1 Copyright, 2004 © Centreline Solutions Inc. 1 Why Projects Fail v.2005.02.18 getpmtraining.com getpmtraining.com Preventing Project Failure Welcome 10 Major Causes of Project Failure Centreline Solutions Inc. Project Management Institute Global Registered Education Provider #2029 Copyright, 2004 © Centreline Solutions Inc. 2 Why Projects Fail v.2005.02.18 getpmtraining.com getpmtraining.com Preventing Project Failure

10 Major Causes of Project Failure

Embed Size (px)

DESCRIPTION

xd

Citation preview

  • 1Copyright, 2004 Centreline Solutions Inc.

    1

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    Preventing Project Failure

    Welcome

    10 Major Causes of

    Project Failure

    Centreline Solutions Inc.Project Management Institute Global Registered Education Provider #2029

    Copyright, 2004 Centreline Solutions Inc.

    2

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    Preventing Project Failure

  • 2Copyright, 2004 Centreline Solutions Inc.

    3

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    Preventing Project Failure

    In this seminar we will cover:

    What is project failure?The impacts of project failure?The Top 10 problems that result in project failure The cause of the problem How to fix the problem How to prevent the problem from happening

    again

    Copyright, 2004 Centreline Solutions Inc.

    4

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    Why do I.T. Projects Fail?

    Why do I.T. Projects Fail?

  • 3Copyright, 2004 Centreline Solutions Inc.

    5

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    Why do I.T. Projects Fail?

    Because nobody stops them from failing!

    Copyright, 2004 Centreline Solutions Inc.

    6

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    Iron Triangle

    Manage the Iron Triangle, or it will manage you

  • 4Copyright, 2004 Centreline Solutions Inc.

    7

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    I.T. Project Disposition

    I.T. Projects have a bad attitude. They WANT to fail.

    New technologies are difficult to use or predict Aggressive time schedules Lack of resources First time, unique services Unrealistic expectations

    Copyright, 2004 Centreline Solutions Inc.

    8

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    Role of the PM

    As Project Manager, it is your role to

    prevent these projects from failing.

    How?

  • 5Copyright, 2004 Centreline Solutions Inc.

    9

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    How? You can do it this way

    Copyright, 2004 Centreline Solutions Inc.

    10

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    How?

    Or

    Learn what usually goes wrong Plan out how to deal with it Thenjust follow the plan.

  • 6Copyright, 2004 Centreline Solutions Inc.

    11

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    How to Manage Projects

    Managing Projects is very much like driving a car.

    Determine the destination, timeframe and how much you have to spend

    Create a plan (route, speed, breaks, weather, etc) Follow the plan Continuously monitor progress and keep the car on

    the road

    Copyright, 2004 Centreline Solutions Inc.

    12

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    What is Project Failure?

    A project is considered a failure

    whenever a project does not meet the expectations of the stakeholders.

  • 7Copyright, 2004 Centreline Solutions Inc.

    13

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    So What if it Fails

    Impacts of project failure?

    Cost & Time Overruns Quality degradation Frustration, sometimes resulting in people

    quitting Stress, sometimes resulting in people quitting Low job satisfaction Low corporate market value Low public opinion Negative media campaigns

    Copyright, 2004 Centreline Solutions Inc.

    14

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    Impacts of Project Failures

    The cumulative effects can be very costly to your company

    May even force the company into closure

  • 8Copyright, 2004 Centreline Solutions Inc.

    15

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    10 Primary Causes of Project Failure

    10 Primary Causes of Project Failure

    Copyright, 2004 Centreline Solutions Inc.

    16

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #1 - Lack of Change Management

    Also known as Youd like it just a bit bigger? No problem

    Oh, still a bit biggerok.

    Even bigger? It wasnt in the plan but okay

  • 9Copyright, 2004 Centreline Solutions Inc.

    17

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #1 - Lack of Change Management

    When scope creep happens, the end result is always more work than expected.

    Copyright, 2004 Centreline Solutions Inc.

    18

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #1 - Lack of Change Management

    The Problem:

    Changes that were not initially planned for are added to the project

    The project takes longer and costs more than planned and there is no record of why.

  • 10

    Copyright, 2004 Centreline Solutions Inc.

    19

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #1 - Lack of Change Management

    Cause:

    Not having a method to handle or recognize changes

    Copyright, 2004 Centreline Solutions Inc.

    20

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #1 - Lack of Change Management

    What to do:

    Document the change management process to be used and followed by the project team

    Educate the project team to recognize a change or deviation from the plan

    Follow the change management processes

  • 11

    Copyright, 2004 Centreline Solutions Inc.

    21

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #2 - Poor Communications

    Copyright, 2004 Centreline Solutions Inc.

    22

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #2 - Poor Communications

    The Problems:

    Team members do not have the information they need when then need it, causing delays

    Issues or changes do not get escalated

    Project reporting (and therefore control) is sluggish

  • 12

    Copyright, 2004 Centreline Solutions Inc.

    23

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #2 - Poor Communications

    Cause:

    The projects communications plan was not completed

    The projects communications plan does not have enough detail

    Copyright, 2004 Centreline Solutions Inc.

    24

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #2 - Poor Communications

    What to do & Prevention:

    Find out the communications requirements of all team members and stakeholders, document them in a comm. plan, and follow the plan Who needs the information What do they need to know What level of detail How do they want it When and how often do they need it How should it be delivered, and by whom

  • 13

    Copyright, 2004 Centreline Solutions Inc.

    25

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #3 - Inadequate Resources

    You do not have enough people, the right skillsets, or the team is not committed to the project.

    Copyright, 2004 Centreline Solutions Inc.

    26

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #3 - Inadequate Resources

    The Problems:

    Tasks take longer than expected to complete Deadlines and milestones get missed Project completion date comes into jeopardy You end up working double-shifts to complete

    all the work

  • 14

    Copyright, 2004 Centreline Solutions Inc.

    27

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #3 - Inadequate Resources

    Cause:

    There was no pre-commitment of resources to the project

    The project was not supported

    There was no analysis and documentation of all skillsets required

    Copyright, 2004 Centreline Solutions Inc.

    28

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #3 - Inadequate Resources

    What to do:

    Get executive sponsorship for the project Document which resources and skillsets are

    needed to get the job done Create a plan that gives enough time to get the

    job done with the allocated resources Pre-assign the required resources to the team

  • 15

    Copyright, 2004 Centreline Solutions Inc.

    29

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #4 - Poorly Defined Requirements

    Id like a set of stairs that leads up to a bridge.

    Copyright, 2004 Centreline Solutions Inc.

    30

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #4 - Poorly Defined Requirements

    The Problems:

    Customer will be unhappy Customer will complain and you will end up

    doing the what they want - often at your expense

  • 16

    Copyright, 2004 Centreline Solutions Inc.

    31

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #4 - Poorly Defined Requirements

    Cause:

    What the customer wants was not clearly documented

    What you believe the customer wants is different that what the customer believes theyve asked for

    The customer did not sign off for the requirements document

    Copyright, 2004 Centreline Solutions Inc.

    32

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #4 - Poorly Defined Requirements

    What to do:

    Find out and document exactly what the customer wants

    Inform everybody of the project scope Document business, functional and technical

    requirements. Have the customer agree to and sign off the

    requirement documents

  • 17

    Copyright, 2004 Centreline Solutions Inc.

    33

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #5 - Inaccurate Estimates

    How do you figure out how long the project will take?

    Copyright, 2004 Centreline Solutions Inc.

    34

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #5 - Inaccurate Estimates

    The Problems:

    An unrealistic timeline or budget will be agreed to

    You will not be able to do all the work in the time allocated

  • 18

    Copyright, 2004 Centreline Solutions Inc.

    35

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #5 - Inaccurate Estimates

    Cause:

    No formal estimating method Estimate confidence is low Volume of work not understood

    Copyright, 2004 Centreline Solutions Inc.

    36

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #5 - Inaccurate Estimates

    What to do:

    List all the work as well as possible Estimate each work package Add up all work packages Do not give elevator estimates if possible Always give answers using a range of dates:

    Estimates where the work is well defined: ~15% inaccuracy

    Estimates where the work is not well defined: ~100% inaccuracy

  • 19

    Copyright, 2004 Centreline Solutions Inc.

    37

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #6 - Poor Risk Management

    Sorry about the project, I left it in my car this morning and there was a bit of an incident.

    Copyright, 2004 Centreline Solutions Inc.

    38

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #6 - Poor Risk Management

    The Problems:

    Unexpected events cause delays Domino effect of things going wrong

  • 20

    Copyright, 2004 Centreline Solutions Inc.

    39

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #6 - Poor Risk Management

    Cause:

    No formal risk management Just try to predict the big things that can go

    wrong Its the sum of all the little things that make a

    project late Nothing is more stressful than trying to keep on

    schedule when unexpected things keep happening

    Copyright, 2004 Centreline Solutions Inc.

    40

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #6 - Poor Risk Management

    What to do:

    List all the work as well as possible Figure out what can go wrong with each piece of

    work Prioritize each risk:

    High/Med/Low probability High/Med/Low impact (or effect)

    Sort the list Create a plan to deal with the risks at the top of

    the list

  • 21

    Copyright, 2004 Centreline Solutions Inc.

    41

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #7 - Poorly Defined Deliverables

    Emergency phones installed. Deliverable Completed.

    Copyright, 2004 Centreline Solutions Inc.

    42

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #7 - Poorly Defined Deliverables

    The Problems:

    Difficult to get agreement that the project is finished

    Customer keeps wanting more, saying you didnt do it to their specifications

  • 22

    Copyright, 2004 Centreline Solutions Inc.

    43

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #7 - Poorly Defined Deliverables

    Cause:

    The milestones or deliverables were not measurable

    The customer never told us how many they wanted, so we just assumed 1.

    Copyright, 2004 Centreline Solutions Inc.

    44

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #7 - Poorly Defined Deliverables

    What to do:

    Ensure milestones or deliverables are: Clearly defined Measurable (or quantifiable)

    For example: Red is bad, Red #ED2D2D is better Fast is good, 1.22 GHz is better Good response is good, sub 1Ms is better

  • 23

    Copyright, 2004 Centreline Solutions Inc.

    45

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #8 - Over Optimism

    Of course we can do that for you

    Copyright, 2004 Centreline Solutions Inc.

    46

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #8 - Over Optimism

    The Problems:

    There was little or no planning before deciding you can get the job done

    The task you agree to turns out to be more work than expected

    It takes you longer and jeopardizes other deliverables

  • 24

    Copyright, 2004 Centreline Solutions Inc.

    47

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #8 - Over Optimism

    Cause:

    Not enough time spent planning You may have been pressured into giving an

    answer right then and there Didnt have a full understanding of the work

    involved before committing

    Copyright, 2004 Centreline Solutions Inc.

    48

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #8 - Over Optimism

    What to do:

    Take the time to fully understand the work before agreeing to it

    Its okay to say the work is not possible or will take too long

    Only agree to work when youre sure it can be done, this will benefit you and your manager

  • 25

    Copyright, 2004 Centreline Solutions Inc.

    49

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #9 - No Time for Project Management

    Hurry we have a tight deadline. No time to plan. Just start digging.

    Copyright, 2004 Centreline Solutions Inc.

    50

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #9 - No Time for Project Management

    The Problems:

    The plan is flawed from the start The project gets out of control and cant be

    recovered.

  • 26

    Copyright, 2004 Centreline Solutions Inc.

    51

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #9 - No Time for Project Management

    Cause:

    You have to do the work and werent also given time for project management

    Perhaps you only have a 10% or 20% allotment for project management duties

    Copyright, 2004 Centreline Solutions Inc.

    52

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #9 - No Time for Project Management

    What to do:

    Planning a project is like setting out a roadmap. Without it you will likely get lost.

    Controlling a project is like controlling a car. You have to continuously watch the road (the plan) and make little adjustments. Imagine driving home tonight and only controlling the car 10-20% of the time.

  • 27

    Copyright, 2004 Centreline Solutions Inc.

    53

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #10 - Improved PM Skillset Needed

    I think I know how this helmet goes on. Ive been riding scooters for two years now.

    Copyright, 2004 Centreline Solutions Inc.

    54

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #10 - Improved PM Skillset Needed

    The Problems:

    Your projects dont finish on time Your projects are always squeezed at the end Your projects are stressful You have to deal with unrealistic expectations or

    customers You feel your projects are out of control

  • 28

    Copyright, 2004 Centreline Solutions Inc.

    55

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #10 - Improved PM Skillset Needed

    Cause:

    People often dont know what they dont know Their projects are out of control but they dont

    know why They feel they are doing okay but could benefit

    from formal project management education

    Copyright, 2004 Centreline Solutions Inc.

    56

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    #10 - Improved PM Skillset Needed

    What to do:

    Learn the methods, tools, and techniques successful professional project manager use to initiate, plan, execute and control their projects

    Contact a PMI Certified Global Registered Education Provider in your area (such as Centreline Solutions Incorporated)

    Visit us on the web at: http://www.getpmtraining.com

  • 29

    Copyright, 2004 Centreline Solutions Inc.

    57

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    Thank You!

    About Centreline Solutions Incorporated

    PMI Global Registered Education Provider Specialists in project management education Some of our other courses include:

    Managing I.T. Projects The Complete Project Management Course PMP Preparation Course Guaranteed PMP Certification Program Project Management Overview

    For full details, visit us on the web at: http://www.getpmtraining.com

    Copyright, 2004 Centreline Solutions Inc.

    58

    Why Projects Fail v.2005.02.18

    getpmtraining.comgetpmtraining.com

    Break