Upload
jared
View
30
Download
0
Tags:
Embed Size (px)
DESCRIPTION
1 X 700 MW BTPS STAGE-III. STATOR UNLOADING . 10-04-2014. Proposed Vehicle Movement Rout. Material Gate. Vehicle movement in forward direction. Vehicle movement in reverse direction. Stator Unloading Area. unit-III Cooling Tower. UNIT-3 POWER HOUSE. UNIT-3 BOILER. UNIT-3 ESP. - PowerPoint PPT Presentation
Citation preview
1 X 700 MW BTPS STAGE-III
STATOR UNLOADING
10-04-2014
Material Gate
unit-IIICooling Tower
Pipe Rack
Unit-IIConveyor
fabrication yard
unit-IChimney
Technical Building
unit-IIIChimney
UNIT-3
ESP
UNIT-3
BOILER
UNIT-3 POWE
R HOUS
E
Stator Unloading
Area
Crane Position
Proposed Vehicle Movement Rout
Vehicle movement in forward direction
Vehicle movement in reverse direction
VEHICLE ENTERING INTO PLANT THROUGH MAIN GATE
VEHICLE MARCHING TOWARDS POWER HOUSE FOR UNLOADING
VEHICLE REACHING UNIT-III AREA
VEHICLE REACHED THE UNLOADING AREA
90MM DIA 21.8 Mtrs ENDLESS SLING INSERTED IN THE CRANE HOOK
CRANE POSITIONED FOR INSERTING SLING
STATOR IS READY FOR LIFTING
ED/KPCL & CE/KPCL AFTER PERFORMING POOJA
SITE INCHARGE/BHEL & OTHER BHEL EMPLOYEES AT UNLOADING LOCATION
STATOR LIFTED 80MM ABOVE THE TRAILER LEVEL
VEHICLE HAS BEEN MOOVED FROM THE UNLOADING LOCATION
3 NOS RAIL PLACED BELOW THE STATOR
SUCESSFULLY STATOR PLACED ON THE RAILS
THANK YOU