1 The Voice of the Industrial Base1
IBR Guide
NDIA PMSC Working Group
NDIA PMSC Meeting
January 31, 2007Updated Feb 4, 2007
Prepared by;Joe Houser
KM Systems Group
Strength through Industry & Technology
2
IBR GuideNDIA PMSC Working Group
IBR Guide NDIA Working Group Objectives:
Review the current Integrated Baseline Review Guide and determine if it should be revised to reflect:
- Changes in the environment that would justify a revision
- Clarifications that would improve results of IBRs- Verify consistency between the IBR Guide and
recent other NDIA EVM Guides
3
IBR GuideNDIA PMSC Working Group
IBR Guide NDIA Working Group Members
Joe Houser, Lead, KM Systems Group
Walt Berkey, Lockheed Martin
Gary Humphreys, Humphreys & Associates
Dennis White, Robbins Goioa
Kevin Martin, KM Systems Group
Sondra Ewing, Lockheed Martin
Denis Hallman, Welkin / CSC
Deborah Duffy, UTC
Dan Milano, FAA
Keith Kratzert, FAA
Government, Debbie Tomic to provide 1 - 2 volunteers
4
IBR GuideNDIA PMSC Working Group
Current Environment
Since the NDIA IBR Guide was issued in June 2003, there have been changes in policy and practices that may justify a Guide review to address:
- Review NDIA application guide and recently revised FAR-EVM, OMB requirements, and Capital Programming Guide to
identify changes required for existing NDIA IBR Guide
- Compare IBR guide to other NDIA Guides for inconsistencies clarifications that would improve IBRs
- Candidate revisions include:- Program Level IBRs- Pre-contract award IBRs- Consolidated program level and contractor IBRs- Consolidating or clearly separating IBRs and EVM surveillance
5
IBR GuideNDIA PMSC Working Group
Forward Plan
- Conduct May 2007 PMI-CPM IBR Workshop with EVM community to gather satisfaction levels and recommendations – Humphreys, Houser, and Gov’t rep
- Conduct comparison of related documents and document findings- DoD EVMIG and other DoD IBR needs – DoD rep- Capital Programming Guide – Kevin Martin- EVM FAR Clause – Gary Humphreys- Application Guide – Walt Berkey- Surveillance Guide – Deborah Duffy- Certification Guide – Denis Hallman- Intent Guide – Keith Kratzert- OMB August 2005 Guidance – Dennis White- Civilian Agency IBR needs – Dan Milano
- Assess and recommend IBR Guide revisions
Note: during the NDIA PMSC meeting, Debbie Tomsic indicated a single NDIA IBR guide for all Government agencies and departments was acceptable
6
IBR GuideNDIA PMSC Working Group
Forward Plan Schedule
March 15 - Findings report due (use attached format)
March 31, Distribute summary of findings (Houser)
April 2 – Telecon review of summary findings and preliminary
recommendations discussion
April 25 - Report findings and preliminary recommendations
- Excludes PMI-CPM workshop findings
May 10 – PMI-CPM IBR Workshop
- IBR Working Group members are encouraged to attend and assist with the IBR Workshop
August NDIA PMSC Meeting
- Incorporate PMI-CPM Workshop findings
- IBR Working Group final recommendations for PMSC review and concurrence
7
IBR GuideNDIA PMSC Working Group
Attachment:
sample format for findings documentation
Other Program Level IBRs
Pre-Contract Award IBRs
Consolidated Program Level and contractor IBRs
Segregating EVM Surveillance from IBRs
IBR Guide does not distinguish between program level and contractor IBRs
IBR Guide does not include guidance for conducting pre-award IBRs
Evaluation Area: EVM FAR ClauseEvaluator: Gary Humphreys
Note: state findings as a statement and not as a recommendation