1
Water Services Planning
J. Mc Gowan
Senior Engineer
May 2015
Kildare County CouncilKildare County Council
Water ServicesWater Services
2
Water Services - Assessment
Water supply
Foul sewage
Surface Water
J. McGowan SE
B. Rea SEE
T. Moore EE
1st January 2014
IRISH WATER
National Authority - Water & Wastewater
Statutory body – responsible for all services– Budget Capital & Operations– Customer Complaints - work orders– Metering and Billing - Domestic
Local Authority - agents under Service Level Agreement
Irish Water monitor KCC performance under ASP
3
IRISH WATER - Planning
Statutory Consultee - under Planning Act– Application for permission– Planning approval – Applications to An Bord Pleanala
KCC refer Planning files to Irish Water
WS Dept in KCC continue to assess planning applications and submit observations to Irish Water
Irish Water will submit formal response to Local Authority
4
IW - Comments / Observations
The following comments from IW are interpreted by Planning Dept and put as a condition on Planning files as required.
1. Where the applicant proposes to connect directly or indirectly to a public water/wastewater network operated by Irish Water, the applicant must sign a connection agreement with IW prior to the commencement of the development and adhere to the standards and conditions set out in that agreement.
2. In the interest of Public Health and Environmental Sustainability, Irish Water Infrastructure capacity requirements and proposed connections to the Water and Waste Water Infrastructure will be subject to the constraints of the Irish Water Capital Investment Programme.
5
Pre-Planning Protocol - Connections
KCC & IW - jointly manage statutory consultations
KCC to advise IW where significant impact – attend– Advise applicant of any issues – subject to confirmation– IW advise - Applicant shall fill out Pre-Connection Enquiry form for
all significant developments
If Potential Applicant requires a connection to IW network– KCC advise applicant to make contact with IW - if significant !
No development to take place until developer obtains a Connection agreement from Irish Water.
6
New Connection Agreements ( Water & Wastewater )
KCC as an agent for IW shall – Manage and act as main point of contact for Customer– Application forms can be downloaded from KCC website
Completed application forms from developer– Should be returned to KCC - sent on to IW ( inc OS Maps )
IW will send out quotation & connection offer to customer– Connection fees, Payment method, Validity duration– Conditions, Direction to specifications, Instructions for works
Water and Wastewater Development Charges– KCC will no longer levy such charges– Will now be part of connection charge
KCC will process Road opening licence separately7
8
Submission – Pre planning
Pre Planning meeting - Site location map Scale of development Availability of services Proposed flows / demand Need for Flood Risk Assessment – submit if required
Application to include Design calculations Pipe sizes, Pump stations etc Drawings – services - on site & connection to outfall Capacity of existing network – constraints Longitudinal section – sewers SW pipes Wayleave agreements as necessary
9
Water Supply
Public supply– Metered – main & service– Min 24 hour storage - on site– Housing Estate min 100mm - looped
Private supply – Water quality tests - HSE – KCC ground water Source Protection Policy
Water Conservation– Dual flush systems, - Rainwater Harvesting– Water audit & leakage survey– Taps with water conservation mechanisms
10
Waste Water - Sewerage
Connect to public supply Only foul waste not surface water
Gravity or rising main Drawings – Longitudinal sections etc
Pump Station ( Design & Location ) New standard specification – KCC website
- access, overflows, flow recorder, standby generator, dosing - septicity etc Pre Planning meeting advised
Waste Water Treatment plant Licence / Regulation Design/Construction standards – future maintenance Pre planning meeting advised
11
Surface Water Drainage
Storm Water Management Policy - GDSDS– Design & construct & maintain– Sustainable Urban Drainage Systems – SUDS– Attenuation – On site storage systems – 1 :100 year storm event – Post development flows not to exceed green field runoff
Design– Min pipe size 225 mm– Return Period - 5 yr - allow 20% for Climate Change– Surcharge analysis
Discharge – Public system – existing capacity - outfall – Arterial Drainage Act 1945 ( S. 50 ) – culvert sizes– On site - BRE Digest 365 - soakpits
12
FLOODING
Assessment of Application OPW website : floodmaps.ie Local Knowledge Flood maps – Local Area Plan / Dev Plan CFRAMS - draft mapping available
OPW Guidelines to Local Authorities “ Planning System and Flood Management Guidelines” Flood Risk Assessment
High : only in exceptional circumstances Moderate : vulnerable developments - inappropriate Low : yes - engineering / planning criteria
13
General Policy
Development Plan – Strategic Flood Risk Assessment– All villages & settlements - adequate water supply– Promote conservation of water - reduction in overall demand – One main municipal Sewerage plant per settlement – Management of Group Water schemes - Rural Water Strategic Plan– Co-operate with adjoining LAs - servicing of towns - water & sewerage
Constraints - Sewer Capacity ( 2006 – 2014 )
– Case by Case basis– Large Developments - may be premature– Smaller Developments - conditions re phasing – Priority to Developments
(a) Employment (b) Significant Community gain
IW Capital Investment Plan - CIP
Capital Schemes - WWTPs
Osberstown ( 80,000 - 130,000 ) PE– Contract signed May 2014– Q4 2015 : 100,000 Q4 2016 : 130,000
Leixlip ( 80,000 - 150,000 ) PE – Under construction – 27 month contract– Q3 2015 - full upgrade
Minor Capital Schemes– Coill Dubh, Calverstown, Timolin, Rathcoffey, Athgarvan
14
Capital Network Schemes
Upper Liffey Valley Sewerage Scheme– Contract 2A - Newbridge Eastern Int. Sewer
Design Q4 2016 - 18 months
– Contract 2B - ( Naas, Clane, Sallins, Kill ) Planning / Design Q2 2017 - 24 months
Kildare Town Sewerage Scheme – Expected Contract sign Q4 2015 - 12 months
15
16
End of Presentation
Thanks
For your attention
Questions & Answers