109
he field operations tea

10 0915 jcfo__seattle cw final public meeting

  • Upload
    tfooq

  • View
    467

  • Download
    7

Embed Size (px)

Citation preview

Page 1: 10 0915 jcfo__seattle cw final public meeting

the field operations team

Page 2: 10 0915 jcfo__seattle cw final public meeting

Race Street Pier, Philadelphia, PAThe High Line, New York, NY

field operations

N. Delaware Riverfront Master Plan, Philadelphia, PAChuncheon, Korea

Page 3: 10 0915 jcfo__seattle cw final public meeting

Barclays Center, Brooklyn, NYThe Porter House, New York, NY

South Street Seaport, New York, NY

GREGG PASQUARELLISHoP ARCHITECTS

East River Esplanade, NY

shop architects

Page 4: 10 0915 jcfo__seattle cw final public meeting

Taylor 28, Seattle, WATaylor 28, Seattle, WA Blue Ring, Seattle, WABlue Ring, Seattle, WA

Seattle AquariumSeattle Aquarium Project Green, Austin, TXProject Green, Austin, TX

mithun

Page 5: 10 0915 jcfo__seattle cw final public meeting

Cal Anderson Park, Seattle, WA

Magnuson Park, Seattle, WAMagnuson Park, Seattle, WA

Cal Anderson Park, Seattle, WA

the berger partnership

Page 6: 10 0915 jcfo__seattle cw final public meeting

Toronto Waterfront, Toronto, CanadaHudson River Park, New York, NY

Atlanta BeltLine, Atlanta, GeorgiaN. Delaware Riverfront Master Plan, Philadelphia, PA

hr&a advisors

Page 7: 10 0915 jcfo__seattle cw final public meeting

Point State Park, Pittsburgh, PAPoint State Park, Pittsburgh, PA

The High Line, New York, NYDiscovery Green, Houston, TX

Hudson River Park, New York, NYHudson River Park, New York, NY

etm associates

Page 8: 10 0915 jcfo__seattle cw final public meeting

Vivarium, Hofgarten, 2002, Germany

Neukom Vivarium, 2007, Seattle, WAThe Hunter’s Cabin and the Biological Field Station, 2000

Rescue Archaeology, 2004, Tate Modern, London

mark dion

Page 9: 10 0915 jcfo__seattle cw final public meeting

Justin Ouellette, Playing the Building, New York, NY

Spencer Finch, The High Line, New York, NY Haluk Akakçe, Sky is the Limit, Las Vegas, NV

Cai Guo-Qiang, Light Cycle: Central Park, New York, NY

creative time

Page 10: 10 0915 jcfo__seattle cw final public meeting

TV Asahi, Tokyo, JapanTV Asahi, Tokyo, Japan

Motion Graphics, AOL

tv asahi, Japan Fresh Kills Park, Staten Island, NY

EACC, Castello, Spain

tomato

Page 11: 10 0915 jcfo__seattle cw final public meeting

San Antonio Main Plaza, New York, NY

fluidity

Page 12: 10 0915 jcfo__seattle cw final public meeting

Longmu Bay Resort SSA, Hainan, ChinaLongmu Bay Resort SSA, Hainan, China

Carkeek Park Env. Learning Center, Seattle, WA

Metro Habitats, Portland, ORMetro Habitats, Portland, OR

herrera environmental consultants

Page 13: 10 0915 jcfo__seattle cw final public meeting

Olympic Sculpture Park, Seattle, WA Duwamish Restored Wetlands, Seattle, WA

Seawall Test Panels, Seattle, WA

jason toft

Page 14: 10 0915 jcfo__seattle cw final public meeting
Page 15: 10 0915 jcfo__seattle cw final public meeting
Page 16: 10 0915 jcfo__seattle cw final public meeting
Page 17: 10 0915 jcfo__seattle cw final public meeting

Railroads across the Survey Landscape. Castleton, ND.

Page 18: 10 0915 jcfo__seattle cw final public meeting

Irrigated Fields in Desert, Holtville, California.

Page 19: 10 0915 jcfo__seattle cw final public meeting

Circles of Green. Farmington, NM.

Page 20: 10 0915 jcfo__seattle cw final public meeting

Dry Farming Fields with Tractor. Chester area, MT.

Page 21: 10 0915 jcfo__seattle cw final public meeting

Wheat Fields on Tablelands Cut by the Marias River. Cutbank, MT.

Page 22: 10 0915 jcfo__seattle cw final public meeting
Page 23: 10 0915 jcfo__seattle cw final public meeting
Page 24: 10 0915 jcfo__seattle cw final public meeting
Page 25: 10 0915 jcfo__seattle cw final public meeting
Page 26: 10 0915 jcfo__seattle cw final public meeting
Page 27: 10 0915 jcfo__seattle cw final public meeting
Page 28: 10 0915 jcfo__seattle cw final public meeting
Page 29: 10 0915 jcfo__seattle cw final public meeting
Page 30: 10 0915 jcfo__seattle cw final public meeting
Page 31: 10 0915 jcfo__seattle cw final public meeting
Page 32: 10 0915 jcfo__seattle cw final public meeting
Page 33: 10 0915 jcfo__seattle cw final public meeting
Page 34: 10 0915 jcfo__seattle cw final public meeting
Page 35: 10 0915 jcfo__seattle cw final public meeting
Page 36: 10 0915 jcfo__seattle cw final public meeting
Page 37: 10 0915 jcfo__seattle cw final public meeting
Page 38: 10 0915 jcfo__seattle cw final public meeting
Page 39: 10 0915 jcfo__seattle cw final public meeting
Page 40: 10 0915 jcfo__seattle cw final public meeting
Page 41: 10 0915 jcfo__seattle cw final public meeting
Page 42: 10 0915 jcfo__seattle cw final public meeting

SEATTLE’S FRONT PORCH

Page 43: 10 0915 jcfo__seattle cw final public meeting

THE CORRIDOR

Page 44: 10 0915 jcfo__seattle cw final public meeting

THE SEAWALL

Page 45: 10 0915 jcfo__seattle cw final public meeting

THE PIERS

Page 46: 10 0915 jcfo__seattle cw final public meeting

THE BAYS

Page 47: 10 0915 jcfo__seattle cw final public meeting

THE CONNECTIONS

Page 48: 10 0915 jcfo__seattle cw final public meeting

THE FRONTAGES

Page 49: 10 0915 jcfo__seattle cw final public meeting

THE PUBLIC REALM

Page 50: 10 0915 jcfo__seattle cw final public meeting

the high line, new york, new york

Page 51: 10 0915 jcfo__seattle cw final public meeting
Page 52: 10 0915 jcfo__seattle cw final public meeting
Page 53: 10 0915 jcfo__seattle cw final public meeting
Page 54: 10 0915 jcfo__seattle cw final public meeting
Page 55: 10 0915 jcfo__seattle cw final public meeting
Page 56: 10 0915 jcfo__seattle cw final public meeting
Page 57: 10 0915 jcfo__seattle cw final public meeting
Page 58: 10 0915 jcfo__seattle cw final public meeting
Page 59: 10 0915 jcfo__seattle cw final public meeting
Page 60: 10 0915 jcfo__seattle cw final public meeting
Page 61: 10 0915 jcfo__seattle cw final public meeting
Page 62: 10 0915 jcfo__seattle cw final public meeting
Page 63: 10 0915 jcfo__seattle cw final public meeting
Page 64: 10 0915 jcfo__seattle cw final public meeting
Page 65: 10 0915 jcfo__seattle cw final public meeting
Page 66: 10 0915 jcfo__seattle cw final public meeting
Page 67: 10 0915 jcfo__seattle cw final public meeting
Page 68: 10 0915 jcfo__seattle cw final public meeting
Page 69: 10 0915 jcfo__seattle cw final public meeting
Page 70: 10 0915 jcfo__seattle cw final public meeting
Page 71: 10 0915 jcfo__seattle cw final public meeting
Page 72: 10 0915 jcfo__seattle cw final public meeting
Page 73: 10 0915 jcfo__seattle cw final public meeting
Page 74: 10 0915 jcfo__seattle cw final public meeting
Page 75: 10 0915 jcfo__seattle cw final public meeting
Page 76: 10 0915 jcfo__seattle cw final public meeting
Page 77: 10 0915 jcfo__seattle cw final public meeting
Page 78: 10 0915 jcfo__seattle cw final public meeting

GREEN URBANISM

Page 79: 10 0915 jcfo__seattle cw final public meeting
Page 80: 10 0915 jcfo__seattle cw final public meeting
Page 81: 10 0915 jcfo__seattle cw final public meeting
Page 82: 10 0915 jcfo__seattle cw final public meeting
Page 83: 10 0915 jcfo__seattle cw final public meeting
Page 84: 10 0915 jcfo__seattle cw final public meeting

EARLY WINS

Page 85: 10 0915 jcfo__seattle cw final public meeting
Page 86: 10 0915 jcfo__seattle cw final public meeting
Page 87: 10 0915 jcfo__seattle cw final public meeting
Page 88: 10 0915 jcfo__seattle cw final public meeting

FRESH KILLS PARK NATIVE MEADOW MIX

Page 89: 10 0915 jcfo__seattle cw final public meeting
Page 90: 10 0915 jcfo__seattle cw final public meeting
Page 91: 10 0915 jcfo__seattle cw final public meeting
Page 92: 10 0915 jcfo__seattle cw final public meeting

PUBLIC ENGAGEMENT

Page 93: 10 0915 jcfo__seattle cw final public meeting
Page 94: 10 0915 jcfo__seattle cw final public meeting

SHELBY FARMS PARK ‘IMAGINING PLAY WORKSHOP’

Page 95: 10 0915 jcfo__seattle cw final public meeting
Page 96: 10 0915 jcfo__seattle cw final public meeting

SANTA MONICA CIVIC PARKSCOMMUNITY WORKSHOP

Page 97: 10 0915 jcfo__seattle cw final public meeting
Page 98: 10 0915 jcfo__seattle cw final public meeting
Page 99: 10 0915 jcfo__seattle cw final public meeting
Page 100: 10 0915 jcfo__seattle cw final public meeting

334 surveys submittedPUBLIC INPUT SURVEY RESULTS

Top 2 are Access to the River + Views and Horizons

most people want to see passive recreation

68% say I-95 barrier + connectivity to the CityPlay and social seating ranked highest. Access, water’s edge, and habitat ranked high as well)

Page 101: 10 0915 jcfo__seattle cw final public meeting
Page 102: 10 0915 jcfo__seattle cw final public meeting

Mult

i-pur

pose

Law

n

QUESTION 1: RANK DESIGN

ELEMENTS

Grove

of T

rees

Urban

Bea

ch

Pier P

erim

eter

Walk

Woo

d Dec

king

Paving

with

Sola

r Ligh

ts

Peren

nial P

lantin

gs

Seatin

g Ste

ps +

Rive

r Ter

race

Seatin

g at

end

of t

he P

ier

Two-lev

el pie

r

Sky P

rom

enad

e (s

loped

ram

p)

Raised

elev

ation

at e

nd o

f pier

Mult

i-pur

pose

Law

n

91 Surveys were Completed

Many Design Elements Ranked High

FAVORITE DESIGN ELEMENTS:

1. Pier Perimeter Walk

2. Seating Steps and River Terrace

3. Perennial Plantings

4. Multi-purpose Lawn

5. Raised Elevation at End of Pier

6. Paving with Solar Lighting

7. Seating at end of the Pier

LEAST FAVORITE DESIGN ELEMENT:

The Urban Beach

Page 103: 10 0915 jcfo__seattle cw final public meeting
Page 104: 10 0915 jcfo__seattle cw final public meeting
Page 105: 10 0915 jcfo__seattle cw final public meeting
Page 106: 10 0915 jcfo__seattle cw final public meeting

race street pier, philadelphia, pennsylvania

Page 107: 10 0915 jcfo__seattle cw final public meeting
Page 108: 10 0915 jcfo__seattle cw final public meeting
Page 109: 10 0915 jcfo__seattle cw final public meeting

the field operations team