1
Copyright, 2004 © Centreline Solutions Inc.
1
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
Preventing Project Failure
Welcome
10 Major Causes of
Project Failure
Centreline Solutions Inc.Project Management Institute Global Registered Education Provider #2029
Copyright, 2004 © Centreline Solutions Inc.
2
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
Preventing Project Failure
2
Copyright, 2004 © Centreline Solutions Inc.
3
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
Preventing Project Failure
In this seminar we will cover:
What is project failure?The impacts of project failure?The Top 10 problems that result in project failure• The cause of the problem• How to fix the problem• How to prevent the problem from happening
again
Copyright, 2004 © Centreline Solutions Inc.
4
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
Why do I.T. Projects Fail?
Why do I.T. Projects Fail?
3
Copyright, 2004 © Centreline Solutions Inc.
5
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
Why do I.T. Projects Fail?
Because nobody stops them from failing!
Copyright, 2004 © Centreline Solutions Inc.
6
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
Iron Triangle
Manage the Iron Triangle, or it will manage you
4
Copyright, 2004 © Centreline Solutions Inc.
7
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
I.T. Project Disposition
I.T. Projects have a bad attitude. They WANT to fail.
• New technologies are difficult to use or predict• Aggressive time schedules• Lack of resources• First time, unique services• Unrealistic expectations
Copyright, 2004 © Centreline Solutions Inc.
8
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
Role of the PM
As Project Manager, it is your role to
prevent these projects from failing.
How?
5
Copyright, 2004 © Centreline Solutions Inc.
9
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
How? You can do it this way…
Copyright, 2004 © Centreline Solutions Inc.
10
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
How?
Or
• Learn what usually goes wrong• Plan out how to deal with it• Then…just follow the plan.
6
Copyright, 2004 © Centreline Solutions Inc.
11
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
How to Manage Projects
Managing Projects is very much like driving a car.
• Determine the destination, timeframe and how much you have to spend
• Create a plan (route, speed, breaks, weather, etc)• Follow the plan• Continuously monitor progress and keep the car on
the road
Copyright, 2004 © Centreline Solutions Inc.
12
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
What is Project Failure?
A project is considered a failure…
whenever a project does not meet the expectations of the stakeholders.
7
Copyright, 2004 © Centreline Solutions Inc.
13
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
So What if it Fails…
Impacts of project failure?
• Cost & Time Overruns• Quality degradation• Frustration, sometimes resulting in people
quitting• Stress, sometimes resulting in people quitting• Low job satisfaction• Low corporate market value• Low public opinion• Negative media campaigns
Copyright, 2004 © Centreline Solutions Inc.
14
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
Impacts of Project Failures
• The cumulative effects can be very costly to your company
• May even force the company into closure
8
Copyright, 2004 © Centreline Solutions Inc.
15
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
10 Primary Causes of Project Failure
10 Primary Causes of Project Failure…
Copyright, 2004 © Centreline Solutions Inc.
16
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#1 - Lack of Change Management
Also known as “You’d like it just a bit bigger? No problem”
Oh, still a bit bigger…ok.
Even bigger? It wasn’t in the plan but okay…
9
Copyright, 2004 © Centreline Solutions Inc.
17
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#1 - Lack of Change Management
When scope creep happens, the end result is always more work than expected.
Copyright, 2004 © Centreline Solutions Inc.
18
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#1 - Lack of Change Management
The Problem:
• Changes that were not initially planned for are added to the project
• The project takes longer and costs more than planned and there is no record of why.
10
Copyright, 2004 © Centreline Solutions Inc.
19
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#1 - Lack of Change Management
Cause:
• Not having a method to handle or recognize changes
Copyright, 2004 © Centreline Solutions Inc.
20
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#1 - Lack of Change Management
What to do:
• Document the change management process to be used and followed by the project team
• Educate the project team to recognize a change or deviation from the plan
• Follow the change management processes
11
Copyright, 2004 © Centreline Solutions Inc.
21
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#2 - Poor Communications
Copyright, 2004 © Centreline Solutions Inc.
22
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#2 - Poor Communications
The Problems:
• Team members do not have the information they need when then need it, causing delays
• Issues or changes do not get escalated
• Project reporting (and therefore control) is sluggish
12
Copyright, 2004 © Centreline Solutions Inc.
23
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#2 - Poor Communications
Cause:
• The project’s communications plan was not completed
• The project’s communications plan does not have enough detail
Copyright, 2004 © Centreline Solutions Inc.
24
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#2 - Poor Communications
What to do & Prevention:
• Find out the communications requirements of all team members and stakeholders, document them in a comm. plan, and follow the plan– Who needs the information– What do they need to know– What level of detail– How do they want it– When and how often do they need it– How should it be delivered, and by whom
13
Copyright, 2004 © Centreline Solutions Inc.
25
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#3 - Inadequate Resources
You do not have enough people, the right skillsets, or the team is not committed to the project.
Copyright, 2004 © Centreline Solutions Inc.
26
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#3 - Inadequate Resources
The Problems:
• Tasks take longer than expected to complete• Deadlines and milestones get missed• Project completion date comes into jeopardy• You end up working double-shifts to complete
all the work
14
Copyright, 2004 © Centreline Solutions Inc.
27
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#3 - Inadequate Resources
Cause:
• There was no pre-commitment of resources to the project
• The project was not supported
• There was no analysis and documentation of all skillsets required
Copyright, 2004 © Centreline Solutions Inc.
28
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#3 - Inadequate Resources
What to do:
• Get executive sponsorship for the project• Document which resources and skillsets are
needed to get the job done• Create a plan that gives enough time to get the
job done with the allocated resources• Pre-assign the required resources to the team
15
Copyright, 2004 © Centreline Solutions Inc.
29
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#4 - Poorly Defined Requirements
“I’d like a set of stairs that leads up to a bridge.”
Copyright, 2004 © Centreline Solutions Inc.
30
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#4 - Poorly Defined Requirements
The Problems:
• Customer will be unhappy• Customer will complain and you will end up
doing the what they want - often at your expense
16
Copyright, 2004 © Centreline Solutions Inc.
31
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#4 - Poorly Defined Requirements
Cause:
• What the customer wants was not clearly documented
• What you believe the customer wants is different that what the customer believes they’ve asked for
• The customer did not sign off for the requirements document
Copyright, 2004 © Centreline Solutions Inc.
32
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#4 - Poorly Defined Requirements
What to do:
• Find out and document exactly what the customer wants
• Inform everybody of the project scope• Document business, functional and technical
requirements.• Have the customer agree to and sign off the
requirement documents
17
Copyright, 2004 © Centreline Solutions Inc.
33
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#5 - Inaccurate Estimates
How do you figure out how long the project will take?
Copyright, 2004 © Centreline Solutions Inc.
34
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#5 - Inaccurate Estimates
The Problems:
• An unrealistic timeline or budget will be agreed to
• You will not be able to do all the work in the time allocated
18
Copyright, 2004 © Centreline Solutions Inc.
35
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#5 - Inaccurate Estimates
Cause:
• No formal estimating method• Estimate confidence is low• Volume of work not understood
Copyright, 2004 © Centreline Solutions Inc.
36
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#5 - Inaccurate Estimates
What to do:
• List all the work as well as possible• Estimate each work package• Add up all work packages• Do not give “elevator” estimates if possible• Always give answers using a range of dates:
– Estimates where the work is well defined: • ~15% inaccuracy
– Estimates where the work is not well defined:• ~100% inaccuracy
19
Copyright, 2004 © Centreline Solutions Inc.
37
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#6 - Poor Risk Management
Sorry about the project, I left it in my car this morning and there was a bit of an incident.
Copyright, 2004 © Centreline Solutions Inc.
38
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#6 - Poor Risk Management
The Problems:
• Unexpected events cause delays• Domino effect of things going wrong
20
Copyright, 2004 © Centreline Solutions Inc.
39
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#6 - Poor Risk Management
Cause:
• No formal risk management• Just try to predict the big things that can go
wrong• It’s the sum of all the little things that make a
project late• Nothing is more stressful than trying to keep on
schedule when unexpected things keep happening
Copyright, 2004 © Centreline Solutions Inc.
40
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#6 - Poor Risk Management
What to do:
• List all the work as well as possible• Figure out what can go wrong with each piece of
work• Prioritize each risk:
– High/Med/Low probability– High/Med/Low impact (or effect)
• Sort the list• Create a plan to deal with the risks at the top of
the list
21
Copyright, 2004 © Centreline Solutions Inc.
41
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#7 - Poorly Defined Deliverables
“Emergency phones installed. Deliverable Completed. “
Copyright, 2004 © Centreline Solutions Inc.
42
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#7 - Poorly Defined Deliverables
The Problems:
• Difficult to get agreement that the project is finished
• Customer keeps wanting more, saying you didn’t do it to their specifications
22
Copyright, 2004 © Centreline Solutions Inc.
43
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#7 - Poorly Defined Deliverables
Cause:
• The milestones or deliverables were not measurable
• “The customer never told us how many they wanted, so we just assumed 1.”
Copyright, 2004 © Centreline Solutions Inc.
44
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#7 - Poorly Defined Deliverables
What to do:
• Ensure milestones or deliverables are:– Clearly defined– Measurable (or quantifiable)
• For example:– Red is bad, Red #ED2D2D is better– Fast is good, 1.22 GHz is better– Good response is good, sub 1Ms is better
23
Copyright, 2004 © Centreline Solutions Inc.
45
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#8 - Over Optimism
Of course we can do that for you…
Copyright, 2004 © Centreline Solutions Inc.
46
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#8 - Over Optimism
The Problems:
• There was little or no planning before deciding you can get the job done
• The task you agree to turns out to be more work than expected
• It takes you longer and jeopardizes other deliverables
24
Copyright, 2004 © Centreline Solutions Inc.
47
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#8 - Over Optimism
Cause:
• Not enough time spent planning• You may have been pressured into giving an
answer right then and there• Didn’t have a full understanding of the work
involved before committing
Copyright, 2004 © Centreline Solutions Inc.
48
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#8 - Over Optimism
What to do:
• Take the time to fully understand the work before agreeing to it
• It’s okay to say the work is not possible or will take too long
• Only agree to work when you’re sure it can be done, this will benefit you and your manager
25
Copyright, 2004 © Centreline Solutions Inc.
49
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#9 - No Time for Project Management
Hurry… we have a tight deadline. No time to plan. Just start digging.
Copyright, 2004 © Centreline Solutions Inc.
50
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#9 - No Time for Project Management
The Problems:
• The plan is flawed from the start• The project gets out of control and can’t be
recovered.
26
Copyright, 2004 © Centreline Solutions Inc.
51
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#9 - No Time for Project Management
Cause:
• You have to do the work and weren’t also given time for project management
• Perhaps you only have a 10% or 20% allotment for project management duties
Copyright, 2004 © Centreline Solutions Inc.
52
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#9 - No Time for Project Management
What to do:
• Planning a project is like setting out a roadmap. Without it you will likely get lost.
• Controlling a project is like controlling a car. You have to continuously watch the road (the plan) and make little adjustments. Imagine driving home tonight and only controlling the car 10-20% of the time.
27
Copyright, 2004 © Centreline Solutions Inc.
53
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#10 - Improved PM Skillset Needed
I think I know how this helmet goes on. I’ve been riding scooters for two years now.
Copyright, 2004 © Centreline Solutions Inc.
54
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#10 - Improved PM Skillset Needed
The Problems:
• Your projects don’t finish on time• Your projects are always squeezed at the end• Your projects are stressful• You have to deal with unrealistic expectations or
customers• You feel your projects are out of control
28
Copyright, 2004 © Centreline Solutions Inc.
55
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#10 - Improved PM Skillset Needed
Cause:
• People often don’t know what they don’t know• Their projects are out of control but they don’t
know why• They feel they are doing okay but could benefit
from formal project management education
Copyright, 2004 © Centreline Solutions Inc.
56
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
#10 - Improved PM Skillset Needed
What to do:
• Learn the methods, tools, and techniques successful professional project manager use to initiate, plan, execute and control their projects
• Contact a PMI Certified Global Registered Education Provider in your area (such as Centreline Solutions Incorporated)
• Visit us on the web at:– http://www.getpmtraining.com
29
Copyright, 2004 © Centreline Solutions Inc.
57
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
Thank You!
About Centreline Solutions Incorporated
• PMI Global Registered Education Provider• Specialists in project management education• Some of our other courses include:
– Managing I.T. Projects– The Complete Project Management Course– PMP Preparation Course– Guaranteed PMP Certification Program– Project Management Overview
• For full details, visit us on the web at:– http://www.getpmtraining.com
Copyright, 2004 © Centreline Solutions Inc.
58
Why Projects Fail v.2005.02.18
getpmtraining.comgetpmtraining.com
Break