Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 1 of 19
UNCONTROLLED WHEN PRINTED
Process Definition:
Engineering and Technical Services
1. SUMMARY
1.1. This document defines the processes provided by the Engineering and Technical Services
(E&TS) business unit in detail.
1.2. The relationship between this Business Unit process and the other Business Unit
processes within the Facilities and Services Division (F&S, or the Division) management
system is illustrated in the process flow map included in the Quality Manual.
2. REVISION AND APPROVAL
Rev. Date Nature of Changes Approved By
0 24/11/2016 Final for Publication Mark Pritchard
1 03/02/2017 Added new Process Flow (QMS-FS-PRF-62-011) Mark Pritchard
2 23/03/2017 Revised E&TS TAR Process Flow (QMS-FS-PRF-62-006) Mark Pritchard
3. PROCESS DEFINITION
3.1. The Engineering & Technical Services Planning (E&TS) team have an integral role to play
in managing the asset life cycle and asset management plans (AMPs) across the ANU.
The E&TS team provide specialist advice, technical expertise and strategic planning in the
fields of building engineering services (eg. Civil, structural, electrical, mechanical,
hydraulic, fire) and building management systems for assets across the University.
3.2. Campus facilities and infrastructure are key enablers in the delivery of teaching, learning
and research outcomes. The linking of the capability and management of the campus
infrastructure is informed by a comprehensive understanding of the conditions,
performance and functionality of the asset and infrastructure.
3.3. Effective management of these assets occurs through a strategic asset management plan
which provides the framework for measuring and recording the condition and performance
of existing assets as well as identifying future requirements and funding strategies for the
various assets, consistent with the intended future use.
3.4. E&TS team outcomes cover the following:
Investigation and scoping of projects including energy efficiency program
Management of specific technical projects
BMS building management
Asset Management Planning for Buildings, colleges, and estate wide
Condition assessments for buildings
Provide technical input into the ANU CBRM
Technical advice to the service delivery team and other internal and external
stakeholders
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 2 of 19
UNCONTROLLED WHEN PRINTED
Supporting processes and practices for Asset Management
Support to incident response
Emergency preparedness and evacuation procedure training
4. BUSINESS UNIT PROCESS OBJECTIVES AND METRICS
4.1. The E&TS business unit process objectives and metrics have been derived from, and align
with, the Goals detailed in the F&S 2016 Strategic Business Plan.
4.2. The objectives for the E&TS processes are defined in detail below and reviewed during the
conduct of quarterly management reviews; see the documented procedure Management
Review.
4.3. In addition, each process objective has at least one metric (or KPI) with which
management can measure the effectiveness of the Business Unit process. These are also
defined below and reviewed quarterly in records of management reviews.
Objective 1 – Establish energy consumption baseline per building to enable the achievement of
energy reduction targets (Meets F&S Divisional Goals 1, 3, and 5)
Team Tasks KPI Lead By By When
Energy audits Top 50 Mechanical
Engineer
Ongoing
Building Tune-ups Top 50 Mechanical
Engineer
Ongoing
Capital works to improve energy
efficiency
Use energy audit to develop
program
Mechanical
Engineer
Ongoing
Objective 2 – Provide technical input to the preventative and statutory maintenance programs
(Meets F&S Divisional Goals 2, 3 and 5)
Team Tasks KPI Lead By By When
Optimize preventative and
statutory maintenance programs
Review monthly PM and SM
reports
Discipline Leads
Ongoing
Identify potential capital works to
address PM or SM issues
Provide technical specifications
for implementation
Discipline Leads
Ongoing
Development and evaluation of
tender packages
Provide technical input and
scope
Discipline Leads
Ongoing
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 3 of 19
UNCONTROLLED WHEN PRINTED
Objective 3 – Capital renewal and backlog maintenance programs (Meets F&S Divisional Goals 2, 3 and 5)
Team Tasks KPI Lead By By When
Identify assets and infrastructure
requiring replacement
Conduct and review condition
assessments
Discipline
Leads
Ongoing
Ensure availability of relevant and
accurate asset attributes with the
provision of technical advice
Provide asset data to program
team
Discipline
Leads
Ongoing
Objective 4 – Client focused outcomes (Meets F&S Divisional Goals 1 and 5)
Team Tasks KPI Lead By By When
Enhance and maintain
communications with other units in
the Maintenance Portfolio
Regular fortnightly trade based
meetings between SDT, CRT and
E&TS
Discipline
Leads
Ongoing
Enhance and maintain
communications with parties
external to F&S
Participate in monthly
contractor meeting
Discipline
Leads
Ongoing
Develop and maintain project
related communications with ANU
stakeholders
Project dependent Discipline
Leads
Ongoing
Objective 5 – Maintain AMP process for the ANU (Meets F&S Divisional Goals 1 and 5)
Team Tasks KPI Lead By By When
Maintain governance documents
and framework for AMP
Review governance documents
and framework for AMP in line
with review dates
Asset
Planning
Officer
Ongoing
Maintain levels of service “ins &
outs” document
Annual review of levels of
service “ins & outs”
documentation
Asset
Planning
Officer
Ongoing
Develop and maintain estate and
building asset management plans
Annual review of estate and
building asset management
plans
Asset
Planning
Officer
Ongoing
Develop and maintain
communications with ANU
stakeholders
Ongoing meetings held with
stakeholders
Asset
Planning
Officer
Ongoing
Develop and manage the backlog
and capital renewal work programs
Develop and review backlog and
capital renewal work programs
6 monthly
Asset
Planning
Officer
Annually /
6 monthly
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 4 of 19
UNCONTROLLED WHEN PRINTED
Objective 6 – Manage the BMS and EMS systems for the ANU (Meets F&S Divisional Goals 1 and 5)
Team Tasks KPI Lead By By When
Receive, manage and undertake
BMS works
Respond to BMS work orders
within Maximo priority
timelines
BMS team Ongoing
Develop and manage BMS
improvements and upgrade
programs
Provide a program for continual
improvement of the BMS at
ANU
BMS
Engineer
Ongoing
Electrical metering Manage all aspects of the
electrical metering program
BMS
Engineer
Ongoing
Objective 7 – ETS input into CBRM (Meets F&S Divisional Goals 1 and 5)
Team Tasks KPI Lead By By When
Manage, update and review CBRM
owned by ETS
Review annually, provide input
when necessary
ETS
Manager
Ongoing
5. PROCESS OWNERS AND RESPONSIBLE PARTIES
5.1. The owner of this process is the E&TS Planning Manager (Technical).
5.2. The ETS Planning Manager reports to the Associate Director – Maintenance and is a key
member of the leadership group within the Maintenance portfolio. The ETS Planning
Manager is responsible for the line management of the specialist electrical and mechanical
engineers, building and fire officers, the BMS engineer and technicians within the team.
5.3. The ETS Planning Manager uses initiative and technical expertise to establish, negotiate,
innovate, implement and provide proactive communication, advice, services and
strategies, consistent with the values and priorities of the Division, University and relevant
government legislation and statutory frameworks.
5.4. The ETS Planning Manager develops and maintains professional and effective working
relationships, and is responsive and works closely with campus tenants, Facilities and
Services staff, external clients and contractors to ensure all engineering and technical
services meet requirements.
5.5. The ETS Planning Manager also works closely with the Associate Director – Maintenance,
Client Relationship Manager, Program Manager and Service Delivery Manager to ensure
an excellent standard for all aspects of maintenance services provision across the
Maintenance portfolio, with a focus on strategic planning and continuous improvement.
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 5 of 19
UNCONTROLLED WHEN PRINTED
6. TYPICAL PROCESS INPUTS
6.1. The typical required inputs for the E&TS process are:
6.1.1. Technical information needed:
OM Manuals, drawings and technical specifications
Commissioning documentation
Standards and codes
Post-occupancy evaluations
BMS and Asset data
Fire monitoring
MAXIMO Technical Assistance Requests
Procurement documentation
Asset Renewal Values
Building data
Maintenance funding models
6.1.2. Resources needed:
BMS laptops
Basic trade-specific tools and PPE
Cameras
Monitoring and measuring instruments
Specialised software (IES, Camel, AutoCAD, MAXIMO, Archibus)
Mobile phones and tablets
Templates and metadata
6.1.3. Personnel needed:
The E&TS Planning section comprises ten full-time positions, as detailed below:
Position Level Position Title
SM1 E&TS Planning Manager
SM1 Mechanical Engineer
ANU08 Mechanical Engineer
SM1 Electrical Engineer
ANU08 E&TS Officer - Hydraulic
ANU08 E&TS Officer - Building
ANU08 E&TS Officer
ANU07 E&TS Officer - Asset Planning
ANU08 BMS Engineer
ANU07 BMS Technician
ANU05 BMS Technician
ANU05 BMS Technician
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 6 of 19
UNCONTROLLED WHEN PRINTED
6.1.4. Special training needed:
Use of specialist software platforms (IES, MAXIMO, AutoCAD, ArchiBUS, BMS Platform Training)
Review PDR’s and PDs for special training
Attending technical conferences and workshops
7. TYPICAL PROCESS STEPS
7.1. E&TS processes cover the following functional activities, and are captured in the process
flow charts attached herein:
QMS-FS-PRO-20-004 Indoor Thermal Comfort Evaluation Procedure
QMS-FS-PRF-62-002 Bushfire Assessment or Fire Safety Audit
QMS-FS-PRF-62-003 New Building Fire Monitoring System Connection
QMS-FS-PRF-62-004 Building Emergency Training and Exercises
QMS-FS-PRF-62-005 Fire Systems Impairment
QMS-FS-PRF-62-006 E&TS Technical Assistance Request
QMS-FS-PRF-62-007 Commissioning Utilities Meter
QMS-FS-PRF-62-008 Verifying Meter Data
QMS-FS-PRF-62-009 Patch Utilities Meter Data Points
QMS-FS-PRF-62-010 Decommission Utilities Meter
QMS-FS-PRF-62-011 E&TS HVAC Issue and/or Assessment
Conduct Energy Audits (to be drafted)
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 7 of 19
UNCONTROLLED WHEN PRINTED
Indoor Thermal Comfort Evaluation Procedure
AN
USt
aff
/ St
ud
ent
Man
ager
/
Sup
ervi
sor
Bu
ildin
g C
ust
od
ian
CR
TE&
TS B
MS
QMS-FS-PRF-20-004 Rev B
Raise Thermal Comfort (TC)
issue
EndFollow Indoor TC
GuidelineTC issue
resolved?Yes
Monitor / Log TC levels
TC outside
recommended levels?
No No
Raise Service Request
Yes
Schedulers Raise WO and assign to
E&TS BMS for resolution
Investigate
Defective Control?
Rectify, then close WO
Yes
CRT inform Users TC issue resolved
Plantoperating as
intended?
No
Yes
NoCorrective
Maintenance / TAR process
Reassign WO to
Sustainability Office
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 8 of 19
UNCONTROLLED WHEN PRINTED
E&TS - Bushfire Assessment or Fire Safety Audit
Clie
nt
Fire
Saf
ety
Off
icer
Ass
ista
nt
Dir
ecto
r
QMS-FS-PRF-62-002_Revision 0_20161124
Start(Fire Safety Audit or
Bushfire Assessment)
Prep for site visit (documents, past
data)
Organise access to the site
Engagement with site staff
Access site
Compile all necessary data
Assessment handed to the Associate
Director for review
Apply changes
Changes required?
YES
NO
End
Prepare Fire Safety Audit or Bushfire
Assessment documentation
Cross-reference F&S Fire Safety Audit
Register or Bushfire Management Plan
Send final copy to the Site manager,
F&S Senior Management Team,
Relevant College and the ANU
Insurance Office
YESApprove
NO
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 9 of 19
UNCONTROLLED WHEN PRINTED
E&TS – New Building Fire Monitoring System Connection
Clie
nt
Fire
saf
ety
Staf
f A
DT
Del
egat
e
QMS-FS-PRF-62-003_Revision 0_20161124
Start
Email ADT for processing
ADT process the form
Invoice received from ADT
Delegate Approves payment
Cost recovery End
Update Master List of fire monitoring
Complete application form
1.Name of building,2.Building no.
3.Building Custodian 4.Projects
5.Fire system details
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 10 of 19
UNCONTROLLED WHEN PRINTED
E&TS – Building Emergency Training & Exercises
Ch
ief
War
den
sE&
TS F
ire
Safe
tyW
ork
En
viro
nm
ent
Gro
up
QMS-FS-PRF-62-004_Revision 0_20161124
Start
Chief Warden(s) requests training
Work order raised
Notify Work Environment Group
Schedule training session in HORUS
Room booked, date scheduled
Deliver training session with
building wardens(2 hours)
Execute Drill
Invoicing END
1.WHS Registration2.ANU Policy
3. AS 3745
Post Drill Debriefing/Report
Written report with respect to
improvments
Training or Exercise?
Exercise
Training
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 11 of 19
UNCONTROLLED WHEN PRINTED
E&TS - Fire Systems ImpairmentC
lien
tFi
re T
ech
nic
al O
ffic
erM
ain
ten
ance
sta
ff /
C
on
trac
tors
QMS-FS-PRF-62-005_Revision 0_20161124
Start
Advise a Fire System Impairment Imminent
Issues Fire Impairment Form
Completes part 1 of Fire Impairment
Form
Notify building custodians, insurers
and fire brigade
Fire System Impairment Ends
Completes part 2 of Fire Impairment
Form
Notify building custodians, insurers
and fire brigade
Form deriving of entire assessment
End
Emergency Control Organisation and
Building Staff notified
High Risk Activities Cease
(if applicable)
Emergency Control Organisation and
Building Staff notified
High Risk Activities Re-commence (if applicable)
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 12 of 19
UNCONTROLLED WHEN PRINTED
E&TS – Technical Assistance
E&TS
Tec
hn
ical
Off
icer
Clie
nt
Co
nsu
ltan
tC
RT
/ SD
TC
on
trac
tor
QMS-FS-PRF-62-006_Rev 0A_20170323
Analyse TAR & determine
appropriate course of action
Client review / accept TAR
End
Formulate Advice?
Yes
No
Analyse Request for Technical Advice
Formulate Technical Advice
Response
GenerateTechnical Advice
Conduct analyses, research and make recommendations
Seek Independent
TechnicalAdvice?
Yes
No
Analyse Scope of Work (SOW)
Provide Tender Response (Quote)
Identify Technical Solution
Cost Technical Solution
Quote for Corrective
Maint
Develop Scope of Work (SOW)
No
Review Independent
Technical Advice
Accept Quote?
No
Generate Purchase Order/Work Order
Complete Scope of Work (SOW)
Raise Invoice & Work Completed
Report
Yes
External
Review and approveInvoice
Commence Scope of Work (SOW)
No
Yes
Client review / accept TAR
Client review / accept WO
E&TS TOto raise Child WO
Yes
Clarification
Raise TAR iawQMS-FS-PRF-63-005
Manage WO iawQMS-FS-PRF-61-002
Internal
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 13 of 19
UNCONTROLLED WHEN PRINTED
E&TS – Commission Utilities Meter
BM
S Te
chn
icia
nC
on
trac
tor
Sust
ain
abili
ty
Team
Fin
ance
Tea
mP
PM
QMS-FS-PRF-62-007_Rev 0_20161124
No
Yes
YesStart
Organise new utilities meter
installation
Engage contractor to verify meter
data
Engage contractor to
patch data points
Provide PPM commissioned meter details
Update Reporting System
Reporting system
updated?
Validate data between reporting tool and SkySpark
Is thedata valid?
No
Update Master Spreadsheet, inform
Sustainability & Finance
Update energy usage data
Update invoicing
Install new utilities meter and datapoints
End
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 14 of 19
UNCONTROLLED WHEN PRINTED
E&TS – Commission Utilities Meter – Verify Meter Data
BM
S Te
chn
icia
nC
on
trac
tor
(th
ird
par
ty)
Met
er
Inst
alla
tio
n
Co
ntr
acto
r
Pro
ject
D
eliv
ery
Dat
a P
atch
C
on
trac
tor
QMS-FS-PRF-62-008_Revision 0_20161124
YesNo YesYes
No
Start
End
Provide GL Code to pay for testing and
commissioning
Engage third party contractor to verify
data to meters
SubmitCommissioning
Sheets?
Verify data and submit
commissioning sheets
Check addressing and verify meter
hierarchy
Commissioning Sheet with port
addressing
Addressing& hierarchy
verified?
Engage contractor to integrate meters into SkySpark and
SQL database
Integrate meters into SkySpark and
SQL database
Verify data from meter to SkySpark
Datato SkySpark
verified?No
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 15 of 19
UNCONTROLLED WHEN PRINTED
E&TS – Commission Utilities Meter – Patch Data Points
BM
S Te
chn
icia
nD
ata
Pat
ch
Co
ntr
acto
rIT
SP
roje
ct D
eliv
ery
Team
QMS-FS-PRF-62-009_Rev 0_20161124
Yes
Start
End
Provide GL Code to pay for testing and
commissioning
Engage ITS approved contractor
Patch Data Points & submit
Commissioning Sheets
Commissioning sheet?
No YesLog IT Service
Request to activate ports
Activate ports
NoPorts
active/correctVLAN?
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 16 of 19
UNCONTROLLED WHEN PRINTED
E&TS – Decommission Utilities Meter
BM
S Te
chn
icia
nC
on
trac
tor
Sust
ain
abili
ty
Team
Fin
ance
Tea
mP
PM
QMS-FS-PRF-62-010_Rev 0_20161124
Yes No
Start
End
Organise meter decommissioning
Decommission utilities meter
Remove and return meter to BMS
Complete and submit job paperwork
Meter de- commissioned?
NoProvide PPM
decommissioned meter details
Update Reporting System
Update Reporting system?
Yes
UpdateMaster Spreadsheet
& inform Sustainability &
Finance
Update energy usage data
Update invoicing
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 17 of 19
UNCONTROLLED WHEN PRINTED
E&TS - HVAC Issue or Assessment
Engi
nee
rin
g &
Tec
hn
ical
Ser
vice
sO
ther
s(I
nte
rnal
or
Exte
rnal
)
QMS-FS-PRF-62-011 Rev. B
HVACWork Order (WO)
Corrective Maint or TAR
QMS-FS-PRF-63-005
EndE&TS - TAR
QMS-FS-PRF-62-006
BuildingType?
EquipmentFailure?
BMS
ELECor
MECH?
Yes
Assess No. ofCHILD WO s
Required
ElectricalStand Alone
TARrequired?
Mechanical
No
Raiserequired No. of
CHILD WO s
Review and assess BMS Controls
No
DetermineScope of Work
for TAR
DetermineScope of Work
for BMS
Yes
Delivery?
RaiseCHILD WO
External
Contractorcompletes WO
Raise WO Completion Report
E&TS completeWO
Internal
Raise WO Completion Report
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 18 of 19
UNCONTROLLED WHEN PRINTED
8. TYPICAL PROCESS OUTPUTS
8.1. The typical results (outputs) of the process are as follows:
8.1.1. Product produced:
Reports
Technical drawings
Plans
Specifications
8.1.2. Documents or technical information produced:
Technical Advice Reports
Condition and assessment reports
Energy management reports
Incident investigation reports
Project Management documentation (Tender SOR/SOW/Specs)
Business cases and project briefs
Asset Management Plans and associated capital works
8.1.3. Records produced:
Technical specifications and drawings
Project Management documentation (SOR/SOW/Specs)
Incident investigation reports
8.1.4. Services produced:
Review external consultants technical drawings and specifications
Liaison with external specialist consultants
Verbal and written technical advice
Internal consultancy services
Review technical deliverables associated with Capital works projects
9. RELATED RISKS
9.1. The following risks are identified related to this process.
9.2. Management may elect to conduct a formal risk assessment for any of these risks; the
preferred method of risk assessment is the ANU Risk Management Framework.
Facilities and Services Division Process Definition: Engineering and Technical Services
QMS-FS-PRO-62-001 Revision 2
Page 19 of 19
UNCONTROLLED WHEN PRINTED
Risk
Like
liho
od
Co
nse
qu
ence
Ass
essm
en
t Sc
ore
Mitigation
No or limited information
in O&M manuals and
project documentation to
be able to make educated
decisions
Like
ly
Maj
or
Hig
h
- F&S project officer s to ensure all O&M manuals
and specifications are received by the ANU.
- F&S Drawing Office to ensure documents are
stored appropriately.
- Contribute to CBRM requirements
ANU drawings not being
updated
Alm
ost
cert
ain
Mo
der
ate
Hig
h
- Provide F&S drawings for updating
- Incorporate drawing updates as part of
deliverable of the project.
No access to the latest
standards, codes or
specifications
Po
ssib
le
Mo
der
ate
Mo
der
ate
- Ensure the ANU maintains its login to Australian
Standards
- Ensure professional memberships with AIRAH,
Engineers Australia etc.
Dynamic procurement
documents and no central
repository of documents Like
ly
Mo
der
ate
Mo
der
ate
- F&S to set up a central repository for documents
- Must be part of the QMS
Project delays due to NCA
approval process
Po
ssib
le
Maj
or
Mo
der
ate
- Provide NCA the required information in a timely
manner
- Plan projects well in advance
No information on
condition or age of assets
for the AMP Like
ly
Min
or
Mo
der
ate
- F&S Program team to manage asset data
- Provide Program Team data required
- Undertake audits and assessments
Aging BMS infrastructure
Like
ly
Mo
der
ate
Mo
der
ate
- Develop ongoing program to manage the ANU
BMS system
Increase of heating and
cooling calls at peak times
Like
ly
Mo
der
ate
Mo
der
ate
- Ensure leave is minimal
- Develop service level agreement with a supplier