UMTSRNS_204 Connection of Iub Interface
Objectives: Master the methods and steps of the connection of Iub interface
Master the methods of alarm examining
Master the data configuration and debugging on the RNC side
Master the basic service testing
References: ZXSDR B8200&R8840(V4.0) base station commissioning and
debugging guide
ZXSDR BS8800(V4.0) indoor macro base station commissioning
and debugging guide
7/27/2019 10 Iub Debugging
http://slidepdf.com/reader/full/10-iub-debugging 2/11
Contents1 Connection of Iub Interface.........................................................................................................................1
1.1 Alarm Examination.................................................................................................................................1
1.2 Connection Data Configuration and Debugging of RNC Side..............................................................2
1.2.1 NBAP Signaling Observation......................................................................................................2
1.2.2 SCTP Signaling Observation........................................................................................................4
1.2.3 Public Physical Channels Observation.........................................................................................5
1.2.4 Public Transmission Channels Observing....................................................................................6
1.3 Basic Service Testing..............................................................................................................................7
1.3.1 Test of Services in CS Domain.....................................................................................................7
1.3.2 Test of Services in PS Domain-FTP Download........................................................................8
1.3.3 Test of Other Cells........................................................................................................................9
i
7/27/2019 10 Iub Debugging
http://slidepdf.com/reader/full/10-iub-debugging 3/11
1 Connection of Iub Interface
Knowledge Points
Alarm examination, signaling observation, channel observation, and service test
1.1 Alarm Examination
Under the online login mode, click the FMS shortcut button on the toolbar of OMS, asshown in Fig 1-1, to open the alarm management interface of the base station.
Fig. 1-1 Start Alarm Query
The alarm management interface is shown in Fig 1-2.
1
7/27/2019 10 Iub Debugging
http://slidepdf.com/reader/full/10-iub-debugging 4/11
Fig. 1-2.Alarm Status Tracing Interface
The examination of alarms should conform to the following order: firstly check CC
board, including alarms related to transmission and then alarms related to clock;
secondly, check FS board and then analyze the faults of other boards one by one after
all the boards start up successfully; finally check the RTR board on RRU.
1.2 Connection Data Configuration and Debugging of RNC Side
1.2.1 NBAP Signaling Observation
Start DMS. In the maintenance navigation tree interface, choose [assistant functions
→ NBAP signaling observing ]. The [NBAP signaling observing] interface appears on
the right side of the screen. Right-click in the blank area of this interface and select “
start ”, as shown in Fig.1-3. In the signaling, we can clearly find the setup flow of the
cell.
2
7/27/2019 10 Iub Debugging
http://slidepdf.com/reader/full/10-iub-debugging 5/11
Fig.1-3 Start NBAP Signaling Observing
Cell establishment can get through calls, the process of Radio Link establishment is
seen by the NBAP signaling observe. Choose [ assistant functions →NBAP signaling
observing ], pop out the window of “ NBAP signaling observing ”, select the “
start ” button of the toolbar, as shown in Fig. 1-4:
Fig.1-4 NBAP Signaling Observing
After starting NBAP signaling observing, power on the handset. If you observe “ Radio
-3-
7/27/2019 10 Iub Debugging
http://slidepdf.com/reader/full/10-iub-debugging 6/11
Link establish request ”,“ Radio Link establish response ” and “ Radio Link recover ”
as shown in Fig. 1-5, it shows that UE has already communicated with RNC
successfully, and NodeB has established successfully.
Fig.1-5 Radio Link Establishment Signaling
1.2.2 SCTP Signaling Observation
In the maintenance navigation tree interface, choose [ assistant functions→SCTP
signaling observing ]. Right-click in the blank area of the interface, select “ start ”,
as shown in Fig. 1-6:
Fig.1-6 Start SCTP Signaling Observing
Select the link to be observed, and click “Yes ”. The link is normal if it is observed that
-4-
7/27/2019 10 Iub Debugging
http://slidepdf.com/reader/full/10-iub-debugging 7/11
Rx receives a “HEARTBEAT”, and Tx transmits a “HEARTBEATACK ”. And then the
link transmits an acknowledge message “SACK ”every time when it receives a data
message“DATA”, as shown in Fig. 1-7.
Fig.1-7 SCTP Signaling Observing
1.2.3 Public Physical Channels Observation
In the maintenance navigation tree interface, choose [assistant functions→ public
physical channels observing]. The “public physical channels observing” interface
appears on the right side of the screen, as shown in Fig. 1-8.
-5-
7/27/2019 10 Iub Debugging
http://slidepdf.com/reader/full/10-iub-debugging 8/11
Fig.1-8 Public Physical Channels Observing
Tips:
Here we have 1 cell, the cell ID is 1601. In the field, we can proceed the observing
according to the cell’s actual situation. After the cell establishes normally, we can see 9
public physical channels of 8 kinds:
PSCH:SSCH:PCPICH:PCCPCH:2*SCCPCH:PICH:PRACH:AICH.
1.2.4 Public Transmission Channels Observing
In the maintenance navigation tree interface, choose [assistant functions→ public
transmission channels observing]. The “public transmission channels observing”
interface appears on the right side of the screen, as shown in Fig. 1-9.
-6-
7/27/2019 10 Iub Debugging
http://slidepdf.com/reader/full/10-iub-debugging 9/11
Fig.1-9 Public Transmission Channels Observing
Tips:
Here we have 1 cell, the cell ID is 1601. In the field, we can proceed the observing
according to the cell’s actual situation. After the cell establishes normally, we can see 5
public transmission channels of 4 kinds: BCH:2*FACH:RACH:PCH.
1.3 Basic Service Testing
1.3.1 Test of Services in CS Domain
1.3.1.1 Test Preparations
1: The commissioning of equipment completes successfully.
2: Prepare two handsets A and B, related accessories, and two SIM cards.
3: Handsets such as NOKIA7600: NOKIA6630: NOKIA6680 can dial 4606 to
check the locked frequency of WCDMA after entering into the engineering
mode. After pressing to execute, you should set the downlink frequency point
and the scramble, the former 5 bits are the frequency point, and the latter 5 bits
are the scramble. If there are no enough bits, fill it with zeros at the left side.
Moreover, dial *#06# to check the IMEI number, dial *#0000# to see the
-7-
7/27/2019 10 Iub Debugging
http://slidepdf.com/reader/full/10-iub-debugging 10/11
software information of the NOKIA handset, dial *99***1# when using the
handset as a modem.
4: If you are using ZTE’s handsets, dial *99# when using the handsets as modems,
dial *983*837# to see the version information of the handsets. Dial
*983*3641# to enter engineer mode, close the cover of the handset and open it
again, then input *983*3640# to cancel the engineer mode. Frequency lock
method: open QXDM, hold the “Connect”state, and then select “ NV
browser ”in the “view”frame ( not menu ), modify NV item 3524 and 3525,
force UE search for networks or select cells among the frequencies appointed
by the users:
: 1 : Set the value of NV 3524 item to the frequency value that is appointed
( downlink frequency point, such as 10737,10662). After that, press " write
", and then "read" again to see whether it has been modified or not.
:2: Set the value of NV 3524 item to 1, this is a BOOL value. It determines
whether or not to enable UE to search for networks according to
frequencies appointed by item 3524.
1.3.1.2 Test Steps
1. Testing handset A calls testing handset B.
2. Press to talk after testing handset B rings.
3. Hang up the phone after holding the call for one minute.
4. If the calling is successful, the quality of voice is clear, being able to hang up
the phone normally, it shows that this testing is successful.
5. Repeat the upper testing steps for 5 times.
1.3.1.3 Acceptance Conditions
Speech service is normal.
1.3.2 Test of Services in PS Domain:FTP Download
PS domain services include several different data rate, here we only need to test one
relatively high data rate service.
1.3.2.1 Test Preparations
1. The commissioning of equipment completes successfully.
-8-
7/27/2019 10 Iub Debugging
http://slidepdf.com/reader/full/10-iub-debugging 11/11
2. Prepare one testing mobile subscriber which supports packet switch domain
services, the related accessories ( such as data cable ), a SIM card.
3. Prepare one testing computer for the connection with the testing mobile
subscriber.
1.3.2.2 Test Steps
1. The testing mobile subscriber connects with the testing computer with data
cable, the testing mobile subscriber dials to initiate the PS services.
2. The testing mobile subscriber links up to FTP server, after connecting
successfully, it download files (suggesting the size of files is not less than 10M)
from FTP server by using the network download tools.
3. Observe the download rate, after the files are downloaded completely, hang up
this call normally.
4. Repeat the upper testing steps for 5 times.
1.3.2.3 Acceptance Conditions
1. Download the files from the FTP server successfully.
2. The downloaded files are completed.
3. After the downloading, the average download rate shown in the download tool
is not lower than the rate which we expect.
1.3.3 Test of Other Cells
If an SDR base station establishes several cells, and we need to test the commissioning
of other cells is normal or not, we can use the methods which we discussed above. We
only need to block the first cell on the LMT manually to let the mobile subscriber
occupy the signals of other cells that need testing.
-9-