TR41Chairs’ TrainingPresented by:

Billie Zidek-ConnerManager, Standards Secretariat

ServicesSusan Hoyler

Director, Standards Development and Promotion

Page 2: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

2

Overview

Requirements Relative to Meetings– Agendas– Quorums– IP Disclosure– Conduct of Meeting– Meeting Reports

Page 3: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

3

Overview

Requirements for Physical vs. Virtual Meetings– Requirement Differences

Page 4: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

4

Overview

• Requirements Relative to Projects– Project Requests– Ballot Procedures– Ballot Resolution– Publication

Page 5: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

5

Requirements to Hold a Meeting

Meeting Notices and Agendas

Page 6: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

6

Meeting Notices and Agendas

• Meeting Notices– 24 days before the start of the meeting to TIA– 14 days before the start of the meeting TIA sends it

to all registered interested parties in the TIA database

– See Section 5.2.1 of the 2001 Engineering Manual– Send to Bari St. Cyr ([email protected]) and copy

Billie Zidek-Conner ([email protected])– Standards Secretariat posts the notice and sends an

email to all registered parties in the TIA database

Page 7: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

7

Meeting Notices and Agendas

(continued)• Contents of the agenda– Examples of contents can be found in

Section 5.2.2– Sample of agenda can be found in Annex D

Page 8: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

8

Quorum for a Meeting

• Quorum consists of simple majority (50% plus one) of the eligible member companies– See Section 5.3.2– If no quorum is present, the meeting can be

conducted but no decisions can be made

Page 9: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

9

Contribution Template Section 6.5.1, Annex G

• Gives TIA permission from the contributor to use material in a derivative work (i.e. standard)

• New template clarifies that it is the company rather than the individual that is granting permission

• New template contains optional language for early disclosure

• Does not offer licensing rights to other companies

Page 10: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

10

Early Disclosure

• Three forms of early disclosure– Chairs Create Awareness– Contribution Template Option– Reminder on Ballot

Page 11: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

11

Patent Holder Statement

• In a nutshell, the options are:– Disavow– Declare

• without compensation OR reasonable terms and conditions that are demonstrably free of any unfair discrimination

– Declare and modify– Decline

• Submitted statements must be worded exactly as stated in Annex H. It is acceptable to submit on company letterhead; however, no modifications to the prescribed wording are allowed.

Page 12: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

12

Conduct of Meeting

• (1)   Represent the consensus of the Group even when said position is not aligned with the person’s company position.

• (2)  Lead the Group to consensus even when the consensus position is not aligned with the person’s company position.

• Section 3.3 and 5.3

Page 13: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

13

Meeting Reports• Meeting Reports are due to TIA prior to the

start of the next meeting• Only reports with legal approval are

considered official• TIA posts the reports on the committee

website, and notifies all identified registered interested parties in the TIA database– See Section 5.2.3– Must be on file for ANSI Audit

Page 14: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

14

Requirements for

Physical vs. Virtual Meetings

Page 15: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

15

ANS and Non-ANS Documents

ANS = American National Standard

– Document that has been put through the ANSI public review period

– Received approval by the ANSI Board of Standards Review (BSR)

– Must be reviewed every five years (starts with the ANSI approval date)

Page 16: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

16

ANS and Non-ANS Documents

• Non-ANS Documents– TIA only (old interim standards)– TSB – Telecommunications Systems

Bulletin– New five year review cycle (old review was

every year for TSBs and three years for interim standards

Page 17: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

17

Physical vs. Virtual Meetings

• Both require appropriate notice and agenda for the meeting

• Quorum must be present and called at both meetings

• Quorum vote should be conducted for all virtual meeting votes (cannot hear someone raising their hand)

Page 18: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

18

Physical vs. Virtual Meetings

• Virtual (conference calls) shall be coordinated through Stephanie Montgomery ([email protected]) or Rosa Ibar ([email protected])

• Meeting reports are required for all duly called virtual or physical meetings

• Attendance rosters (produced by TIA) are required for both meetings

Page 19: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

19

Requirements for Projects

Project Number AssignmentBalloting

Publishing

Page 20: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

20

Request for Project Number

• Chair or duly appointed representative fills out and submits a request for a new project number (see Section 6.3)

• URL = http://www.tiaonline.org/standards/sfg/procedures/new_pn_request form.cfm

Page 21: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

21

New Project Number Assignments

• Five days after the new project request has been received a project number is assigned by TIA

• On the 15th of every month TIA sends a report to the chairs with the project number assignments

• New project numbers are available from Ray Anderson at [email protected]

Page 22: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

22

Existing Project Request

• Chair or duly appointed representative fills out and submits a request for an existing project request (see Section 6.3.3)

• URL = http://www.tiaonline.otg/standards/sfg/procedures/pn_request_form.cfm

Page 23: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

23

Existing Project Number Assignments

• Unsure of the Project Number previously assigned or what extension to use?– Contact Ray Anderson or Billie Zidek-

Conner

• These are available immediately (no waiting period)

Page 24: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

24

Existing Project Number Assignments

• Extensions to be usedRV = Revision

UG = Upgrade (no revision)

WD = Withdrawal

RF = Reaffirmation

URV = Upgrade and revision

AD = Addendum

Page 25: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

25

Existing Project Number Assignments

• These are sent out to the chairs on the 15th of every month

Page 26: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

26

Balloting Documents• All documents must have a completed

ballot authorization on file at TIA (see Section 6.3.3.1 for TIA only documents and Section 6.3.3.2 for ANS documents

• This authorization is completed by the chair or duly authorized representative

• URL = http://www.tiaonline.org/standards/sfg/procedures/ballot.cfm

Page 27: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

27

Balloting Documents• Document to be balloted is sent to TIA

under separate cover• Currently TIA does not require a document

for reaffirmations or withdrawals• Ballot posting notification is automatically

sent to all registered interested parties in the TIA database by the TIA balloting system

Page 28: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

28

Balloting TIA Documents

• PN Ballots (TIA documents and TSBs) are for no less than 30 days (see Section 6.6.1 for balloting TIA documents)– Can be longer at the discretion of the

committee

Page 29: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

29

Balloting ANS Documents

• SP Ballots (American National Standard Candidates) are balloted for no less than 45 days and up to 60 days (see Section 6.6.2 for balloting ANS documents)– Can be longer at the discretion of the

committee

Page 30: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

30

Balloting Documents

• No public review required on TIA only and TSB documents

• 45 or 60 day public review required on American National Standard Candidates

Page 31: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

31

Balloting Documents

• ANSI Standards Action Publication Schedule on TIA website

• URL = http://www.tiaonline.org/standards/sfg/procedures/action.cfm

Page 32: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

32

Balloting Documents

• It is up to the individual to decide whether or not they want to vote on the document

• Chair and duly authorized representative(s) (editor) can view the ballot summary and comments coming in on the document

Page 33: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

33

Balloting Documents• Reminder sent to those who did not

vote half way through the balloting cycle and again two days before the ballot is due to close

• TIA sends an email to the chair and duly authorized person when the ballot closes stating what is needed to proceed to the next step

Page 34: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

34

Reballot vs. Default

• Reballoting document (see Section 6.11.3)

• Default ballot on a document (see Section 6.11.4)

Page 35: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

35

Reballot vs. Default

• Reballot the complete document is sent out for comment– The whole document is subject to comment– No response letters or blue cards are

required on the original ballot

Page 36: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

36

Reballot vs. Default• Default ballot

– Only a section or portion of the document is being balloted

– Comments must be confined to the scope of the default ballot (only those sections identified)

– Response letters and blue cards are required on the previous ballot and the default ballot

• TIA internal test – if more than 20% of the document changes as a result of technical comments it should be sent out as a reballot

Page 37: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

37

Reballot vs. Default• PN Reballot and default ballot are no less

than 30 days• SP reballot can be either 45 or 60 day• SP default ballot can be for 30 days

– Must go for either a 45 or 60 day ANSI public review– If the default ballot consists of no more than 100

words a 30-day public review can be requested– If after the vote closes, and it is determined that

there is no support, the committee can publish the document with continuing objections

Page 38: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

38

Final Default Ballot

• If all efforts have been exhausted to resolve continuing disapprovals the committee has one last option– A default ballot is sent to the voters to

determine if there is support for the objections

Page 39: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

39

Comment Resolution

• Comment disposition must be recorded in the meeting report (see Section 6.10)

• Response letters detailing the disposition of the comments must be sent to commentor. The commentor must also be advised of the right to appeal

Page 40: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

40

Response Letters and Blue Cards

• Currently TIA does not require response letters and blue cards be on file at TIA for PN balloted documents (TIA only and TSBs)

• TIA does require response letters and blue cards be on file at TIA for SP balloted documents

Page 41: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

41

Response Letters and Blue Cards

• A copy of the response letter for SP ballots must be on file with the TIA Standards Secretariat

• TIA currently does not require response letters and blue cards on PN ballots

Page 42: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

42

Response Letters and Blue Cards

• Response letters must:– Inform the commentor of his/her right to

appeal (See Sections 6.11.6 and A.5)– Inform them of where to go to fill out the

“blue card” (vote change form) – required only for disapprove with comment votes

– URL = http://www.tiaonline.org/standards/sfg/procedures/blue_card.cfm

Page 43: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

43

Publishing

ANS and TIA Documents

Page 44: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

44

Publishing Documents• Once response letters have been sent

to commentors and agreement has been reached, the chair or duly authorized representative fills out the publication authorization

• URL = http://www.tiaonline.org/standards/sfg/procedures/publication.cfm

Page 45: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

45

Publishing Documents

• Document status can be viewed on the TIA website (updated bi-weekly soon to be weekly)

• URL = http://www.tiaonline.org/standards/sfg/sp_report.cfm

Page 46: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

46

Publishing Documents

• Document is sent to TIA under separate cover

• ANS documents go through a legal review, and then sent to ANSI for Board of Standards Review (BSR) approval (see Section 6.12.2)

Page 47: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

47

Publishing Documents

• TIA only documents are sent to the TSSC chair for review and approval (see Section 6.12.1)

• ANSI sends TIA an approval letter, a copy of this letter is forwarded to the chair of the committee

Page 48: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

48

Publishing Documents• TIA puts the front and back matter on the

document and sends it to Global Engineering for publication

• TIA sends one complimentary electronic copy of the document to the authorized voter– This is usually sent in the form of an email, but if the

document is large, the voter will receive a CD from TIA with the final approved document on it

Page 49: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

49

Tools

URLs for the documents

Page 50: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

50

Tools

IPR Statement

http://www.tiaonline.org/standards/ipr/

Blue Card

http://www.tiaonline.org/standards/sfg/procedures/blue_card.cfm

Page 51: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

51

Tools

Ballot Authorization

http://www.tiaonline.org/standards/sfg/procedures/ballot.cfm

New TIA Project Request Form

http://www.tiaonline.org/standards/new_pn_request_form.cfm

Page 52: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

52

Tools

Interim Standard Upgrade Form

http://www.tiaonline.org/standards/sfg/procedures/interim.cfm

Reaffirmation/Withdrawal Form for TSB and TIA Only Documentshttp://www.tiaonline.org/standards/sfg/procedures/reaffirmation.cfm

Page 53: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

53

Tools

Existing Project ANSI PINS form

http://www.tiaonline.org/standards/sfg/procedures/ansi_form0.cfm

New ANSI PINS form

http://www.tiaonline.org/standards/sfg/procedures/new_ansi_form.cfm

Page 54: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

54

Tools

Engineering Manualhttp://www.tiaonline.org/standards/sfg/engineering _manual.cfm

Style Manualhttp://www.tiaonline.org/standards/sfg/style.cfm

Page 55: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

55

Tools

Scope Manualhttp://www.tiaonline.org/standards/sfg/scope.cfm

Publication Authorizationhttp://www.tiaonline.org/standards/sfg/publication.cfm

Page 56: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

56

ToolsExisting Project Request formhttp://www.tiaonline.org/standards/sfg/procedures/pn_request_form.cfm

ANSI Standards Action Publication Schedulehttp://www.tiaonline.org/standards/sfg/procedures/action.cfm

Page 57: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

57

Tools

Open SP Ballot Status Report http://www.tiaonline.org/standards/sfg/sp_report.cfm

Page 58: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

58

Who Can Answer Your Questions

Staff Information

Page 59: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

59

Procedures

Billie Zidek-ConnerManager, Standards Secretariat [email protected]

Page 60: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

60

Balloting or Publication Questions

Ray AndersonStandards [email protected]

Page 61: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

61

Meeting Agendas,Reportsand Ballot Summaries

Bari St. CyrStandards Secretariat [email protected]

Page 62: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

62

Database Questions

Rosa IbarStandards Database [email protected]

Page 63: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

63

FTP Site QuestionsCommittee Liaison

Stephanie MontgomerySr. Manager, Standards Development and [email protected]

Page 64: 1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion

64

IPR and Copyright Questions

Susan HoylerDirector, Standards Development and [email protected]