OPENING AGENDA ITEMS 11/04/2014
PAGE NUMBER(S)
1.01 – Announcements 0 1.02 – Approval of Agenda for November 4, 2014 2-3
1.03- Adoption of Minutes 4-7
1.04 – Public Comments
INVOCATION – M. DAVIS PLEDGE OF ALLEGIANCE
AGENDA
A REGULAR MEETING SCHOOL BOARD OF WALTON COUNTY, FLORIDA Tivoli Administrative Complex, 145 Park Street, Suite 3, DeFuniak Springs, FL 32435
Tuesday, November 04, 2014 5:00 PM Opening Agenda Items 1 - OPENING ITEMS - 1.01 - Announcements
1.02 - Approval of Agenda Approval of November 4, 2014 Regular Meeting Agenda (C. Anderson) 1.03 - Adoption of Minutes a. Approval of September 29, 2014 Special Meeting 9:00 AM/Walton County Public Education Financing Authority, Inc. (C. Anderson) b. Approval of October 21, 2014 Regular Meeting Minutes (C. Anderson) c. Approval of October 27, 2014 Special Meeting Minutes (C. Anderson)
1.04 - Public Comments NOTE: Any person addressing the Board is reminded that the name of the student, other than the children of the person addressing the Board, should not be mentioned or disclosed in the person's comments.
Consent Agenda Items 1 - OPENING ITEMS - 1.05 - Approval of Consent Agenda Items Approval of the November 4, 2014 Consent Agenda Items (C. Anderson) 8 - FINANCE - 8.05 - Purchasing Approval of Purchase Orders Exceeding $25,000.00 (D. Noyes) 15 - TRANSPORTATION - 15.01 - Trip (Bus/Van) Requests a. Approval of Emerald Coast Middle School National Junior Beta Club to Travel to Orlando, Florida (J. Hicks) b. Approval of South Walton High School 2014-2015 Boys and Girls Soccer Schedule (J. Hicks) c. Approval of South Walton High School 2014-2015 Varsity and Junior Varsity Boys Basketball Schedule (J. Hicks) d. Approval of South Walton High School 2014-2015 Varsity and Junior Varsity Girls Basketball Schedule (J. Hicks) e. Approval of Walton High School 2014-2015 Varsity Softball Schedule (J. Hicks)
f. Approval of Walton High School French Class Students to Travel to New Orleans, Louisiana on November 15, 2014 to See The Off-Broadway Production of "The Phantom of the Opera" (J. Hicks)
g. Approval of Freeport Middle school Eighth (8th) Grade Students to Travel to Busch Gardens in Tampa, Florida via Charter Bus on May 1-2, 2015 to Attend the Eighth (8th) Grade Grad Night (J. Hicks)
Action Agenda Items 5 - AGREEMENTS / CONTRACTS - 5.01 - Agreements / Contracts a. Approval of Contract with Tri-County Community Council, Inc., Headstart for SY 2014-2015 (R. Stafford) b. Approval of Contract between The School Board of Walton County, Florida and Ashlee Scarpulla of South Walton High School (A. Tibbetts) c. Approval of Contract between the School Board of Walton County, Florida and Vivian Rodriguez of South Walton High School (A. Tibbetts)
9 - PERSONNEL - 9.01 - Personnel Recommendations a. Approval of November 4, 2014 Personnel Recommendations (S. Alford) b. Approval of November 4, 2014 Personnel Addendum (S. Alford)
Agenda 11/4/2014 Page 2
19 - FACILITIES / CONSTRUCTION - 19.02 - Construction Bids / Contracts Approval of Freeport Elementary school Classroom Additions - Guaranteed Maximum Price (GMP) from Ajax Building Corporation (M. Gardner)
19.38 - Naming and/or Dedication of Facilities Approval of Designation of District's Postsecondary Institution as Technical College with New Name and Designation Effective January 1, 2012 (M. Davis)
25 - ADMINISTRATION - 25.01 - Board Policies/Rules Approval of Approval to Advertise a Notice of Rule Development for Two (2) Revised School Board Rules/Policies (T. Blackshear)
89 - ITEMS REMOVED FROM CONSENT AGENDA FOR INDIVIDUAL CONSIDERATION - 89.01 - Items Removed from Consent Agenda
90 - CLOSING ITEMS - 90.01 - Attorney's Report
90.02 - Board Comments
90.03 - Chairperson's Report
90.04 - Superintendent's Report
99 - ADJOURNMENT - 99.01 - Adjournment
NOTE: If a person decides to appeal any decision made by the School Board with respect to any matter considered at such meeting or hearing, such person will need a record of the proceedings and, for such purpose, such person may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based.
A SPECIAL MEETING OF THE SCHOOL BOARD SCHOOL BOARD OF WALTON COUNTY, FLORIDA
Monday, September 29, 2014 9:00 AM
MEMBERS PRESENT: Mark Davis, Gail Smith, Sharon Roberts, Dennis Wallace, and Faye Leddon
MEMBERS ABSENT: NONE
Chairperson Leddon called the meeting to order at 9:00 AM
8 FINANCE -- 8.10 Annual Financial Reports Approval of Annual Financial Report for Fiscal Year 2013-2014 (D. Noyes) **THIS AGENDA ITEM WAS TABLED** **School Board Davis made the motion to Table the Annual Financial Report until October 7, 2014, Regular Meeting Motion: Davis Second by: Wallace Ayes: ALL (5) Nayes: NONE Motion: CARRIED
6 RESOLUTIONS -- 6.01 WCSB Resolutions Approval of Resolution for the Issuance of Certificate of Participation (M. Gardner) The Superintendent introduced Mark Gardner, Facilities and Maintenance Director.
Mr. Gardner Introduced Brent Wilder, Public Financial Management and Financial Advisor to the District. Mr. Wilder introduced the following in attendance:
Brent Wilder - Public Financial Management Financial Advisor to the District Russell Edghill, - Director/SunTrust Robinson Humphrey/Underwriter for the COPS Mr. George Smith – Attorney/Bryant Miller Olive - Bond Council and Disclosure Council for the District Jason Brett – Attorney/Bryant Miller Olive - Bond Council and disclosure Council for the District Mr. George Smith and Jason Brett, Law Firm of Bryant Miller Olive provided a brief overview of the documents to be considered for approval.
*The Superintendent made the recommendation to approve of Resolution #1415-12 by the Walton County School Board for the Issuance of Certificate of Participation to fund Walton Middle School project
**Motion was made to accept the Superintendent's recommendation Motion: Davis Second by: Wallace Ayes: ALL (5) Nayes: NONE Motion: CARRIED
Page 2 Monday, September 29, 2014 M I N U T E S
99 ADJOURNMENT -- 99.01 Adjournment **Motion was made to adjourn 9:33PM Motion: Davis Second by: Wallace Ayes: ALL (5) Nayes: NONE Motion: CARRIED FAYE LEDDON CARLENE H. ANDERSON Chairperson of the Board Secretary to the Board
A SPECIAL MEETING OF THE SCHOOL BOARD SCHOOL BOARD OF WALTON COUNTY, FLORIDA
Monday, September 29, 2014 9:30 AM
MEMBERS Chairperson: Mark Davis, Gail Smith, Sharon Roberts, Dennis Wallace, and Faye Leddon
MEMBERS ABSENT: NONE
Chairperson Leddon called the meeting to order at 9:34 AM
6 RESOLUTIONS -- 6.01 WCSB Resolutions Approval by the Walton County Public Education Financers Authority, Inc. to adopt a Resolution for Issuance of Certificate of Participation (M. Gardner) ** School Board Member Davis made the motion to open the Walton County Public Education Financers Authority, Inc. meeting for the Issuance of Certificate of Participation to fund the Walton Middle School project Motion: Davis Second by: Roberts Ayes: ALL (5) Nayes: NONE Motion: CARRIED
**The Superintendent made the motion to approve of Resolution #1415-11 approving and authorizing the Officers of the Walton County Public Education Financers Authority, Inc. to sign all documents necessary to be executed by the Financing authority in connection with the issuance of certificates of participation by the School Board of Walton County, Florida to secure finance to be executed Walton County Public
Education Financers Authority, Inc. to
99 ADJOURNMENT -- 99.01 Adjournment Motion was made to adjourn at 9:40 AM Motion: Davis Second by: Roberts Ayes: ALL (5) Nayes: NONE Motion: CARRIED FAYE LEDDON CARLENE H. ANDERSON Chairperson of the Board Secretary to the Board
CONSENT AGENDA ITEMS 11/04/2014
PAGE NUMBER(S) 8.05– Finance – Purchasing Exceeding 25,000.00 0 15.01 – Trip (Bus/Van) Requests 9-39
ACTION AGENDA ITEMS 11/04/2014
PAGE NUMBER(S) 5.01 – Agreements/Contracts 41-56 9.01 – Personnel – Recommendation & Addendum 57-72 19.02 – Facilities/Construction – FES “GMP” 73-143 19.38 - Facilities/Construction – Naming of Facilities 144 25.01 – Administration – Board Policies/Rules 150 89.01 – Items Removed from Consent Agenda
WALTON COUNTY SCHOOL BOARDFREEPORT ELEMENTARY SCHOOL ADDITION
TOWNES + architects , P.A.4-Apr-14
OPINION OF PROBABLE COST - PHASE III NEW CONSTRUCTION
VALUE UNIT QUANTITY COSTDIVISION ONE GENERAL CONDITIONS 3,000.00$ Month 9 27,000.00$
Demolition 10,000.00$ LS 1 10,000.00$ DIVISION TWO SITE WORK
Site work 233,000.00$ LS 1 233,000.00$
DIVISION THREE CONCRETEConcrete slab and foundations 5.00$ SF 10,089 50,445.00$ Covered Walkway slab and foundations 10.00$ SF 500 5,000.00$
DIVISION FOUR MASONRYExterior CMU and Brick Veneer 24.00$ SF 6,625 159,000.00$ Interior CMU 12.00$ SF 3,990 47,880.00$
DIVISION FIVE METALSStructural Steel, decking 29,188.50$ LS 1 29,188.50$ Steel joists 25,212.00$ LS 1 25,212.00$ Misc. Steel 33,577.50$ LS 1 33,577.50$
DIVISION SIX WOODBase Cabinets & tops 250.00$ LF 180 45,000.00$ Wall shelves 150.00$ LF 130 19,500.00$ Misc. blocking 3,000.00$ LS 1 3,000.00$
DIVISION SEVEN THERMAL AND MOISTUREPROTECTIONRoof Insulation (R-24 above deck) 1.50$ SF 10,089 15,133.50$ Wall Insulation 2.50$ SF 6,625 16,562.50$ Membrane Flashing 3.50$ SF 200 700.00$ Vapor Barrier 1.00$ SF 6,625 6,625.00$ Metal Roofing/Accessories 7.50$ SF 10,089 75,667.50$ Firestopping/Sealant 5,000.00$ LS 1 5,000.00$ Expansion Control 2,000.00$ LS 1 2,000.00$
-$ DIVISION EIGHT DOORS AND WINDOWS
Exterior HM doors, frames, HDW 650.00$ EA 5 3,250.00$ Interior SCWD doors, frames, HDW 650.00$ EA 15 9,750.00$ Interior SCWD doors, rated glazing frames, HDW 850.00$ EA 6 5,100.00$ Aluminum Windows, glazing 60.00$ SF 500 30,000.00$ DBL. HM Entrance Doors 2,000.00$ EA 5 10,000.00$
DIVISION NINE FINISHES2 sided GWB walls and furr outs 4.20$ SF 4,470 18,774.00$ 1 sided GWB walls 3.00$ SF 11,100 33,300.00$ Vinyl Composition Tile 1.50$ SF 672 1,008.00$ Ceramic Floor tile 10.00$ SF 525 5,250.00$ Carpet 35.00$ SY 950 33,250.00$ Rubber Wall Base 3.00$ LF 1,600 4,800.00$ Painting 1.00$ SF 17,000 17,000.00$ Ceramic Wall Tile 8.00$ SF 800 6,400.00$ Suspended ACT 4.30$ SF 9,000 38,700.00$ GWB Ceilings 4.50$ SF 525 2,362.50$
DIVISION TEN SPECIALTIESToilet Accessories 1,500.00$ LS 1 1,500.00$ Toilet Partitions 1,250.00$ EA 3 3,750.00$ Urinal Partitions 400.00$ EA 1 400.00$ Fire Extinguishers and Cabinets 300.00$ EA 5 1,500.00$ Room Signs 50.00$ EA 28 1,400.00$ Bulletin Boards 365.00$ EA 18 6,570.00$ Marker Boards 545.00$ EA 6 3,270.00$ Aluminum covered Walkways 35.00$ SF 500 17,500.00$
DIVISION ELEVEN EQUIPMENT -$
DIVISION TWELVE FURNISHINGSHorizontal Blinds 6.00$ SF 600 3,600.00$
DIVISION THIRTEEN SPECIAL CONSTRUCTION
DIVISION FOURTEEN ELEVATORS
DIVISION FIFTEEN MECHANICALPlumbing 45,000.00$ LS 1 45,000.00$ HVAC 250,000.00$ LS 1 250,000.00$
DIVISION SIXTEEN ELECTRICALElectrical systems(includes FA & Security rough in only) 190,000.00$ LS 1 190,000.00$ Voice/Data 92,000.00$ LS 1 92,000.00$
SUBTOTAL 1,644,926.00$
OPINION OF PROBABLE COST- BASE BID 1,644,926.00$
Cost per Square Foot 163.97$
Cost per square foot (Div. 3-16 only) 137.05$
Alternate #1 Add 2 Primary Classrooms 2392 SF at $137.05 327,833.23$
OPINION OF PROBABLE COST- INCLUDING ALTERNATE 1 1,972,759.23$
AJAX PROJECT NO. 201426 FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
TABLE OF CONTENTS I. Executive Summary II. List of Documents
III. Description of Work
A. Clarifications, Qualifications and Assumptions B. Exclusions C. Proposed Substitutions, Modifications and/or Variances D. Value Engineering and Budget Options E. Allowance Schedule F. Alternates
IV. GMP Cost Summary
A. GMP Estimate Narrative B. GMP Estimate – Base Bid GMP (CM Detail Report)
V. Site Utilization Plan
A. Site Utilization Plan Narrative B. Site Utilization Plan
VI. Project Schedule
A. Project Schedule Narrative B. Project Schedule
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
EXECUTIVE SUMMARY Ajax Building Corporation is pleased to present this Guaranteed Maximum Price (GMP) Proposal for the Freeport Elementary School Classroom Additions for consideration by The Walton County School Board. This GMP Proposal will recap the status of the project through the end of the GMP Phase and will provide estimate, schedule and other project information to be utilized by the project team as the project moves forward. This GMP Proposal, upon acceptance by The Walton County School Board, is intended to serve as the basis for an Amendment to the CM Contract, adding the construction phase activities to the current contract. Project Description The project consists of site preparation and building construction required to complete the new 4 classroom addition at the east end of the 4th Grade Wing and the new 2 classroom addition at the east end of the Kindergarten Wing. Each addition will be constructed using CMU Masonry block with brick veneer, steel roof joists with metal roof deck, insulation and metal roof. Sitework will consist of removing and relocating existing utilities, installing a new lift station, retaining walls, and concrete sidewalks. Guaranteed Maximum Price (GMP) Ajax Building Corporation is confident that the GMP Estimate included herein is representative of the proposed scope of work depicted in the GMP Documents. The work included in the GMP Estimate is based upon the List of Documents included in Section II of this proposal as amended by 1) the Clarifications, Qualifications, and Assumptions, 2) the Exclusions, 3) Value Engineering and Budget Options, and 4) the Allowance Schedule, all contained in Section III of this proposal. The Base Bid GMP Proposal for the Freeport Elementary School Classroom Additions totals $2,691,547.00. The Base Bid GMP Proposal includes construction of a new 4 classroom addition at the east end of the 4th Grade Wing and the new 2 classroom addition at the east end of the Kindergarten Wing and all associated sitework and utilities. In addition to the Base Bid GMP Proposal, Ajax Building Corporation has provided pricing for various Alternates in Section III-F of this proposal for consideration by The Walton County School Board. At this time, none of these Alternates are included within the Base Bid GMP Proposal. The following is a summary of the Alternates:
▪ Alternate No. 1 – Additional 2 class extension at Kindergarten wing Add $355,247.00 Project Schedule
The project schedule included within this proposal is based on the information represented in the GMP Documents. The project schedule reflects an overall duration of seven and three quarters (7.75) months.
for the construction phase of the project. The following contractual dates are incorporated into the CM Contract via this GMP Proposal.
▪ Substantial Completion May 29, 2015 ▪ Final Completion June 19, 2015
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
The following additional Milestone Dates are anticipated within the project schedule in order to achieve the contractual dates listed above.
▪ Mobilization / Start of Construction October 23, 2014 ▪ Top-Out of Building Structure 4th Grade: Feb. 13, 2015 K-wing: Mar. 06, 2015 ▪ Building Dry-In 4th Grade: Feb. 20, 2015 K-wing: Mar. 13, 2015 ▪ Permanent Power 4th Grade: May 01, 2015 K-wing: May 15, 2015 ▪ Owner Occupancy 4th Grade: Jun. 19, 2015 K-wing: Jun. 19, 2015
In order for construction activities to commence on October 9, 2015 as scheduled, the following contractual activities will need to be completed as indicated.
▪ GMP Negotiations Complete October 10, 2014 ▪ CM Contract Amendment Executed October 27, 2014 ▪ All Required Permits Issued October 21, 2014 ▪ Notice to Proceed Issued October 22, 2014
In order to expedite the project start-up activities, the Design Team, the Construction Manager and the Owner will be required to closely coordinate and expedite submittal review/approval, respond to information requests, respond to conflicts/unforeseen conditions, etc.
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
LIST OF DOCUMENTS The work included in this GMP Proposal is based upon the List of Documents immediately following this narrative subject to amendments by 1) the Clarifications, Qualifications, and Assumptions, 2) the Exclusions, 3) Value Engineering and Budget Options, and 4) the Allowance Schedule, all contained in Section III of this proposal. The List of Documents includes the:
▪ Contract Drawings ▪ Project Specifications ▪ Addenda Issued by the Architect / Engineer ▪ Bid Packages and Bid Package Addenda
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
CONTRACT DRAWINGS Entitled Six Classroom Addition Freeport Elementary School dated 04/04/2014
SHEET DESCRIPTION DATE REVISED REVISED
G101 TITLE SHEET, DRAWING INDEX 04/04/14
CIVIL
C001 GENERAL NOTES AND LEGEND 04/04/14 05/27/14
C002 EROSION & SEDIMENT CONTROL NOTES & DETAILS 04/04/14
C101 EXISTING CONDITIONS 04/04/14 05/27/14
C201 DEMOLITION & EROSION CONTROL PLAN 04/04/14 05/27/14
C301 SITE PLAN 04/04/14 05/27/14
C401 GRADING & DRAINAGE PLAN 04/04/14
C501 SITE UTILITIES PLAN 04/04/14 05/27/14
C601 SITE GEOMETRY PLAN 04/04/14 05/27/14
C701 SITE DETAILS 04/04/14 05/27/14
C702 PROJECT DETAILS 04/04/14 05/27/14
C703 PROJECT DETAILS 04/04/14
C704 LIFT STATION DETAILS 04/04/14
DEMOLITION
D101 DEMOLITION PLANS 04/04/14
LIFESAFETY
L101 LIFESAFETY PLANS 04/04/14 05/27/14
ARCHITECTURAL
A101 NEW WORK PLANS INTERMEDIATE WING 04/04/14 05/27/14
A102 NEW WORK PLANS PRIMARY WING 04/04/14
07/14/14
A201 REFLECTED CEILING PLAN INTERMIDIATE WING 04/04/14
A202 REFLECTED CEILING PLANS PRIMARY PLAN 04/04/14
07/14/14
A301 ROOF PLAN INTERMEDIATE WING 04/04/14
A302 ROOF PLANS PRIMARY WING 04/04/14
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
SHEET DESCRIPTION DATE REVISED REVISED
A303 COVERED WALKWAY DETAILS 04/04/14
A401 ELEVATIONS 04/04/14
A402 ELEVATIONS 04/04/14
A403 ELEVATIONS 04/04/14
A404 ELEVATIONS 04/04/14
A501 WALL SECTIONS 04/04/14
A502 WALL SECTIONS 04/04/14
A503 DETAILS 04/04/14
A601 CASEWORK ELEVATIONS 04/04/14
A602 CASEWORK SECTIONS 04/04/14
A603 ELNLARGED PLANS & FINISH SCHEDULE 04/04/14
07/14/14
A604 PARTITION TYPES 04/04/14
A605 INTERIOR ELEVATIONS 04/04/14
A701 STANDARD DETAILS 04/04/14
A702 STANDARD DETAILS 04/04/14
A801 DOOR SCHEDULE 04/04/14 05/27/14 07/14/14
A802 DOOR DETAILS 04/04/14
A803 WINDOW ELEVATIONS & DETAILS 04/04/14 05/27/14
STRUCTURAL
S001 GENERALSTRUCTURAL NOTES & TYPICAL DETAILS 04/04/14 05/27/14
S101 FOUNDATION PLAN INTERMEDIATE WING 04/04/14 05/27/14
S102 FOUNDATION PLAN PRIMARY WING 04/04/14 05/27/14
S201 ROOF FRAMING PLAN INTERMEDIATE WING 04/04/14 05/27/14
S202 ROOF FRAMING PLAN PRIMARY WING 04/04/14
S301 FOUNDATION SECTIONS & DETAILS 04/04/14
S302 ROOF FRAMING SECTIONS & DETAILS 04/04/14
MECHANICAL
M101 HVAC DEMOLITION PLANS 04/04/14
M201 HVAC NORTH WING NEW WORK DUCT PLAN 04/04/14 05/27/14
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
SHEET DESCRIPTION DATE REVISED REVISED
M202 HVAC SOUTH WING NEW WORK DUCT PLANS 04/04/14 05/27/14 07/14/14
M301 HVAC OVERALL PIPING NEW WORK PLAN 04/04/14
M302 HVAC NORTH WING & CHILLER BUILDING NEW WORK PIPING PLANS 04/04/14
M303 HVAC SOUTH WING NEW WORK PIPING PLANS 04/04/14
07/14/14
M401 HVAC DETAILS 04/04/14
M402 HVAC CONTROLS 04/04/14 05/27/14
M501 HVAC SCHEDULES & LEGEND 04/04/14 05/27/14
PLUMBING
P101 PLUMBING DEMOLITION PLANS 04/04/14
P201 PLUMBING OVERALL NEW WORK FLOOR PLAN 04/04/14
P202 PLUMBING NORTH WING NEW WORK PLAN 04/04/14 05/27/14 07/14/14
P203 PLUMBING SOUTH WING NEW WORK PLANS 04/04/14
07/14/14
P301 PLUMBING RISER DIAGRAMS 04/04/14
07/14/14
ELECTRICAL
E100 ELECTRICAL SITE PLAN 04/04/14
E101 ELECTRICAL NORTH WING NEW WORK LIGHTING PLAN 04/04/14 05/27/14
E102 ELECTRICAL NORTH WING NEW WORK POWER PLAN 04/04/14 05/27/14 07/21/14
E103 ELECTRICAL NORTH WING NEW WORK SYSTEMS PLAN 04/04/14 05/27/14
E201 ELECTRICAL SOUTH WING NEW WORK LIGHTING PLANS 04/04/14 05/27/14 07/21/14
E202 ELECTRICAL SOUTH WING NEW WORK POWER PLANS 04/04/14 05/27/14 07/21/14
E203 ELECTRICAL SOUTH WING NEW WORK SYSTEMS PLANS 04/04/14 05/27/14 07/21/14
E301 ELECTRICAL LEGEND, SCHEDULES, & RISER DIAGRAMS 04/04/14 05/27/14
E302 ELECTRICAL PANEL SCHEDULES 04/04/14 05/27/14
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
SHEET DESCRIPTION DATE REVISED REVISED
TELE.
TEL101 COMMUNICATIONS SITE PLAN 04/04/14
TEL201 COMMUNICATIONS FLOOR PLAN 04/04/14
TEL301 COMMUNICATIONS TYPICAL DETAILS 04/04/14
TEL302 COMMUNICATIONS TYPICAL ROUGH-IN DETAILS 04/04/14
TEL303 CLASSROOM A/V SYSTEM DETAILS 04/04/14
TEL 304 COMMUNICATIONS TYPICAL FACEPLATE & LABELING DETAILS 04/04/14
TEL 401 VOICE & DATA SYSTEM SINGLE LINE CONFIGUATION DIAGRAMS 04/04/14
TEL402 ITV DISTRIBUTION SYSTEM SINGLE LINE DIAGRAM 04/04/14
TEL501 COMMUNICATIONS ENLARGED FLOOR PLAN & RACK ELEVATIONS 04/04/14
(END OF CONTRACT DRAWINGS)
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
PROJECT SPECIFICATIONS Entitled Six Classroom Addition Freeport Elementary School dated 04/04/2014
SECTION DESCRIPTION DATE REVISED
DIVISION 00
0 00 61 TRENCH SAFETY ADDENDUM
05/27/14
DIVISION 01 - GENERAL
01 10 00 SUMMARY 04/04/14 01 23 00 ALTERNATES 04/04/14 01 25 00 SUBSTITUTION PROCEDURES 04/04/14 01 33 00 SUBMITTAL PROCEDURES 04/04/14 01 40 00 QUALITY REQUIREMENTS 04/04/14 01 50 00 TEMPORARY FACILITIES AND CONTROLS 04/04/14 01 73 29 CUTTING AND PATCHING 04/04/14 01 77 00 CLOSEOUT PROCEDURES 04/04/14 01 82 00 DEMONSTRATION AND TRAINING 04/04/14
DIVISION 2 - EXISTING CONDITIONS/SITEWORK
00 22 00 GEOTECHNICAL DATA 04/04/14 00 22 30 SITE CLEARING 04/04/14 00 23 00 EARTHWORK 04/04/14 00 23 61 TERMITE CONTROL 04/04/14 00 24 00 GRADED AGGREGATE BASE 04/04/14 00 25 01 ASPHALTE SEAL COATING 04/04/14 00 25 15 CAST-IN-PLACE CONCRETE (SITEWORK) 04/04/14 00 25 16 PAVEMENT MARKING 04/04/14 00 25 25 ASPHALT CONCRETE PAVEMENT 04/04/14 00 25 56 WATER DISTRIBUTION AND SERVICE LINES 04/04/14 00 25 70 SANITARY SEWERS 04/04/14 00 25 76 SANITARY SEWER FORCE MAINS 04/04/14
00 26 00 STORMWATER SYSTEM 04/04/14
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
SECTION DESCRIPTION DATE REVISED
00 27 00 SUBMERSIBLE GRINDER PUMPING STATIONS 04/04/14
00 27 15 REMOTE TERMINAL UNIT 04/04/14
00 28 20 CHAIN LINK FENCING AND GATES 04/04/14 00 28 34 MODULAR CONCRETE RETAINING WALL 04/04/14 00 28 60 MAINTENANCE OF TRAFFIC 04/04/14 00 29 00 GRASSING 04/04/14 02 41 19 SELECTIVE DEMOLITION 04/04/14
DIVISION 3 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE 04/04/14
DIVISION 4 - MASONRY
04 20 00 UNIT MASONRY 04/04/14
DIVISION 5 - METALS
05 12 00 STRUCTURAL STEEL FRAMING 04/04/14 05 21 00 STEEL JOIST FRAMING 04/04/14 05 31 00 STEEL DECKING 04/04/14
DIVISION 6 - WOOD PLASTICS
06 10 00 ROUGH CARPENTRY 04/04/14 06 20 23 INTERIOR FINISH CARPENTRY 04/04/14 06 41 16 PLASTIC LAMINATE FACED ARCHITECTURAL CABINETS 04/04/14
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07 21 00 THERMAL INSULATION 04/04/14 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS 04/04/14 07 41 13 METAL PANEL ROOFING 04/04/14 07 62 00 SHEET METAL FLASHING AND TRIM 04/04/14 07 84 13 PENETRATION FIRESTOPPING 04/04/14 07 92 00 JOINT SEALANTS 04/04/14
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
SECTION DESCRIPTION DATE REVISED
07 95 00 EXPANSION CONTROL 04/04/14
DIVISION 8 - DOORS AND WINDOWS
08 11 13 HOLLOW METAL DOORS AND FRAMES 04/04/14 08 14 16 FLUSH WOOD DOORS 04/04/14 08 31 13 ACCESS DOORS AND FRAMES 04/04/14 08 51 13 ALUMINUM WINDOWS 04/04/14 08 71 00 DOOR HARDWARE 04/04/14 08 80 00 GLAZING 04/04/14
DIVISION 9 - FINISHES
09 22 16 NON-STRYCTURAL METAL FRAMING 04/04/14 09 29 00 GYPSUM BOARD 04/04/14 09 30 00 TILING 04/04/14 09 51 23 ACOUSTICAL TILE CEILINGS 04/04/14 09 65 13 RESILIENT BASE AND ACCESSORIES 04/04/14 09 65 19 RESILIENT TILE FLOORING 04/04/14 09 68 16 SHEET CARPETING 04/04/14 09 91 13 EXTERIOR PAINTING 04/04/14 09 91 23 INTERIOR PAINTING 04/04/14
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS 04/04/14 10 14 23 PANEL SIGNAGE 04/04/14 10 21 13 TOILET COMPARTMENTS 04/04/14 10 28 00 TOILET, BATH, AND LAUNDRY ACCESSORIES 04/04/14 10 44 13 FIRE EXTINGUISHER CABINETS 04/04/14 10 44 16 FIRE EXTINGUISHERS 04/04/14 10 53 00 EXTRUDED ALUMINUM WALKWAY COVERS 04/04/14
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
SECTION DESCRIPTION DATE REVISED
DIVISION 12 - FURNISHINGS
12 21 13 HORIZONTAL LOUVER BLINDS 04/04/14
DIVISION 17 - COMMUNICATIONS
17 00 00 COMMUNICATIONS STRUCTURED CABLING 04/04/14
DIVISION 22 - PLUMBING
22 40 00 PLUMBING 04/04/14
DIVISION 23 - HEATING, VENTILATION, AND AIR CONDITIONING
23 05 13 GENRAL REQUIREMENTS OF MECHANICAL WORK 04/04/14 23 05 93 TESTING AND BALANCING AIR AND WATER DISTRIBUTION SYSTEMS 04/04/14 23 08 01 LIMITED CX OF HVAC SYSTEMS
05/27/14
23 09 00 DIRECT DIGITAL CONTROL SYSTEM FOR HVAC 04/04/14 23 60 00 HEATING, VENTILATION, AND AIR CONDITIONING 04/04/14
DIVISION 26 - ELECTRICAL SYSTEMS
26 01 00 ELECTRICAL 04/04/14
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 00 FIRE ALARM SYSTEM 04/04/14
ASBESTOS & LEAD PAINT SURVEY/ REPORT
(END OF PROJECT SPECIFICATIONS)
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
ADDENDA ISSUED BY THE ARCHITECT/ENGINEER
Addenda # Description # Pages Date Revised
1 Added Janitor Closet #085 14 7/22/14
2 Revised Specification 033000 9 7/28/14
3 Revised Specification 074113 8 8/18/14
(END OF ADDENDA)
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
BID PACKAGES AND BID PACKAGE ADDENDA
BP No./ Description Date
BP 01.1 Site Survey 7/22/14
Addendum No. 01.1-1 7/23/14
Addendum No. 01.1-2 7/29/14
Addendum No. 01.1-3 8/18/14
BP 01.2 Materials Testing 7/21/14
Addendum No. 01.2-1 7/23/14
Addendum No. 01.2-2 7/29/14
Addendum No. 01.2-3 8/18/14
BP 01.3 Final Clean 7/22/14
Addendum No. 01.3-1 7/23/14
Addendum No. 01.3-2 7/29/14
Addendum No. 01.3-3 8/18/14
BP 02.1 Sitework 7/21/14
Addendum No. 2.1-1 7/23/14
Addendum No. 2.1-2 7/29/14
Addendum No. 2.1-3 8/18/14
BP 03.1 Concrete 7/18/14
Addendum No. 3.1-1 7/23/14
Addendum No. 3.1-2 7/29/14
Addendum No. 3.1-3 8/18/14
BP 04.1 Masonry 7/17/14
Addendum No. 4.1-1 7/23/14
Addendum No. 4.1-2 7/29/14
Addendum No. 4.1-3 8/18/14
BP 05.1 Structural and Miscellaneous Steel 7/21/14
Addendum No. 5.1-1 7/23/14
Addendum No. 5.1-2 7/29/14
Addendum No. 5.1-3 8/18/14
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
BP No./ Description Date
BP 06.1 Cabinets, Casework & Millwork 7/21/14
Addendum No. 6.1-1 7/23/14
Addendum No. 6.1-2 7/29/14
Addendum No. 6.1-3 8/18/14
BP 07.1 Roofing 7/21/14
Addendum No. 7.1-1 7/23/14
Addendum No. 7.1-2 7/29/14
Addendum No. 7.1-3 8/18/14
BP 08.1 Doors, Frames, & Hardware 7/21/14
Addendum No. 8.1-1 7/23/14
Addendum No. 8.1-2 7/29/14
Addendum No. 8.1-3 8/18/14
BP 08.2 Glass & Glazing 7/21/14
Addendum No. 8.2-1 7/23/14
Addendum No. 8.2-2 7/29/14
Addendum No. 8.2-3 8/18/14
BP 09.1 Drywall, Framing, Rough Carpentry 7/21/14
Addendum No. 9.1-1 7/23/14
Addendum No. 9.1-2 7/29/14
Addendum No. 9.1-3 8/18/14
BP 09.2 Hard Tile 7/21/14
Addendum No. 9.2-1 7/23/14
Addendum No. 9.2-2 7/29/14
Addendum No. 9.2-3 8/18/14
BP 09.3 Carpet & Resilient Flooring 7/21/14
Addendum No. 9.3-1 7/23/14
Addendum No. 9.3-2 7/29/14
Addendum No. 9.3-3 8/18/14
BP 09.4 Acoustical Ceilings 7/21/14
Addendum No. 9.4-1 7/23/14
Addendum No. 9.4-2 7/29/14
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
BP No./ Description Date
Addendum No. 9.4-3 8/18/14
BP 09.5 Painting & Waterproofing 7/21/14
Addendum No. 9.5-1 7/23/14
Addendum No. 9.5-2 7/29/14
Addendum No. 9.5-3 8/18/14
BP 10.1 Visual Displays 7/22/14
Addendum No. 10.1-1 7/23/14
Addendum No. 10.1-2 7/29/14
Addendum No. 10.1-3 8/18/14
BP 10.2 Signs 7/22/14
Addendum No. 10.2-1 7/23/14
Addendum No. 10.2-2 7/29/14
Addendum No. 10.2-3 8/18/14
BP 10.3 Aluminum Walkway Covers 7/22/14
Addendum No. 10.3-1 7/23/14
Addendum No. 10.3-2 7/29/14
Addendum No. 10.3-3 8/18/14
BP 10.4 Toilet & Bath Accessories 7/21/14
Addendum No. 10.4-1 7/23/14
Addendum No. 10.4-2 7/29/14
Addendum No. 10.4-3 8/18/14
BP 12.1 Window Treatment 7/22/14
Addendum No. 12.1-1 7/23/14
Addendum No. 12.1-2 7/29/14
Addendum No. 12.1-3 8/18/14
BP 15.1 Plumbing 7/17/14
Addendum No. 15.1-1 7/23/14
Addendum No. 15.1-2 7/29/14
Addendum No. 15.1-3 8/18/14
BP 15.2 HVAC 7/17/14
Addendum No. 15.2-1 7/23/14
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
BP No./ Description Date
Addendum No. 15.2-2 7/29/14
Addendum No. 15.2-3 8/18/14
BP 16.1 Electrical 7/17/14
Addendum No. 16.1-1 7/23/14
Addendum No. 16.1-2 7/29/14
Addendum No. 16.1-3 8/18/14
END OF DOCUMENT LIST
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
CLARIFICATIONS, QUALIFICATIONS AND ASSUMPTIONS
Basis of the GMP Proposal
This GMP Proposal has been prepared based on the following documents: ▫ The Contract Drawings entitled Six Classroom Addition Freeport Elementary School dated April 4,
2014 as prepared by Townes + Architects. Refer to Document List included in Section II of this proposal. ▫ The Project Specifications entitled Six Classroom Addition Freeport Elementary School dated April 4, 2014 as
prepared by Townes + Architects. Refer to Document List included in Section II of this proposal. ▫ All Addenda, including; Addendum No. 1, dated July 21, 2014; Addendum No. 2, dated July 28, 2014;
Addendum No. 3, dated August 14, 2014 all prepared by Townes + Architects and their consultants, to the extent that the addenda was made available and issued to bidders by Ajax Building Corporation as part of a bid package addenda prior to their bid date.
▫ The Construction Manager’s GMP Estimate dated October 10, 2014. ▫ The Construction Manager’s Project Schedule dated September 19, 2014. ▫ The Bid Packages and Bid Package Addenda issued to bidders by the Construction Manager.
It is understood that allowances are included in this GMP Proposal as indicated in Section III-E of this proposal. It is further understood that the Construction Manager’s Contract will require adjustments by change order (either additive or deductive) for reconciling the difference between each allowance and the actual costs and/or savings realized on each allowance.
The sizes, quantities and descriptions indicated within the GMP Estimate are considered to be part of these clarifications, qualifications and assumptions.
These qualifications, clarifications and assumptions are intended to supplement the GMP Estimate and the GMP Documents, and are an attempt to inform the Owner and the Design Team of the Construction Manager’s interpretation of the scope items which are included or excluded, and which may not be clearly shown or defined by specification, plan, elevation, detail, section, schedule, or schematic.
Scope of the GMP Proposal
The scope of this GMP Proposal consists of the following: ▫ The Construction Manager’s general conditions and general requirements for a period of seven and three
quarters (7.75) months. ▫ The Construction Manager’s pre-construction fee of $20,370.00 ▫ Base GMP – Includes the following scope of work:
Base Estimate -Site preparation and building construction required to complete the 4 classroom addition at the east end of the 4th Grade Wing and the 2 classroom addition at the east end of the Kindergarten Wing and all related earthwork, utilities, retaining walls, and hardscapes
▫ Ajax Building Corporation has provided pricing for Proposed Substitutions, Alternates, and Value Engineering opportunities in Section III of this proposal for consideration by The Walton County School Board. At this time, none of these Alternates, Substitutions or Value Engineering options are included within the Base Bid GMP Proposal.
Division 01 – General Requirements
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
Clarifications, qualifications and assumptions related to Division 01: ▫ This GMP Proposal includes the Construction Manager’s general conditions and general requirements for a
period of seven and a half (7.5). ▫ We have included the necessary jobsite supervision, layout, safety supplies, equipment, temporary jobsite
office facility, postage, office equipment, project telephones, and jobsite communications. ▫ We have not included a jobsite office facility for the Owner, Architect, Engineer, or their representatives. ▫ Temporary utility services (water, sewer and electric) are not included in the estimate. It is assumed that all
temporary utilities required for the project will be tied into permanent utilities and that these permanent utilities are readily accessible, of adequate size to handle any additional load as required by temporary utilities and that temporary on-site facilities can be located as necessary to prevent the need for any substantial overhead and/or underground temporary utilities.
▫ Aerial photographs are not included in the estimate. ▫ Costs related to a threshold inspector are not included in the estimate. ▫ It is assumed that any steam, chilled water and/or natural gas utilities consumed in the performance of the
work will be provided by the Owner at no cost to the Construction Manager. ▫ The costs associated with temporary water, sewer and electric utilities will be paid for by Walton County
Schools and are not included in the estimate. Only costs for the hook-up of these utilities are included in the GMP Proposal.
▫ Environmental permits are not included in the estimate. ▫ The estimate does not include any tap fees, connection charges, system charges, impact fees, meter fees, or
other regulatory requirements/fees as all utilities are being tied into existing utility services. ▫ The cost of reproduction and distribution of Contract Documents for the purpose of construction is included in
the estimate. ▫ One (1) each standard 4’ x 8’ project sign is included in the estimate. ▫ A site survey is included in the estimate. ▫ An as-built survey is included in the estimate for the final documentation of the location and elevation of the
proposed new construction. ▫ Jobsite cleanup, rubbish removal and rubbish disposal are included in the estimate. ▫ The final project cleaning is included in the estimate. ▫ An allowance of $6,000.00 is included in the estimate for lab testing. ▫ Temporary jobsite fencing and gates are included in the estimate as 6’-0” high chain link fencing. A visual
barrier will be provided at areas that abut occupied areas. ▫ Silt fencing is included in the estimate for areas where construction runoff and/or erosion may occur. ▫ We have included an allowance to sod/ seed/ hydroseed with native grass areas disturbed by construction
activities as necessary to return those areas to their pre-construction condition. It should be understood that there will be a “growing in” period following the seeding operations.
▫ Temporary gravel, limerock, crushed concrete or asphalt millings is included in the estimate for the stabilization of the construction entrances.
▫ This proposal does not include any provisions for enhanced hurricane protection (EHPA). ▫ Performance and Payment Bonds are included in the estimate. ▫ General Liability Insurance is included in the estimate. ▫ Costs for procuring Builder’s Risk Insurance are included in the estimate.
The standard deductible for this policy is $10,000.
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
The earthquake and flood deductibles for this policy are each $25,000. The named storm deductibles for this policy are $100,000. Should a Builder’s Risk claim occur, any deductibles or uncovered costs will be treated as a change in
scope to be funded via a change order to the Construction Manager’s Contract. ▫ The Builder’s Risk and General Liability Policies do not cover existing construction or existing building
components, therefore the Owner shall list Ajax Building Corporation as an additional insured on their Property Damage Policy or provide for a waiver of subrogation in Ajax Building Corporation’s favor.
▫ A Construction Manager’s Contingency is included in the estimate. This contingency is to be utilized by Ajax Building Corporation in executing the work described in this GMP Proposal. Acceptable uses of this contingency include, but are not limited to, the following: Buy-out of work not included in previously awarded bid packages. Repair of damages caused by an unknown source or contractor (not including Builder’s Risk claims). To improve and/or accelerate the progress of the work. To improve the conditions of the work. For modification of the work resulting from an unknown ambiguity (not an error or omission) in the
contract documents. To increase and/or supplement staff as necessary to effectively manage the project. To adjust the reimbursable general conditions in excess of the budget.
▫ Architectural and/or Engineering Fees are not included in the estimate. ▫ The Construction Manager’s Construction Phase Fee is included.
Division 02 – Site Work
Clarifications, qualifications and assumptions related to Division 02: ▫ Abatement and Remediation Work
We specifically exclude any asbestos abatement, lead paint abatement or removal, PCB abatement or removal, and related surveys, air monitoring, clearances, testing services, etc.
▫ Demolition / Selective Demolition Demolition work and selective demolition work as required to remove the structural canopy on the east
end of the Kindergarten wing is included in this proposal. An allowance of $5,000.00 is included in this estimate for misc. demolition that may be required at
building tie-ins. The water and runoff generated from construction operations will not be contained on the project site. It
is assumed that the water and/or runoff generated from construction and demolition operations will not require collection, treatment or disposal.
Existing/ abandoned utilities will be disconnected and removed as indicated on the Construction Drawings. Existing lift station will be pumped out, crushed and filled in place.
We specifically exclude the relocation and/or reinstallation of any existing or temporary buildings, structures, etc. unless specifically noted otherwise in this GMP Proposal. − All playground equipment within the construction areas will be removed by Ajax Building
Corporation and turned over to Walton County Schools in it’s existing condition. − An allowance of $10,000.00 has been provided to disassemble/ re-assemble the Little Tikes
plastic playground set currently located east of the Kindergarten Wing and the Swing-N-Slide wood playground set currently located east of the 4th Grade Wing. This allowance includes,
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
dismantling/ disassembling, relocating, and reassembling these structures in their new permanent location once construction is complete. − This allowance does not include any replacement parts, pieces, fasteners or attachments
that may be needed due to overuse/ misuse, corrosion or other damage, whether existing or occurring during disassembly.
▫ Site Work / Earthwork It is assumed that the existing soils are of an acceptable material and that compaction can be achieved
under normal means and methods, and that over-excavation and/or replacement of unsuitable soils will not be required in the performance of the work.
Sitework / Earthwork is included per the Contract Documents as Described in Bid Package 2.1 - Sitework.
▫ Site Utilities Site Utilities are included per the Contract Documents as Described in Bid Package 2.1 - Sitework.
▫ Paving We have not included any milling and/or resurfacing of existing roadways, parking lots or drives except
those specifically noted on the Construction Documents. It is anticipated that various roadways, paving, parking lots, etc. surrounding the project site will require resurfacing and/or repair at the completion of the project. We recommend that a more detailed evaluation be performed by the project team during the later stages of the project so that a definitive scope of work can be prepared and priced accordingly.
Asphalt Paving, curbing, striping, and open pavers are included as indicated on the Contract Documents as Described in Bid Package 2.1 – Sitework.
▫ Sidewalks, Hardscaping and Site Improvements Sidewalks, Hardscaping, and Site Improvements are included as indicated on the Contract Documents
as Described in Bid Package 2.1 – Sitework and 3.1 Concrete. Site Furnishings are excluded from the GMP Proposal. These will be furnished and installed under the
Owner’s FF & E. Removal/ Relocation of existing playground equipment will be performed as noted above.
An allowance of $3,500.00 is included in this estimate for additional chainlink fencing that may be required.
▫ Landscaping and Irrigation Landscaping and Irrigation is not included in the GMP Proposal.
− Sod/ seed/ hydroseed (with native grass) disturbed areas once construction activities has completed is included in this estimate. It should be understood that there will be a “growing in” period following the seeding operations.
Division 03 – Concrete
Clarifications, qualifications and assumptions related to Division 03: ▫ Concrete Work
Concrete work is included in the GMP Proposal per the Contract Documents as Described in Bid Package 3.1 Cast-in-Place Concrete.
▫ General Concrete Items No colored concrete, special mixes, special finishes, or admixtures are included. We exclude any special rebar finishes, galvanizing, epoxy coatings, or special chairs/supports.
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
Division 04 – Masonry
Clarifications, qualifications and assumptions related to Division 04: ▫ Masonry Work
Masonry scope is included in the GMP Proposal per the Contract Documents as described in Bid Package 4.1 Masonry.
▫ General Masonry Items Exposed masonry joints are included as concave joints both horizontally and vertically. Vapor Retarding Membrane Air Barrier included at exterior CMU walls to receive brick.
Division 05 – Metals
Clarifications, qualifications and assumptions related to Division 05: ▫ Structural Steel, Joists and Deck
Structural Steel, Joists, and Metal Deck are included in the GMP Proposal per the Contract Documents as described in Bid Package 5.1 Structural Steel.
▫ Cold-Formed Metal Framing Cold Formed Metal Framing is included in the GMP Proposal per the Contract Documents as described
in Bid Package 9.1 Drywall, Framing, and Rough Carpentry. ▫ Miscellaneous and Fabricated Metals
Miscellaneous and Fabricated Metals are included in the GMP Proposal per the Contract Documents as described in Bid Package 5.1 Structural Steel.
Division 06 – Wood and Plastics
Clarifications, qualifications and assumptions related to Division 06: ▫ Lumber and Rough Carpentry
Lumber and Rough Carpentry is included in the GMP Proposal per the Contract Documents. It is included in various packages (Drywall and Framing, Roofing, Windows, etc.) depending on what it is being used for.
▫ Architectural Millwork & Cabinetry Architectural Woodwork is included in the GMP Proposal per the Contract Documents as described in
Bid Package 6.1 Cabinets, Casework and Millwork. Teacher’s Desks are supplied and installed by Owner and therefore are not included in this estimate.
Division 07 – Thermal and Moisture Protection
Clarifications, qualifications and assumptions related to Division 07: ▫ Waterproofing
Waterproofing is included in the GMP Proposal per the Contract Documents as described in Bid Package 3.1 Concrete and Bid Package 9.5 Painting & Waterproofing.
▫ Thermal Protection Building Insulation is included in the GMP Proposal per the Contract Documents as described in Bid
Package 9.1 Drywall, Framing, and Rough Carpentry. Rigid insulation in wall cavities (between brick and CMU block) is included in the GMP Proposal per the
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
Contract Documents as described in Bid Package 4.1 Masonry. ▫ Roofing and Sheet Metal
Roofing and Sheet Metal is included in the GMP Proposal per the Contract Documents as described in Bid Package 7.1 Roofing.
▫ Joint Sealers Joint Sealers are included in the GMP Proposal per the Contract Documents and are included under the
applicable scope of work that it abuts. Casework sealants are completed under the Casework scope; Window sealants are completed under the window scope; Etc. The painter will provide all other sealant work as described in Bid Package 9.5 Painting and Waterproofing.
An allowance of $3,000.00 is included in this estimate for remedial repairs of fire/ smoke protective partitions.
Division 08 – Doors and Windows
Clarifications, qualifications and assumptions related to Division 08:
▫ Metal Doors and Frames Metal Doors & Frames are included in the GMP Proposal per the Contract Documents as described in
Bid Package 8.1 Doors, Frames, and Hardware. ▫ Wood Doors
Wood Doors are included in the GMP Proposal per the Contract Documents as described in Bid Package 8.1 Doors, Frames, and Hardware.
▫ Windows Windows are included in the GMP Proposal per the Contract Documents as described in Bid Package
8.2 Glass and Glazing. ▫ Finished Hardware
Finish Hardware is included in the GMP Proposal per the Contract Documents as described in Bid Package 8.1 Doors, Frames, and Hardware.
▫ Glass and Glazing Glass and Glazing is included in the GMP Proposal per the Contract Documents as described in Bid
Package 8.2 Glass, Glazing, and Storefronts.
Division 09 – Finishes
Clarifications, qualifications and assumptions related to Division 09: ▫ Gypsum Board Systems
Gypsum Board Systems are included in the GMP Proposal per the Contract Documents as described in Bid Package 9.1 Drywall, Framing, and Rough Carpentry unless clarified elsewhere in this GMP Proposal.
No interior veneer plaster or hard coat finishes are included. Abuse resistant gypsum board is included up to 4’-0” height in all areas. Mold/mildew resistant gypsum board is not included unless clearly identified otherwise on the Contract Drawings.
▫ Tile Work Tile is included in the GMP Proposal per the Contract Documents as described in Bid Package 9.2
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
Hard Tile. No special tile patterns, mosaics, colors or shapes are included.
▫ Ceilings Acoustical Ceilings are included in the GMP Proposal per the Contract Documents as described in Bid
Package 9.4 Acoustical Ceilings & Treatments. Gypsum Ceilings are included in the GMP Proposal per the Contract Documents as described in Bid
Package 9.1 Drywall, Framing, and Rough Carpentry. ▫ Finished Flooring
Carpet
− Carpet is included in the GMP Proposal per the Contract Documents as described in Bid Package 9.3 Carpet & Resilient Flooring.
Resilient Flooring
− Resilient Flooring is included in the GMP Proposal per the Contract Documents as described in Bid Package 9.3 Carpet & Resilient Flooring.
Wall Base
− Rubber Base is included in the GMP Proposal per the Contract Documents as described in Bid Package 9.3 Carpet & Resilient Flooring.
▫ Wall Finishes Gypsum Board finishes are included as denoted in Specification Section 092900/ 3.1/ G.
▫ Paints and Coatings Painting and Coating is included in the GMP Proposal per the Contract Documents as described in Bid
Package 9.6 Painting & Wallcovering. Painting of interior walls, ceilings, and soffits is included.
− No accent walls are included.
Painting of hollow metal doors and door frames, and hollow metal window frames is included. No painting is included for concealed areas or areas otherwise not exposed to view.
Division 10 – Specialties
Clarifications, qualifications and assumptions related to Division 10: ▫ Visual Display Surfaces
Visual Display Surfaces are included in the GMP Proposal per the Contract Documents as described in Bid Package 10.1 Visual Displays.
▫ Toilet Compartments Toilet Partitions are included in the GMP Proposal per the Contract Documents as described in Bid
Package 10.4 Toilet & Bath Accessories. ▫ Louvers and Vents
Louvers & Vents are included in the GMP Proposal per the Contract Documents as described in Bid Package 15.2 HVAC. The HVAC Subcontractor will supply all Louvers whether attached to the HVAC system or not.
▫ Signage Building Signage is included in the GMP Proposal per the Contract Documents as described in Bid
Package 10.2 Signs and Plaques. Exterior building signage/ plaques are not included in this estimate.
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
▫ Fire Protection Specialties Fire Protection Specialties are included in the GMP Proposal per the Contract Documents as described
in Bid Package 10.4 Toilet & Bath Accessories.
▫ Walkway Covers and Exterior Protective Construction Aluminum Walkway Covers are included in this GMP Proposal per the Contract Documents as
described in Bid Package 10.3 Aluminum Walkway Covers. Temporary covered walkways will be provided and installed by The Owner and are therefore not
included in this estimate ▫ Toilet and Bath Accessories
Toilet Accessories are included in the GMP Proposal per the Contract Documents as described in Bid Package 10.4 Toilet & Bath Accessories.
Division 12 – Furnishings
Clarifications, qualifications and assumptions related to Division 12: ▫ Furnishings are not included in this estimate other than those specifically indicated in Division 6 of this GMP
and as noted below. ▫ Window Treatment
Window Treatment is included in the GMP Proposal per the Contract Documents as described in Bid Package 12.1 Window Treatments.
Diivision 13 – Special Construction
Clarifications, qualifications and assumptions related to Division 13: ▫ Fire Protection Systems are not included in the GMP Proposal.
Division 15 – Mechanical
Clarifications, qualifications and assumptions related to Division 15: ▫ Fire Protection Systems
Fire Protection Systems are not included in the GMP Proposal. ▫ Plumbing Work
Plumbing Systems are included in the GMP Proposal per the Contract Documents as described in Bid Package 15.1 Plumbing.
▫ HVAC Work HVAC Systems are included in the GMP Proposal per the Contract Documents as described in Bid
Package 15.2 HVAC.
− HVAC Instrumentation and Controls will be provided by the Owner and therefore are not included in the GMP Proposal. Items being supplied by HVAC Controls (DDC) Subcontractor are as follows:
A. Controllers for the VAV boxes. B. Thermostats, discharge air sensors, and reheat valves for the VAV boxes (no boxes). C. Motorized control valve(s) for AHU(s)and VAV(s) chilled water. D. Variable frequency drive for the AHUs.
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
E. Gold series airflow measuring station. F. Return and outside air damper actuators. G. Return air, mixed air, discharge air temperature sensors and freeze stats. For the AHU. H. Interface to new ENC being installed under other project. I. Installation, commissioning and one year warranty. J. 120/24vac 100va transformers and low voltage wiring for AHU’s. K. Controls for new chiller (ex. Enable,status,alarm) L. Sensors for EWT, LWT and building temp. M. Communications for new chiller. N. Chilled water pump enable and status Air Cooled Water Chiller (ACWC#1) HVAC Pumps (CWP#1, CWP#1A, HWP#1)
Division 16 – Electrical
Clarifications, qualifications and assumptions related to Division 16: ▫ Electrical Work
Electrical Systems are included in the GMP Proposal per the Contract Documents as described in Bid Package 16.1 Electrical.
▫ Basic Materials and Methods Secondary electrical service from the Main Distribution Panel to the new construction electrical service
and distribution thereafter is included. − It is assumed the existing main transformer, MDP and distribution panels are adequately sized to
accommodate the proposed new electrical services. The estimate does not include any jacking, boring, or directional drilling for new utilities.
▫ Raceways Raceways only will be provided for DDC Controls, Fire Alarm, Intercomm, and security systems.
Raceways will be provided with pull strings only unless specifically noted otherwise
− J-hooks and cable hooks, as required by others for the installation of DDC Controls, Fire Alarm, Intercomm, security systems, etc., are specifically excluded.
▫ Cable Tray Cable Tray is NOT included in the GMP Proposal.
▫ Lightning Protection Systems Lightning Protection Systems are not included in the GMP Proposal.
▫ Clock Systems Clock Systems are not included in the GMP Proposal.
▫ Data / Communications Systems Data, Phone, and Telecommunications Systems are included in the GMP Proposal as described in Bid
Package 16.1 Electrical and per the Contract Documents (unless clearly identified otherwise on the Contract Documents).
The following items are designated as Owner furnished/ contractor installed: 48 Port Workgroup Switch for Non-POE Gigabit Data Connections 24 port workgroup switch for POE+ Gigabit data connections. Wireless access points
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
POE enabled ethernet workgroup switch. −Supply and installation of the Intercomm system will be directly subcontracted by the Owner/
performed by the Owner’s personnel and therefore this work is not included in this GMP Proposal. Items being supplied by Intercomm Subcontractor are as follows:
Intercom System equipment Installation of all equipment and field devices for Intercom System All wire and installation of wire for the Intercom System All weatherproof surface mounted backboxes for outside appliances Drawings and submittals Final hookup and testing of Intercom System
Sound and Video Systems are not included in this GMP Proposal. ▫ Fire Alarm Systems
Fire Alarm Systems will be directly subcontracted by the Owner/ performed by the Owner’s personnel and therefore this work is not included in the GMP Proposal. Items being supplied by Fire Alarm Subcontractor are as follows:
Fire Alarm System equipment Installation of all equipment and field devices for Fire Alarm System All wire and installation of wire for the Fire Alarm System All weatherproof surface mounted backboxes for outside horn appliances Drawings and submittals Final hookup and testing of Fire Alarm System
▫ Security, Alarm and Detection Systems Camera Surveillance Systems are not included in the GMP Proposal.
General Notes
General clarifications, qualifications and assumptions related to the GMP Proposal: ▫ Electronic, CAD or BIM “As-Builts” are not included. Ajax Building Corporation will maintain “As-Built”
drawings at the jobsite throughout the construction phase and provide copies to the Architect and Owner at Final Completion.
▫ O&M training, manuals or video-training is not included for Owner furnished equipment or items provided by the Owner’s vendors.
▫ This GMP Proposal is based on the premise and understanding that Ajax Building Corporation will have full control to reallocate any funds and/or budgets within the GMP (excluding allowances) as determined necessary in the execution of the CM Contract.
▫ It is anticipated that various conflicts, unforeseen conditions and discrepancies will arise during the construction phase. It is assumed that the Design Team and Owner will assign a staff member(s) that will be readily available to respond and provide timely assistance in resolving all issues that may arise.
▫ Due to budget restrictions, Ajax Building Corporation has based this GMP Proposal on a fair, standard and reasonable interpretation of the GMP Documents. We exclude any specific language, items or processes that are not typical, are unreasonable or would otherwise require that additional costs be added to the GMP Estimate as a contingency in the event that a literal interpretation should be made.
END OF CLARIFICATIONS, QUALIFICATIONS AND ASSUMPTIONS TO THE GMP PROPOSAL
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
EXCLUSIONS
The following items are specifically excluded from the GMP Proposal: Division 01 – General Requirements
We have not included a jobsite office facility for the Owner, Architect, Engineer, or their representatives. Temporary utility services (water, sewer and electric) are not included in the estimate. It is assumed that all
temporary utilities required for the project will be tied into permanent utilities and that these permanent utilities are readily accessible, of adequate size to handle any additional load as required by temporary utilities and that temporary on-site facilities can be located as necessary to prevent the need for any substantial overhead and/or underground temporary utilities.
Aerial photographs are not included in the estimate. Costs related to a threshold inspector are not included in the estimate. It is assumed that any steam, chilled water and/or natural gas utilities consumed in the performance of the work
will be provided by the Owner at no cost to the Construction Manager. The costs associated with any temporary or permanent water, sewer and electric utilities beyond the date of
Substantial Completion are excluded. Permits required to proceed with the work (environmental, building, municipal, etc.) are not included in the
estimate. This proposal does not include any provisions for enhanced hurricane protection (EHPA). Architectural and/or Engineering Fees are not included in the estimate.
Division 02 – Site Work
We exclude any asbestos abatement, lead paint abatement or removal, PCB abatement or removal, and related surveys, air monitoring, clearances, testing services, etc.
The treatment or disposal of water and/or runoff generated from demolition operations is excluded. It is assumed the abandoned lift station will be disconnected, pumped out, crushed and filled with dirt. We exclude the relocation and/or reinstallation of any existing or temporary buildings, structures, with the
exception of playground items specifically noted in this GMP. The salvage of any materials, equipment, furniture, etc. is excluded. We have not included any milling and/or resurfacing of existing roadways, parking lots or drives surrounding
and/or outside the project site. Site Furnishings are excluded from the GMP Proposal. These will be furnished and installed under the
Owner’s FF & E. Landscaping and Irrigation is not included in the GMP Proposal other than sodding/ seeding disturbed areas
as indicated in this proposal. Division 03 – Concrete
We exclude any special rebar finishes, galvanizing, epoxy coatings, or special chairs/supports.
Division 06 – Wood and Plastics
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
Teacher’s Desks are supplied and installed by Owner and therefore are not included in this estimate. Division 09 – Finishes
Mold/mildew resistant gypsum board is not included unless clearly identified otherwise on the Contract Drawings.
Division 10 – Specialties Temporary covered walkways will be provided and installed by The Owner and are therefore not included in
this estimate Exterior building signage/ plaques are not included in this estimate.
Division 12 – Furnishings
Furnishings (Owner’s FF&E) are not included in this estimate other than those specifically indicated in Division 6 of this GMP.
Diivision 13 – Special Construction
Fire Protection Systems are not included in the GMP Proposal. Division 15 – Mechanical
HVAC Instrumentation and Controls will be provided by the Owner and therefore are not included in the GMP Proposal.
Air Cooled Water Chiller (ACWC#1), and HVAC Pumps (CWP#1, CWP#1A, HWP#1) will be provided by the Owner and therefore are not included in the GMP.
Division 16 – Electrical
The estimate does not include any jacking, boring, or directional drilling for new utilities. Cable Tray is NOT included in the GMP Proposal. Lightning Protection Systems are not included in the GMP Proposal. Clock Systems are not included in the GMP Proposal. Camera Surveillance Systems are not included in the GMP Proposal. Sound and Video Systems are not included in this GMP Proposal.
Division 17 – Information Technology
Supply and installation of the Intercomm system will be directly subcontracted by the Owner/ performed by the Owner’s personnel and therefore this work is not included in this GMP Proposal.
Fire Alarm Systems will be directly subcontracted by the Owner/ performed by the Owner’s personnel and therefore this work is not included in this GMP Proposal.
The following items are designated as Owner furnished/ contractor installed: ▫ 48 Port Workgroup Switch for Non-POE Gigabit Data Connections ▫ 24 port workgroup switch for POE+ Gigabit data connections. ▫ Wireless access points
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
▫ D. POE enabled ethernet workgroup switch. Other Exclusions
Electronic, CAD or BIM “As-Builts” are not included. Ajax Building Corporation will maintain “As-Built” drawings at the jobsite throughout the construction phase and provide copies to the Architect and Owner at Final Completion.
O&M training, manuals or video-training is not included for Owner furnished equipment or items provided by the Owner’s vendors.
Due to budget restrictions, Ajax Building Corporation has based this GMP Proposal on a fair, standard and reasonable interpretation of the GMP Documents. We exclude any items or processes that are not typical, are unreasonable or would otherwise require that additional costs be added to the GMP Proposal.
END OF EXCLUSIONS
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
PROPOSED SUBSTITUTIONS, MODIFICATIONS AND/OR VARIANCES The GMP Proposal includes the following substitutions, modifications and/or variances to the GMP Documents: No substitutions, modifications and/ or variances were discussed
END OF PROPOSED SUBSTITUTIONS, MODIFICATIONS AND/OR VARIANCES
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
VALUE ENGINEERING and BUDGET OPTIONS
The following Value Engineering and Budget Option ideas, suggestions, pricing requests, etc. are being suggested for consideration by The Walton County School Board. These items are not incorporated into the GMP, but are being offered as a means of reducing the overall construction cost to meet the budget constraints of the project. Note: The proposed change in scope and related pricing for various options may be overlapping in nature and may require revisions based on the combination of items accepted. Note: Pricing noted is presented as an order of magnitude unless specifically identified as ‘approved’.
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
VALUE ENGINEERING AND BUDGET OPTIONS
Date:
10/08/2014
Item No. Estimated Schedule Accepted Pending Rejected Date Added Open /
(Div. & No.) Value (+/-) Impact (+/-) Value Value Value to Estimate Closed
01.1
Delete 2 classroom addition @ Kindergarten Wing from base bid
(If this option is accepted, all other options below will need to be re-evaluated as they are based
on the Base Bid scope of work) $ (650,591.00)
02.1 Playground eqpt. Disassembly, removal, storage, re-assembly/ re-installation by Owner. $ (10,000.00)
02.3 Supply Lift station and controls by Owner (installation/ coordination by Ajax) $ (72,800.00)
02.4 Utilize asphalt paving in lieu of pavers at new parking area $ (5,671.00)
04.1 Bituminous dampproofing ILO Air Moisture Barrier (For Base Bid only) $ (41,102.00)
04.2 Delete Masonry foam fill insulation $ (4,199.00)
04.3 Utilize brick mortar type N grey $ (3,899.00)
15.1 Supply AHU equipment by Owner (installation/ coordination by Ajax) $ (24,327.00)
16.1 Supply Low Voltage Package by Owner (installation/ coordination by Ajax) (For Base Bid only) $ (40,000.00)
16.1Supply Major Electr. Pkg (Lighting/ Switchgear) by Owner (installation/ coordination by Ajax)
(For Base Bid only). $ (68,000.00)
$ - $ - $ -
N/A N/A $ -
$ -
Description of Proposed Change Status
Totals $ (920,589) $ - $ -
All items presented below are ideas presented by Ajax Building Corporation for the purpose of reducing costs on above referenced project. Any items affecting the design of the project will need to be
verified by Townes+ Architects for compliance prior to incorporation into GMP and project.
Project:
Freeport Elementary School Classroom Additions
Freeport, FL
Design Phase:
GMP Proposal
VALUE ENGINEERING AND BUDGET OPTIONS
Page 1 of 1
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
ALLOWANCE SCHEDULE The following allowances are included in the GMP Proposal where a clear scope has not been defined by the GMP Documents or where the items require further research. These allowances are for the cost of work only and do not include costs for insurance, bonds, contingency, fee, etc. It is understood that the Construction Manager’s Contract will require adjustments by change order (either additive or deductive) for reconciling the difference between each of the below listed allowances and the actual costs and/or savings realized for each allowance.
Estimate Item No. Description Allowance Amount
Division 02 – Site Work
02800.000 Playground eqpt. Disassembly, removal, replace damaged parts, re-assembly/ re-installation (storage by owner)
$10,000.00
02820.000 Chain Link Fencing $3,500.00
02100.000 Misc. Demolition $5,000.00
Division 07 – Thermal and Moisture Protection
07800.000 Remedial repairs of fire/ smoke protective partitions $3,000.00
END OF ALLOWANCE SCHEDULE
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
ALTERNATES NARRATIVE Within this section we have included pricing for various Alternates for consideration by The Walton County School Board. At this time, none of these Alternates are included within the Base Bid GMP Proposal. The pricing for each alternate represents the adjustment required to the Base Bid GMP Proposal to incorporate the proposed change in scope. A summary listing of the proposed alternates is listed below. A more detailed description and a detailed estimate for each alternate have been provided immediately following this narrative. All quantities and descriptions listed in the narratives and detailed estimates are part of the alternate pricing provided. The pricing provided includes all applicable mark-ups for bonds, insurance, etc.
▪ Alternate No. 1 – Additional 2 class extension at Kindergarten wing Add $355,247.00
The Alternate Pricing provided is guaranteed through November 21, 2014 or as indicated otherwise in this proposal, at which time the pricing and feasibility for the proposed change in scope would require an updated evaluation. Note: The proposed change in scope and related pricing for various Alternates may be overlapping in nature and may require revisions based on the combination of Alternates accepted. In addition to the alternate pricing provided in this section of the proposal, pricing for various Value Engineering and Budget Options under consideration have been provided in Section III-D of this proposal.
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
ALTERNATE NO. 1 Alternate Narrative: Extend construction at Kindergarten wing to add 2 classrooms onto the 2 classroom addition provided in the base bid. Alternate 1 includes Primary Classrooms 087 and 088 as depicted on Sheet A102 and all structure, systems and finishes indicated on the Contract Drawings. Adjustment to the Base Bid GMP: Add $ 355,247.00 Note: A copy of the CM Detail Estimate related to this alternate is attached and immediately follows this narrative. Adjustment to the Contract Time: Add 15 Calendar Days
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
ESTIMATE NARRATIVE
Ajax Building Corporation is confident that the GMP Estimate included herein is representative of the proposed scope of work depicted in the GMP Documents. The work included in the GMP Estimate is based upon the List of Documents included in Section II of this proposal as amended by 1) the Clarifications, Qualifications, and Assumptions, 2) the Exclusions, and 3) the Allowance Schedule, all contained in Section III of this proposal. The Base Bid GMP Proposal for the The Freeport Elementary School Classroom Additions totals $2,691,547.00. The Base Bid GMP Proposal includes construction of the 4 class addition at the 4th grade wing and 2 class addition at the kindergarten wing as well as all sitework and utilities indicated on the Contract Drawings. In addition to the Base Bid GMP Proposal, Ajax Building Corporation has provided pricing for various “Value Engineering and Budget Options” and “Alternates” for consideration by The Walton County School Board, included in Sections III-D and III-F respectively. At this time, none of the Value Engineering and Budget Options have been incorporated into the GMP Proposal, and no Alternates have been incorporated into the GMP Proposal.
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
GMP Estimate:
BASE BID GMP CM Detail Report
Cost Management DetailAjax Building Corporation
1080 Commerce BoulevardMidway, FL 32343
Phone: (850) 224-9571 Fax: (850) 224-2496
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
Sec BB BASE BID
Sub 01 CM MGMT CM MANAGEMENT FEE
Major Item Code 01300.000 GENERAL CONDITIONS
Minor Item Code 01300.000 ADMINISTRATIVEREQUIREMENTS
20,37020,370.00CM Preconstruction Phase Fee 1.00 LPSM
224,585224,585.00CM Construction Phase Mgmt Fee 1.00 LPSM
Total Minor Item Code 01300.000ADMINISTRATIVE REQUIREMENTS
$244,955
Total Major Item Code 01300.000GENERAL CONDITIONS
$244,955
Total Sub 01 CM MGMT CM MANAGEMENTFEE
$244,955
Sub 02 GEN COND GENERAL CONDITIONS
Major Item Code 01300.300 GENERAL REQUIREMENTS
Minor Item Code 01320.000 CONSTRUCTION PROGRESSDOCUMENTATION
58175.00Project Camera 7.75 MO
Aerial Photographs - 3 @ 8 x 10's 1.00 NIC
- Additional Aerial Photos 1.00 NIC
Total Minor Item Code 01320.000CONSTRUCTION PROGRESSDOCUMENTATION
$581
Minor Item Code 01410.000 REGULATORYREQUIREMENTS
Building Permits (By Owner) 1.00 NIC
Environmental Permits (By Owner) 1.00 NIC
Total Minor Item Code 01410.000REGULATORY REQUIREMENTSMinor Item Code 01720.000 CONSTRUCTIONPREPARATION
3,7633,762.50Purchase Drawings/Reproduction Cost 1.00 LPSM
Total Minor Item Code 01720.000CONSTRUCTION PREPARATION
$3,763
Minor Item Code 01770.000 CLOSEOUT PROCEDURES806806.25As-Built Drawings 1.00 LPSM
538134.38Close-Out Manuals 4.00 EACH
Total Minor Item Code 01770.000CLOSEOUT PROCEDURES
$1,344
Total Major Item Code 01300.300GENERAL REQUIREMENTS
$5,688
Page 1
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
Total Sub 02 GEN COND GENERALCONDITIONS
$5,688
Sub 03 GEN REQM GENERAL REQUIREMENTS
Major Item Code 01300.300 GENERAL REQUIREMENTS
Minor Item Code 01410.000 REGULATORYREQUIREMENTS
Water System Service Charges 1.00 NIC
Water Systems Tap Charges 1.00 NIC
Sewer System Service Charges 1.00 NIC
Sewer System Tap Charges 1.00 NIC
Impact/Connection Fees 1.00 NIC
Meter/Tap Fees 1.00 NIC
Total Minor Item Code 01410.000REGULATORY REQUIREMENTSMinor Item Code 01420.000 SAFETY
161161.25First Aid Supply Set-Up 1.00 LPSM
41753.75Safety Supplies 7.75 MO
94347.15Safety Jobsite Signs 20.00 EACH
324108.05Temporary Fire Protection 3.00 EA
55616.13Water, Ice, & Cups 34.50 WEEK
Total Minor Item Code 01420.000SAFETY
$2,401
Minor Item Code 01450.000 QUALITY CONTROL6,0006,000.00BP 01.2 - Laboratory Testing 1.00 LPSM
Total Minor Item Code 01450.000QUALITY CONTROL
$6,000
Minor Item Code 01510.000 TEMPORARY UTILITIES2,083268.75Chemical Toilets 7.75 MO
1,041134.38Sanitary Holding Tank 7.75 MO
1,666215.00Electric Usage Charge 7.75 MO
2,5002,500.00Temporary Electric Connections 1.00 LPSM
Water Usage Charge (By Owner - Existing Service) 1.00 NIC
1,5001,500.00Temporary Water Connections (Existing Service) 1.00 LPSM
Temporary Sewer Connection (Existing Service) 1.00 NIC
Total Minor Item Code 01510.000TEMPORARY UTILITIES
$8,790
Minor Item Code 01540.000 CONSTRUCTION TOOLS &EQUIPMENT
1,163150.00Small Tools & Equipment 7.75 MO
Total Minor Item Code 01540.000CONSTRUCTION TOOLS &EQUIPMENT
$1,163
Minor Item Code 01550.000 VEHICULAR ACCESS &PARKING
5,7975.80Gravel at Jobsite Entry 1,000.00 SQYD
Total Minor Item Code 01550.000VEHICULAR ACCESS & PARKING
$5,797
Minor Item Code 01560.000 TEMPORARY BARRIERS &ENCLOSURES
1,5529.70Temporary Dustproof Partitions 160.00 SQFT
Page 2
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
546182.00Protect Trees 3.00 EACH
319159.65Temporary Doors 2.00 EACH
Total Minor Item Code 01560.000TEMPORARY BARRIERS &ENCLOSURES
$2,417
Minor Item Code 01580.000 PROJECT IDENTIFICATION466465.50Project Sign 1.00 EACH
Total Minor Item Code 01580.000PROJECT IDENTIFICATION
$466
Minor Item Code 01720.000 CONSTRUCTIONPREPARATION
5,9405,940.00BP 01.1 - Surveys 1.00 LPSM
26926.88Layout Supplies 10.00 WEEK
91065.00Builder's Level 14.00 WEEK
1,250125.00Transits 10.00 WEEK
21015.00Surveyor's Rods 14.00 WEEK
Total Minor Item Code 01720.000CONSTRUCTION PREPARATION
$8,579
Minor Item Code 01740.000 PROJECT CLEANING1,8401,840.00BP 01.3 - Final Cleaning 1.00 LPSM
5,14118.63Construction Clean-up 276.00 MNHR
41753.75Rubbish Removal 7.75 MO
10,30019.62Dump Charges 525.00 CUYD
Total Minor Item Code 01740.000PROJECT CLEANING
$17,697
Total Major Item Code 01300.300GENERAL REQUIREMENTS
$53,310
Major Item Code 02800.000 SITE IMPROVEMENTS &AMENITIES
Minor Item Code 02820.000 FENCES & GATES7,0313.75Temporary Job Fence - In-Ground Posts 1,875.00 LNFT
4,9508.25Temporary Job Fence - Panels 600.00 LNFT
6,8062.75Wind Screen/Visual Barrier 2,475.00 LNFT
Total Minor Item Code 02820.000FENCES & GATES
$18,788
Total Major Item Code 02800.000 SITEIMPROVEMENTS & AMENITIES
$18,788
Total Sub 03 GEN REQM GENERALREQUIREMENTS
$72,097
Sub 03 WORK COST OF WORK
Major Item Code 02100.000 REMEDIATION & DEMOLITION
Minor Item Code 02100.000 DEMOLITION WORK5,5005,500.00Selective Demolition 1.00 LPSM
5,0005,000.00Allowance - Misc Selective Demolition 1.00 ALLW
Total Minor Item Code 02100.000DEMOLITION WORK
$10,500
Total Major Item Code 02100.000REMEDIATION & DEMOLITION
$10,500
Major Item Code 02200.000 SITEWORK, PAVING, & UTILITIES
Minor Item Code 02310.000 SITE GRADING
Page 3
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
291,181291,181.00BP 02.1 - Site Work 1.00 LPSM
18,5092.89Prep Disturbed Site Areas for Sodding 6,405.00 SQYD
Total Minor Item Code 02310.000 SITEGRADING
$309,690
Total Major Item Code 02200.000SITEWORK, PAVING, & UTILITIES
$309,690
Major Item Code 02800.000 SITE IMPROVEMENTS &AMENITIES
Minor Item Code 02800.000 SITE IMPROVEMENTS2,5002,500.00Allowance - Dismantle & Store Playground Equipment 1.00 ALLW
7,5007,500.00Allowance - Reinstall Stored Playground Equipment 1.00 ALLW
Total Minor Item Code 02800.000 SITEIMPROVEMENTS
$10,000
Minor Item Code 02820.000 FENCES & GATES3,5003,500.00Allowance - Chain Link Fencing 1.00 ALLW
Total Minor Item Code 02820.000FENCES & GATES
$3,500
Total Major Item Code 02800.000 SITEIMPROVEMENTS & AMENITIES
$13,500
Major Item Code 02900.000 LANDSCAPING & IRRIGATION
Minor Item Code 02920.000 LAWNS & GRASS20,1740.35Sod Disturbed Areas 57,640.00 SQFT
Total Minor Item Code 02920.000LAWNS & GRASS
$20,174
Total Major Item Code 02900.000LANDSCAPING & IRRIGATION
$20,174
Major Item Code 03000.000 CONCRETE WORK
Minor Item Code 03310.000 STRUCTURAL CONCRETE145,848145,848.00BP 03.1 - Concrete 1.00 LPSM
Total Minor Item Code 03310.000STRUCTURAL CONCRETE
$145,848
Total Major Item Code 03000.000CONCRETE WORK
$145,848
Major Item Code 04000.000 MASONRY WORK
Minor Item Code 04200.000 MASONRY UNITS371,323371,323.00BP 04.1 - Masonry 1.00 LPSM
Total Minor Item Code 04200.000MASONRY UNITS
$371,323
Total Major Item Code 04000.000MASONRY WORK
$371,323
Major Item Code 05500.000 MISCELLANEOUS & FABRICATEDMETALS
Minor Item Code 05500.000 METAL FABRICATIONS96,61496,614.00BP 05.1 - Structural & Misc Steel 1.00 LPSM
Total Minor Item Code 05500.000METAL FABRICATIONS
$96,614
Total Major Item Code 05500.000MISCELLANEOUS & FABRICATEDMETALS
$96,614
Major Item Code 06400.000 ARCHITECTURAL WOODWORK
Minor Item Code 06410.000 CUSTOM CABINETS
Page 4
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
49,77649,776.00BP 06.1 - Cabinets, Casework & Millwork 1.00 LPSM
Total Minor Item Code 06410.000CUSTOM CABINETS
$49,776
Total Major Item Code 06400.000ARCHITECTURAL WOODWORK
$49,776
Major Item Code 07400.000 ROOFING & SIDING PANELS
Minor Item Code 07410.000 METAL ROOF & WALLPANELS
149,350149,350.00BP 07.1 - Roofing 1.00 LPSM
Total Minor Item Code 07410.000METAL ROOF & WALL PANELS
$149,350
Total Major Item Code 07400.000ROOFING & SIDING PANELS
$149,350
Major Item Code 07800.000 FIRE & SMOKE PROTECTION
Minor Item Code 07800.000 FIRE & SMOKE PROTECTION3,0003,000.00Allowance - Fire/Smoke Protection - Remedial Work 1.00 ALLW
Total Minor Item Code 07800.000 FIRE& SMOKE PROTECTION
$3,000
Total Major Item Code 07800.000 FIRE &SMOKE PROTECTION
$3,000
Major Item Code 08200.000 WOOD & PLASTIC DOORS
Minor Item Code 08210.000 WOOD DOORS65,52565,525.00BP 08.1 - Doors, Frames & Hdwr 1.00 LPSM
Total Minor Item Code 08210.000WOOD DOORS
$65,525
Total Major Item Code 08200.000 WOOD &PLASTIC DOORS
$65,525
Major Item Code 08500.000 WINDOWS
Minor Item Code 08500.000 WINDOWS59,83559,835.00BP 08.2 - Glass & Glazing 1.00 LPSM
Total Minor Item Code 08500.000WINDOWS
$59,835
Total Major Item Code 08500.000WINDOWS
$59,835
Major Item Code 09100.000 GYP BOARD, PLASTER, &STUCCO SYSTEMS
Minor Item Code 09250.000 GYPSUM BOARD164,903164,903.00BP 09.1 / 09.3 - Drywall & Acoustical Ceilings 1.00 LPSM
Total Minor Item Code 09250.000GYPSUM BOARD
$164,903
Total Major Item Code 09100.000 GYPBOARD, PLASTER, & STUCCO SYSTEMS
$164,903
Major Item Code 09300.000 TILE
Minor Item Code 09300.000 TILE16,99516,995.00BP 09.2 - Hard Tile 1.00 LPSM
Total Minor Item Code 09300.000 TILE $16,995Total Major Item Code 09300.000 TILE $16,995Major Item Code 09600.000 FINISHED FLOORING
Minor Item Code 09600.000 FLOORS26,78026,780.00BP 09.3 - Carpet & Resilient Flooring 1.00 LPSM
Page 5
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
Total Minor Item Code 09600.000FLOORS
$26,780
Total Major Item Code 09600.000FINISHED FLOORING
$26,780
Major Item Code 09900.000 PAINTS & COATINGS
Minor Item Code 09910.000 PAINT20,14620,146.00BP 09.5 - Painting 1.00 LPSM
Total Minor Item Code 09910.000PAINT
$20,146
Total Major Item Code 09900.000 PAINTS& COATINGS
$20,146
Major Item Code 10000.000 MISCELLANEOUS BUILDINGSPECIALTIES
Minor Item Code 10000.000 MISCELLANEOUSSPECIALTIES
9,4079,407.00BP 10.4 - Toilet & Bath Accessories 1.00 LPSM
Total Minor Item Code 10000.000MISCELLANEOUS SPECIALTIES
$9,407
Minor Item Code 10115.000 MARKERBOARDS7,7907,790.00BP 10.1 - Visual Displays 1.00 LPSM
Total Minor Item Code 10115.000MARKERBOARDS
$7,790
Minor Item Code 10430.000 EXTERIOR SIGNAGEExterior Signage / Building Plaque (Not Required) 1.00 NIC
Total Minor Item Code 10430.000EXTERIOR SIGNAGEMinor Item Code 10440.000 INTERIOR SIGNAGE
1,3231,323.00BP 10.2 - Signage 1.00 LPSM
Total Minor Item Code 10440.000INTERIOR SIGNAGE
$1,323
Minor Item Code 10530.000 PROTECTIVE COVERS23,50023,500.00BP 10.3 - Aluminum Walkway Covers 1.00 LPSM
Total Minor Item Code 10530.000PROTECTIVE COVERS
$23,500
Total Major Item Code 10000.000MISCELLANEOUS BUILDINGSPECIALTIES
$42,020
Major Item Code 12000.000 BUILDING FURNISHINGS
Minor Item Code 12490.000 WINDOW TREATMENTS4,0004,000.00BP 12.1 - Window Treatment 1.00 LPSM
Total Minor Item Code 12490.000WINDOW TREATMENTS
$4,000
Minor Item Code 12560.000 INSTITUTIONAL FURNITUREFurnishings (By Owner) 1.00 NIC
Total Minor Item Code 12560.000INSTITUTIONAL FURNITURE
Total Major Item Code 12000.000BUILDING FURNISHINGS
$4,000
Major Item Code 15000.000 PLUMBING WORK
Minor Item Code 15410.000 PLUMBING FIXTURES72,77472,774.00BP 15.1 - Plumbing 1.00 LPSM
Page 6
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
Total Minor Item Code 15410.000PLUMBING FIXTURES
$72,774
Total Major Item Code 15000.000PLUMBING WORK
$72,774
Major Item Code 15500.000 H.V.A.C. WORK
Minor Item Code 15700.000 HVAC EQUIPMENT215,659215,659.00BP 15.2 - HVAC 1.00 LPSM
Total Minor Item Code 15700.000HVAC EQUIPMENT
$215,659
Minor Item Code 15900.000 HVAC INSTRUMENTATION &CONTROLS
Building Controls System (By Owner) 1.00 NIC
Total Minor Item Code 15900.000HVAC INSTRUMENTATION &CONTROLS
Total Major Item Code 15500.000 H.V.A.C.WORK
$215,659
Major Item Code 16000.000 ELECTRICAL WORK
Minor Item Code 16050.000 BASIC ELECTRICALMATERIALS & METHODS
240,299240,299.00BP 16.1 - Electrical 1.00 LPSM
Total Minor Item Code 16050.000BASIC ELECTRICAL MATERIALS &METHODS
$240,299
Minor Item Code 16710.000 DATA/COMMUNICATIONSSYSTEMS
Voice/Data/Comm Systems (By Owner) 1.00 NIC
Total Minor Item Code 16710.000DATA/COMMUNICATIONS SYSTEMSMinor Item Code 16770.000 FIRE ALARM SYSTEMS
Fire Alarm System (By Owner) 1.00 NIC
Total Minor Item Code 16770.000 FIREALARM SYSTEMS
Total Major Item Code 16000.000ELECTRICAL WORK
$240,299
Total Sub 03 WORK COST OF WORK $2,098,711Sub 99 ROLLUPS CM BONDS | INSURANCE | CONTINGENCY |FEE
Major Item Code 36000.000 BONDS & INSURANCE
Minor Item Code 36000.000 BONDS & INSURANCE22,12122,121.00Performance & Payment Bond 1.00 LPSM
24,62124,621.00General Liability Insurance 1.00 LPSM
16,32216,322.00Builder's Risk Insurance 1.00 LPSM
Total Minor Item Code 36000.000BONDS & INSURANCE
$63,064
Total Major Item Code 36000.000 BONDS& INSURANCE
$63,064
Major Item Code 37000.000 WARRANTIES
Minor Item Code 37000.000 WARRANTY968968.00Warranty Allocation 1.00 LPSM
Page 7
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
Total Minor Item Code 37000.000WARRANTY
$968
Total Major Item Code 37000.000WARRANTIES
$968
Major Item Code 40000.000 DESIGN/CONSULTANTS FEES
Minor Item Code 40000.000 DESIGN/CONSULTANT'SFEES
Design/Consultant's Fees 1.00 NIC
Total Minor Item Code 40000.000DESIGN/CONSULTANT'S FEES
Total Major Item Code 40000.000DESIGN/CONSULTANTS FEESMajor Item Code 60000.000 MBE PARTICIPATION
Minor Item Code 60000.000 M.B.E. PARTICIPATIONM.B.E. Participation 1.00 NIC
Total Minor Item Code 60000.000M.B.E. PARTICIPATION
Total Major Item Code 60000.000 MBEPARTICIPATIONMajor Item Code 70000.000 OWNER'S F,F,& E
Minor Item Code 70000.000 OWNER/OPERATOR'S F.,F., &E.
Owner's FF&E 1.00 NIC
Total Minor Item Code 70000.000OWNER/OPERATOR'S F.,F., & E.
Total Major Item Code 70000.000OWNER'S F,F,& EMajor Item Code 80000.000 CONTINGENCY
Minor Item Code 80000.000 CONTINGENCY75,00075,000.00Construction Manager's Contingency 1.00 LPSM
Total Minor Item Code 80000.000CONTINGENCY
$75,000
Total Major Item Code 80000.000CONTINGENCY
$75,000
Major Item Code 90000.000 OVERHEAD & FEE
Minor Item Code 90000.000 OVERHEAD & FEE131,064131,064.00Construction Manager's Fee 1.00 LPSM
Total Minor Item Code 90000.000OVERHEAD & FEE
$131,064
Total Major Item Code 90000.000OVERHEAD & FEE
$131,064
Total Sub 99 ROLLUPS CM BONDS |INSURANCE | CONTINGENCY | FEE
$270,096
Total Sec BB BASE BID $2,691,54710,536.00 SQFT $255
Page 8
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
Sec Z01 ALT #1 - ADDITIONAL 2 CLASSROOMS
Sub 01 CM MGMT CM MANAGEMENT FEE
Major Item Code 01300.000 GENERAL CONDITIONS
Minor Item Code 01300.000 ADMINISTRATIVEREQUIREMENTS
17,15017,150.00CM Construction Phase Mgmt Fee 1.00 LPSM
Total Minor Item Code 01300.000ADMINISTRATIVE REQUIREMENTS
$17,150
Total Major Item Code 01300.000GENERAL CONDITIONS
$17,150
Total Sub 01 CM MGMT CM MANAGEMENTFEE
$17,150
Sub 02 GEN COND GENERAL CONDITIONS
Major Item Code 01300.300 GENERAL REQUIREMENTS
Minor Item Code 01320.000 CONSTRUCTION PROGRESSDOCUMENTATION
5675.00Project Camera 0.75 MO
Aerial Photographs - 3 @ 8 x 10's 1.00 NIC
- Additional Aerial Photos 1.00 NIC
Total Minor Item Code 01320.000CONSTRUCTION PROGRESSDOCUMENTATION
$56
Total Major Item Code 01300.300GENERAL REQUIREMENTS
$56
Total Sub 02 GEN COND GENERALCONDITIONS
$56
Sub 03 GEN REQM GENERAL REQUIREMENTS
Major Item Code 01300.300 GENERAL REQUIREMENTS
Minor Item Code 01420.000 SAFETY4053.75Safety Supplies 0.75 MO
4816.13Water, Ice, & Cups 3.00 WEEK
Total Minor Item Code 01420.000SAFETY
$89
Minor Item Code 01450.000 QUALITY CONTROL1,0001,000.00BP 01.2 - Laboratory Testing 1.00 LPSM
Total Minor Item Code 01450.000QUALITY CONTROL
$1,000
Minor Item Code 01510.000 TEMPORARY UTILITIES202268.75Chemical Toilets 0.75 MO
101134.38Sanitary Holding Tank 0.75 MO
161215.00Electric Usage Charge 0.75 MO
Total Minor Item Code 01510.000TEMPORARY UTILITIES
$464
Minor Item Code 01540.000 CONSTRUCTION TOOLS &EQUIPMENT
113150.00Small Tools & Equipment 0.75 MO
Total Minor Item Code 01540.000CONSTRUCTION TOOLS &EQUIPMENT
$113
Page 9
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
Minor Item Code 01720.000 CONSTRUCTIONPREPARATION
500500.00BP 01.1 - Surveys 1.00 LPSM
Total Minor Item Code 01720.000CONSTRUCTION PREPARATION
$500
Minor Item Code 01740.000 PROJECT CLEANING620620.00BP 01.3 - Final Cleaning 1.00 LPSM
44718.63Construction Clean-up 24.00 MNHR
4053.75Rubbish Removal 0.75 MO
88319.62Dump Charges 45.00 CUYD
Total Minor Item Code 01740.000PROJECT CLEANING
$1,990
Total Major Item Code 01300.300GENERAL REQUIREMENTS
$4,155
Total Sub 03 GEN REQM GENERALREQUIREMENTS
$4,155
Sub 03 WORK COST OF WORK
Major Item Code 02200.000 SITEWORK, PAVING, & UTILITIES
Minor Item Code 02310.000 SITE GRADING6,7606,760.00BP 02.1 - Site Work 1.00 LPSM
Total Minor Item Code 02310.000 SITEGRADING
$6,760
Total Major Item Code 02200.000SITEWORK, PAVING, & UTILITIES
$6,760
Major Item Code 03000.000 CONCRETE WORK
Minor Item Code 03310.000 STRUCTURAL CONCRETE21,52721,527.00BP 03.1 - Concrete 1.00 LPSM
Total Minor Item Code 03310.000STRUCTURAL CONCRETE
$21,527
Total Major Item Code 03000.000CONCRETE WORK
$21,527
Major Item Code 04000.000 MASONRY WORK
Minor Item Code 04200.000 MASONRY UNITS53,49153,491.00BP 04.1 - Masonry 1.00 LPSM
Total Minor Item Code 04200.000MASONRY UNITS
$53,491
Total Major Item Code 04000.000MASONRY WORK
$53,491
Major Item Code 05500.000 MISCELLANEOUS & FABRICATEDMETALS
Minor Item Code 05500.000 METAL FABRICATIONS22,14522,145.00BP 05.1 - Structural & Misc Steel 1.00 LPSM
Total Minor Item Code 05500.000METAL FABRICATIONS
$22,145
Total Major Item Code 05500.000MISCELLANEOUS & FABRICATEDMETALS
$22,145
Major Item Code 06400.000 ARCHITECTURAL WOODWORK
Minor Item Code 06410.000 CUSTOM CABINETS12,54612,546.00BP 06.1 - Cabinets, Casework & Millwork 1.00 LPSM
Page 10
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
Total Minor Item Code 06410.000CUSTOM CABINETS
$12,546
Total Major Item Code 06400.000ARCHITECTURAL WOODWORK
$12,546
Major Item Code 07400.000 ROOFING & SIDING PANELS
Minor Item Code 07410.000 METAL ROOF & WALLPANELS
26,78026,780.00BP 07.1 - Roofing 1.00 LPSM
Total Minor Item Code 07410.000METAL ROOF & WALL PANELS
$26,780
Total Major Item Code 07400.000ROOFING & SIDING PANELS
$26,780
Major Item Code 08200.000 WOOD & PLASTIC DOORS
Minor Item Code 08210.000 WOOD DOORS11,47211,472.00BP 08.1 - Doors, Frames & Hdwr 1.00 LPSM
Total Minor Item Code 08210.000WOOD DOORS
$11,472
Total Major Item Code 08200.000 WOOD &PLASTIC DOORS
$11,472
Major Item Code 08500.000 WINDOWS
Minor Item Code 08500.000 WINDOWS20,16620,166.00BP 08.2 - Glass & Glazing 1.00 LPSM
Total Minor Item Code 08500.000WINDOWS
$20,166
Total Major Item Code 08500.000WINDOWS
$20,166
Major Item Code 09100.000 GYP BOARD, PLASTER, &STUCCO SYSTEMS
Minor Item Code 09250.000 GYPSUM BOARD30,79730,797.00BP 09.1 / 09.3 - Drywall & Acoustical Ceilings 1.00 LPSM
Total Minor Item Code 09250.000GYPSUM BOARD
$30,797
Total Major Item Code 09100.000 GYPBOARD, PLASTER, & STUCCO SYSTEMS
$30,797
Major Item Code 09300.000 TILE
Minor Item Code 09300.000 TILE3,6053,605.00BP 09.2 - Hard Tile 1.00 LPSM
Total Minor Item Code 09300.000 TILE $3,605Total Major Item Code 09300.000 TILE $3,605Major Item Code 09600.000 FINISHED FLOORING
Minor Item Code 09600.000 FLOORS7,7257,725.00BP 09.3 - Carpet & Resilient Flooring 1.00 LPSM
Total Minor Item Code 09600.000FLOORS
$7,725
Total Major Item Code 09600.000FINISHED FLOORING
$7,725
Major Item Code 09900.000 PAINTS & COATINGS
Minor Item Code 09910.000 PAINT3,1263,126.00BP 09.5 - Painting 1.00 LPSM
Total Minor Item Code 09910.000PAINT
$3,126
Page 11
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
Total Major Item Code 09900.000 PAINTS& COATINGS
$3,126
Major Item Code 10000.000 MISCELLANEOUS BUILDINGSPECIALTIES
Minor Item Code 10000.000 MISCELLANEOUSSPECIALTIES
2,5342,534.00BP 10.4 - Toilet & Bath Accessories 1.00 LPSM
Total Minor Item Code 10000.000MISCELLANEOUS SPECIALTIES
$2,534
Minor Item Code 10115.000 MARKERBOARDS2,4902,490.00BP 10.1 - Visual Displays 1.00 LPSM
Total Minor Item Code 10115.000MARKERBOARDS
$2,490
Minor Item Code 10430.000 EXTERIOR SIGNAGEExterior Signage / Building Plaque (Not Required) 1.00 NIC
Total Minor Item Code 10430.000EXTERIOR SIGNAGEMinor Item Code 10440.000 INTERIOR SIGNAGE
483483.00BP 10.2 - Signage 1.00 LPSM
Total Minor Item Code 10440.000INTERIOR SIGNAGE
$483
Total Major Item Code 10000.000MISCELLANEOUS BUILDINGSPECIALTIES
$5,507
Major Item Code 12000.000 BUILDING FURNISHINGS
Minor Item Code 12490.000 WINDOW TREATMENTS1,0001,000.00BP 12.1 - Window Treatment 1.00 LPSM
Total Minor Item Code 12490.000WINDOW TREATMENTS
$1,000
Minor Item Code 12560.000 INSTITUTIONAL FURNITUREFurnishings (By Owner) 1.00 NIC
Total Minor Item Code 12560.000INSTITUTIONAL FURNITURE
Total Major Item Code 12000.000BUILDING FURNISHINGS
$1,000
Major Item Code 15000.000 PLUMBING WORK
Minor Item Code 15410.000 PLUMBING FIXTURES4,0264,026.00BP 15.1 - Plumbing 1.00 LPSM
Total Minor Item Code 15410.000PLUMBING FIXTURES
$4,026
Total Major Item Code 15000.000PLUMBING WORK
$4,026
Major Item Code 15500.000 H.V.A.C. WORK
Minor Item Code 15700.000 HVAC EQUIPMENT27,13227,132.00BP 15.2 - HVAC 1.00 LPSM
Total Minor Item Code 15700.000HVAC EQUIPMENT
$27,132
Minor Item Code 15900.000 HVAC INSTRUMENTATION &CONTROLS
Building Controls System (By Owner) 1.00 NIC
Page 12
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
Total Minor Item Code 15900.000HVAC INSTRUMENTATION &CONTROLS
Total Major Item Code 15500.000 H.V.A.C.WORK
$27,132
Major Item Code 16000.000 ELECTRICAL WORK
Minor Item Code 16050.000 BASIC ELECTRICALMATERIALS & METHODS
39,36539,365.00BP 16.1 - Electrical 1.00 LPSM
Total Minor Item Code 16050.000BASIC ELECTRICAL MATERIALS &METHODS
$39,365
Minor Item Code 16710.000 DATA/COMMUNICATIONSSYSTEMS
Voice/Data/Comm Systems (By Owner) 1.00 NIC
Total Minor Item Code 16710.000DATA/COMMUNICATIONS SYSTEMSMinor Item Code 16770.000 FIRE ALARM SYSTEMS
Fire Alarm System (By Owner) 1.00 NIC
Total Minor Item Code 16770.000 FIREALARM SYSTEMS
Total Major Item Code 16000.000ELECTRICAL WORK
$39,365
Total Sub 03 WORK COST OF WORK $297,170Sub 99 ROLLUPS CM BONDS | INSURANCE | CONTINGENCY |FEE
Major Item Code 36000.000 BONDS & INSURANCE
Minor Item Code 36000.000 BONDS & INSURANCE3,9373,937.00Performance & Payment Bond 1.00 LPSM
3,2493,249.00General Liability Insurance 1.00 LPSM
2,1542,154.00Builder's Risk Insurance 1.00 LPSM
Total Minor Item Code 36000.000BONDS & INSURANCE
$9,340
Total Major Item Code 36000.000 BONDS& INSURANCE
$9,340
Major Item Code 37000.000 WARRANTIES
Minor Item Code 37000.000 WARRANTY128128.00Warranty Allocation 1.00 LPSM
Total Minor Item Code 37000.000WARRANTY
$128
Total Major Item Code 37000.000WARRANTIES
$128
Major Item Code 80000.000 CONTINGENCY
Minor Item Code 80000.000 CONTINGENCY10,00010,000.00Construction Manager's Contingency 1.00 LPSM
Total Minor Item Code 80000.000CONTINGENCY
$10,000
Total Major Item Code 80000.000CONTINGENCY
$10,000
Major Item Code 90000.000 OVERHEAD & FEE
Minor Item Code 90000.000 OVERHEAD & FEE
Page 13
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
17,24817,248.00Construction Manager's Fee 1.00 LPSM
Total Minor Item Code 90000.000OVERHEAD & FEE
$17,248
Total Major Item Code 90000.000OVERHEAD & FEE
$17,248
Total Sub 99 ROLLUPS CM BONDS |INSURANCE | CONTINGENCY | FEE
$36,716
Total Sec Z01 ALT #1 - ADDITIONAL 2CLASSROOMS
$355,2472,418.00 SQFT $147
Page 14
Sort Sequences:1. Sec2. Sub3. Major Item Code4. Minor Item Code
Report includes Taxes & Insurance.Partial Report
Estimate File: :201426_Freeport ES GMP_2014.10.08.est - Freeport Elementary School, FreeportFL
Estimator: Judd WestPrimary Project Qty:0 SF
Secondary Project Qty:0 FLRSEstimate UM: Imperial
10/7/2014 6:02:00PM
Description Unit $ Total $Quantity
$ perPrimarySort Qty
ESTIMATE TOTALS $3,046,794
Page 15
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
SITE UTILIZATION PLAN NARRATIVE
Refer to the attached Site Utilization Plan dated September 22, 2014 as prepared by Ajax Building Corporation and included in Section V-B of this proposal for the illustration of the below listed items.
Temporary Fencing Material: Six foot (6’) high galvanized chain link fencing will be utilized for the temporary construction fencing. Locations: Temporary fencing will be installed at the locations indicated on the Site Utilization Plan. Visual Barriers: Full-height windscreening will be installed as a visual barrier on all chain link fencing and gates
abutting occupied areas of the campus. This visual barrier will be maintained for the duration of the project.
Construction Entrances and Temporary Gates
Primary Construction Entrance: The primary construction entrance is located on the south side of the construction laydown/ personnel parking area. Access to this area will be through the dirt entrance south of the main school entrance. A 20’ wide vehicle gate will be located at this entrance.
Secondary Construction Entrances: Secondary entrances to the project site will be located on the west side of the construction laydown/ personnel parking area. 12’ wide vehicle gates will be located at these entrances. These entrances will serve as secondary and emergency access to the project site.
All construction entrances intended for vehicular traffic will be stabilized with gravel, limerock, crushed concrete, asphalt millings, or other stabilization materials as determined appropriate by Ajax Building Corporation. Although it is anticipated that a large portion of the stabilization materials will be inherently absorbed by the project site, Ajax Building Corporation will endeavor to remove and dispose of these stabilization materials to a practical limit prior to the installation of site finishes.
Pedestrian Gates: o Pedestrian gates will be located throughout the construction site in order to provide a clear egress path for
students and staff in case of an emergency, drills, etc. o Pedestrian gate access will also be provided along the wooded area near the existing lift station for DEP/
Water Management personnel to access this area.. These gates will provide access for pedestrian traffic to and from the project site.
Note: The locations for all gates are indicated on the Site Utilization Plan.
Site Security Gate Security: All temporary gates, vehicle and pedestrian, will be chained and locked during non-work hours
throughout the duration of the project.
Debris Removal Roll-off containers will be supplied and maintained by Ajax Building Corporation for removing construction debris
from the project site. All roll-off container pulls will be scheduled by Ajax Building Corporation’s Project Superintendent.
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
Unless otherwise dictated by the progress/requirements of the project, Ajax Building Corporation will endeavor to perform all roll-off container pulls during business hours.
Tree Protection / Erosion Control / Barricades
Tree protection: All tree protection required by the Contract Documents will be installed prior to the commencement
of site work. Erosion Control: All silt fencing, hay bales and other erosion control measures required by the Contract Documents
will be installed prior to the commencement of site work. Tree and Root Pruning: All tree and root pruning required will be performed in accordance with the Contract
Documents.
Crane, Vehicle and Equipment Paths Crane, vehicle and equipment paths required for equipment and/or vehicle travel, bearing, access, etc. within the
project site will be stabilized with gravel, limerock, crushed concrete, asphalt millings, or other stabilization materials as determined appropriate by Ajax Building Corporation.
Although it is anticipated that a large portion of the stabilization materials will be inherently absorbed by the project site, Ajax Building Corporation will endeavor to remove and dispose of these stabilization materials to a practical limit prior to the installation of site finishes.
On-Site Material Storage
Storage Containers: Various materials, equipment and fabricated items will be stored in Connex-type trailers,
tractor trailers and storage boxes within the fenced area of the project site. All storage containers will be locked during non-work hours.
Open Material Storage: Various materials, equipment and fabricated items that do not lend themselves to be stored in containers will be stored and/or staged on the project site. Such items will be stored on dunnage and protected from the elements as necessary to ensure that that quality and condition of the items is not jeopardized.
Temporary Facilities
Jobsite Office Trailers: The locations for jobsite office trailers are indicated on the Site Utilization Plan. The locations indicated have been proposed in an effort to minimize interference with construction activities and to allow for minimal disturbance of the completed construction when the office trailers are removed at the completion of the project. All jobsite office trailers will be well-maintained units.
Schedule: The project schedule indicates that the mobilization of jobsite office trailers will commence in October 2014 with the start of mobilization activities.
Temporary Power: o Temporary electrical service for the jobsite office trailers will be obtained from the existing power extending
down the north property line from Business 331. The temporary electrical service is being provided by Ajax Building Corporation and will be installed by Chelco (primary), Ajax Subcontractor (secondary service)
o Temporary electrical service for the construction site will be obtained from within the existing building. The temporary electrical service is being provided by WCSD/ FES and will be installed by Ajax Subcontractor
Temporary Water:
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
o Temporary water service for the jobsite office trailers will be obtained from the existing site water service The temporary water service is being provided by WCSD/ FES and will be installed by Ajax Subcontractor
o Temporary water service for the construction site will be obtained from the existing site water service The temporary water service is being provided by WCSD/ FES and will be installed by Ajax Subcontractor
Temporary Sanitary Sewer: o The temporary sanitary sewer service for the jobsite office trailers will be obtained by supplying a sanitary
holding tank. o The temporary sanitary sewer service for the construction site will be obtained by supplying portable toilet
facilities (port-o-lets). o In such cases that a holding tank or portable toilet facilities (port-o-lets) are required, those facilities will be
serviced two (2) times per week or as otherwise necessary when they are in use. Temporary Telephone and Internet Services:
o Temporary telephone service for the jobsite office trailers will be obtained from the existing FES phone service if available. If existing phone service is not available, mobile phones/ WIFI service/ Mobile Hotspot will be provided by Ajax Building Corporation. If existing phone service is available from WCSD/ FES, temporary telephone service will be installed by Ajax Subcontractor.
o Temporary internet service for the jobsite office trailers will be obtained from WIFI service/ Mobile Hotspot provided by Ajax Building Corporation.
Construction Traffic, Parking and Deliveries
Ajax Office Staff: Ajax office staff will utilize the construction entrance gate and drive for access, parking and project
management activities. Parking for Ajax office staff will be in the construction laydown/ personnel parking area indicated on the Site Utilization Plan.
Construction Employees and Personnel: Construction employees and personnel will utilize the construction entrance gate and drive for access, parking and project management activities. Parking for Ajax office staff will be in the construction laydown/ personnel parking area indicated on the Site Utilization Plan.
Construction Deliveries: General construction related deliveries will utilize the construction Entrance gate and drive for access to the project site.
Maintenance of Site
Ajax Building Corporation will maintain all temporary fencing, visual windscreen barriers, tree protection, erosion
control measures, construction storage areas, and construction parking areas to ensure safety and an acceptable appearance. It is assumed that the Owner will continue to maintain all other areas outside the construction site or not occupied by Ajax Building Corporation.
Street sweeping will be performed as necessary. The site will be monitored for trash, debris, and general housekeeping. Cleanup and housekeeping will be
performed on a regular basis as necessary to ensure safety and an acceptable appearance.
Emergency Contact Information Emergency Contacts: The following is a list of emergency contact numbers for Ajax personnel assigned to the
project.
feetmeters
700200
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
Contact Person Job Title Contact Number Judd West Operations Manager Office # 850-224-9571 / Mobile # 850-556-4440 James Penrod Project Manager Mobile # 850-590-0871 Steve Farmer Project Superintendent Mobile # 941-628-0211
AJAX PROJECT NO. 201426
FREEPORT ELEMENTARY SCHOOL CLASSROOM ADDITIONS
GMP PROPOSAL October 10, 2014
SCHEDULE NARRATIVE
Refer to the attached Master Project Schedule dated Sept. 30, 2014 as prepared by Ajax Building Corporation and included in Section VI-B of this proposal for the illustration of the below listed items. The project schedule has been updated to include progress achieved through Sept. 30, 2015.
The project schedule included within this proposal is based on the information represented in the GMP Documents. The project schedule reflects an overall duration of seven and three quarters (7.75) months.
for the construction phase of the project.
The following contractual dates are incorporated into the CM Contract via this GMP Proposal.
▪ Substantial Completion May 29, 2015 ▪ Final Completion June 19, 2015
The following additional Milestone Dates are anticipated within the project schedule in order to achieve the contractual dates listed above.
▪ Mobilization / Start of Construction October 23, 2014 ▪ Top-Out of Building Structure 4th Grade: Feb. 13, 2015 K-wing: Mar. 06, 2015 ▪ Building Dry-In 4th Grade: Feb. 20, 2015 K-wing: Mar. 13, 2015 ▪ Permanent Power 4th Grade: May 01, 2015 K-wing: May 15, 2015 ▪ Owner Occupancy 4th Grade: Jun. 19, 2015 K-wing: Jun. 19, 2015
In order for construction activities to commence on October 9, 2015 as scheduled, the following contractual activities will need to be completed as indicated.
▪ GMP Negotiations Complete October 10, 2014 ▪ CM Contract Amendment Executed October 27, 2014 ▪ All Required Permits Issued October 21, 2014 ▪ Notice to Proceed Issued October 22, 2014
Should any of the above listed dates not be met and therefore delay the commencement and/or progress of construction, the contractual substantial and final completion dates noted above will require extension on a day for day basis.
In order to expedite the project start-up activities, the Design Team, the Construction Manager and the Owner will be required to closely coordinate and expedite submittal review/approval, respond to information requests, respond to conflicts/unforeseen conditions, etc.
The schedule is based upon the assumption that any design revisions required to address future design review comments and/or permitting review comments will be issued to the Construction Manager within one (1) week of receipt of such comments with a directive to proceed. It is further assumed that such revisions (if any) will be minor in nature and will not result in a material change in the overall scope and/or direction of the project.
Ajax Building Corporation will continue to work closely with the Project Team throughout the Preconstruction and Construction Phases of the project to ensure that all critical dates are maintained.
ActID
Description OriginalDuration
EarlyStart
EarlyFinish
JUL2014
AUG2015
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP C
DESIGN, BID PHASE & GMP APPROVAL
1000 A/E Issue 100% Const Documents 5 UNUN02JUN14 A 04JUN14 A
1010 A/E Finalize Bidding/GMP Documents 15 UNUN02JUN14 A 04JUN14 A
1670 Prepare Bid Packages 15 UNUN30JUN14 A 18JUL14
1910 Bidder Prequalification 15 UNUN30JUN14 A 18JUL14
1640 Permitting 20 UNU 01JUL14 29JUL14
1680 Pre-Bid Conference(s) 2 UNUN 22JUL14 * 23JUL14
1020 Subcontractor Bidding Phase 15 UNU 22JUL14 11AUG14
1930 Receive Bids 15 UU 12AUG14 02SEP14
1590 Prepare & Submit GMP Proposal 27 UU 03SEP14 09OCT14
1040 Notice to Proceed 1 UU 22OCT14 22OCT14
PROCUREMENT
ISSUE SUBCONTRACTS
1070 Award Structural & MEP Subcontracts 5 UU 23OCT14 29OCT14
1100 Award Remaining Subcontracts 5 UU 30OCT14 05NOV14
SUBCONTRACTORS - PREPARE & SUBMIT SUBMITTALS
2220 Concrete Submittals - Prepare & Submit 10 UU 30OCT14 12NOV14
2260 Masonry Submittals - Prepare & Submit 10 UU 30OCT14 12NOV14
2320 Roof Structure Submittal - Prepare & Submit 10 UU 30OCT14 12NOV14
2690 Plumbing Submittals - Prepare & Submit 10 UU 30OCT14 12NOV14
2740 HVAC Submittals - Prepare & Submit 10 UU 30OCT14 12NOV14
2810 Electrical Submittals - Prepare & Submit 10 UU 30OCT14 12NOV14
2370 Door & Hardware Submittal - Prepare & Submit 10 UE 06NOV14 19NOV14
2440 Window Submittal - Prepare & Submit 10 UE 06NOV14 19NOV14
2480 Framing & Drywall Submittals - Prepare & Submit 10 UE 06NOV14 19NOV14
2520 ACT Ceiling Submittal - Prepare & Submit 10 UE 06NOV14 19NOV14
2560 Flooring Submittals - Prepare & Submit 10 UE 06NOV14 19NOV14
Issue 100% Const Documen
Finalize Bidding/GMP Document
Prepare Bid Packages
Bidder Prequalification
Permitting
Pre-Bid Conference(s)
Subcontractor Bidding Phase
Receive Bids
Prepare & Submit GMP Proposal
Notice to Proceed
Award Structural & MEP Subcontracts
Award Remaining Subcontracts
Concrete Submittals - Prepare & Submit
Masonry Submittals - Prepare & Submit
Roof Structure Submittal - Prepare & Submit
Plumbing Submittals - Prepare & Submit
HVAC Submittals - Prepare & Submit
Electrical Submittals - Prepare & Submit
Door & Hardware Submittal - Prepare & Submit
Window Submittal - Prepare & Submit
Framing & Drywall Submittals - Prepare & Submit
ACT Ceiling Submittal - Prepare & Submit
Flooring Submittals - Prepare & Submit
Start date 02JUN14Finish date 10JUL15Data date 01JUL14Run date 30SEP14Page number 1A© Primavera Systems, Inc.
FREEPORT ELEMENTARY SCHOOL
Classroom Additions
Ajax Building Corporation
Early barProgress barCritical barSummary barStart milestone poinFinish milestone poi
ActID
Description OriginalDuration
EarlyStart
EarlyFinish
JUL2014
AUG2015
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP C
2610 Painting Submittals - Prepare & Submit 10 UE 06NOV14 19NOV14
2650 Misc Bldg Specialties Subm - Prepare & Submit 10 UE 06NOV14 19NOV14
AJAX BLDG CORP - SUBMITTAL REVIEW
2230 Concrete Submittals - Ajax Review 5 UE 13NOV14 19NOV14
2270 Masonry Submittals - Ajax Review 5 UE 13NOV14 19NOV14
2330 Roof Structure Submittal - Ajax Review 5 UE 13NOV14 19NOV14
2700 Plumbing Submittals - Ajax Review 5 UE 13NOV14 19NOV14
2750 HVAC Submittals - Ajax Review 5 UE 13NOV14 19NOV14
2820 Electrical Submittals - Ajax Review 5 UE 13NOV14 19NOV14
2380 Door & Hardware Submittal - Ajax Review 5 EEP 20NOV14 26NOV14
2450 Window Submittal - Ajax Review 5 EEP 20NOV14 26NOV14
2490 Framing & Drywall Submittals - Ajax Review 5 EEP 20NOV14 26NOV14
2530 ACT Ceiling Submittal - Ajax Review 5 EEP 20NOV14 26NOV14
2570 Flooring Submittals - Ajax Review 5 EEP 20NOV14 26NOV14
2620 Painting Submittals - Ajax Review 5 EEP 20NOV14 26NOV14
2660 Misc Bldg Specialties Submittal - Ajax Review 5 EEP 20NOV14 26NOV14
ARCHITECT/ENGINEER - SUBMITTAL REVIEW
2240 Concrete Submittals - A/E Review 5 EEP 20NOV14 26NOV14
2290 Masonry Submittals - A/E Review 5 EEP 20NOV14 26NOV14
2340 Roof Structure Submittal - A/E Review 5 EEP 20NOV14 26NOV14
2710 Plumbing Submittals - A/E Review 5 EEP 20NOV14 26NOV14
2760 HVAC Submittals - A/E Review 5 EEP 20NOV14 26NOV14
2830 Electrical Submittals - A/E Review 5 EEP 20NOV14 26NOV14
2390 Door & Hardware Submittal - A/E Review 5 EE 27NOV14 03DEC14
2460 Window Submittal - A/E Review 5 EE 27NOV14 03DEC14
2500 Framing & Drywall Submittals - A/E Review 5 EE 27NOV14 03DEC14
2540 ACT Ceiling Submittal - A/E Review 5 EE 27NOV14 03DEC14
Painting Submittals - Prepare & Subm
Misc Bldg Specialties Subm - Prepare & Submit
Concrete Submittals - Ajax Review
Masonry Submittals - Ajax Review
Roof Structure Submittal - Ajax Review
Plumbing Submittals - Ajax Review
HVAC Submittals - Ajax Review
Electrical Submittals - Ajax Review
Door & Hardware Submittal - Ajax Review
Window Submittal - Ajax Review
Framing & Drywall Submittals - Ajax Review
ACT Ceiling Submittal - Ajax Review
Flooring Submittals - Ajax Review
Painting Submittals - Ajax Review
Misc Bldg Specialties Submittal - Ajax Review
Concrete Submittals - A/E Review
Masonry Submittals - A/E Review
Roof Structure Submittal - A/E Review
Plumbing Submittals - A/E Review
HVAC Submittals - A/E Review
Electrical Submittals - A/E Review
Door & Hardware Submittal - A/E Review
Window Submittal - A/E Review
Framing & Drywall Submittals - A/E Review
ACT Ceiling Submittal - A/E Review
Start date 02JUN14Finish date 10JUL15Data date 01JUL14Run date 30SEP14Page number 2A© Primavera Systems, Inc.
FREEPORT ELEMENTARY SCHOOL
Classroom Additions
Ajax Building Corporation
Early barProgress barCritical barSummary barStart milestone poinFinish milestone poi
ActID
Description OriginalDuration
EarlyStart
EarlyFinish
JUL2014
AUG2015
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP C
2590 Flooring Submittals - A/E Review 5 EE 27NOV14 03DEC14
2630 Painting Submittals - A/E Review 5 EE 27NOV14 03DEC14
2670 Misc Bldg Specialties Submittal - A/E Review 5 EE 27NOV14 03DEC14
MATERIAL PROCUREMENT
2720 Plumbing Rough-In Materials - Fab & Deliver 10 EE 27NOV14 10DEC14
2780 HVAC Piping Materials - Fab & Deliver 10 EE 27NOV14 10DEC14
2840 Electrical Rough-In Materials - Fab & Deliver 10 EE 27NOV14 10DEC14
2250 Concrete Materials - Fab & Deliver 15 EC 27NOV14 17DEC14
2770 HVAC Duct Materials - Fab & Deliver 15 EC 27NOV14 17DEC14
2790 HVAC Rough-In Materials - Fab & Deliver 15 EC 27NOV14 17DEC14
2730 Plumbing Fixtures & Trim - Fab & Deliver 20 EC 27NOV14 24DEC14
2310 Brick Materials - Fab & Deliver 30 EC 27NOV14 09JAN15
2350 Roof Structure Matls - Fab & Deliver 30 EC 27NOV14 09JAN15
2360 Metal Roof Deck - Fab & Deliver 30 EC 27NOV14 09JAN15
2850 Electrical Fixtures & Equipment - Fab & Deliver 30 EC 27NOV14 09JAN15
2860 Fire Alarm Equipment & Devices - Fab & Deliver 30 EC 27NOV14 09JAN15
2800 HVAC Equipment - Fab & Deliver 50 EO 27NOV14 06FEB15
2510 Framing & Drywall Materials - Fab & Deliver 10 EC 04DEC14 17DEC14
2550 ACT Ceiling Materials - Fab & Deliver 10 EC 04DEC14 17DEC14
2640 Painting Materials - Fab & Deliver 10 EC 04DEC14 17DEC14
2400 HM Frames - Fab & Deliver 15 EC 04DEC14 24DEC14
2410 HM Doors - Fab & Deliver 20 EC 04DEC14 02JAN15
2430 Hardware - Fab & Deliver 20 EC 04DEC14 02JAN15
2470 Windows - Fab & Deliver 20 EC 04DEC14 02JAN15
2600 Flooring Materials - Fab & Deliver 20 EC 04DEC14 02JAN15
2680 Misc Bldg Specialties - Fab & Deliver 20 EC 04DEC14 02JAN15
2420 Wood Doors - Fab & Deliver 30 EC 04DEC14 16JAN15
Flooring Submittals - A/E Revie
Painting Submittals - A/E Review
Misc Bldg Specialties Submittal - A/E Review
Plumbing Rough-In Materials - Fab & Deliver
HVAC Piping Materials - Fab & Deliver
Electrical Rough-In Materials - Fab & Deliver
Concrete Materials - Fab & Deliver
HVAC Duct Materials - Fab & Deliver
HVAC Rough-In Materials - Fab & Deliver
Plumbing Fixtures & Trim - Fab & Deliver
Brick Materials - Fab & Deliver
Roof Structure Matls - Fab & Deliver
Metal Roof Deck - Fab & Deliver
Electrical Fixtures & Equipment - Fab & Deliver
Fire Alarm Equipment & Devices - Fab & Deliver
HVAC Equipment - Fab & Deliver
Framing & Drywall Materials - Fab & Deliver
ACT Ceiling Materials - Fab & Deliver
Painting Materials - Fab & Deliver
HM Frames - Fab & Deliver
HM Doors - Fab & Deliver
Hardware - Fab & Deliver
Windows - Fab & Deliver
Flooring Materials - Fab & Deliver
Misc Bldg Specialties - Fab & Deliver
Wood Doors - Fab & Deliver
Start date 02JUN14Finish date 10JUL15Data date 01JUL14Run date 30SEP14Page number 3A© Primavera Systems, Inc.
FREEPORT ELEMENTARY SCHOOL
Classroom Additions
Ajax Building Corporation
Early barProgress barCritical barSummary barStart milestone poinFinish milestone poi
ActID
Description OriginalDuration
EarlyStart
EarlyFinish
JUL2014
AUG2015
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP C
1030 GMP Board Approval 1 UU 21OCT14 * 21OCT14
CONSTRUCTION
CLASSROOM ADDITION #1
10000 Mobilization / Site Control 5 UU 23OCT14 29OCT14
10010 Install Temp Barriers at Existing Bldg 5 UU 23OCT14 29OCT14
10020 Selective Demo at Existing Bldg 5 UU 30OCT14 05NOV14
10030 Utility Relocations at Bldg Footprint 5 UU 30OCT14 05NOV14
10040 Prepare Building Pad 5 UU 06NOV14 12NOV14
10050 FRP Foundations 10 UEP 13NOV14 26NOV14
10060 CMU Stemwalls 10 EE 20NOV14 03DEC14
10070 MEP Under-Slab Rough-Ins 10 EE 27NOV14 10DEC14
10080 FRP Slab On Grade 10 CC 18DEC14 02JAN15
10090 Set Door Frames 5 CC 05JAN15 09JAN15
10100 Complete CMU Walls 15 CO 05JAN15 23JAN15
10110 MEP CMU Wall Rough-In 15 CO 05JAN15 23JAN15
10120 Prepare Walls for Roof Structure 5 OO 26JAN15 30JAN15
10130 Roof Framing, Roof Structure & Roof Deck 10 OO 02FEB15 13FEB15
10140 Dampproofing & Rigid Insulation Ext Walls 5 OE 16FEB15 20FEB15
10150 Roof Blocking, Insulation, Decking & Dry-In 5 OE 16FEB15 20FEB15
10160 Point & Patch CMU Walls 5 OE 16FEB15 20FEB15
10170 Metal Roofing, Fascia, Soffits & Trim 10 EE 23FEB15 06MAR15
10180 Interior Framing 10 EE 23FEB15 06MAR15
10440 Install HVAC Equipment 10 EE 23FEB15 06MAR15
10190 Exterior Masonry Veneer 15 EE 23FEB15 13MAR15
10200 MEP Overhead & Wall Rough-In 15 EAN 09MAR15 27MAR15
10210 Gutters & Downspouts 5 EAN 16MAR15 20MAR15
10220 Fine Grade Site 5 ANAN 23MAR15 27MAR15
GMP Board Approval
Mobilization / Site Control
Install Temp Barriers at Existing Bldg
Selective Demo at Existing Bldg
Utility Relocations at Bldg Footprint
Prepare Building Pad
FRP Foundations
CMU Stemwalls
MEP Under-Slab Rough-Ins
FRP Slab On Grade
Set Door Frames
Complete CMU Walls
MEP CMU Wall Rough-In
Prepare Walls for Roof Structure
Roof Framing, Roof Structure & Roof Deck
Dampproofing & Rigid Insulation Ext Walls
Roof Blocking, Insulation, Decking & Dry-In
Point & Patch CMU Walls
Metal Roofing, Fascia, Soffits & Trim
Interior Framing
Install HVAC Equipment
Exterior Masonry Veneer
MEP Overhead & Wall Rough-In
Gutters & Downspouts
Fine Grade Site
Start date 02JUN14Finish date 10JUL15Data date 01JUL14Run date 30SEP14Page number 4A© Primavera Systems, Inc.
FREEPORT ELEMENTARY SCHOOL
Classroom Additions
Ajax Building Corporation
Early barProgress barCritical barSummary barStart milestone poinFinish milestone poi
ActID
Description OriginalDuration
EarlyStart
EarlyFinish
JUL2014
AUG2015
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP C
10230 OFOI Rough-In Data/Comm Systems 5 ANAN 30MAR15 03APR15
10240 HTF Interior Drywall 10 ANAN 30MAR15 10APR15
10250 Hardscaping 10 ANAN 30MAR15 10APR15
10260 Prime & First Coat Paint 5 ANE 13APR15 17APR15
10270 Hard Tile 10 ANE 13APR15 24APR15
10280 Landscaping 10 ANE 13APR15 24APR15
10290 Casework 5 EE 20APR15 24APR15
10300 MEP Wall Trim-Out 5 EE 20APR15 24APR15
10310 Acoustical Ceilings 10 EE 20APR15 01MAY15
10320 MEP Ceiling Trim-Out 10 EE 20APR15 01MAY15
10330 Install Plumbing Fixtures 5 EE 27APR15 01MAY15
10340 Doors / Hardware 5 EE 04MAY15 08MAY15
10350 Misc Building Specialties 5 EE 04MAY15 08MAY15
10360 OFOI Data/Comm Equip & Trim-Out 5 EE 04MAY15 08MAY15
10370 OFOI Smart Boards 5 EE 04MAY15 08MAY15
10380 Flooring & Base 10 EA 11MAY15 22MAY15
10390 Final Paint 10 AA 18MAY15 29MAY15
10400 Ajax Pre-Punch Bldg 10 AA 18MAY15 29MAY15
10410 Substantial Completion 0 A 29MAY15
10420 Punchlist 15 APR 01JUN15 19JUN15
10430 Final Completion 0 PR 19JUN15
CLASSROOM ADDITION #2
11010 Install Temp Barriers at Existing Bldg 5 UU 23OCT14 29OCT14
11000 Mobilization / Site Control 5 UU 30OCT14 05NOV14
11030 Utility Relocations at Bldg Footprint 5 UU 30OCT14 05NOV14
11020 Selective Demo at Existing Bldg 5 UU 06NOV14 12NOV14
11040 Prepare Building Pad 5 UE 13NOV14 19NOV14
OFOI Rough-In Data/Comm System
HTF Interior Drywall
Hardscaping
Prime & First Coat Paint
Hard Tile
Landscaping
Casework
MEP Wall Trim-Out
Acoustical Ceilings
MEP Ceiling Trim-Out
Install Plumbing Fixtures
Doors / Hardware
Misc Building Specialties
OFOI Data/Comm Equip & T
OFOI Smart Boards
Flooring & Base
Final Paint
Ajax Pre-Punch Bldg
Substantial Completion
Punchlist
Final Completion
Install Temp Barriers at Existing Bldg
Mobilization / Site Control
Utility Relocations at Bldg Footprint
Selective Demo at Existing Bldg
Prepare Building Pad
Start date 02JUN14Finish date 10JUL15Data date 01JUL14Run date 30SEP14Page number 5A© Primavera Systems, Inc.
FREEPORT ELEMENTARY SCHOOL
Classroom Additions
Ajax Building Corporation
Early barProgress barCritical barSummary barStart milestone poinFinish milestone poi
ActID
Description OriginalDuration
EarlyStart
EarlyFinish
JUL2014
AUG2015
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP C
11050 FRP Foundations 10 EE 27NOV14 10DEC14
11060 CMU Stemwalls 10 EC 04DEC14 17DEC14
11070 MEP Under-Slab Rough-Ins 10 EC 11DEC14 24DEC14
11080 FRP Slab On Grade 10 CC 18DEC14 02JAN15
11090 Set Door Frames 5 OO 26JAN15 30JAN15
11100 Complete CMU Walls 15 OO 26JAN15 13FEB15
11110 MEP CMU Wall Rough-In 15 OO 26JAN15 13FEB15
11120 Prepare Walls for Roof Structure 5 OE 16FEB15 20FEB15
11130 Roof Framing, Roof Structure & Roof Deck 10 EE 23FEB15 06MAR15
11140 Dampproofing & Rigid Insulation Ext Walls 5 EE 09MAR15 13MAR15
11150 Roof Blocking, Insulation, Decking & Dry-In 5 EE 09MAR15 13MAR15
11160 Point & Patch CMU Walls 5 EE 09MAR15 13MAR15
11170 Metal Roofing, Fascia, Soffits & Trim 10 EAN 16MAR15 27MAR15
11180 Interior Framing 10 EAN 16MAR15 27MAR15
11440 Install HVAC Equipment 10 EAN 16MAR15 27MAR15
11190 Exterior Masonry Veneer 15 EAN 16MAR15 03APR15
11200 MEP Overhead & Wall Rough-In 15 ANE 30MAR15 17APR15
11210 Gutters & Downspouts 5 ANAN 06APR15 10APR15
11220 Fine Grade Site 5 ANE 13APR15 17APR15
11230 OFOI Rough-In Data/Comm Systems 5 EE 20APR15 24APR15
11240 HTF Interior Drywall 10 EE 20APR15 01MAY15
11250 Hardscaping 10 EE 20APR15 01MAY15
11260 Prime & First Coat Paint 5 EE 04MAY15 08MAY15
11270 Hard Tile 10 EA 04MAY15 15MAY15
11280 Landscaping 10 EA 04MAY15 15MAY15
11290 Casework 5 EA 11MAY15 15MAY15
11300 MEP Wall Trim-Out 5 EA 11MAY15 15MAY15
FRP Foundations
CMU Stemwalls
MEP Under-Slab Rough-Ins
FRP Slab On Grade
Set Door Frames
Complete CMU Walls
MEP CMU Wall Rough-In
Prepare Walls for Roof Structure
Roof Framing, Roof Structure & Roof Deck
Dampproofing & Rigid Insulation Ext Wa
Roof Blocking, Insulation, Decking & Dry
Point & Patch CMU Walls
Metal Roofing, Fascia, Soffits & Trim
Interior Framing
Install HVAC Equipment
Exterior Masonry Veneer
MEP Overhead & Wall Rough-In
Gutters & Downspouts
Fine Grade Site
OFOI Rough-In Data/Comm Sy
HTF Interior Drywall
Hardscaping
Prime & First Coat Paint
Hard Tile
Landscaping
Casework
MEP Wall Trim-Out
Start date 02JUN14Finish date 10JUL15Data date 01JUL14Run date 30SEP14Page number 6A© Primavera Systems, Inc.
FREEPORT ELEMENTARY SCHOOL
Classroom Additions
Ajax Building Corporation
Early barProgress barCritical barSummary barStart milestone poinFinish milestone poi
ActID
Description OriginalDuration
EarlyStart
EarlyFinish
JUL2014
AUG2015
SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP C
11310 Acoustical Ceilings 10 EA 11MAY15 22MAY15
11320 MEP Ceiling Trim-Out 10 EA 11MAY15 22MAY15
11330 Install Plumbing Fixtures 5 AA 18MAY15 22MAY15
11340 Doors / Hardware 5 AA 25MAY15 29MAY15
11350 Misc Building Specialties 5 AA 25MAY15 29MAY15
11360 OFOI Data/Comm Equip & Trim-Out 5 AA 25MAY15 29MAY15
11370 OFOI Smart Boards 5 AA 25MAY15 29MAY15
11380 Flooring & Base 10 AA 01JUN15 12JUN15
11390 Final Paint 10 APR 08JUN15 19JUN15
11400 Ajax Pre-Punch Bldg 10 APR 08JUN15 19JUN15
11410 Substantial Completion 0 PR 19JUN15
11420 Punchlist 15 PRPR 22JUN15 10JUL15
11430 Final Completion 0 PR 10JUL15
PROJECT CLOSEOUT
2060 Prepare & Submit Closeout Documents 30 APR 29MAY15 10JUL15
2090 Owner Training 30 APR 29MAY15 10JUL15
1650 Substantial Completion - Project 0 PR 19JUN15
1660 Final Completion - Project 0 PR 10JUL15
Acoustical Ceilings
MEP Ceiling Trim-Out
Install Plumbing Fixtures
Doors / Hardware
Misc Building Specialties
OFOI Data/Comm Equip
OFOI Smart Boards
Flooring & Base
Final Paint
Ajax Pre-Punch Bldg
Substantial Comple
Punchlist
Final Completio
Prepare & Subm
Owner Training
Substantial Comple
Final Completio
Start date 02JUN14Finish date 10JUL15Data date 01JUL14Run date 30SEP14Page number 7A© Primavera Systems, Inc.
FREEPORT ELEMENTARY SCHOOL
Classroom Additions
Ajax Building Corporation
Early barProgress barCritical barSummary barStart milestone poinFinish milestone poi