
Route SR-5 ProjectDescription
SR-5 (US-78) ADD LANES FROM FINLEY BLVD. TO PRATT HWY (2ND ST) (PHASE 2)
Type of Work ADDITIONAL ROADWAY LANES
Project Length in Miles 0.810 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063746 NH 0005 (510) PRELIMINARY ENGINEERING
ADDITIONAL ROADWAY LANES
2023 $217 $54 $271
TOTAL COST: $217 $54 $271
Route SR-7 ProjectDescription
WIDEN SR-7(US-11) FR END OF 5-LANE FACILITY, EAST OF CHALKVILLE RD TO THE CAHABA RIVER BRIDGE
Type of Work WIDENING AND RESURFACING (RDWY)
Project Length in Miles 0.441 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100039839 STPBH 7073 (602) CONSTRUCTION
WIDENING AND RESURFACING (RDWY)
2019 $2,049 $512 $2,562
TOTAL COST: $2,049 $512 $2,562
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
58 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM SR-75 TO 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE ROAD). INCLUDES SINGLE BRIDGES ON BROOKWOOD ROAD AT STATIONS 8+01 TO 11+31 AND STATIONS 21+70 TO 22+28. GRADE, DRAIN, PARTIAL BASE AND PAVE, AND BRIDGE.
Type of Work GRADE, DRAIN, BASE, PAVE AND BRG
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058452 ACNHF 1602 (556) RIGHT OF WAY
GRADE, DRAIN, BASE, PAVE AND BRG
2026 $4,418 $1,105 $5,523
TOTAL COST: $4,418 $1,105 $5,523
Route SR-959 ProjectDescription
(BNB) DUAL MAINLINE BRGS OVER CR-129 (GLENWOOD RD), TURKEY CREEK, CR-131 (MAJESTIC RD) / CSX RR, CR-121 (BRADFORD ROAD), CR-141 (OLD DIXIANA RD), SR-79, AND SELF CREEK STATIONS 2149+00 TO 2158+00. ALSO INCLUDES RAMP C BRIDGE AT SR-79.
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058465 ACNHF 1602 (553) CONSTRUCTION
BRIDGE 2026 $26,789 $6,697 $33,487
TOTAL COST: $26,789 $6,697 $33,487
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
59 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.13 MILE WEST OF I-65 TO 0.09 MILE WEST OF SR-3 (US-31). INCLUDES ACCEL/DECEL LANES ON I-65
Type of Work GRADE, DRAIN, BASE AND PAVE
Project Length in Miles 1.210 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047841 ACNHF 1602 () RIGHT OF WAY
GRADE, DRAIN, BASE AND PAVE
2025 $15,330 $3,832 $19,162
TOTAL COST: $15,330 $3,832 $19,162
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE INCLUDES DUAL MAINLINE BRIDGES OVER US-31, RAMP A AND B, BRIDGES AT US-31 AND RAMP 3 AND 4, BRIDGES AT I-65
Type of Work BRIDGE
Project Length in Miles 0.970 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047834 ACNHF 1602 () CONSTRUCTION
BRIDGE 2025 $59,727 $14,932
$74,659
TOTAL COST: $59,727 $14,932
$74,659
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
60 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.09 MILE WEST OF SR-3 (US-31) TO CUNNINGHAM CREEK
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 1.877 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047848 ACNHF 1602 () RIGHT OF WAY
GRADE, DRAIN AND BRIDGE
2025 $7,340 $1,835 $9,176
TOTAL COST: $7,340 $1,835 $9,176
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CUNNINGHAM CREEK.
Type of Work BRIDGE
Project Length in Miles 0.240 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100047854 ACNHF 1602 () CONSTRUCTION
BRIDGE 2025 $51,536 $12,884
$64,420
TOTAL COST: $51,536 $12,884
$64,420
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
61 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
SR-959 (BIRMINGHAM NORTHERN BELTLINE) FROM CUNNINGHAM CREEK TO 0.39 MI EAST OF SR-79. GRADE, DRAIN, PARTIAL BASE AND PAVE.
Type of Work GRADE AND DRAIN
Project Length in Miles 6.840 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058461 ACNHF 1602 (555) RIGHT OF WAY
GRADE AND DRAIN
2026 $18,541 $4,635 $23,176
TOTAL COST: $18,541 $4,635 $23,176
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SELF CREEK AT STATIONS 2183+00 TO 2199+00, DUAL MAINLINE BRIDGES AT STATION 2208+50 TO 2218+50, AND SINGLE BRIDGES ON RAMPS B AND D AT SR-79.
Type of Work BRIDGE
Project Length in Miles 2.780 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100048413 ACAPDF 1602 (550) CONSTRUCTION
BRIDGE 2023 $52,718 $0 $52,718
TOTAL COST: $52,718 $0 $52,718
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
62 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER SR-75, CR-159 (CEDAR MT. ROAD), CR-2186 (CAVERN RD / BUD ALISON RD), AND CR-30 (OLD SPRINGVILLE ROAD). ALSO INCLUDES SINGLE RAMP H AND I BRIDGES AT SR-75.
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056652 ACNHF 1602 (561) CONSTRUCTION
BRIDGE 2025 $299,327 $74,832
$374,158
TOTAL COST: $299,327 $74,832
$374,158
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE FROM 0.57 MI EAST OF CR-30 (OLD SPRINGVILLE RD) TO I-59. INCLUDES ACCEL/DECEL LANES ON I-59 BETWEEN CR-2133 (DEERFOOT PKWY) AND CR-2145 (HONOR KEITH RD / LILES LN) AND BRIDGE OVER I-59 ON CR-2137 (ADVENT CIRCLE)
Type of Work GRADE, DRAIN AND BRIDGE
Project Length in Miles 3.360 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100058456 ACNHF 1602 (557) RIGHT OF WAY
GRADE, DRAIN AND BRIDGE
2026 $1,854 $464 $2,318
TOTAL COST: $1,854 $464 $2,318
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
63 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019
Route SR-959 ProjectDescription
BIRMINGHAM NORTHERN BELTLINE DUAL MAINLINE BRIDGES OVER CR-2137 (ADVENT CIRCLE) AND SINGLE BRIDGES ON RAMP O AND RAMP Q OVER I-59.
Type of Work BRIDGE
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100056660 ACNHF 1602 (554) CONSTRUCTION
BRIDGE 2026 $36,684 $9,171 $45,855
TOTAL COST: $36,684 $9,171 $45,855
Route SR-959 ProjectDescription
FY 2020 AND 2021 BIRMINGHAM NORTHERN BELTLINE WETLAND AND STREAM MITIGATION CREDITS
Type of Work UNCLASSIFIED
Project Length in Miles 0.000 Urban Area BIRMINGHAM COST IN THOUSANDS
Project Reference Nbr FA Number
Scope of Work Type of Work Fiscal Year Federal
State-Other TOTAL
100063385 APDF 1602 () SPECIAL
UNCLASSIFIED 2020 $2,353 $0 $2,353
TOTAL COST: $2,353 $0 $2,353
11/11/2018 ALABAMA DEPARTMENT OF TRANSPORTATION
FIVE YEAR PLAN YEARS from 10/1/2018-9/30/2023
64 of 64
HIGHWAY PROJECTS - JEFFERSON
FIVE YEAR PLAN: 2019 - Original
FIVE YEAR PLAN FOR PLAN 2019