Research Programme
M&E in a SETA Environment10 May 2019
SETA CRWG Progress Update
Prepared by Prof Eureta Rosenberg | Presented by Mike Ward
Contents Page
• General Update (since last CWRG i.e. March – April 2019)
• Research Updates (Projects Current Status and Next Steps)
• Matters to Discuss• Date, venue and agenda for Consultative Workshop (June)
General Update: March – May 2019
Stakeholder Engagements
• Learning Event, 13 March 2019• Hosted by BANKSETA; quite well attended
• Sharing examples of current evaluation practices using DPME ‘evaluation types’ and expansive learning cycle
• National Skills Summit, 14-15 March• Hosted by NSA
• Ministers Pandor and Dlamini Zuma both referred to M&E in their keynotes
• Commission 5 on SETA M&E well attended, e.g. DHET, NSA, GTAC, Mzabalaza & SETAs
• Chair presented draft findings & recommendations; all were well received, further developed & adopted in the Summit Resolutions
Research Team Update
• Prof Eureta Rosenberg, PI (Rhodes)
• Mike Ward, Research & Stakeholder Engagement (Rhodes)
• Khotso Tsotsotso, Research & Stakeholder Engagement (CLEAR-AA)
• Prof Mike Rogan (Rhodes)
• Dr Glenda Raven (WWF)
• Nande Nodada, Research Assistance (Rhodes)
• Carlene Royle, Project Administration (Rhodes)
1. High level M&E Framework (ELRC)
2. Evaluating skills for enterprise
development (CE)
3. Standards for SETA Performance
(ELRC)
4. Cost Benefit Analysis Tool
(WWF)
5. Tracer Study Protocol (NALSU)
6. M&E for Discretionary Grant
7. M&E for Mandatory Grant
8. Evaluate SETA Governance (outsource)
9. Capacity Development
Reminder of the 9 Projects making up
the Research Programme
Research Projects – Current Status & Next Steps (1)
• Scoping report produced and uploaded to website
• Recommendations drafted; shared at Learning Event, National Skills Summit
• Next step: Draft more detailed recommendations to discuss at Consultative Workshop in June
Project 1: Overall M&E Framework
• Scoping report produced and uploaded to website
• Next step: Draft more detailed recommendations to discuss at Consultative Workshop in June
Project 3: Standards for SETA Performance
• Scoping report produced and uploaded to the website
• Next step: Produce draft report (extension requested) with recommendations to discuss in June
Project 6: Discretionary Grant M&E Framework
• Scoping report completed and uploaded to website; Draft report completed
• Next steps: Summarise recommendations for discussion in June
Project 7: Mandatory Grant M&E Framework
Research Projects – Current Status & Next Steps (3)
• Scoping report; Cap Dev ‘curriculum’ drafted and uploaded to website
• Learning Event hosted with BANKSETA
• Next step: Discuss format and dates at Consultative Workshop in June
Project 9: Capacity development & Change support
Organisational Learning Through Evaluation
Enhanced skill for economic participation and social development
Design Evaluation
Implementation Evaluation
Diagnostic Evaluation
Implementation Evaluation
Economic Evaluation
Impact Evaluation
Synthesis Evaluation
Research Projects – Current Status & Next Steps (2)
• ServiceSETA project separate report (Garry Rosenberg will present in person)
Project 2: Activity System Evaluation of Township Enterprise Skills Development
• Separate report (from Prof Mike Rogan, presented by Mike Ward)
Project 4: Tracer Study Protocol
• Separate report (from Dr Glenda Raven, presented by Mike Ward)
Project 5: Cost Benefit Analysis Tool
• Terms of Reference (ToR) drafted and circulated
• Next step: Finalise ToR once all comments have been received and budget confirmed (behind schedule)
Project 8: Evaluation of SETA Performance
Matters to Discuss at CRWG Meeting
1. Consultative Workshopsi. Purpose: Obtain stakeholder buy-in and input to improve the eventual use
of recommendations regarding SETA M&E
ii. Agenda: Share findings & recommendations, facilitate and record inputs from key stakeholders: SETAs, all relevant DHET entities, DPME, GTAC, etc.
iii. Proposed dates: • Workshop 1: one full day during 3-14 June (preferred: 12 or 14 June)
• Workshop 2: one full day during 9-20 Sept
iv. Proposed venues: Wits Education Faculty, Parktown Campus OR BANKSETA, Midrand
Eureta Rosenberg, Glenda Raven and Mike [email protected] | @EuretaRose | @RU_elrc2 | [email protected]
Thank You!